ROAD MAP TO
24Hrs Workshop operation
KUN AUTOMOBILES PVT LTD HYDERABAD
OBJECTIVE-Service load /Service Capacity /productivity analysis
THE SERVICE LOAD OF KUN HAS INCREASED 2 FOLDS IN THE LAST 3 YEARS
777
796
815
818
855
857
914
958
995
1010
1015
1026
1034
1044
1073
1074
1085
1214
1230
1241
1304
1321
1322
1355
1382
1431
1432
1469
1490
1500
1501
1508
1519
1565
1566
1682
700
900
1100
1300
1500
1700
Jan-06
Feb-06
Mar-06
Apr-06
May-06
Jun-06
Jul-06
Aug-06
Sep-06
Oct-06
Nov-06
Dec-06
Jan-07
Feb-07
Mar-07
Apr-07
May-07
Jun-07
Jul-07
Aug-07
Sep-07
Oct-07
Nov-07
Dec-07
Jan-08
Feb-08
Mar-08
Apr-08
May-08
Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
SERVICE LOAD
SERVICE LOAD
2006 2007 2008
OBJECTIVE-Service load /Service Capacity /productivity analysis
777
796
815
818
855
857
914
958
995
1010
1015
1026
0.0
0.5
1.0
1.5
2.0
2.5
3.0
500
600
700
800
900
1000
1100
1200
1300
1400
Jan-06
Feb-06
Mar-06
Apr-06
May-06
Jun-06
Jul-06
Aug-06
Sep-06
Oct-06
Nov-06
Dec-06
Produvtivity
scale
No.
of
Jobs
Service load/ Service Capacity/Productivity
SERVICEDEMAND SERVICE LOAD PRODUCTIVITY STD. PROD.
LOST
OPPORTUNITY
CONSISTANT SERVICE GROWTH HOWEVER
• LOST OPPORTUNITY BASED ON THE MARKET REQUIREMENT
• EXCESSIVE PRODUCTIVITY – LOW SERVICE QUALITY
S T A N D A R D P R O D U C T I V I T Y
COUNTER MEASURES MEET SERVICE DEMANDS AND MANAGE PRODUCTIVITY
HUMAN RESOURCE INFRASTRUCTURE TIME
SECONDARY
CHANNELS
METHODS / APPROACH
ADDITIONAL
MANPOWER
TRAINING
MANPOWER
RETENTION
MOTIVATION
NEW WORKSHOP
ADDITIONAL lifts/ Tools
ADDITIONAL BAYS
ADDITIONAL PARKING /
SPARES AREA / STORAGE
ASC’S
PWO’S TIE UPS
FUEL STATIONS
LOCAL WORKSHOPS
TIE UPS
ADDITIONAL WASHING
QUICK SERVICE
SERVICE
COORDINATOR
ASSIGNED
TEAMS OR GROUPS
PRE BINNING FOR
APPOINTMENTS
EXTENDED HOURS
2 SHIFT OPERATIONS
SUNDAY WORKING
3 SHIFT OPERATIONS
1. EXTENDED WORKING HOURS – [ Started October 2006 ]
Due to increasing service load there was a need to reduce pending vehicles,
thereby following action initiated –
• Gaurding the man prod. Levels - Additional SA-1no, Tech-2no, Elec-1no.
• Std working hours extended by 2 hours
• Spare parts requisition in advance.
• Early receipt of vehicles to ease peak load
• Communication while appointment for convenience of early drop
777
796
815 818
855 857
914
958
995 1010 1015 1026 1034 1044
0.0
0.5
1.0
1.5
2.0
2.5
3.0
500
600
700
800
900
1000
1100
1200
1300
Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07
Produvtivity
scale
No.
of
Jobs
Service load management / Productivity
SERVICE LOAD PRODUCTIVITY STD. PROD.
COUNTER MEASURES - SERVICE DEMANDS AND MANAGE PRODUCTIVITY
BAY PRODUCTIVITY INCREASED FROM 1.6 TO 2.
COUNTER MEASURES - SERVICE DEMANDS AND MANAGE PRODUCTIVITY
2. SHIFT SYSTEM – [ Started June 2007 ]
To clear out the vehicles where in jobs have been completed and to further enhance
productivity.
• Working hours for first shift from 6:00am – 14:00 pm and second shift from
13:00pm – 21:00 hrs
• Additional manpower recruited
• Washing team additional introduced to clear backlog cars in the morning before
start of normal operating hours.
1044
1073 1074 1085
1214
1230
0.0
0.5
1.0
1.5
2.0
2.5
3.0
800
900
1000
1100
1200
1300
1400
1500
Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07
Produvtivity
scale
No.
of
Jobs
Service load management / Productivity
SERVICE LOAD PRODUCTIVITY STD. PROD.
BAY PRODUCTIVITY INCREASED TO 2.3
1214
1230
1241
1304
1321 1322
1355
0.0
0.5
1.0
1.5
2.0
2.5
3.0
1100
1150
1200
1250
1300
1350
1400
1450
1500
1550
1600
Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07
Produvtivity
scale
No.
of
Jobs
Service load management / Productivity
SERVICE LOAD PRODUCTIVITY STD. PROD.
COUNTER MEASURES - SERVICE DEMANDS AND MANAGE PRODUCTIVITY
3. SUNDAY WORKING – August 2007 ]
To cater to increased service load from IT sector and fleet operators
• Teams selected from regular roster on rotational basis.
• 2 teams identified – each team consists of SA-1no, Tech-2no, Elec-1no &
Washing team.
• Working time team 1 08:00 a.m to 14:00p.m and Team 2 13:00p.m to 18:00p.m
• Special working incentive for teams working on Sunday.
BAY PRODUCTIVITY INCREASED TO 2.4
1322
1355
1382
1431 1432
1469
1490
0.0
0.5
1.0
1.5
2.0
2.5
3.0
1300
1350
1400
1450
1500
1550
1600
Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08
Produvtivity
scale
No.
of
Jobs
Service load management / Productivity
SERVICE LOAD PRODUCTIVITY STD. PROD.
COUNTER MEASURES - SERVICE DEMANDS AND MANAGE PRODUCTIVITY
4. QUICK SERVICE - [ January 2008 ]
To enhance productivity by the quick turnaround of the vehicles
• Shorten the waiting time of customers, enhance the bay utilisation and increase the technician
productivity.
• Identified and allotted separate bays for Carlines and Tavera. – 2 post lift, toolkits, pneumatic
lines, pre picked parts.
• Priority given for WA/ WB & washing job for QS vehicles.
• Manpower – Every QS bay consists of 2 Tech with runner for parts.
• QS program incentivized where in additional benefits offered to team turning out vehicles
more than threshold value.
• Final Inspection completed by QS team to ensure 100% quality job and minimize repeats
BAY PRODUCTIVITY INCREASED TO 2.5
COUNTER MEASURES - SERVICE DEMANDS AND MANAGE PRODUCTIVITY
5. 24 HOURS WORKSHOP - [ March 2008 ]
Customer convenience for dropping vehicles for
service ANYTIME.
• Additional team enhancement to maintain
the manpower productivity.
• Parts in charge dedicated in each shift
• Cashier made available for round the clock
billing to enhance customer convenience.
• Quality control and monitoring for
maintaining the deliverables.
1432
1469
1490
1500 1501 1508
1519
1565 1566
1682
0.0
0.5
1.0
1.5
2.0
2.5
3.0
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08
Produvtivity
scale
No.
of
Jobs
Service load management / Productivity
SERVICE LOAD PRODUCTIVITY STD. PROD.
BAY PRODUCTIVITY INCREASED TO 2.7
Results - Win Win situation both dealers and customers
For Dealer
Infrastructure utilization
Clear backlog & be ready for
next day
Balance day – time load
Additional business
Positive Impact on CSI Score
For Customer
Convenience – No time
restriction
Get the vehicle serviced
when the car is parked idle
@ home
Confidence of available
service 24 X 7
For fleet customers –
utilization of the lean hours
and better business returns
Results – Consistent growth and productivity check
777
796
815
818
855
857
914
958
995
1010
1015
1026
1034
1044
1073
1074
1085
1214
1230
1241
1304
1321
1322
1355
1382
1431
1432
1469
1490
1500
1501
1508
1519
1565
1566
1682
0.0
0.5
1.0
1.5
2.0
2.5
3.0
500
700
900
1100
1300
1500
1700
Jan-06
Feb-06
Mar-06
Apr-06
May-06
Jun-06
Jul-06
Aug-06
Sep-06
Oct-06
Nov-06
Dec-06
Jan-07
Feb-07
Mar-07
Apr-07
May-07
Jun-07
Jul-07
Aug-07
Sep-07
Oct-07
Nov-07
Dec-07
Jan-08
Feb-08
Mar-08
Apr-08
May-08
Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Produvtivity
scale
No.
of
Jobs
Service load/ Service Capacity/Productivity
SERVICEDEMAND SERVICE LOAD PRODUCTIVITY STD. PROD.
1
2
3
4 5
Results – Consistent growth and productivity check
Results – Satisfaction Indicators
25
35
45
55
65
75
85
95
sss score
sss score
Consistently at 85% over the last year
Results – Satisfaction Indicators
 Take a testimony video from customer
Results – Satisfaction Indicators
 Take a testimony video from customer
Results – Satisfaction Indicators
 Take a testimony video from customer
Results – Cost Benefits on average of last 6 months
Input cost Returns
Additional Manpower exp 53000.00
Electricity charges 21761.00
Night shift allowance 17500.00
Snacks 3750.00
Incentives 12500.00
Telephone charges 2500.00
Additional one time exp. On cc TV 34000.00
_________________________________________________
111001.00
__________________________________________________
Direct expenses 34243.00
Additional job cards opened 91
Total part billing 293217.00
Total labor billing 176437.00
Income on spares 58643.00
___________________________________________
Income on labor and spares 235080
___________________________________________
Nett Profits
89827.00
Standardization / Methodology for 24 Hours (night operation)
1. Identify / Recruit additional manpower – work out special incentives for the
motivation, Pantry 24 hours operational
2. Manpower scheduling - Guard carefully and keep a check to avoid crossing
threshold productivity of technicians
3. Job scheduling – Assign and standardize the jobs on the night shift.
PM/RR -Free Services, Paid Services, Backlog vehicles, Assembly replacement
BP – Minor repairs , Surface preparation , Assembly operations
4. Control / Monitoring – A very stringent quality system in terms of FINAL
INSPECTION , POST SERVICE FOLLOW UP, COMMUNICATION
5. Security personnel to ensure safety of workshop , manpower , vehicles and to
control unwanted practices.
6. COMMUNICATIONS – Extensive marketing to ensure service demand and a healthy
inflow needs to be maintained.
7. SUSTENANCE – Ensure that the program is run for at least 6 months , awareness is
reached in the market, Team is settled in the operations and the feed back is used
for improvements, before the cost benefits are visible.
ABOVE ALL “ WISH TO DO THINGS DIFFERENTLY” AND AN OPEN MIND
THANK YOU

More Related Content

Similar to Road map to 24 hrs service by kun

session 1
session 1session 1
session 1
ninan chandy
 
A Successful Case Study Presentation on Visionary SME Programme by Anand Aut...
A Successful Case Study Presentation on Visionary SME Programme by  Anand Aut...A Successful Case Study Presentation on Visionary SME Programme by  Anand Aut...
A Successful Case Study Presentation on Visionary SME Programme by Anand Aut...
Confederation of Indian Industry
 
MR12AB Tuesday15h00 - Gavin Puckle
MR12AB Tuesday15h00 - Gavin PuckleMR12AB Tuesday15h00 - Gavin Puckle
MR12AB Tuesday15h00 - Gavin Puckle
7391456
 
Vsm and wip with arena simulation
Vsm and wip with  arena simulationVsm and wip with  arena simulation
Vsm and wip with arena simulation
uniceder1111
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
Mohammad IFTAKHAR
 
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
Joel Justice Okine
 
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service ShortcomingsHow Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
TSSParatransit
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics Reporting
TSSParatransit
 
The Irish Motor Industry - an Economic review Q2 2014
The Irish Motor Industry - an Economic review Q2 2014The Irish Motor Industry - an Economic review Q2 2014
The Irish Motor Industry - an Economic review Q2 2014
Teresa Noone
 
Project feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarniProject feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarni
ANIKET KULKARNI
 
Feasibility Report on autoshop
Feasibility Report on autoshopFeasibility Report on autoshop
Feasibility Report on autoshop
mudassar yasin yasin
 
OpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of working
OpenText Portfolio
 
Diesel generator rent service (long term) for Telecom Operator
Diesel generator rent service (long term) for Telecom OperatorDiesel generator rent service (long term) for Telecom Operator
Diesel generator rent service (long term) for Telecom Operator
Otgontugs Ulziisuren
 
European Bus Operators' Forum - Juha Hakavouri
European Bus Operators' Forum - Juha HakavouriEuropean Bus Operators' Forum - Juha Hakavouri
European Bus Operators' Forum - Juha Hakavouri
Russell Publishing
 
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
APRIL  -23 TO  Feb 24 FINAL PPT (3).pptxAPRIL  -23 TO  Feb 24 FINAL PPT (3).pptx
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
nkarthik21
 
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
APRIL  -23 TO  Feb 24 FINAL PPT (3).pptxAPRIL  -23 TO  Feb 24 FINAL PPT (3).pptx
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
nkarthik21
 
Dpr
DprDpr
Japanese 5 S System for Store of Power & Steel Plant
Japanese  5 S System for Store of Power & Steel Plant Japanese  5 S System for Store of Power & Steel Plant
Japanese 5 S System for Store of Power & Steel Plant
Er. EHS & Fire Syed Ali
 
CSCMP 2014 - Capacity Crunch: Utilizing Technology to Overcome Capacity Const...
CSCMP 2014 - Capacity Crunch: Utilizing Technology to Overcome Capacity Const...CSCMP 2014 - Capacity Crunch: Utilizing Technology to Overcome Capacity Const...
CSCMP 2014 - Capacity Crunch: Utilizing Technology to Overcome Capacity Const...
Peter Vomocil
 
ajayuikey
ajayuikeyajayuikey
ajayuikey
AJAY UIKEY
 

Similar to Road map to 24 hrs service by kun (20)

session 1
session 1session 1
session 1
 
A Successful Case Study Presentation on Visionary SME Programme by Anand Aut...
A Successful Case Study Presentation on Visionary SME Programme by  Anand Aut...A Successful Case Study Presentation on Visionary SME Programme by  Anand Aut...
A Successful Case Study Presentation on Visionary SME Programme by Anand Aut...
 
MR12AB Tuesday15h00 - Gavin Puckle
MR12AB Tuesday15h00 - Gavin PuckleMR12AB Tuesday15h00 - Gavin Puckle
MR12AB Tuesday15h00 - Gavin Puckle
 
Vsm and wip with arena simulation
Vsm and wip with  arena simulationVsm and wip with  arena simulation
Vsm and wip with arena simulation
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
 
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service ShortcomingsHow Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics Reporting
 
The Irish Motor Industry - an Economic review Q2 2014
The Irish Motor Industry - an Economic review Q2 2014The Irish Motor Industry - an Economic review Q2 2014
The Irish Motor Industry - an Economic review Q2 2014
 
Project feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarniProject feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarni
 
Feasibility Report on autoshop
Feasibility Report on autoshopFeasibility Report on autoshop
Feasibility Report on autoshop
 
OpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of working
 
Diesel generator rent service (long term) for Telecom Operator
Diesel generator rent service (long term) for Telecom OperatorDiesel generator rent service (long term) for Telecom Operator
Diesel generator rent service (long term) for Telecom Operator
 
European Bus Operators' Forum - Juha Hakavouri
European Bus Operators' Forum - Juha HakavouriEuropean Bus Operators' Forum - Juha Hakavouri
European Bus Operators' Forum - Juha Hakavouri
 
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
APRIL  -23 TO  Feb 24 FINAL PPT (3).pptxAPRIL  -23 TO  Feb 24 FINAL PPT (3).pptx
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
 
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
APRIL  -23 TO  Feb 24 FINAL PPT (3).pptxAPRIL  -23 TO  Feb 24 FINAL PPT (3).pptx
APRIL -23 TO Feb 24 FINAL PPT (3).pptx
 
Dpr
DprDpr
Dpr
 
Japanese 5 S System for Store of Power & Steel Plant
Japanese  5 S System for Store of Power & Steel Plant Japanese  5 S System for Store of Power & Steel Plant
Japanese 5 S System for Store of Power & Steel Plant
 
CSCMP 2014 - Capacity Crunch: Utilizing Technology to Overcome Capacity Const...
CSCMP 2014 - Capacity Crunch: Utilizing Technology to Overcome Capacity Const...CSCMP 2014 - Capacity Crunch: Utilizing Technology to Overcome Capacity Const...
CSCMP 2014 - Capacity Crunch: Utilizing Technology to Overcome Capacity Const...
 
ajayuikey
ajayuikeyajayuikey
ajayuikey
 

Recently uploaded

原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
78tq3hi2
 
Globalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full resultsGlobalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full results
vaterland
 
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsWhat Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
Sprinter Gurus
 
Hand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptxHand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptx
wstatus456
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
Forth
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
Hyundai Motor Group
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
MarynaYurchenko2
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
jennifermiller8137
 
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
afkxen
 
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitExpanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Forth
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
afkxen
 
EV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker JamiesonEV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker Jamieson
Forth
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
78tq3hi2
 
Kaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality EngineerspptxKaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality Engineerspptx
vaibhavsrivastava482521
 
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects
 
Catalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptxCatalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptx
Blue Star Brothers
 
EN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptxEN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptx
aichamardi99
 

Recently uploaded (17)

原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
 
Globalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full resultsGlobalfleet - global fleet survey 2021 full results
Globalfleet - global fleet survey 2021 full results
 
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsWhat Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill Roads
 
Hand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptxHand Gesture Control Robotic Arm using image processing.pptx
Hand Gesture Control Robotic Arm using image processing.pptx
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
 
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
 
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitExpanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
 
EV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker JamiesonEV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker Jamieson
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
 
Kaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality EngineerspptxKaizen SMT_MI_PCBA for Quality Engineerspptx
Kaizen SMT_MI_PCBA for Quality Engineerspptx
 
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
 
Catalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptxCatalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptx
 
EN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptxEN Artificial Intelligence by Slidesgo.pptx
EN Artificial Intelligence by Slidesgo.pptx
 

Road map to 24 hrs service by kun

  • 1. ROAD MAP TO 24Hrs Workshop operation KUN AUTOMOBILES PVT LTD HYDERABAD
  • 2. OBJECTIVE-Service load /Service Capacity /productivity analysis THE SERVICE LOAD OF KUN HAS INCREASED 2 FOLDS IN THE LAST 3 YEARS 777 796 815 818 855 857 914 958 995 1010 1015 1026 1034 1044 1073 1074 1085 1214 1230 1241 1304 1321 1322 1355 1382 1431 1432 1469 1490 1500 1501 1508 1519 1565 1566 1682 700 900 1100 1300 1500 1700 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 SERVICE LOAD SERVICE LOAD 2006 2007 2008
  • 3. OBJECTIVE-Service load /Service Capacity /productivity analysis 777 796 815 818 855 857 914 958 995 1010 1015 1026 0.0 0.5 1.0 1.5 2.0 2.5 3.0 500 600 700 800 900 1000 1100 1200 1300 1400 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Produvtivity scale No. of Jobs Service load/ Service Capacity/Productivity SERVICEDEMAND SERVICE LOAD PRODUCTIVITY STD. PROD. LOST OPPORTUNITY CONSISTANT SERVICE GROWTH HOWEVER • LOST OPPORTUNITY BASED ON THE MARKET REQUIREMENT • EXCESSIVE PRODUCTIVITY – LOW SERVICE QUALITY S T A N D A R D P R O D U C T I V I T Y
  • 4. COUNTER MEASURES MEET SERVICE DEMANDS AND MANAGE PRODUCTIVITY HUMAN RESOURCE INFRASTRUCTURE TIME SECONDARY CHANNELS METHODS / APPROACH ADDITIONAL MANPOWER TRAINING MANPOWER RETENTION MOTIVATION NEW WORKSHOP ADDITIONAL lifts/ Tools ADDITIONAL BAYS ADDITIONAL PARKING / SPARES AREA / STORAGE ASC’S PWO’S TIE UPS FUEL STATIONS LOCAL WORKSHOPS TIE UPS ADDITIONAL WASHING QUICK SERVICE SERVICE COORDINATOR ASSIGNED TEAMS OR GROUPS PRE BINNING FOR APPOINTMENTS EXTENDED HOURS 2 SHIFT OPERATIONS SUNDAY WORKING 3 SHIFT OPERATIONS
  • 5. 1. EXTENDED WORKING HOURS – [ Started October 2006 ] Due to increasing service load there was a need to reduce pending vehicles, thereby following action initiated – • Gaurding the man prod. Levels - Additional SA-1no, Tech-2no, Elec-1no. • Std working hours extended by 2 hours • Spare parts requisition in advance. • Early receipt of vehicles to ease peak load • Communication while appointment for convenience of early drop 777 796 815 818 855 857 914 958 995 1010 1015 1026 1034 1044 0.0 0.5 1.0 1.5 2.0 2.5 3.0 500 600 700 800 900 1000 1100 1200 1300 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Produvtivity scale No. of Jobs Service load management / Productivity SERVICE LOAD PRODUCTIVITY STD. PROD. COUNTER MEASURES - SERVICE DEMANDS AND MANAGE PRODUCTIVITY BAY PRODUCTIVITY INCREASED FROM 1.6 TO 2.
  • 6. COUNTER MEASURES - SERVICE DEMANDS AND MANAGE PRODUCTIVITY 2. SHIFT SYSTEM – [ Started June 2007 ] To clear out the vehicles where in jobs have been completed and to further enhance productivity. • Working hours for first shift from 6:00am – 14:00 pm and second shift from 13:00pm – 21:00 hrs • Additional manpower recruited • Washing team additional introduced to clear backlog cars in the morning before start of normal operating hours. 1044 1073 1074 1085 1214 1230 0.0 0.5 1.0 1.5 2.0 2.5 3.0 800 900 1000 1100 1200 1300 1400 1500 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Produvtivity scale No. of Jobs Service load management / Productivity SERVICE LOAD PRODUCTIVITY STD. PROD. BAY PRODUCTIVITY INCREASED TO 2.3
  • 7. 1214 1230 1241 1304 1321 1322 1355 0.0 0.5 1.0 1.5 2.0 2.5 3.0 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Produvtivity scale No. of Jobs Service load management / Productivity SERVICE LOAD PRODUCTIVITY STD. PROD. COUNTER MEASURES - SERVICE DEMANDS AND MANAGE PRODUCTIVITY 3. SUNDAY WORKING – August 2007 ] To cater to increased service load from IT sector and fleet operators • Teams selected from regular roster on rotational basis. • 2 teams identified – each team consists of SA-1no, Tech-2no, Elec-1no & Washing team. • Working time team 1 08:00 a.m to 14:00p.m and Team 2 13:00p.m to 18:00p.m • Special working incentive for teams working on Sunday. BAY PRODUCTIVITY INCREASED TO 2.4
  • 8. 1322 1355 1382 1431 1432 1469 1490 0.0 0.5 1.0 1.5 2.0 2.5 3.0 1300 1350 1400 1450 1500 1550 1600 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Produvtivity scale No. of Jobs Service load management / Productivity SERVICE LOAD PRODUCTIVITY STD. PROD. COUNTER MEASURES - SERVICE DEMANDS AND MANAGE PRODUCTIVITY 4. QUICK SERVICE - [ January 2008 ] To enhance productivity by the quick turnaround of the vehicles • Shorten the waiting time of customers, enhance the bay utilisation and increase the technician productivity. • Identified and allotted separate bays for Carlines and Tavera. – 2 post lift, toolkits, pneumatic lines, pre picked parts. • Priority given for WA/ WB & washing job for QS vehicles. • Manpower – Every QS bay consists of 2 Tech with runner for parts. • QS program incentivized where in additional benefits offered to team turning out vehicles more than threshold value. • Final Inspection completed by QS team to ensure 100% quality job and minimize repeats BAY PRODUCTIVITY INCREASED TO 2.5
  • 9. COUNTER MEASURES - SERVICE DEMANDS AND MANAGE PRODUCTIVITY 5. 24 HOURS WORKSHOP - [ March 2008 ] Customer convenience for dropping vehicles for service ANYTIME. • Additional team enhancement to maintain the manpower productivity. • Parts in charge dedicated in each shift • Cashier made available for round the clock billing to enhance customer convenience. • Quality control and monitoring for maintaining the deliverables. 1432 1469 1490 1500 1501 1508 1519 1565 1566 1682 0.0 0.5 1.0 1.5 2.0 2.5 3.0 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Produvtivity scale No. of Jobs Service load management / Productivity SERVICE LOAD PRODUCTIVITY STD. PROD. BAY PRODUCTIVITY INCREASED TO 2.7
  • 10. Results - Win Win situation both dealers and customers For Dealer Infrastructure utilization Clear backlog & be ready for next day Balance day – time load Additional business Positive Impact on CSI Score For Customer Convenience – No time restriction Get the vehicle serviced when the car is parked idle @ home Confidence of available service 24 X 7 For fleet customers – utilization of the lean hours and better business returns
  • 11. Results – Consistent growth and productivity check 777 796 815 818 855 857 914 958 995 1010 1015 1026 1034 1044 1073 1074 1085 1214 1230 1241 1304 1321 1322 1355 1382 1431 1432 1469 1490 1500 1501 1508 1519 1565 1566 1682 0.0 0.5 1.0 1.5 2.0 2.5 3.0 500 700 900 1100 1300 1500 1700 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Produvtivity scale No. of Jobs Service load/ Service Capacity/Productivity SERVICEDEMAND SERVICE LOAD PRODUCTIVITY STD. PROD. 1 2 3 4 5
  • 12. Results – Consistent growth and productivity check
  • 13. Results – Satisfaction Indicators 25 35 45 55 65 75 85 95 sss score sss score Consistently at 85% over the last year
  • 14. Results – Satisfaction Indicators  Take a testimony video from customer
  • 15. Results – Satisfaction Indicators  Take a testimony video from customer
  • 16. Results – Satisfaction Indicators  Take a testimony video from customer
  • 17. Results – Cost Benefits on average of last 6 months Input cost Returns Additional Manpower exp 53000.00 Electricity charges 21761.00 Night shift allowance 17500.00 Snacks 3750.00 Incentives 12500.00 Telephone charges 2500.00 Additional one time exp. On cc TV 34000.00 _________________________________________________ 111001.00 __________________________________________________ Direct expenses 34243.00 Additional job cards opened 91 Total part billing 293217.00 Total labor billing 176437.00 Income on spares 58643.00 ___________________________________________ Income on labor and spares 235080 ___________________________________________ Nett Profits 89827.00
  • 18. Standardization / Methodology for 24 Hours (night operation) 1. Identify / Recruit additional manpower – work out special incentives for the motivation, Pantry 24 hours operational 2. Manpower scheduling - Guard carefully and keep a check to avoid crossing threshold productivity of technicians 3. Job scheduling – Assign and standardize the jobs on the night shift. PM/RR -Free Services, Paid Services, Backlog vehicles, Assembly replacement BP – Minor repairs , Surface preparation , Assembly operations 4. Control / Monitoring – A very stringent quality system in terms of FINAL INSPECTION , POST SERVICE FOLLOW UP, COMMUNICATION 5. Security personnel to ensure safety of workshop , manpower , vehicles and to control unwanted practices. 6. COMMUNICATIONS – Extensive marketing to ensure service demand and a healthy inflow needs to be maintained. 7. SUSTENANCE – Ensure that the program is run for at least 6 months , awareness is reached in the market, Team is settled in the operations and the feed back is used for improvements, before the cost benefits are visible. ABOVE ALL “ WISH TO DO THINGS DIFFERENTLY” AND AN OPEN MIND