SlideShare a Scribd company logo
1 of 2
Risk Assessment

Risk Identified

Weather

Shooting Location

Outdoors

Responsibility

N/A

Illness / injury

All

Actor / myself and
Gillian

Actor Inconveniences
/ clashes

All

Actor/ myself and
Gillian

Public interference

All

Actor/ myself and
Gillian/ person who
interfered

Strategy to
Overcome/Prevention
To prevent having to
film in bad weather, I
will check the weather
forecast for the days we
need to film outside, this
is because rain and bad
weather will be
inconvenient as it may
affect the sound and can
damage the equipment.
Incase an actor is
injured or falls ill during
the filming, I will make
sure someone else is
there as a substitute. If
Gillian or I is ill or
injured, we will just
have to reschedule for a
day when we are better.
To ensure that Gillian,
the actors and myself
can make the shoot
scheduled for that day
and the shoot doesn’t
clash with another
event, we made sure
that the most reliable
actors were chosen for
the job. However, we
made sure that we had
substitutes incase there
are any inconveniences.
Because the film is set
in/ at a sixth form, there
may be times when
students may be in the
way, or cause risk to he
equipment. We may
need to bring along an
assistant to keep watch
for new people entering
the scene and to keep
watch on the
equipment, this is
because it will be
difficult to do this
ourselves, as we will be
too busy filming and
performing.
Malfunctions with
camera

All

Myself and Gillian

I will make sure that
before and after every
shoot, the camera will
be charged, so there will
be no problems with
low battery during
filming. Also, I will
bring back up memory
cards to the shoot,
incase the original one
runs out of memory.

More Related Content

Viewers also liked (12)

Alone
AloneAlone
Alone
 
Call Sheet Useless
Call Sheet UselessCall Sheet Useless
Call Sheet Useless
 
манғолия
манғолияманғолия
манғолия
 
Shielding Kenya’s Economy
Shielding Kenya’s EconomyShielding Kenya’s Economy
Shielding Kenya’s Economy
 
Educacion para la salud
Educacion para la saludEducacion para la salud
Educacion para la salud
 
SAIA Certificate
SAIA CertificateSAIA Certificate
SAIA Certificate
 
CASE CICI2011 by Agência IMAM
CASE CICI2011 by Agência IMAMCASE CICI2011 by Agência IMAM
CASE CICI2011 by Agência IMAM
 
perfume
perfumeperfume
perfume
 
Convite
ConviteConvite
Convite
 
Nebosh HSW
Nebosh HSWNebosh HSW
Nebosh HSW
 
Taller 12 Meses, 12 Tendencias: "Do It Yourself"
Taller 12 Meses, 12 Tendencias: "Do It Yourself"Taller 12 Meses, 12 Tendencias: "Do It Yourself"
Taller 12 Meses, 12 Tendencias: "Do It Yourself"
 
Pi encontro pedagógico administrativo 2012
Pi encontro pedagógico administrativo 2012Pi encontro pedagógico administrativo 2012
Pi encontro pedagógico administrativo 2012
 

Similar to Risk assessment

Similar to Risk assessment (20)

Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk Assessment s&h
Risk Assessment s&hRisk Assessment s&h
Risk Assessment s&h
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Potential Issues and Backup Plan
Potential Issues and Backup PlanPotential Issues and Backup Plan
Potential Issues and Backup Plan
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk
RiskRisk
Risk
 
Risk
RiskRisk
Risk
 

Risk assessment

  • 1. Risk Assessment Risk Identified Weather Shooting Location Outdoors Responsibility N/A Illness / injury All Actor / myself and Gillian Actor Inconveniences / clashes All Actor/ myself and Gillian Public interference All Actor/ myself and Gillian/ person who interfered Strategy to Overcome/Prevention To prevent having to film in bad weather, I will check the weather forecast for the days we need to film outside, this is because rain and bad weather will be inconvenient as it may affect the sound and can damage the equipment. Incase an actor is injured or falls ill during the filming, I will make sure someone else is there as a substitute. If Gillian or I is ill or injured, we will just have to reschedule for a day when we are better. To ensure that Gillian, the actors and myself can make the shoot scheduled for that day and the shoot doesn’t clash with another event, we made sure that the most reliable actors were chosen for the job. However, we made sure that we had substitutes incase there are any inconveniences. Because the film is set in/ at a sixth form, there may be times when students may be in the way, or cause risk to he equipment. We may need to bring along an assistant to keep watch for new people entering the scene and to keep watch on the equipment, this is because it will be difficult to do this ourselves, as we will be too busy filming and performing.
  • 2. Malfunctions with camera All Myself and Gillian I will make sure that before and after every shoot, the camera will be charged, so there will be no problems with low battery during filming. Also, I will bring back up memory cards to the shoot, incase the original one runs out of memory.