The document summarizes information about a proposed 710 Tunnel project that would extend the Long Beach Freeway into Pasadena. Some key points: - The 4.5 mile twin-bore tunnel would run from Alhambra to Pasadena with no exits and carry 160,000-200,000 vehicles per day, including trucks. - Construction would take 9-11 years and involve massive excavation that would remove over 200 million cubic feet of dirt. It would cause widespread disruption to the area. - Opponents argue the tunnel would increase traffic, pollution, and trucks in Pasadena rather than reduce congestion as claimed. Alternative public transit options like Gold Line improvements have not been adequately