PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 1
RETAIL MANAGEMENT STRATEGY
GROUP ASSIGNMENT
Picasso Art Gallery
SUBMITTED BY:
ANURAG BISEN 1307
MUSTAHID ALI 1334
NIVEDITA SUBBARAM 1337
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 2
TABLE OF CONTENT
1.0 EXECUTIVE SUMMARY…………………………………………………………………………………………………………………… 4
CHART: HIGHLIGHTS ................................................................................................................................... 6
1.1 OBJECTIVES ........................................................................................................................................... 6
1.2 KEYS TO SUCCESS.................................................................................................................................. 7
1.3 MISSION ................................................................................................................................................ 7
2.0 COMPANY SUMMARY........................................................................................................................... 7
2.1 COMPANY OWNERSHIP ........................................................................................................................ 8
2.2 START-UP SUMMARY............................................................................................................................ 8
TABLE: START-UP ........................................................................................................................................ 9
CHART: START-UP ..................................................................................................................................... 11
3.0 SERVICES ............................................................................................................................................. 11
4.0 MARKET ANALYSIS SUMMARY............................................................................................................ 12
4.1 MARKET SEGMENTATION................................................................................................................... 12
TABLE: MARKET ANALYSIS ........................................................................................................................ 13
CHART: MARKET ANALYSIS (PIE)............................................................................................................... 13
4.2 TARGET MARKET SEGMENT STRATEGY .............................................................................................. 13
4.3 SERVICE BUSINESS ANALYSIS .............................................................................................................. 14
4.3.1 COMPETITION AND BUYING PATTERNS .......................................................................................... 15
5.0 STRATEGY AND IMPLEMENTATION SUMMARY.................................................................................. 16
5.1 COMPETITIVE EDGE ............................................................................................................................ 17
5.2 MARKETING STRATEGY....................................................................................................................... 18
5.3 SALES STRATEGY ................................................................................................................................. 19
5.3.1 SALES FORECAST .............................................................................................................................. 20
5.4 MILESTONES........................................................................................................................................ 22
6. BRAND PERSONALITY………..…………………………………………………………………………………………….………………22
7.LAYOUT…………………………………………………………………………………………………………………………………………….23
8.RETAIL MIX……………………………………………………………………………………………………………………………………….24
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 3
9. OPERATION PLAN ……………………………………………………………………………………………………………………………26
10. CUSTOMER JOURNEY MAP…………………………………………………………………………………………………………….27
11. PRE AND POST TRANSACTION ………………………………………………………………………………………………………28
12. WEB PLAN SUMMARY......................................................................................................................... 28
12.1 WEBSITE MARKETING STRATEGY...................................................................................................... 29
12.2 DEVELOPMENT REQUIREMENTS ...................................................................................................... 29
13. MANAGEMENT SUMMARY................................................................................................................. 29
13.1 PERSONNEL PLAN ............................................................................................................................. 30
TABLE: PERSONNEL................................................................................................................................... 30
14.0 FINANCIAL PLAN................................................................................................................................ 31
14.1 IMPORTANT ASSUMPTIONS ............................................................................................................. 31
14.2 BREAK-EVEN ANALYSIS ..................................................................................................................... 31
TABLE: BREAK-EVEN ANALYSIS ................................................................................................................. 32
CHART: BREAK-EVEN ANALYSIS ................................................................................................................ 34
14.3 PROJECTED PROFIT AND LOSS.......................................................................................................... 34
TABLE: PROFIT AND LOSS.......................................................................................................................... 35
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 4
1.0 Executive Summary
PICASSO ART GALLERY Creative Centre is the place where artists meet. PICASSO ART GALLERY is an
acronym for "No Artist Left Behind," with our company by-line stating: "Live Your Art." Picasso art
gallery is a specialty retail store offering a large array of artists' materials and supplies, crafters'
needs, a gallery, and an education centre. Picasso art gallery will provide a pleasant facility that will
inspire and support amateurs, professionals and crafters in the Big Place art community. PICASSO
ART GALLERY will sponsor art shows and competitions, art and craft fairs, scholarships for artists to
continue their formal education, and other community events. PICASSO ART GALLERY will facilitate,
organize and offer creative workshops and classes in a variety of techniques and media.
The Market
PICASSO ART GALLERY is at the forefront in an exciting and growing market. The India has many
stores exclusively offering art and craft supplies but neither of these stores is able to offer education
and hands-on opportunities. Neither currently supports the artists community in active ways. They
are also not able to give the high level of customer support that PICASSO ART GALLERY can. PICASSO
ART GALLERY is the only art supply store in Goa that is owned and operated exclusively by
artists. PICASSO ART GALLERY Creative Center will tap into the growing number of professional
artists in Goa. We will also fill the needs of the growing market of retirees (100% growth in the last
three years).Also PICASSO ART GALLERY encourages the thriving artists. PICASSO ART GALLERY will
actively market to teachers and students in the growing public and private education systems. We
have chosen Goa as it is the worldwide famous tourist place later on we will open our second store
in Jaipur because these places are more famous tourist place and popularly known for arts and
antics.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 5
The Organization
PICASSO ART GALLERY is owned and operated by practicing artists. It is founded on the idea that
maintaining satisfied customers is essential to the bottom line. With this in mind, PICASSO ART
GALLERY Creative Centre will be working hard to ensure that all of their customers' expectations are
exceeded in all transactions. To maintain a presence within the art and craft community and close
relationships to customers, PICASSO ART GALLERY will be an active member of the local art scene
through participation and education. PICASSO ART GALLERY staff will receive training in the most
current trends and products. Picasso Art Gallery owners will both anticipate and set consumer
trends in creative work.
Products, Services, and Delivery
PICASSO ART GALLERY will be located in the commercial business Panjim, in a 3,000 square foot
store. The previous tenants were cabinet makers and much of their handiwork remains to our
benefit. PICASSO ART GALLERY will have the floor space to offer a wide variety of art and craft
supplies. Due to our size, we will also have the purchasing power to buy from manufacturers
directly, thus avoiding middle man mark-ups. We will offer discounts to regular customers. We will
also offer free delivery in near Goa and Mumbai for orders of Rs300 or more. PICASSO ART GALLERY
will offer Artist's Oasis holidays to travellers by arranging local accommodations, renting equipment,
selling supplies, and offering maps and guides.
Financials
PICASSO ART GALLERY will show modest profit from month one. Margins are forecasted to be at
50%, due to the ability to buy wholesale. Sales in the first full year will be slightly over
Rs13,35,500. We are projecting conservatively a growth rate of 5% the first three years and 20%
thereafter, even though existing art supply stores are reporting growth of over 30%. We budget
conservatively, but have great vision.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 6
Chart: Highlights
1.1 Objectives
1. Customer Satisfaction: To create a shopping environment that caters to the needs of the art and
craft community of the Big Place by offering knowledgeable and professional customer service.
Customer satisfaction will be measured through repeat business (our goal is that 50% of our
customers will return within 6 months for an additional purchase) and multiple sales (our goal is
that 30% of sales are accompanied by an additional purchase).
2. To earn 80% market share and become the number one art and craft supplier on the place.
3. To achieve a 50% profit margin within the first year.
4. To be an active and vocal member in the community and to provide continual re-investment
through sponsorship of community activities and celebrations, including: supporting art and
craft events, hosting classes, providing scholarships.
0
500000
1000000
1500000
2000000
2500000
3000000
YEAR 1 YEAR 2 YEAR 3
AllterminRs
Years
Highlights
SALES GROSS MARGIN NET PROFIT
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 7
5. To develop, in year two and three, Artist's Oasis of Panjim. In this program we would arrange
local accommodations and materials rental for visiting/vacationing artists.
1.2 Keys to Success
In order for PICASSO ART GALLERY Creative Center to succeed we must:
 Provide for the satisfaction of 100% of our customers and vendors.
 Advertise and promote in areas where our target customer base will learn about our store.
 Continuously review our inventory and sales and adjust our inventory levels accordingly.
 Sell products that are of the highest reliability and quality. We must offer as many or more
premium products than our competition offers. Offer loss leaders and other promotions that
bring customers into the store to buy goods, explore our line of services, and sign up for future
events.
 Be an active member of the community.
 Provide in-store classes, demonstrations, and events.
1.3 Mission
PICASSO ART GALLERY Creative Center's mission is to support and contribute to the community of
artists and crafters by offering quality, name brand supplies to accommodate customer needs; by
hosting and supporting shows, events, classes and contests; and by promoting the place as an artist's
oasis and destination.
We will strive, constantly, to supply what the consumer is asking for; we will continually review what
is available in the marketplace. We will provide new products and services to the areas of need. We
will maintain PICASSO ART GALLERY as a place for artists to gather.
Success will ultimately be measured by our customers choosing us because of their belief in our
ability to meet or exceed their expectations of price, service, and selection.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 8
2.0 Company Summary
PICASSO ART GALLERY Creative Center is a startup, to go into business in the Summer of this year.
We will offer a large variety of art and craft supplies, focusing on those items that are currently
unavailable on this place. The Internet will continue to be a competitor, as artists use websites to
buy familiar products. We will stock products that artists don't necessarily have experience with.
We will maintain our price comparisons to include those available on line.
We will offer classes in the use of new materials and techniques.
We will build an Artist's Oasis tour program. We will book local Bed and Breakfasts, rent easels and
materials; sell paint and other supplies and ship completed work to the clients when dry.
We will expand the store into an art center including: A fine art gallery, offering original art at, or
near, wholesale prices; Musical instruments/studio space; Classrooms for art/music lessons;
Art/Music books; Live music/coffee bar; Do-it-Yourself crafts such as specialty T-Shirts, signs, cards,
ceramics for the tourist trade.
2.1 Company Ownership
PICASSO ART GALLERY Creative Center is a subsidiary of PICASSO ART GALLERY LLC, a limited liability
corporation equally owned and operated by Mustahid Ali and Nivedita. Additional subsidiaries
include PICASSO ART GALLERY Design (Interior/Web), PICASSO ART GALLERY Fine Art, PICASSO ART
GALLERY Music.
2.2 Start-up Summary
PICASSO ART GALLERY Creative Center's start-up costs are listed below. The company will start
with 10 months inventory on hand as this is the main revenue generator. The majority of the
company's assets will reside in inventory.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 9
There will be other normal business costs such as a liability umbrella, rent, interior design costs, and
opening day promotions.
Current (short-term) assets, acquired during interior build-out, shelving, slotwall, fixtures, signage,
display cases, etc., come to Rs 8,00000.
The operating capital cash on hand balance will be Rs11,00000.
The purpose of this business plan is to drive the company direction in accord with its vision and to
secure a Rs45,00000 loan. This supplemental financing is required to work on site preparation,
inventory, and operational expenses. Other financing will include the owner's investment of
Rs10,00000 and a short-term revolving line-of-credit for inventory replenishment during months of
high receipts.
Successful operation and the building of a loyal customer base will allow PICASSO ART GALLERY
Creative Center to be self-sufficient and profitable in the first full year.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 10
Table: Start -up
Start-up
Requirements
Start-up Expenses
Legal Rs10,000
Stationery etc. Rs5,000
Insurance Rs5,000
Office Space Rs10,00,000
Travel: Trade Show Rs3,50,000
Set-up Banking Rs1,000
POS System Rs20,000
Security System Rs15,000
Advertising Rs20,000
Phone System Rs10,000
Computers Rs50,000
Other Rs10,000
Total Start-up Expenses Rs14,96,,000
Start-up Assets
Cash Required Rs5,00,000
Start-up Inventory Rs5,00000
Other Current Assets Rs8,00000
Long-term Assets Rs17,00000
Total Assets Rs30,00000
Total Requirements Rs49,96,000
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 11
3.0 Services
PICASSO ART GALLERY Creative Center will provide a wide variety of products of interest to artists
and crafters. Our wholesale suppliers will include: Sai handicrafts, Mona Lisa fine art production, art
Alley, Athena art arena. There are thousands of products available, we will offer many that are
unusual, or new, as well as the basics that every artist needs on a regular basis. We will offer lines
to include bargain, mid-range and professional quality products.
Management will rely on customer feedback, suggestions, and daily sales reports to introduce or
eliminate certain brands or products.
In year two we will begin marketing our Artist's Oasis tour packages, as well as art/craft equipment
rental. Rentals will include equipment items that are too bulky to carry on vacation, or too
expensive, or used only periodically, for the average artist or crafter to justify purchase. An example
would be a Giclee Printer.
0
5,00,000
10,00,000
15,00,000
20,00,000
25,00,000
30,00,000
35,00,000
40,00,000
45,00,000
Expenses Assets Investment Loans
14,96,000
30,00,000
17,00,000
45,00,000
Rs
START-UP
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 12
4.0 Market Analysis Summary
PICASSO ART GALLERY Creative Center will market to four primary customers:
1. Professional artists.
2. Amateur artists and crafters, including hobbyists.
3. Businesses, such as architects, graphic designers, interior designers, or direct mail advertisers.
4. Teachers and students.
4.1 Market Segmentation
Average household income has steadily grown with about 36 percent of Big Place households
reporting incomes of Rs25,000 - Rs50,000 and another 36 percent in the Rs50,000 - Rs75,000 range.
Predictions for Goa and Jaipur include continued population growth, economic growth and business
opportunity.
1. Professional artists. There are currently at least 30 Fine Art Galleries in Goa and Jaipur. Each
gallery represents several artists.
2. Amateur artists and crafters, including hobbyists. Many of the amateurs are retirees* with
relatively high disposable income levels.
3. Businesses. Architects (30 companies on place), technical drawing, interior/graphic design (18
companies on place), advertising/direct mail companies (12 companies on place).
4. Teachers and students. This group will include K-12 teachers and students as well as those
attending art classes at the store. (25,000 public school students).
*The total population of Goa and Jaipur has grown by about 14.9 and 26.91% percent in the past
decade respectively, the older segments - such as those from 45 - 54 and those 55 and up have
increased at rates of 100 percent and 64 percent, respectively.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 13
Table: Market Analysis
Chart: Market Analysis (Pie)
4.2 Target Market Segment Strategy
1. Professional Artists. With only one existing art supply store in Goa and jaipur, if the
professional's need for customer service is not met, they will utilize the Internet and mainland
20%
30%
10%
40%
Growth
Professional Artists Amateur Artists Business to Business Education
Market Analysis
Year 1 Year 2 Year 3 Year 4 Year 5
Potential Customers Growth CAGR
Professional Artists 20% 200 240 288 346 415 20.02%
Amateur Artists 40% 1,000 1,400 1,960 2,744 3,842 40.00%
Business to Business 10% 66 73 80 88 97 10.10%
Educational 20% 10,000 12,000 14,400 17,280 20,736 20.00%
Total 22.16% 11,266 13,713 16,728 20,458 25,090 22.16%
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 14
stores. The area we can impact most heavily is having the actual products in the store that artists
can manipulate, study, etc. This would especially apply to products that a customer may not take
a chance on ordering from an Internet site (because of variations in quality, or new
techniques/products).
2. Amateur artists and crafters, including hobbyists. In general, this segment has the same needs,
desires, and fulfilment requirements as the professional artists. Some will be purchasing from
lower and mid-priced product lines, but many are avid in pursuing their avocations, and
appreciate, buy and use the professional quality materials.
3. Businesses such as architectural, technical drawing, interior/graphic design, advertising/direct
mail companies. Currently, this segment is not served in any way on the west side of the place,
except by casual shopping at the existing art supply store. Much of the purchasing by this
group is done on the Internet.
4. Teachers and students. This is a much neglected segment on our place. Students and teachers
currently have access to products in Wal-Mart, K-Mart, a small school supply specialty shop
(open part-time), and the sole existing art supply store. We plan to have a store big enough to
accommodate the art supply needs of the education community.
4.3 Service Business Analysis
PICASSO ART GALLERY Creative Center is a specialty retailer filling an underserved niche market on
the place.
Currently customers can buy low end art products at Wal-Mart, K-Mart, Long's, and Ace Hardware.
The products offered at these outlets is severely limited. Products include: a few small canvases, a
small selection of papers in limited sizes, a few paint sets, and writing pens and pencils. The same
stores offer limited selections of craft and hobby products as well, usually aimed at general interest
and unsophisticated shoppers.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 15
Goa Printing Corp. and Panjim Coast Office Supply, Inc. stock a limited variety of drafting supplies:
pens, pencils and paper products that could be used for arts and crafts but are usually associated
with writing.
Art and craft products can also be purchased at Art Supply Panjim in the old industrial area. This
store offers a much better selection in terms of variety, type and quality, but has a reputation for
poor customer service satisfaction.
4.3.1 Competition and Buying Patterns
Art Supply of Gallery attic in Panjim is the closest competitor to Picasso art gallery. It is a small two-
story facility of 1,300 sq. ft. The store has been in business for 10 years, seven years in Hilo and three
years in Panjim. They offer a variety of fine art supplies, canvas, paints, stained glass, ceramics,
oriental arts, beads, textile arts, crafts, scrapbooking, and children's craft kits. The store is currently
for sale with an asking price of Rs395,000. According to their advertising, the store serves a growing
local artist community, retirees and both public and private schools.
Many artists known to the owners, refuse to shop at Gallery attic because they are dissatisfied with
the level of customer service, and generally uncomfortable in the shopping experience. They
currently shop off the Internet, and in mainland stores during infrequent visits out-of-state. These
artists represent a significant customer base for PICASSO ART GALLERY Creative Center.
Customers in the educational segment buy at the discount stores, due to the convenience of one-
stop shopping for all their household needs as well as school supplies for the kids. We will market
directly to the art teachers in the local schools. We will supply order forms to the classrooms, and
deliver directly to the schools.
Many professional artists buy from Internet sources due to the still limited selections in the local
marketplace in the quantities needed. With a store space nearly three times the size of ASH, we will
be able to stock appropriate quantities, styles and sizes, and deliver orders much more quickly than
Internet sources. We will provide free delivery to the North Kona area on purchases over Rs300. We
will also provide friendly, professional customer service. We'll provide a generous return and
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 16
exchange policy. We'll provide hands-on access to materials and make Picasso Art Gallery a
gathering place for artists. None of these benefits are available through Internet sources.
5.0 Strategy and Implementation Summary
Picasso Art Gallery goal is to provide products, service and education to the underserved creative
community on the Big Place. The current population is underserved due to a perceived lack of
customer service in the few existing outlets for supplies.
Our intention is to gain 80% of the market share by focusing on our customer service, niche
positioning, convenient location, quality brands, special promotions and becoming a gathering spot
for artists. While we will focus on our primary customer segments, we offer products that virtually
every artist/crafter requires. We will create an atmosphere that is appealing to the true artist,
whether amateur or professional. The balance of customers will come because they will see this as
the center of creative people.
The store will merchandise in a manner consistent with our values and the fundamentals of good
retail space use. We will provide a bulletin board for all manner of communications among the
community. We will provide space for classes and creative hands-on experimentation.
Strategic Assumptions:
1. Every resident on the Goa and Jaipur is a potential customer. By marketing to our two target
segments, we will expose ourselves to additional new customers.
2. Our proximity to Costco and Home Depot will bring in those travelling from outside Kona.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 17
3. We will continue to be involved in the art and craft community as participants, suppliers and
encouragers.
5.1 Competitive Edge
Picasso Art Gallery competitive edge involves five areas:
1. Customer Service as priority one.
2. Location. The store is located in the Panjim Commercial Industrial Park. The location will attract
more customers from out of the Panjim area because a visit to the art supply store can be
consolidated with a trip to Goa, a store with an established draw on customers from all over the
place.
3. PICASSO ART GALLERY will be an art education center. We will have a large classroom available
for instruction in various media and techniques.
4. PICASSO ART GALLERY will be a gathering place for artists. We will dedicate a portion of the
warehouse area to a cafe style lounge where customers can read art magazines, look at the art
gallery, drink coffee, listen to music, or visit with other artists.
5. We will provide percentage discounts for repeat customers.
Each of these is a competitive advantage because none is being addressed, by an art supply outlet,
in panjim at this time.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 18
5.2 Marketing Strategy
Our marketing strategy will focus heavily on customer service with loyalty and retention in sales; on
sales promotion, and on niche positioning in the market.
In addition to price and item promotional announcements, PICASSO ART GALLERY Creative Center
will focus its marketing efforts via several key direct-to-consumer advertising vehicles:
Local and Regional Magazine Publications. (Goacom magazine, Goa Groove)Each of these papers
provide a demographic base that lines up nicely with that of Picasso Art Gallery.
Direct Mail Postcards: PICASSO ART GALLERY will look to increase consumer awareness, retain the
existing customer base and promote increased sales via postcard mailings. These mailings will be
targeted around special events, and are intended to liquidate slow moving products or showcase
vendor negotiated specials.
 Spring Open House--15% to 20% savings opportunity.
 Fall Open House--15% to 20% savings opportunity.
 Holiday Open House--15% to 20% savings opportunity.
 Annual Anniversary Postcard--promotes in-store design seminars, special events and savings
opportunities.
Website Marketing: As we establish our on-line education and gallery segment, we will support
the business via search engine marketing, URL links and e-mail marketing on all correspondence.
This third channel of business will increase the customer base, sales potential and service
opportunities provided by PICASSO ART GALLERY.
 Direct Calls on professional artists, architects and designers.
 Word of mouth. By giving first-time customers great service and a fair price, the word is sure to
spread.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 19
 In-store events and celebrations.
All marketing decisions with regard to specific media choices, frequency, size, and expenditures will
be analyzed on an on-going basis with careful consideration of returns generated and consistency
with our mission and vision.
5.3 Sales Strategy
PICASSO ART GALLERY Creative Center will approach sales from a relationship basis. We will assist
customers in a personal manner, using personal names and displaying our names on badges. We
will ask the questions needed to provide the customers with the services they desire. Gathering key
customer information and seeking performance feedback on the products and services offered will
assist us in the following ways:
 Targeting our marketing efforts most effectively.
 Developing product offers and merchandising formats that increase sales.
 Developing services and perks that enhance the shopping experience.
 Increasing awareness of Picasso art gallery within the retail consumer marketplace.
 Developing future sales opportunities that allow for continued growth of the business.
Key to the sales strategy is direct sales calls on all market segments targeted in this plan. These sales
calls need to be made by the owners, by virtue of their background and knowledge of the customers,
products and competitors. Experience has proven that the more time we devote to sales, the more
sales result. A full-time team member needs to be found and added as soon as possible. Without
this person, too much of the owner's time is deflected away from their major tasks.
We will utilize the POS software with every sales transaction. With each purchase the software will
record and maintain in its database the customer's name, address and purchases. This information
will be used with our direct mailing program to focus on our top 50% of customers. This will also
make inventory control easier and more effective.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 20
We will offer the best return/exchange policy possible, to build trust with our customers and
maintain retention and loyalty. At least 50% of returns will be sent back to the distributor or vendor.
For in-store sales, our strategy will be to maintain as much on-site point-of-purchase literature as is
physically possible. We will remember that selling art and craft supplies is about educating and filling
a need, not pressuring the customer to buy.
Most importantly, we need to sell our company, not necessarily the products. We will need to push
our service, education, and support capabilities. This will be done through relating with customers,
drawing out creative dreams and aspirations, stretching customers into new creative arenas, and so
forth.
5.3.1 Sales Forecast
The following table and chart highlight forecasted sales. We expect sales to start off conservatively
and increase extensively during the holiday season and during the months of July and August
as the education systems start their new year.
PICASSO ART GALLERY has planned for a rate of growth at 5% for the first year as we build name
recognition and status in the community. In the second year we project a growth rate of 10%. In the
third year we look to see an increase of revenue of 20% as we gain a larger percentage of the market
share and increase our customer base beyond the Kona area.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 21
Table: Sales Forecast
Sales Forecast
Year 1 Year 2 Year 3
Sales
Painting Supplies Rs6,00000 Rs8,00,000 Rs10,00,000
Drawing/Illustration Rs2,00000 Rs2,50,000 Rs4,00,000
Books/Media Rs25,000 Rs30,000 Rs50,000
Cutting Tools Rs10,000 Rs15,000 Rs25,000
Adhesives Rs5,000 Rs5,000 Rs10,000
Glass Rs30,000 Rs40,000 Rs60,000
Ceramics Rs8,000 Rs10,000 Rs25,000
Crafts Rs50,000 Rs75,000 Rs1,00,000
Gifts/Studio Environment Rs25,000 Rs35,000 Rs50,000
Print Making Rs10,000 Rs15,000 Rs30,000
Sculpture Rs25,000 Rs30,000 Rs40,000
Portfolios/Transporting Rs15,000 Rs25,000 Rs40,000
Gallery Sales Rs50,000 Rs60,000 Rs1,00,000
Fabrics/Yarn Rs15,000 Rs20,000 Rs30,000
Equipment Rs10,000 Rs20,000 Rs15,000
Clothing/Accessories Rs25,000 Rs40,000 Rs50,000
Paper/Boards Rs30,000 Rs50,000 Rs75,000
Classes Rs2,500 Rs5,000 Rs15,000
Canvas/Surfaces Rs2,00000 Rs3,00,000 Rs4,00,000
Total Sales Rs13,35,500 Rs18,25,000 Rs25,15,000
Direct Cost of Sales Year 1 Year 2 Year 3
Inventory Rs4,45,166 Rs6,08,333 Rs8,38,333
Other Rs0 Rs0 Rs0
Subtotal Direct Cost of Sales Rs8,90,333 Rs12,16,666 Rs16,76,666
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 22
5.4 Milestones
The accompanying milestone chart highlights our plan with specific dates. This schedule reflects our
strong committment to organization and detail. During the 6-month and 12-month evaluation
period, we will complete a detailed evaluation of all aspects of the business:
 Financials/Bottom Line
 Sales
 Customer satisfaction
 Goals for next period
We will have in place a "Plan-B," for implementation, should the evaluation show that it is ill-advised
to continue the current endeavor. Product diversification, location, advertising, new markets, will
be considered if PICASSO ART GALLERY needs to be more liquid.
6. Brand Personality
A set of human characteristics that are attributed to a brand name. A brand personality is something
to which the consumer can relate, and an effective brand will increase its brand equity by having a
consistent set of traits. This is the added-value that a brand gains, aside from its functional benefits.
There are five main types of brand personalities: excitement, sincerity, ruggedness, competence an
sophistication. Our brand is totally related to the Arts and creativeness, so it shows the personality
of artistic, as the name and the logo “PICCASO ART GALLERY” gives an impact of the best and
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 23
unique designs and arts, logo is full go colours which give the experience of happiness , joy and all
phases of life.
Ultimately its all about personality which pertains the creativity and artistic.
7. Layout:
Layout is according to the displays and the various departments. There are many departments
depends on the type of the products like paintings, drawings, sculptures, tools, crafts, handmade
items and so on. We have mostly transparent windows and displays so that people see it easily.
The entrance is of totally mirror and automated so that outside people can see inside the shop
easily and thus it can attracts them hence increase more sales.
PICASSO ART GALLERY will be located in the commercial business Panjim, in a 3,000 square foot
store. The previous tenants were cabinet makers and much of their handiwork remains to our
benefit. PICASSO ART GALLERY will have the floor space to offer a wide variety of art and craft
supplies. Due to our size, we will also have the purchasing power to buy from manufacturers
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 24
directly, thus avoiding middle man mark-ups. We will offer discounts to regular customers. We will
also offer free delivery in near Goa and Mumbai for orders of Rs300 or more. PICASSO ART GALLERY
will offer Artist's Oasis holidays to travellers by arranging local accommodations, renting equipment,
selling supplies, and offering maps and guides.
8. Retail Mix
1. Merchandise Mix :- Generally as we have products which are different from each other and
have unique attributes, so we have their different- different departments, like drawing
department, painting department, art and tools department, crafts and handies departments,
sculpture department, so its more of departmental retail store.
People have their own perception and hence their own choices that what they want to like and
buy, according tit heat they can visit their respective departments.
2. Price : we have different prices depends on the product type, paintings are ranging from 5Rs
5000 to Rs 1,000,00, drawings, handy crafts, sculpture every product has their own price ranging
from Rs 500 to Rs 50000.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 25
3. Location: Location is very prime in Panjim , Goa, as it is the one of the famous tourist place not
even only for Indians but also for foreigners.
4. Advertisement and promotion: As it a unique store with its unique USP’s and the
competition is very less in Panjim, so it require very less advertisement and promotion , but
initially for the awareness it is very essential. So, we have strategy of Below the line (BTL) to
aware and promote our targeted audience, ads in local newspaper especially on the tourism
section, organising cultural and art events and trade fairs, ads to colleges.
5. Store layout and design: Layout is according to the displays and the various departments.
There are many departments depends on the type of the products like paintings, drawings,
sculptures, tools, crafts, handmade items and so on. We have mostly transparent windows and
displays so that people see it easily. The entrance is of totally mirror and automated so that
outside people can see inside the shop easily and thus it can attracts them hence increase more
sales.
PICASSO ART GALLERY will be located in the commercial business Panjim, in a 3,000 square foot
store. The previous tenants were cabinet makers and much of their handiwork remains to our
benefit. PICASSO ART GALLERY will have the floor space to offer a wide variety of art and craft
supplies. Due to our size, we will also have the purchasing power to buy from manufacturers
directly, thus avoiding middle man mark-ups. We will offer discounts to regular customers. We will
also offer free delivery in near Goa and Mumbai for orders of Rs300 or more. PICASSO ART GALLERY
will offer Artist's Oasis holidays to travellers by arranging local accommodations, renting equipment,
selling supplies, and offering maps and guides.
6. Customer services and selling: we have pre and post transaction services for our customers.
Pre services full details and catalogues for the costumers that will make their purchase easy,
even for loyal customer we provide personal assistant, for touristic we are also providing route
map and location map, so that can makes their traveling a fun without any inconvenience .
We are also providing the basic art, painting and drawing training to our register customers, it
will be online and offline.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 26
Secondly for post transaction free advises that in what pattern the painting, drawing will look
good, apart from this in background to which colour. Replace and second hand services will also
be there.
So it will be complete plan that will fulfil the requirement of the customers.
9. Operation plan
Sourcing
 Artists
 Amateurs
 Museums
 Sculptures
 Tool suppliers
 Cultural & art
exhibition
Picasso art
gallery
Order
 Online(website)
 offline
Delivery
 Free delivery
within GOA and
MUMBAI
Private education
Provides artists
oasis holiday
Packaging
 Robust
packaging
Managing inventory using POS
software, which keeps the track
of every product .
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 27
10.Customer journey map
Picasso
art
gallery
Receptionist
Books
section
Musical
instrument
Art section
Crafts
section
Sculptures
Classroom
for art and
music
Live music
/coffee bar
Do it
yourself
Section
Order
received
Leave
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 28
11. Pre and Post Transaction
12.0 Web Plan Summary
Picasso Art Gallery Web presence will be informational and educational with a contact form for
requesting additional information. Our URL will be on all print items coming from the store
(advertising, sales promotion sheets, letterhead).
 Management will rely
on customer feedback, suggestions, and
daily sales reports to introduce or
eliminate certain brands or products.
 Online feedback
 Artist oasis tour
Cultural and art exhibition
Location information to tourist
Trade fare and event organization
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 29
 Customers will be able to search our inventory and place orders.
 Customers will be able to access a calendar of educational opportunities, and sign up on line.
 Customers will be able to use the website as a portal for art related research: technical, historical
and local.
 Customers will be able to view and print coupons.
 Off-place customers will be able to read about our tour packages, and request additional
information.
 Customers will be able to view our on-line art gallery.
12.1 Website Marketing Strategy
We will direct customers to our website in the following ways:
 Direct e-mail through addresses given to us voluntarily.
 Printing on everything that comes from the store (letterhead, business cards, direct mail,
shopping bags and wrapping paper, promotional items, print advertising).
 Links from local business pages and Hawaii Tourism portals.
 Links from/to national art resource pages.
 Advertising on all company vehicles.
12.2 Development Requirements
Our parent company website is already in place. Through PICASSO ART GALLERY Design, we have
trained staff, domain names, and software in place to build a web presence for PICASSO ART
GALLERY Creative Center at nominal cost.
13.0 Management Summary
PICASSO ART GALLERY Creative Center is managed by the owners/founders.
 We will open with the two owners operating the store.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 30
 As our business expands, we will hire additional employees, our projections include six
employees, with the owners managing the store and cold-call selling.
o Employees will be encouraged to work within their creative, physical, and intellectual
boundaries.
o All duties will be divided and delegated according to strengths and weaknesses.
o At PICASSO ART GALLERY we will expect a high degree of customer service skills and
personality as this is essential to our success.
13.1 Personnel Plan
PICASSO ART GALLERY will be operated in the first few years by the owners. Additional part-time
help will be provided by family members.
As PICASSO ART GALLERY grows over the next years, we will need two additional full-time sales
clerks, and two part-time clerks. This will free the owners to concentrate on building the business,
and expanding into the other areas of Picasso Art Gallery vision (tours, competitions, music, gallery,
special events, etc.).
Table: Personnel
Personnel Plan
Year 1 Year 2 Year 3
1 cashier/receptionist Rs1,20,000 Rs1,30,,000 Rs1,30,,000
Other ( 1 People) R1,20,000 Rs1,30,000 Rs1,30,000
Other (1 extra will add on 3rd year) Rs0 Rs0 Rs1,20,000
Total People 2 2 3
Total Payroll Rs2,40,000 Rs2,60,000 Rs3,80,000
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 31
14.0 Financial Plan
 The growth of PICASSO ART GALLERY will be moderate and the cash balance will always be
positive.
 Being a retail environment we will not be selling on credit. We will accept cash, checks, Visa and
MasterCard.
 Marketing and advertising will remain at or below 5% of sales.
 We will finance growth mainly through cash flow. We recognize that this means we will have to
grow slowly.
 It should be noted that the owners of PICASSO ART GALLERY Creative Center do not intend to
take any profits out of the business until the long-term debt has been satisfied. Whatever profits
remain after the debt payments will be used to finance growth, mainly through the acquisition
of additional inventory.
14.2 Important Assumptions
The financial plan depends on important assumptions, most of which are shown in the following
table. The key underlying assumptions are:
 We do not sell anything on credit. We accept cash, checks, debit cards, Visa, MasterCard.
 A slow-growth economy/customer base, without major recession.
 Monthly sales are the largest indicator for this business. There are some seasonal variations,
with the months October through January being the highest sales months.
 We assume access to capital and financing sufficient to maintain our financial plan as shown in
the tables.
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 32
14.3 Break-even Analysis
Our break-even analysis is summarized by the following chart and table.
Table: Break-even Analysis
Total expected expenditure = Rs 14,96,,000 (from start-up table)
So,
Monthly expected expenditure will be ,
= Rs 14,96,000/12
=Rs 1,24,667
Now expected sales per year (From sales forecast table)
Year 1 = Rs 8,90,333
Year 2 = Rs 12,16,666
Year 3 = Rs 16,76,666
Expenditure recover in first year = Rs 8,90,333
Remained expenditure to be recover in 2nd
year is Rs 14,96,000 – Rs 8,90,333
i.e = Rs 6,05,667
Expected earning in 2nd
year is Rs 12,16,666
So, remained expenditure will be recover in first 6 month of 2nd
year as the monthly average
sales will be Rs 1,01,388. (Rs 12,16,666/12 = Rs
1,01,388 monthly)
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 33
Break-even Analysis
Monthly Revenue Break-even for 1st
year
Monthly Revenue Break-even for 2nd
year
Monthly Revenue Break-even for 3rd year
Rs74,195
Rs 1,01,388
Rs 1,39,722
Assumptions:
Average Percent Variable Cost 50%
Estimated Monthly Fixed Cost Rs 52,550
0.00 890333 1216666 167666
Expenditure (In Rs) -1496000 -1496000 -605667 0
-1496000 -1496000
-605667
0
-1600000
-1400000
-1200000
-1000000
-800000
-600000
-400000
-200000
0
EXPENDITURE(INRS)
SALES (YEARLY IN RS)
BREAK EVEN ANALYSIS (YEARLY)
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 34
Break Even Analysis (Monthly)
14.4 Projected Profit and Loss
We predict that during the second year of operation, our high level of customer service and strong
assortment will allow us to generate approximately 5% profit. This will be above the normal two to
three year period required for a start-up retailer. Our sales projections are conservative. Should
sales increase as we anticipate, the profit-to-sales ratio could be as high as 10% by the end of year
three.
The following chart and table will indicate projected profit and loss.
-2000000
-1500000
-1000000
-500000
0
500000
1000000
MonthlyExpectedExpenditure(inRs)
Monthly Sales (In Rs)
Break Even Analysis (Monthly)
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 35
Table Profit And Loss:
Pro Forma Profit and Loss
Year 1 Year 2 Year 3
Sales Rs 13,35,500 Rs 18,25,000 Rs 25,15,000
Direct Cost of Sales Rs4,45,166 Rs6,06,333 Rs8,38,333
Other Costs of Sales Rs0 Rs0 Rs0
Total Cost of Sales Rs8,90,333 Rs12,16,666 Rs16,76,666
Gross Margin Rs445167 Rs608334 Rs838334
Gross Margin % 66.67% 66.67% 66.67%
Expenses
Payroll Rs2,40,000 Rs2,60,000 Rs3,80,000
Marketing/Promotion Rs10,000 Rs20,000 Rs20,000
Depreciation Rs0 Rs0 Rs0
Utilities Rs5000 Rs5,000 Rs5,000
Insurance Rs5,000 Rs5,000 Rs5,000
Payroll Taxes Rs0 Rs0 Rs0
Other Rs0 Rs0 Rs0
Total Operating Expenses Rs2,60,000 Rs2,90,000 Rs4,10,000
Profit Before Interest and Taxes Rs1,85,167 Rs318334 Rs428334
EBITDA Rs1,85,167 Rs318334 Rs428334
Interest Expense Rs20,000 Rs15,000 Rs12,000
Taxes Incurred Rs15,000 Rs18,000 Rs20,000
Net Profit Rs150167 Rs285334 Rs396334
Net Profit/Sales 6.56% 16.20% 20.19%
PICASSO ART GALLERY RMS RETAIL PROJECT
pg. 36
Over all this Project is totally feasible and will be great Retail Business.

Retail management project, picasso art gallery

  • 1.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 1 RETAIL MANAGEMENT STRATEGY GROUP ASSIGNMENT Picasso Art Gallery SUBMITTED BY: ANURAG BISEN 1307 MUSTAHID ALI 1334 NIVEDITA SUBBARAM 1337
  • 2.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 2 TABLE OF CONTENT 1.0 EXECUTIVE SUMMARY…………………………………………………………………………………………………………………… 4 CHART: HIGHLIGHTS ................................................................................................................................... 6 1.1 OBJECTIVES ........................................................................................................................................... 6 1.2 KEYS TO SUCCESS.................................................................................................................................. 7 1.3 MISSION ................................................................................................................................................ 7 2.0 COMPANY SUMMARY........................................................................................................................... 7 2.1 COMPANY OWNERSHIP ........................................................................................................................ 8 2.2 START-UP SUMMARY............................................................................................................................ 8 TABLE: START-UP ........................................................................................................................................ 9 CHART: START-UP ..................................................................................................................................... 11 3.0 SERVICES ............................................................................................................................................. 11 4.0 MARKET ANALYSIS SUMMARY............................................................................................................ 12 4.1 MARKET SEGMENTATION................................................................................................................... 12 TABLE: MARKET ANALYSIS ........................................................................................................................ 13 CHART: MARKET ANALYSIS (PIE)............................................................................................................... 13 4.2 TARGET MARKET SEGMENT STRATEGY .............................................................................................. 13 4.3 SERVICE BUSINESS ANALYSIS .............................................................................................................. 14 4.3.1 COMPETITION AND BUYING PATTERNS .......................................................................................... 15 5.0 STRATEGY AND IMPLEMENTATION SUMMARY.................................................................................. 16 5.1 COMPETITIVE EDGE ............................................................................................................................ 17 5.2 MARKETING STRATEGY....................................................................................................................... 18 5.3 SALES STRATEGY ................................................................................................................................. 19 5.3.1 SALES FORECAST .............................................................................................................................. 20 5.4 MILESTONES........................................................................................................................................ 22 6. BRAND PERSONALITY………..…………………………………………………………………………………………….………………22 7.LAYOUT…………………………………………………………………………………………………………………………………………….23 8.RETAIL MIX……………………………………………………………………………………………………………………………………….24
  • 3.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 3 9. OPERATION PLAN ……………………………………………………………………………………………………………………………26 10. CUSTOMER JOURNEY MAP…………………………………………………………………………………………………………….27 11. PRE AND POST TRANSACTION ………………………………………………………………………………………………………28 12. WEB PLAN SUMMARY......................................................................................................................... 28 12.1 WEBSITE MARKETING STRATEGY...................................................................................................... 29 12.2 DEVELOPMENT REQUIREMENTS ...................................................................................................... 29 13. MANAGEMENT SUMMARY................................................................................................................. 29 13.1 PERSONNEL PLAN ............................................................................................................................. 30 TABLE: PERSONNEL................................................................................................................................... 30 14.0 FINANCIAL PLAN................................................................................................................................ 31 14.1 IMPORTANT ASSUMPTIONS ............................................................................................................. 31 14.2 BREAK-EVEN ANALYSIS ..................................................................................................................... 31 TABLE: BREAK-EVEN ANALYSIS ................................................................................................................. 32 CHART: BREAK-EVEN ANALYSIS ................................................................................................................ 34 14.3 PROJECTED PROFIT AND LOSS.......................................................................................................... 34 TABLE: PROFIT AND LOSS.......................................................................................................................... 35
  • 4.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 4 1.0 Executive Summary PICASSO ART GALLERY Creative Centre is the place where artists meet. PICASSO ART GALLERY is an acronym for "No Artist Left Behind," with our company by-line stating: "Live Your Art." Picasso art gallery is a specialty retail store offering a large array of artists' materials and supplies, crafters' needs, a gallery, and an education centre. Picasso art gallery will provide a pleasant facility that will inspire and support amateurs, professionals and crafters in the Big Place art community. PICASSO ART GALLERY will sponsor art shows and competitions, art and craft fairs, scholarships for artists to continue their formal education, and other community events. PICASSO ART GALLERY will facilitate, organize and offer creative workshops and classes in a variety of techniques and media. The Market PICASSO ART GALLERY is at the forefront in an exciting and growing market. The India has many stores exclusively offering art and craft supplies but neither of these stores is able to offer education and hands-on opportunities. Neither currently supports the artists community in active ways. They are also not able to give the high level of customer support that PICASSO ART GALLERY can. PICASSO ART GALLERY is the only art supply store in Goa that is owned and operated exclusively by artists. PICASSO ART GALLERY Creative Center will tap into the growing number of professional artists in Goa. We will also fill the needs of the growing market of retirees (100% growth in the last three years).Also PICASSO ART GALLERY encourages the thriving artists. PICASSO ART GALLERY will actively market to teachers and students in the growing public and private education systems. We have chosen Goa as it is the worldwide famous tourist place later on we will open our second store in Jaipur because these places are more famous tourist place and popularly known for arts and antics.
  • 5.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 5 The Organization PICASSO ART GALLERY is owned and operated by practicing artists. It is founded on the idea that maintaining satisfied customers is essential to the bottom line. With this in mind, PICASSO ART GALLERY Creative Centre will be working hard to ensure that all of their customers' expectations are exceeded in all transactions. To maintain a presence within the art and craft community and close relationships to customers, PICASSO ART GALLERY will be an active member of the local art scene through participation and education. PICASSO ART GALLERY staff will receive training in the most current trends and products. Picasso Art Gallery owners will both anticipate and set consumer trends in creative work. Products, Services, and Delivery PICASSO ART GALLERY will be located in the commercial business Panjim, in a 3,000 square foot store. The previous tenants were cabinet makers and much of their handiwork remains to our benefit. PICASSO ART GALLERY will have the floor space to offer a wide variety of art and craft supplies. Due to our size, we will also have the purchasing power to buy from manufacturers directly, thus avoiding middle man mark-ups. We will offer discounts to regular customers. We will also offer free delivery in near Goa and Mumbai for orders of Rs300 or more. PICASSO ART GALLERY will offer Artist's Oasis holidays to travellers by arranging local accommodations, renting equipment, selling supplies, and offering maps and guides. Financials PICASSO ART GALLERY will show modest profit from month one. Margins are forecasted to be at 50%, due to the ability to buy wholesale. Sales in the first full year will be slightly over Rs13,35,500. We are projecting conservatively a growth rate of 5% the first three years and 20% thereafter, even though existing art supply stores are reporting growth of over 30%. We budget conservatively, but have great vision.
  • 6.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 6 Chart: Highlights 1.1 Objectives 1. Customer Satisfaction: To create a shopping environment that caters to the needs of the art and craft community of the Big Place by offering knowledgeable and professional customer service. Customer satisfaction will be measured through repeat business (our goal is that 50% of our customers will return within 6 months for an additional purchase) and multiple sales (our goal is that 30% of sales are accompanied by an additional purchase). 2. To earn 80% market share and become the number one art and craft supplier on the place. 3. To achieve a 50% profit margin within the first year. 4. To be an active and vocal member in the community and to provide continual re-investment through sponsorship of community activities and celebrations, including: supporting art and craft events, hosting classes, providing scholarships. 0 500000 1000000 1500000 2000000 2500000 3000000 YEAR 1 YEAR 2 YEAR 3 AllterminRs Years Highlights SALES GROSS MARGIN NET PROFIT
  • 7.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 7 5. To develop, in year two and three, Artist's Oasis of Panjim. In this program we would arrange local accommodations and materials rental for visiting/vacationing artists. 1.2 Keys to Success In order for PICASSO ART GALLERY Creative Center to succeed we must:  Provide for the satisfaction of 100% of our customers and vendors.  Advertise and promote in areas where our target customer base will learn about our store.  Continuously review our inventory and sales and adjust our inventory levels accordingly.  Sell products that are of the highest reliability and quality. We must offer as many or more premium products than our competition offers. Offer loss leaders and other promotions that bring customers into the store to buy goods, explore our line of services, and sign up for future events.  Be an active member of the community.  Provide in-store classes, demonstrations, and events. 1.3 Mission PICASSO ART GALLERY Creative Center's mission is to support and contribute to the community of artists and crafters by offering quality, name brand supplies to accommodate customer needs; by hosting and supporting shows, events, classes and contests; and by promoting the place as an artist's oasis and destination. We will strive, constantly, to supply what the consumer is asking for; we will continually review what is available in the marketplace. We will provide new products and services to the areas of need. We will maintain PICASSO ART GALLERY as a place for artists to gather. Success will ultimately be measured by our customers choosing us because of their belief in our ability to meet or exceed their expectations of price, service, and selection.
  • 8.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 8 2.0 Company Summary PICASSO ART GALLERY Creative Center is a startup, to go into business in the Summer of this year. We will offer a large variety of art and craft supplies, focusing on those items that are currently unavailable on this place. The Internet will continue to be a competitor, as artists use websites to buy familiar products. We will stock products that artists don't necessarily have experience with. We will maintain our price comparisons to include those available on line. We will offer classes in the use of new materials and techniques. We will build an Artist's Oasis tour program. We will book local Bed and Breakfasts, rent easels and materials; sell paint and other supplies and ship completed work to the clients when dry. We will expand the store into an art center including: A fine art gallery, offering original art at, or near, wholesale prices; Musical instruments/studio space; Classrooms for art/music lessons; Art/Music books; Live music/coffee bar; Do-it-Yourself crafts such as specialty T-Shirts, signs, cards, ceramics for the tourist trade. 2.1 Company Ownership PICASSO ART GALLERY Creative Center is a subsidiary of PICASSO ART GALLERY LLC, a limited liability corporation equally owned and operated by Mustahid Ali and Nivedita. Additional subsidiaries include PICASSO ART GALLERY Design (Interior/Web), PICASSO ART GALLERY Fine Art, PICASSO ART GALLERY Music. 2.2 Start-up Summary PICASSO ART GALLERY Creative Center's start-up costs are listed below. The company will start with 10 months inventory on hand as this is the main revenue generator. The majority of the company's assets will reside in inventory.
  • 9.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 9 There will be other normal business costs such as a liability umbrella, rent, interior design costs, and opening day promotions. Current (short-term) assets, acquired during interior build-out, shelving, slotwall, fixtures, signage, display cases, etc., come to Rs 8,00000. The operating capital cash on hand balance will be Rs11,00000. The purpose of this business plan is to drive the company direction in accord with its vision and to secure a Rs45,00000 loan. This supplemental financing is required to work on site preparation, inventory, and operational expenses. Other financing will include the owner's investment of Rs10,00000 and a short-term revolving line-of-credit for inventory replenishment during months of high receipts. Successful operation and the building of a loyal customer base will allow PICASSO ART GALLERY Creative Center to be self-sufficient and profitable in the first full year.
  • 10.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 10 Table: Start -up Start-up Requirements Start-up Expenses Legal Rs10,000 Stationery etc. Rs5,000 Insurance Rs5,000 Office Space Rs10,00,000 Travel: Trade Show Rs3,50,000 Set-up Banking Rs1,000 POS System Rs20,000 Security System Rs15,000 Advertising Rs20,000 Phone System Rs10,000 Computers Rs50,000 Other Rs10,000 Total Start-up Expenses Rs14,96,,000 Start-up Assets Cash Required Rs5,00,000 Start-up Inventory Rs5,00000 Other Current Assets Rs8,00000 Long-term Assets Rs17,00000 Total Assets Rs30,00000 Total Requirements Rs49,96,000
  • 11.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 11 3.0 Services PICASSO ART GALLERY Creative Center will provide a wide variety of products of interest to artists and crafters. Our wholesale suppliers will include: Sai handicrafts, Mona Lisa fine art production, art Alley, Athena art arena. There are thousands of products available, we will offer many that are unusual, or new, as well as the basics that every artist needs on a regular basis. We will offer lines to include bargain, mid-range and professional quality products. Management will rely on customer feedback, suggestions, and daily sales reports to introduce or eliminate certain brands or products. In year two we will begin marketing our Artist's Oasis tour packages, as well as art/craft equipment rental. Rentals will include equipment items that are too bulky to carry on vacation, or too expensive, or used only periodically, for the average artist or crafter to justify purchase. An example would be a Giclee Printer. 0 5,00,000 10,00,000 15,00,000 20,00,000 25,00,000 30,00,000 35,00,000 40,00,000 45,00,000 Expenses Assets Investment Loans 14,96,000 30,00,000 17,00,000 45,00,000 Rs START-UP
  • 12.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 12 4.0 Market Analysis Summary PICASSO ART GALLERY Creative Center will market to four primary customers: 1. Professional artists. 2. Amateur artists and crafters, including hobbyists. 3. Businesses, such as architects, graphic designers, interior designers, or direct mail advertisers. 4. Teachers and students. 4.1 Market Segmentation Average household income has steadily grown with about 36 percent of Big Place households reporting incomes of Rs25,000 - Rs50,000 and another 36 percent in the Rs50,000 - Rs75,000 range. Predictions for Goa and Jaipur include continued population growth, economic growth and business opportunity. 1. Professional artists. There are currently at least 30 Fine Art Galleries in Goa and Jaipur. Each gallery represents several artists. 2. Amateur artists and crafters, including hobbyists. Many of the amateurs are retirees* with relatively high disposable income levels. 3. Businesses. Architects (30 companies on place), technical drawing, interior/graphic design (18 companies on place), advertising/direct mail companies (12 companies on place). 4. Teachers and students. This group will include K-12 teachers and students as well as those attending art classes at the store. (25,000 public school students). *The total population of Goa and Jaipur has grown by about 14.9 and 26.91% percent in the past decade respectively, the older segments - such as those from 45 - 54 and those 55 and up have increased at rates of 100 percent and 64 percent, respectively.
  • 13.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 13 Table: Market Analysis Chart: Market Analysis (Pie) 4.2 Target Market Segment Strategy 1. Professional Artists. With only one existing art supply store in Goa and jaipur, if the professional's need for customer service is not met, they will utilize the Internet and mainland 20% 30% 10% 40% Growth Professional Artists Amateur Artists Business to Business Education Market Analysis Year 1 Year 2 Year 3 Year 4 Year 5 Potential Customers Growth CAGR Professional Artists 20% 200 240 288 346 415 20.02% Amateur Artists 40% 1,000 1,400 1,960 2,744 3,842 40.00% Business to Business 10% 66 73 80 88 97 10.10% Educational 20% 10,000 12,000 14,400 17,280 20,736 20.00% Total 22.16% 11,266 13,713 16,728 20,458 25,090 22.16%
  • 14.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 14 stores. The area we can impact most heavily is having the actual products in the store that artists can manipulate, study, etc. This would especially apply to products that a customer may not take a chance on ordering from an Internet site (because of variations in quality, or new techniques/products). 2. Amateur artists and crafters, including hobbyists. In general, this segment has the same needs, desires, and fulfilment requirements as the professional artists. Some will be purchasing from lower and mid-priced product lines, but many are avid in pursuing their avocations, and appreciate, buy and use the professional quality materials. 3. Businesses such as architectural, technical drawing, interior/graphic design, advertising/direct mail companies. Currently, this segment is not served in any way on the west side of the place, except by casual shopping at the existing art supply store. Much of the purchasing by this group is done on the Internet. 4. Teachers and students. This is a much neglected segment on our place. Students and teachers currently have access to products in Wal-Mart, K-Mart, a small school supply specialty shop (open part-time), and the sole existing art supply store. We plan to have a store big enough to accommodate the art supply needs of the education community. 4.3 Service Business Analysis PICASSO ART GALLERY Creative Center is a specialty retailer filling an underserved niche market on the place. Currently customers can buy low end art products at Wal-Mart, K-Mart, Long's, and Ace Hardware. The products offered at these outlets is severely limited. Products include: a few small canvases, a small selection of papers in limited sizes, a few paint sets, and writing pens and pencils. The same stores offer limited selections of craft and hobby products as well, usually aimed at general interest and unsophisticated shoppers.
  • 15.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 15 Goa Printing Corp. and Panjim Coast Office Supply, Inc. stock a limited variety of drafting supplies: pens, pencils and paper products that could be used for arts and crafts but are usually associated with writing. Art and craft products can also be purchased at Art Supply Panjim in the old industrial area. This store offers a much better selection in terms of variety, type and quality, but has a reputation for poor customer service satisfaction. 4.3.1 Competition and Buying Patterns Art Supply of Gallery attic in Panjim is the closest competitor to Picasso art gallery. It is a small two- story facility of 1,300 sq. ft. The store has been in business for 10 years, seven years in Hilo and three years in Panjim. They offer a variety of fine art supplies, canvas, paints, stained glass, ceramics, oriental arts, beads, textile arts, crafts, scrapbooking, and children's craft kits. The store is currently for sale with an asking price of Rs395,000. According to their advertising, the store serves a growing local artist community, retirees and both public and private schools. Many artists known to the owners, refuse to shop at Gallery attic because they are dissatisfied with the level of customer service, and generally uncomfortable in the shopping experience. They currently shop off the Internet, and in mainland stores during infrequent visits out-of-state. These artists represent a significant customer base for PICASSO ART GALLERY Creative Center. Customers in the educational segment buy at the discount stores, due to the convenience of one- stop shopping for all their household needs as well as school supplies for the kids. We will market directly to the art teachers in the local schools. We will supply order forms to the classrooms, and deliver directly to the schools. Many professional artists buy from Internet sources due to the still limited selections in the local marketplace in the quantities needed. With a store space nearly three times the size of ASH, we will be able to stock appropriate quantities, styles and sizes, and deliver orders much more quickly than Internet sources. We will provide free delivery to the North Kona area on purchases over Rs300. We will also provide friendly, professional customer service. We'll provide a generous return and
  • 16.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 16 exchange policy. We'll provide hands-on access to materials and make Picasso Art Gallery a gathering place for artists. None of these benefits are available through Internet sources. 5.0 Strategy and Implementation Summary Picasso Art Gallery goal is to provide products, service and education to the underserved creative community on the Big Place. The current population is underserved due to a perceived lack of customer service in the few existing outlets for supplies. Our intention is to gain 80% of the market share by focusing on our customer service, niche positioning, convenient location, quality brands, special promotions and becoming a gathering spot for artists. While we will focus on our primary customer segments, we offer products that virtually every artist/crafter requires. We will create an atmosphere that is appealing to the true artist, whether amateur or professional. The balance of customers will come because they will see this as the center of creative people. The store will merchandise in a manner consistent with our values and the fundamentals of good retail space use. We will provide a bulletin board for all manner of communications among the community. We will provide space for classes and creative hands-on experimentation. Strategic Assumptions: 1. Every resident on the Goa and Jaipur is a potential customer. By marketing to our two target segments, we will expose ourselves to additional new customers. 2. Our proximity to Costco and Home Depot will bring in those travelling from outside Kona.
  • 17.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 17 3. We will continue to be involved in the art and craft community as participants, suppliers and encouragers. 5.1 Competitive Edge Picasso Art Gallery competitive edge involves five areas: 1. Customer Service as priority one. 2. Location. The store is located in the Panjim Commercial Industrial Park. The location will attract more customers from out of the Panjim area because a visit to the art supply store can be consolidated with a trip to Goa, a store with an established draw on customers from all over the place. 3. PICASSO ART GALLERY will be an art education center. We will have a large classroom available for instruction in various media and techniques. 4. PICASSO ART GALLERY will be a gathering place for artists. We will dedicate a portion of the warehouse area to a cafe style lounge where customers can read art magazines, look at the art gallery, drink coffee, listen to music, or visit with other artists. 5. We will provide percentage discounts for repeat customers. Each of these is a competitive advantage because none is being addressed, by an art supply outlet, in panjim at this time.
  • 18.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 18 5.2 Marketing Strategy Our marketing strategy will focus heavily on customer service with loyalty and retention in sales; on sales promotion, and on niche positioning in the market. In addition to price and item promotional announcements, PICASSO ART GALLERY Creative Center will focus its marketing efforts via several key direct-to-consumer advertising vehicles: Local and Regional Magazine Publications. (Goacom magazine, Goa Groove)Each of these papers provide a demographic base that lines up nicely with that of Picasso Art Gallery. Direct Mail Postcards: PICASSO ART GALLERY will look to increase consumer awareness, retain the existing customer base and promote increased sales via postcard mailings. These mailings will be targeted around special events, and are intended to liquidate slow moving products or showcase vendor negotiated specials.  Spring Open House--15% to 20% savings opportunity.  Fall Open House--15% to 20% savings opportunity.  Holiday Open House--15% to 20% savings opportunity.  Annual Anniversary Postcard--promotes in-store design seminars, special events and savings opportunities. Website Marketing: As we establish our on-line education and gallery segment, we will support the business via search engine marketing, URL links and e-mail marketing on all correspondence. This third channel of business will increase the customer base, sales potential and service opportunities provided by PICASSO ART GALLERY.  Direct Calls on professional artists, architects and designers.  Word of mouth. By giving first-time customers great service and a fair price, the word is sure to spread.
  • 19.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 19  In-store events and celebrations. All marketing decisions with regard to specific media choices, frequency, size, and expenditures will be analyzed on an on-going basis with careful consideration of returns generated and consistency with our mission and vision. 5.3 Sales Strategy PICASSO ART GALLERY Creative Center will approach sales from a relationship basis. We will assist customers in a personal manner, using personal names and displaying our names on badges. We will ask the questions needed to provide the customers with the services they desire. Gathering key customer information and seeking performance feedback on the products and services offered will assist us in the following ways:  Targeting our marketing efforts most effectively.  Developing product offers and merchandising formats that increase sales.  Developing services and perks that enhance the shopping experience.  Increasing awareness of Picasso art gallery within the retail consumer marketplace.  Developing future sales opportunities that allow for continued growth of the business. Key to the sales strategy is direct sales calls on all market segments targeted in this plan. These sales calls need to be made by the owners, by virtue of their background and knowledge of the customers, products and competitors. Experience has proven that the more time we devote to sales, the more sales result. A full-time team member needs to be found and added as soon as possible. Without this person, too much of the owner's time is deflected away from their major tasks. We will utilize the POS software with every sales transaction. With each purchase the software will record and maintain in its database the customer's name, address and purchases. This information will be used with our direct mailing program to focus on our top 50% of customers. This will also make inventory control easier and more effective.
  • 20.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 20 We will offer the best return/exchange policy possible, to build trust with our customers and maintain retention and loyalty. At least 50% of returns will be sent back to the distributor or vendor. For in-store sales, our strategy will be to maintain as much on-site point-of-purchase literature as is physically possible. We will remember that selling art and craft supplies is about educating and filling a need, not pressuring the customer to buy. Most importantly, we need to sell our company, not necessarily the products. We will need to push our service, education, and support capabilities. This will be done through relating with customers, drawing out creative dreams and aspirations, stretching customers into new creative arenas, and so forth. 5.3.1 Sales Forecast The following table and chart highlight forecasted sales. We expect sales to start off conservatively and increase extensively during the holiday season and during the months of July and August as the education systems start their new year. PICASSO ART GALLERY has planned for a rate of growth at 5% for the first year as we build name recognition and status in the community. In the second year we project a growth rate of 10%. In the third year we look to see an increase of revenue of 20% as we gain a larger percentage of the market share and increase our customer base beyond the Kona area.
  • 21.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 21 Table: Sales Forecast Sales Forecast Year 1 Year 2 Year 3 Sales Painting Supplies Rs6,00000 Rs8,00,000 Rs10,00,000 Drawing/Illustration Rs2,00000 Rs2,50,000 Rs4,00,000 Books/Media Rs25,000 Rs30,000 Rs50,000 Cutting Tools Rs10,000 Rs15,000 Rs25,000 Adhesives Rs5,000 Rs5,000 Rs10,000 Glass Rs30,000 Rs40,000 Rs60,000 Ceramics Rs8,000 Rs10,000 Rs25,000 Crafts Rs50,000 Rs75,000 Rs1,00,000 Gifts/Studio Environment Rs25,000 Rs35,000 Rs50,000 Print Making Rs10,000 Rs15,000 Rs30,000 Sculpture Rs25,000 Rs30,000 Rs40,000 Portfolios/Transporting Rs15,000 Rs25,000 Rs40,000 Gallery Sales Rs50,000 Rs60,000 Rs1,00,000 Fabrics/Yarn Rs15,000 Rs20,000 Rs30,000 Equipment Rs10,000 Rs20,000 Rs15,000 Clothing/Accessories Rs25,000 Rs40,000 Rs50,000 Paper/Boards Rs30,000 Rs50,000 Rs75,000 Classes Rs2,500 Rs5,000 Rs15,000 Canvas/Surfaces Rs2,00000 Rs3,00,000 Rs4,00,000 Total Sales Rs13,35,500 Rs18,25,000 Rs25,15,000 Direct Cost of Sales Year 1 Year 2 Year 3 Inventory Rs4,45,166 Rs6,08,333 Rs8,38,333 Other Rs0 Rs0 Rs0 Subtotal Direct Cost of Sales Rs8,90,333 Rs12,16,666 Rs16,76,666
  • 22.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 22 5.4 Milestones The accompanying milestone chart highlights our plan with specific dates. This schedule reflects our strong committment to organization and detail. During the 6-month and 12-month evaluation period, we will complete a detailed evaluation of all aspects of the business:  Financials/Bottom Line  Sales  Customer satisfaction  Goals for next period We will have in place a "Plan-B," for implementation, should the evaluation show that it is ill-advised to continue the current endeavor. Product diversification, location, advertising, new markets, will be considered if PICASSO ART GALLERY needs to be more liquid. 6. Brand Personality A set of human characteristics that are attributed to a brand name. A brand personality is something to which the consumer can relate, and an effective brand will increase its brand equity by having a consistent set of traits. This is the added-value that a brand gains, aside from its functional benefits. There are five main types of brand personalities: excitement, sincerity, ruggedness, competence an sophistication. Our brand is totally related to the Arts and creativeness, so it shows the personality of artistic, as the name and the logo “PICCASO ART GALLERY” gives an impact of the best and
  • 23.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 23 unique designs and arts, logo is full go colours which give the experience of happiness , joy and all phases of life. Ultimately its all about personality which pertains the creativity and artistic. 7. Layout: Layout is according to the displays and the various departments. There are many departments depends on the type of the products like paintings, drawings, sculptures, tools, crafts, handmade items and so on. We have mostly transparent windows and displays so that people see it easily. The entrance is of totally mirror and automated so that outside people can see inside the shop easily and thus it can attracts them hence increase more sales. PICASSO ART GALLERY will be located in the commercial business Panjim, in a 3,000 square foot store. The previous tenants were cabinet makers and much of their handiwork remains to our benefit. PICASSO ART GALLERY will have the floor space to offer a wide variety of art and craft supplies. Due to our size, we will also have the purchasing power to buy from manufacturers
  • 24.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 24 directly, thus avoiding middle man mark-ups. We will offer discounts to regular customers. We will also offer free delivery in near Goa and Mumbai for orders of Rs300 or more. PICASSO ART GALLERY will offer Artist's Oasis holidays to travellers by arranging local accommodations, renting equipment, selling supplies, and offering maps and guides. 8. Retail Mix 1. Merchandise Mix :- Generally as we have products which are different from each other and have unique attributes, so we have their different- different departments, like drawing department, painting department, art and tools department, crafts and handies departments, sculpture department, so its more of departmental retail store. People have their own perception and hence their own choices that what they want to like and buy, according tit heat they can visit their respective departments. 2. Price : we have different prices depends on the product type, paintings are ranging from 5Rs 5000 to Rs 1,000,00, drawings, handy crafts, sculpture every product has their own price ranging from Rs 500 to Rs 50000.
  • 25.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 25 3. Location: Location is very prime in Panjim , Goa, as it is the one of the famous tourist place not even only for Indians but also for foreigners. 4. Advertisement and promotion: As it a unique store with its unique USP’s and the competition is very less in Panjim, so it require very less advertisement and promotion , but initially for the awareness it is very essential. So, we have strategy of Below the line (BTL) to aware and promote our targeted audience, ads in local newspaper especially on the tourism section, organising cultural and art events and trade fairs, ads to colleges. 5. Store layout and design: Layout is according to the displays and the various departments. There are many departments depends on the type of the products like paintings, drawings, sculptures, tools, crafts, handmade items and so on. We have mostly transparent windows and displays so that people see it easily. The entrance is of totally mirror and automated so that outside people can see inside the shop easily and thus it can attracts them hence increase more sales. PICASSO ART GALLERY will be located in the commercial business Panjim, in a 3,000 square foot store. The previous tenants were cabinet makers and much of their handiwork remains to our benefit. PICASSO ART GALLERY will have the floor space to offer a wide variety of art and craft supplies. Due to our size, we will also have the purchasing power to buy from manufacturers directly, thus avoiding middle man mark-ups. We will offer discounts to regular customers. We will also offer free delivery in near Goa and Mumbai for orders of Rs300 or more. PICASSO ART GALLERY will offer Artist's Oasis holidays to travellers by arranging local accommodations, renting equipment, selling supplies, and offering maps and guides. 6. Customer services and selling: we have pre and post transaction services for our customers. Pre services full details and catalogues for the costumers that will make their purchase easy, even for loyal customer we provide personal assistant, for touristic we are also providing route map and location map, so that can makes their traveling a fun without any inconvenience . We are also providing the basic art, painting and drawing training to our register customers, it will be online and offline.
  • 26.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 26 Secondly for post transaction free advises that in what pattern the painting, drawing will look good, apart from this in background to which colour. Replace and second hand services will also be there. So it will be complete plan that will fulfil the requirement of the customers. 9. Operation plan Sourcing  Artists  Amateurs  Museums  Sculptures  Tool suppliers  Cultural & art exhibition Picasso art gallery Order  Online(website)  offline Delivery  Free delivery within GOA and MUMBAI Private education Provides artists oasis holiday Packaging  Robust packaging Managing inventory using POS software, which keeps the track of every product .
  • 27.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 27 10.Customer journey map Picasso art gallery Receptionist Books section Musical instrument Art section Crafts section Sculptures Classroom for art and music Live music /coffee bar Do it yourself Section Order received Leave
  • 28.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 28 11. Pre and Post Transaction 12.0 Web Plan Summary Picasso Art Gallery Web presence will be informational and educational with a contact form for requesting additional information. Our URL will be on all print items coming from the store (advertising, sales promotion sheets, letterhead).  Management will rely on customer feedback, suggestions, and daily sales reports to introduce or eliminate certain brands or products.  Online feedback  Artist oasis tour Cultural and art exhibition Location information to tourist Trade fare and event organization
  • 29.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 29  Customers will be able to search our inventory and place orders.  Customers will be able to access a calendar of educational opportunities, and sign up on line.  Customers will be able to use the website as a portal for art related research: technical, historical and local.  Customers will be able to view and print coupons.  Off-place customers will be able to read about our tour packages, and request additional information.  Customers will be able to view our on-line art gallery. 12.1 Website Marketing Strategy We will direct customers to our website in the following ways:  Direct e-mail through addresses given to us voluntarily.  Printing on everything that comes from the store (letterhead, business cards, direct mail, shopping bags and wrapping paper, promotional items, print advertising).  Links from local business pages and Hawaii Tourism portals.  Links from/to national art resource pages.  Advertising on all company vehicles. 12.2 Development Requirements Our parent company website is already in place. Through PICASSO ART GALLERY Design, we have trained staff, domain names, and software in place to build a web presence for PICASSO ART GALLERY Creative Center at nominal cost. 13.0 Management Summary PICASSO ART GALLERY Creative Center is managed by the owners/founders.  We will open with the two owners operating the store.
  • 30.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 30  As our business expands, we will hire additional employees, our projections include six employees, with the owners managing the store and cold-call selling. o Employees will be encouraged to work within their creative, physical, and intellectual boundaries. o All duties will be divided and delegated according to strengths and weaknesses. o At PICASSO ART GALLERY we will expect a high degree of customer service skills and personality as this is essential to our success. 13.1 Personnel Plan PICASSO ART GALLERY will be operated in the first few years by the owners. Additional part-time help will be provided by family members. As PICASSO ART GALLERY grows over the next years, we will need two additional full-time sales clerks, and two part-time clerks. This will free the owners to concentrate on building the business, and expanding into the other areas of Picasso Art Gallery vision (tours, competitions, music, gallery, special events, etc.). Table: Personnel Personnel Plan Year 1 Year 2 Year 3 1 cashier/receptionist Rs1,20,000 Rs1,30,,000 Rs1,30,,000 Other ( 1 People) R1,20,000 Rs1,30,000 Rs1,30,000 Other (1 extra will add on 3rd year) Rs0 Rs0 Rs1,20,000 Total People 2 2 3 Total Payroll Rs2,40,000 Rs2,60,000 Rs3,80,000
  • 31.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 31 14.0 Financial Plan  The growth of PICASSO ART GALLERY will be moderate and the cash balance will always be positive.  Being a retail environment we will not be selling on credit. We will accept cash, checks, Visa and MasterCard.  Marketing and advertising will remain at or below 5% of sales.  We will finance growth mainly through cash flow. We recognize that this means we will have to grow slowly.  It should be noted that the owners of PICASSO ART GALLERY Creative Center do not intend to take any profits out of the business until the long-term debt has been satisfied. Whatever profits remain after the debt payments will be used to finance growth, mainly through the acquisition of additional inventory. 14.2 Important Assumptions The financial plan depends on important assumptions, most of which are shown in the following table. The key underlying assumptions are:  We do not sell anything on credit. We accept cash, checks, debit cards, Visa, MasterCard.  A slow-growth economy/customer base, without major recession.  Monthly sales are the largest indicator for this business. There are some seasonal variations, with the months October through January being the highest sales months.  We assume access to capital and financing sufficient to maintain our financial plan as shown in the tables.
  • 32.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 32 14.3 Break-even Analysis Our break-even analysis is summarized by the following chart and table. Table: Break-even Analysis Total expected expenditure = Rs 14,96,,000 (from start-up table) So, Monthly expected expenditure will be , = Rs 14,96,000/12 =Rs 1,24,667 Now expected sales per year (From sales forecast table) Year 1 = Rs 8,90,333 Year 2 = Rs 12,16,666 Year 3 = Rs 16,76,666 Expenditure recover in first year = Rs 8,90,333 Remained expenditure to be recover in 2nd year is Rs 14,96,000 – Rs 8,90,333 i.e = Rs 6,05,667 Expected earning in 2nd year is Rs 12,16,666 So, remained expenditure will be recover in first 6 month of 2nd year as the monthly average sales will be Rs 1,01,388. (Rs 12,16,666/12 = Rs 1,01,388 monthly)
  • 33.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 33 Break-even Analysis Monthly Revenue Break-even for 1st year Monthly Revenue Break-even for 2nd year Monthly Revenue Break-even for 3rd year Rs74,195 Rs 1,01,388 Rs 1,39,722 Assumptions: Average Percent Variable Cost 50% Estimated Monthly Fixed Cost Rs 52,550 0.00 890333 1216666 167666 Expenditure (In Rs) -1496000 -1496000 -605667 0 -1496000 -1496000 -605667 0 -1600000 -1400000 -1200000 -1000000 -800000 -600000 -400000 -200000 0 EXPENDITURE(INRS) SALES (YEARLY IN RS) BREAK EVEN ANALYSIS (YEARLY)
  • 34.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 34 Break Even Analysis (Monthly) 14.4 Projected Profit and Loss We predict that during the second year of operation, our high level of customer service and strong assortment will allow us to generate approximately 5% profit. This will be above the normal two to three year period required for a start-up retailer. Our sales projections are conservative. Should sales increase as we anticipate, the profit-to-sales ratio could be as high as 10% by the end of year three. The following chart and table will indicate projected profit and loss. -2000000 -1500000 -1000000 -500000 0 500000 1000000 MonthlyExpectedExpenditure(inRs) Monthly Sales (In Rs) Break Even Analysis (Monthly)
  • 35.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 35 Table Profit And Loss: Pro Forma Profit and Loss Year 1 Year 2 Year 3 Sales Rs 13,35,500 Rs 18,25,000 Rs 25,15,000 Direct Cost of Sales Rs4,45,166 Rs6,06,333 Rs8,38,333 Other Costs of Sales Rs0 Rs0 Rs0 Total Cost of Sales Rs8,90,333 Rs12,16,666 Rs16,76,666 Gross Margin Rs445167 Rs608334 Rs838334 Gross Margin % 66.67% 66.67% 66.67% Expenses Payroll Rs2,40,000 Rs2,60,000 Rs3,80,000 Marketing/Promotion Rs10,000 Rs20,000 Rs20,000 Depreciation Rs0 Rs0 Rs0 Utilities Rs5000 Rs5,000 Rs5,000 Insurance Rs5,000 Rs5,000 Rs5,000 Payroll Taxes Rs0 Rs0 Rs0 Other Rs0 Rs0 Rs0 Total Operating Expenses Rs2,60,000 Rs2,90,000 Rs4,10,000 Profit Before Interest and Taxes Rs1,85,167 Rs318334 Rs428334 EBITDA Rs1,85,167 Rs318334 Rs428334 Interest Expense Rs20,000 Rs15,000 Rs12,000 Taxes Incurred Rs15,000 Rs18,000 Rs20,000 Net Profit Rs150167 Rs285334 Rs396334 Net Profit/Sales 6.56% 16.20% 20.19%
  • 36.
    PICASSO ART GALLERYRMS RETAIL PROJECT pg. 36 Over all this Project is totally feasible and will be great Retail Business.