CAREER SUMMARY:
Interest of Work :
Willingness in doing team work with good organization and also accepting
challenging job in the operation of ETP, Stripper, Incinerator.
PERSONAL DETAILS:
NAME : VISHAL SHIVPRASAD PUROHIT
NATIONALITY : INDIAN
DATE OF BIRTH : 2nd
NOVEMBER, 1974
MARITAL STATUS : MARRIED
PRESENT ADDRESS : ASHWAMEGH – 3, B-2 WING, FLAT NO.-
203, AKOTA-MUJMAHUDA ROAD, AKOTA
VADODARA-390020
PERMANENT ADDRESS : A-24, PAVANPURI SOCIETY 1,
B/H PARTH NAGAR, NR. CNG GAS,
OLD N.H. NO. 8, BHOLAV,
BHARUCH - 392001
E-Mail address : vshl.purohit83@gmail.com
CONTACT : (M) : 98245 65904
- 1 -
CURRICULAM VITAE
VISHAL S. PUROHIT
M.Sc. (Ecology & Environment),
Contact no.: (M) – 98245 65904
e-mail: vshl.purohit83@gmail.com
QUALIFICATION:
• MSc (Ecology & Environment) from Sikkim Manipal University (2010)
• B.Sc. ( Chemistry ) from South Gujarat University, Surat. (1995).
• H.S.C. passed in 1992 with 56%.
• S. S. C. passed in 1990 with 70%.
ADDITIONAL QUALIFICATION:
• Higher Diploma In Software Engineering from Aptech Edu. Institute,
Bharuch (2002).
EXPERIENCE WITH THE ORGANIZATIONS:
PRESENT EMPLOYMENT
Alembic Pharmaceuticals Ltd., Panelav
March 10, 2015 to continue Senior Executive, Environment Dept
Work Responsibilities:
 Presently involved in operation of Zero discharge ETP of Alembic
Pharmaceuticals Ltd., API II, Panelav.
 ETP comprises of Stripper(50 kl/day), ETP (60 kl/day), RO plant (70
kl/day), MEE (kl/day).
 Looking after operation of Stripper, ETP, RO plant and MEE plant.
 Also looking after Lab analysis, Liaison Documentaion work , Preparation
of Standard Operating Procedures, working on GPCB XGN .
- 2 -
PREVIOUS EMPLOYMENT (1)
Alembic Ltd. (Chemicals Division), Vadodara
November 3, 2008 to 31 October, 2014 Executive, Environment Dept
Work Responsibilities:
 Had been working with chemicals division of
Alembic Ltd., Vadodara.
 Had been involved in Operation of Effluent
Treatment Plant which consists of Primary (Centrifuge & Clarifier),
Secondary and Tertiary treatment facility and Air Pollution Control Facility
consists of scrubbers at Alembic – Vadodara unit.
 Trouble shooting of daily process problems conduct
process studies and recommend modification/schemes to optimize the
plan efficiency.
 Monitoring the operating parameters as per the
daily operating instructions and controlling the same.
 Recording of important parameters’ reading and
maintaining log books.
 Co-ordination with field operators for the smooth
operation of ETP.
 Implementation of system as per ISO-9001 &
14001.
 Dewatering of fermentation broth and ETP sludge
at decanter with the aid of Polyelectrolyte
 Coordinate for disposal of Hazardous waste at
Common Incineration Site and ETP sludge at landfill site.
 Anaerobic Digestion & Composting of Mycelium and
sell as a soil conditioner to farmers & Organic Manure Manufacturer.
 Minimize odour nuisance by alteration in treatment
process and efficient handling of air pollution control devices.
- 3 -
 Maintaining records of hazardous waste generation,
disposal to landfill site - NECL and incineration of waste at Common
Hazardous Waste incineration facility - NECL.
 Providing assistance in legal and ISO 14001
documentation.
ABOUT PLANT:
The effluent emanated from production, is treated in effluent treatment
plant consists of anaerobic and aerobic system.
ETP plant is designed to dispose off 2085 kl/day. The effluents of higher
organic load are given treatment in anaerobic section where organic
matter is biologically hydrolyzed and acidified to lower organic acids. The
gas generated in the tower is flared & H2S gas is scrubbed in the
scrubbers. The treated effluent from anaerobic section is transferred to
aerobic section for further treatment. The aerobic treatment consists of
primary treatment (equalization, biotowers, primary clarifiers), secondary
treatment (aeration tanks, secondary clarifiers) and tertiary treatment
( final clarifier). Treated effluent is discharged to VMC sewage plant with
GPCB permissible limits.
- 4 -
PREVIOUS EMPLOYMENT (2)
TONIRA PHARMA LTD., Nandesari – Baroda.
April , 2006 – October, 2008 Environment Officer - ETP
Work responsibilities
 ETP operation & waste water analysis. Treat ability study on waste water
of different products.
 Dealing with the environment consultants and liaisoning work which
includes CC&A application, Water cess return, Environment statement and
dealing with the GPCB officials for other legal matters.
 Dealing with CETP ( Common Effluent Treatment Plant of GIDC ) officials
for final treated effluent quality and its disposal. Coordination for the
disposal of Hazardous waste at Common Incineration facility at NECL and
ETP sludge at landfill site – NECL.
ABOUT PLANT:
Operation of ETP consists of primary ( physico-chemical treatment of
lime-alum & polyelectrolyte), secondary and tertiary treatment facility and
air pollution control facility consists of HCl scrubber. ETP plant has a
capacity of discharge of 60 kl/day.
PREVIOUS EMPLOYMENT (3)
TAPAN ENVIRO CARE, ANKLESHWAR.
June – 2004 to April - 2006 Site Supervisor - ETP
- 5 -
 Managing qualified staff of 26 people at different ETP operation sites i.e
Cadila Health Care Ltd. 1-2, Ankleshwar, Sun Pharma Ltd., Ankleshwar &
Panoli, Philips India Ltd, Baroda & Huber Chemicals, Jhagadia.
 Monthly analysis report preparation for each site. Solving out any
technical problem related to any equipment or process parameter.
PREVIOUS EMPLOYMENT (4)
Envision Enviro Engineers Pvt. Ltd.
Site : Narmada Chematur Petrochemicals Ltd. (ISO 9001:14001:18000)
December – 1999 to January - 2004 Site In Charge - ETP
 Managing qualified staff of twenty people. There were six B.Sc. graduates
working as DCS panel operators and fourteen under graduates field
operators. Managing their shift schedules and salary payment.
 Stripper operation from DCS panel including the distribution of field
work among field operators, filling up report log books & various log
sheets akin to equipments of stripper plant.
 Operation of Aniline incinerator from DCS panel where aniline tar is
incinerated at 750 - 800.
c temperature.
 Monitoring the operating parameters as per the work instructions (WI)
and controlling the same.
 Co-ordination with the field operators for the smooth operation of
stripper.
 Co-ordination with QC department for GC, HPLC analysis report and
taking corrective action to improve product quality.
 Taking corrective action for any deviation of process parameter.
 Inspection and trouble shooting of the equipments during the shut down.
 Detecting the alarming situation of equipments to avoid break down of
the same.
 Responsibility of on line work permit system.
 To ensure smooth operation of ETP, proper consumption of raw material
and 100% efficiency of staff.
- 6 -
 Preparation of various monthly reports and monthly compliance reports to
GPCB.
 ISO 9001:14001:18001 activities like list of critical equipments which
includes what line of action should be taken in case of maintenance of
some critical equipments. Emergency preparedness which includes what
safety measures should be taken during handling of some hazardous
chemicals. Identification of significant aspects, raising and implementation
of EMP.
ABOUT PLANT:
Waste water with traces of Nitro Benzene, Aniline, Benzene is sent to Stripper
column for azeotropic distillation where crude NB (90%) is recovered and tar of
Aniline is separated and incinerated at Aniline incinerator with 800 deg. Cent.
temperature. Waste water from the bottom of the column is sent for biological
treatment. Stripper plant and Aniline Incinerator are operated from DCS panel.
ETP has capacity of disposal of 561 cum/day. Waste water is given
primary treatment which consists of equalisation, neutralization (Physico
chemical treatment) and primary clarifier. Secondary treatment is followed by
first stage aeration (421 cum. Cap.), extended aeration (1500 cum. Cap.) and
secondary clarifier. Tertiary treatment consists of collection of final treated water
and passing through activated carbon filters before discharge to natural stream
with GPCB permissible limits.
Current Employer : Alembic Ltd.
Designation : Senior Executive
Experience : 15 years
Current CTC : 5.0 lacs per annum
Notice Period : 3 month as per company rules
Reason for Leaving:
Seeking better & advanced career opportunities and exposure in new fields.
Yours truly,
Vishal S. Purohit
- 7 -
- 8 -
- 9 -
- 9 -

More Related Content

What's hot

Enhancing Sustainability in Pharma; Reducing Your Carbon, Water and Physical ...
Enhancing Sustainability in Pharma; Reducing Your Carbon, Water and Physical ...Enhancing Sustainability in Pharma; Reducing Your Carbon, Water and Physical ...
Enhancing Sustainability in Pharma; Reducing Your Carbon, Water and Physical ...A.T.E. Private Limited
 
C. Belfield Detailed Work History
C. Belfield Detailed Work HistoryC. Belfield Detailed Work History
C. Belfield Detailed Work HistoryCaroline Belfield
 

What's hot (6)

Enhancing Sustainability in Pharma; Reducing Your Carbon, Water and Physical ...
Enhancing Sustainability in Pharma; Reducing Your Carbon, Water and Physical ...Enhancing Sustainability in Pharma; Reducing Your Carbon, Water and Physical ...
Enhancing Sustainability in Pharma; Reducing Your Carbon, Water and Physical ...
 
resume mohammad abu awwad
resume mohammad abu awwadresume mohammad abu awwad
resume mohammad abu awwad
 
Cip For Profit
Cip For ProfitCip For Profit
Cip For Profit
 
Christopher_Magaoay_CV
Christopher_Magaoay_CVChristopher_Magaoay_CV
Christopher_Magaoay_CV
 
Abhai Raj Singh
Abhai Raj SinghAbhai Raj Singh
Abhai Raj Singh
 
C. Belfield Detailed Work History
C. Belfield Detailed Work HistoryC. Belfield Detailed Work History
C. Belfield Detailed Work History
 

Similar to resume_VISHAL_New

EMP for 220,000 BPD Oil Refinery
EMP for 220,000 BPD Oil RefineryEMP for 220,000 BPD Oil Refinery
EMP for 220,000 BPD Oil RefineryAlvaro H. Pescador
 
Activity of different innoculation on food waste anaerobic digestion system o...
Activity of different innoculation on food waste anaerobic digestion system o...Activity of different innoculation on food waste anaerobic digestion system o...
Activity of different innoculation on food waste anaerobic digestion system o...IRJET Journal
 
MUHAMMAD ASIF CV - JUNE-2016
MUHAMMAD ASIF CV  -  JUNE-2016MUHAMMAD ASIF CV  -  JUNE-2016
MUHAMMAD ASIF CV - JUNE-2016MUHAMMAD ASIF
 
Performance evaluation of Effluent Treatment Plant of Dairy Industry
Performance evaluation of Effluent Treatment Plant of Dairy IndustryPerformance evaluation of Effluent Treatment Plant of Dairy Industry
Performance evaluation of Effluent Treatment Plant of Dairy IndustryIJERA Editor
 
Dyes and Pigments Manufacturing Industrial Waste Water Treatment Methodology
Dyes and Pigments Manufacturing Industrial Waste Water  Treatment MethodologyDyes and Pigments Manufacturing Industrial Waste Water  Treatment Methodology
Dyes and Pigments Manufacturing Industrial Waste Water Treatment MethodologyIRJET Journal
 
ARVI Systeemisellä ymmärryksellä kestävyyttä ja liiketoimintaa yhdyskuntajätt...
ARVI Systeemisellä ymmärryksellä kestävyyttä ja liiketoimintaa yhdyskuntajätt...ARVI Systeemisellä ymmärryksellä kestävyyttä ja liiketoimintaa yhdyskuntajätt...
ARVI Systeemisellä ymmärryksellä kestävyyttä ja liiketoimintaa yhdyskuntajätt...CLIC Innovation Ltd
 
Implementation of Biological Effluent Treatment Plant for Waste Water Treatme...
Implementation of Biological Effluent Treatment Plant for Waste Water Treatme...Implementation of Biological Effluent Treatment Plant for Waste Water Treatme...
Implementation of Biological Effluent Treatment Plant for Waste Water Treatme...IJSRED
 
IRJET- Removal of Acetaminophen from Waste Water using Low Cost Adsorbent
IRJET- Removal of Acetaminophen from Waste Water using Low Cost AdsorbentIRJET- Removal of Acetaminophen from Waste Water using Low Cost Adsorbent
IRJET- Removal of Acetaminophen from Waste Water using Low Cost AdsorbentIRJET Journal
 
Treatment Methodology with Ammonia Recovery of Dyes and Pigment Manufacturing...
Treatment Methodology with Ammonia Recovery of Dyes and Pigment Manufacturing...Treatment Methodology with Ammonia Recovery of Dyes and Pigment Manufacturing...
Treatment Methodology with Ammonia Recovery of Dyes and Pigment Manufacturing...IRJET Journal
 
Implementing A Socially Responsible Environmental Management System.pptx
Implementing A Socially Responsible Environmental Management System.pptxImplementing A Socially Responsible Environmental Management System.pptx
Implementing A Socially Responsible Environmental Management System.pptxJuanCamilo166759
 

Similar to resume_VISHAL_New (20)

Updated CV 1
Updated CV 1Updated CV 1
Updated CV 1
 
EMP for 220,000 BPD Oil Refinery
EMP for 220,000 BPD Oil RefineryEMP for 220,000 BPD Oil Refinery
EMP for 220,000 BPD Oil Refinery
 
prasanna
prasannaprasanna
prasanna
 
34079509.ppt
34079509.ppt34079509.ppt
34079509.ppt
 
34079509 (2).ppt
34079509 (2).ppt34079509 (2).ppt
34079509 (2).ppt
 
34079509.ppt
34079509.ppt34079509.ppt
34079509.ppt
 
Activity of different innoculation on food waste anaerobic digestion system o...
Activity of different innoculation on food waste anaerobic digestion system o...Activity of different innoculation on food waste anaerobic digestion system o...
Activity of different innoculation on food waste anaerobic digestion system o...
 
34079509.ppt
34079509.ppt34079509.ppt
34079509.ppt
 
resume
resumeresume
resume
 
MUHAMMAD ASIF CV - JUNE-2016
MUHAMMAD ASIF CV  -  JUNE-2016MUHAMMAD ASIF CV  -  JUNE-2016
MUHAMMAD ASIF CV - JUNE-2016
 
cetp
cetpcetp
cetp
 
Performance evaluation of Effluent Treatment Plant of Dairy Industry
Performance evaluation of Effluent Treatment Plant of Dairy IndustryPerformance evaluation of Effluent Treatment Plant of Dairy Industry
Performance evaluation of Effluent Treatment Plant of Dairy Industry
 
G49033740
G49033740G49033740
G49033740
 
Dyes and Pigments Manufacturing Industrial Waste Water Treatment Methodology
Dyes and Pigments Manufacturing Industrial Waste Water  Treatment MethodologyDyes and Pigments Manufacturing Industrial Waste Water  Treatment Methodology
Dyes and Pigments Manufacturing Industrial Waste Water Treatment Methodology
 
ARVI Systeemisellä ymmärryksellä kestävyyttä ja liiketoimintaa yhdyskuntajätt...
ARVI Systeemisellä ymmärryksellä kestävyyttä ja liiketoimintaa yhdyskuntajätt...ARVI Systeemisellä ymmärryksellä kestävyyttä ja liiketoimintaa yhdyskuntajätt...
ARVI Systeemisellä ymmärryksellä kestävyyttä ja liiketoimintaa yhdyskuntajätt...
 
L 1 introduction
L 1 introductionL 1 introduction
L 1 introduction
 
Implementation of Biological Effluent Treatment Plant for Waste Water Treatme...
Implementation of Biological Effluent Treatment Plant for Waste Water Treatme...Implementation of Biological Effluent Treatment Plant for Waste Water Treatme...
Implementation of Biological Effluent Treatment Plant for Waste Water Treatme...
 
IRJET- Removal of Acetaminophen from Waste Water using Low Cost Adsorbent
IRJET- Removal of Acetaminophen from Waste Water using Low Cost AdsorbentIRJET- Removal of Acetaminophen from Waste Water using Low Cost Adsorbent
IRJET- Removal of Acetaminophen from Waste Water using Low Cost Adsorbent
 
Treatment Methodology with Ammonia Recovery of Dyes and Pigment Manufacturing...
Treatment Methodology with Ammonia Recovery of Dyes and Pigment Manufacturing...Treatment Methodology with Ammonia Recovery of Dyes and Pigment Manufacturing...
Treatment Methodology with Ammonia Recovery of Dyes and Pigment Manufacturing...
 
Implementing A Socially Responsible Environmental Management System.pptx
Implementing A Socially Responsible Environmental Management System.pptxImplementing A Socially Responsible Environmental Management System.pptx
Implementing A Socially Responsible Environmental Management System.pptx
 

resume_VISHAL_New

  • 1. CAREER SUMMARY: Interest of Work : Willingness in doing team work with good organization and also accepting challenging job in the operation of ETP, Stripper, Incinerator. PERSONAL DETAILS: NAME : VISHAL SHIVPRASAD PUROHIT NATIONALITY : INDIAN DATE OF BIRTH : 2nd NOVEMBER, 1974 MARITAL STATUS : MARRIED PRESENT ADDRESS : ASHWAMEGH – 3, B-2 WING, FLAT NO.- 203, AKOTA-MUJMAHUDA ROAD, AKOTA VADODARA-390020 PERMANENT ADDRESS : A-24, PAVANPURI SOCIETY 1, B/H PARTH NAGAR, NR. CNG GAS, OLD N.H. NO. 8, BHOLAV, BHARUCH - 392001 E-Mail address : vshl.purohit83@gmail.com CONTACT : (M) : 98245 65904 - 1 - CURRICULAM VITAE VISHAL S. PUROHIT M.Sc. (Ecology & Environment), Contact no.: (M) – 98245 65904 e-mail: vshl.purohit83@gmail.com
  • 2. QUALIFICATION: • MSc (Ecology & Environment) from Sikkim Manipal University (2010) • B.Sc. ( Chemistry ) from South Gujarat University, Surat. (1995). • H.S.C. passed in 1992 with 56%. • S. S. C. passed in 1990 with 70%. ADDITIONAL QUALIFICATION: • Higher Diploma In Software Engineering from Aptech Edu. Institute, Bharuch (2002). EXPERIENCE WITH THE ORGANIZATIONS: PRESENT EMPLOYMENT Alembic Pharmaceuticals Ltd., Panelav March 10, 2015 to continue Senior Executive, Environment Dept Work Responsibilities:  Presently involved in operation of Zero discharge ETP of Alembic Pharmaceuticals Ltd., API II, Panelav.  ETP comprises of Stripper(50 kl/day), ETP (60 kl/day), RO plant (70 kl/day), MEE (kl/day).  Looking after operation of Stripper, ETP, RO plant and MEE plant.  Also looking after Lab analysis, Liaison Documentaion work , Preparation of Standard Operating Procedures, working on GPCB XGN . - 2 -
  • 3. PREVIOUS EMPLOYMENT (1) Alembic Ltd. (Chemicals Division), Vadodara November 3, 2008 to 31 October, 2014 Executive, Environment Dept Work Responsibilities:  Had been working with chemicals division of Alembic Ltd., Vadodara.  Had been involved in Operation of Effluent Treatment Plant which consists of Primary (Centrifuge & Clarifier), Secondary and Tertiary treatment facility and Air Pollution Control Facility consists of scrubbers at Alembic – Vadodara unit.  Trouble shooting of daily process problems conduct process studies and recommend modification/schemes to optimize the plan efficiency.  Monitoring the operating parameters as per the daily operating instructions and controlling the same.  Recording of important parameters’ reading and maintaining log books.  Co-ordination with field operators for the smooth operation of ETP.  Implementation of system as per ISO-9001 & 14001.  Dewatering of fermentation broth and ETP sludge at decanter with the aid of Polyelectrolyte  Coordinate for disposal of Hazardous waste at Common Incineration Site and ETP sludge at landfill site.  Anaerobic Digestion & Composting of Mycelium and sell as a soil conditioner to farmers & Organic Manure Manufacturer.  Minimize odour nuisance by alteration in treatment process and efficient handling of air pollution control devices. - 3 -
  • 4.  Maintaining records of hazardous waste generation, disposal to landfill site - NECL and incineration of waste at Common Hazardous Waste incineration facility - NECL.  Providing assistance in legal and ISO 14001 documentation. ABOUT PLANT: The effluent emanated from production, is treated in effluent treatment plant consists of anaerobic and aerobic system. ETP plant is designed to dispose off 2085 kl/day. The effluents of higher organic load are given treatment in anaerobic section where organic matter is biologically hydrolyzed and acidified to lower organic acids. The gas generated in the tower is flared & H2S gas is scrubbed in the scrubbers. The treated effluent from anaerobic section is transferred to aerobic section for further treatment. The aerobic treatment consists of primary treatment (equalization, biotowers, primary clarifiers), secondary treatment (aeration tanks, secondary clarifiers) and tertiary treatment ( final clarifier). Treated effluent is discharged to VMC sewage plant with GPCB permissible limits. - 4 -
  • 5. PREVIOUS EMPLOYMENT (2) TONIRA PHARMA LTD., Nandesari – Baroda. April , 2006 – October, 2008 Environment Officer - ETP Work responsibilities  ETP operation & waste water analysis. Treat ability study on waste water of different products.  Dealing with the environment consultants and liaisoning work which includes CC&A application, Water cess return, Environment statement and dealing with the GPCB officials for other legal matters.  Dealing with CETP ( Common Effluent Treatment Plant of GIDC ) officials for final treated effluent quality and its disposal. Coordination for the disposal of Hazardous waste at Common Incineration facility at NECL and ETP sludge at landfill site – NECL. ABOUT PLANT: Operation of ETP consists of primary ( physico-chemical treatment of lime-alum & polyelectrolyte), secondary and tertiary treatment facility and air pollution control facility consists of HCl scrubber. ETP plant has a capacity of discharge of 60 kl/day. PREVIOUS EMPLOYMENT (3) TAPAN ENVIRO CARE, ANKLESHWAR. June – 2004 to April - 2006 Site Supervisor - ETP - 5 -
  • 6.  Managing qualified staff of 26 people at different ETP operation sites i.e Cadila Health Care Ltd. 1-2, Ankleshwar, Sun Pharma Ltd., Ankleshwar & Panoli, Philips India Ltd, Baroda & Huber Chemicals, Jhagadia.  Monthly analysis report preparation for each site. Solving out any technical problem related to any equipment or process parameter. PREVIOUS EMPLOYMENT (4) Envision Enviro Engineers Pvt. Ltd. Site : Narmada Chematur Petrochemicals Ltd. (ISO 9001:14001:18000) December – 1999 to January - 2004 Site In Charge - ETP  Managing qualified staff of twenty people. There were six B.Sc. graduates working as DCS panel operators and fourteen under graduates field operators. Managing their shift schedules and salary payment.  Stripper operation from DCS panel including the distribution of field work among field operators, filling up report log books & various log sheets akin to equipments of stripper plant.  Operation of Aniline incinerator from DCS panel where aniline tar is incinerated at 750 - 800. c temperature.  Monitoring the operating parameters as per the work instructions (WI) and controlling the same.  Co-ordination with the field operators for the smooth operation of stripper.  Co-ordination with QC department for GC, HPLC analysis report and taking corrective action to improve product quality.  Taking corrective action for any deviation of process parameter.  Inspection and trouble shooting of the equipments during the shut down.  Detecting the alarming situation of equipments to avoid break down of the same.  Responsibility of on line work permit system.  To ensure smooth operation of ETP, proper consumption of raw material and 100% efficiency of staff. - 6 -
  • 7.  Preparation of various monthly reports and monthly compliance reports to GPCB.  ISO 9001:14001:18001 activities like list of critical equipments which includes what line of action should be taken in case of maintenance of some critical equipments. Emergency preparedness which includes what safety measures should be taken during handling of some hazardous chemicals. Identification of significant aspects, raising and implementation of EMP. ABOUT PLANT: Waste water with traces of Nitro Benzene, Aniline, Benzene is sent to Stripper column for azeotropic distillation where crude NB (90%) is recovered and tar of Aniline is separated and incinerated at Aniline incinerator with 800 deg. Cent. temperature. Waste water from the bottom of the column is sent for biological treatment. Stripper plant and Aniline Incinerator are operated from DCS panel. ETP has capacity of disposal of 561 cum/day. Waste water is given primary treatment which consists of equalisation, neutralization (Physico chemical treatment) and primary clarifier. Secondary treatment is followed by first stage aeration (421 cum. Cap.), extended aeration (1500 cum. Cap.) and secondary clarifier. Tertiary treatment consists of collection of final treated water and passing through activated carbon filters before discharge to natural stream with GPCB permissible limits. Current Employer : Alembic Ltd. Designation : Senior Executive Experience : 15 years Current CTC : 5.0 lacs per annum Notice Period : 3 month as per company rules Reason for Leaving: Seeking better & advanced career opportunities and exposure in new fields. Yours truly, Vishal S. Purohit - 7 -
  • 10. - 9 -