Qualifications: Twenty-five years construction experience ranging from major industrial
construction, to installation of gathering pipelines for natural gas
transportation ,and to building multi-millions dollar construction projects.
Certified in OHSA 10 Hour and OHSA 30 Hour
Employment: 5/2010 - Present Pipeline Inspector/Construction Manager for
WV & PA
Mountain Gathering/XTO Energy
(Integrity Inspections Services LLC)
10/2013 - Present
Lead Inspector
 Building Job Books, scope of work &
researching contractors for upcoming work in
2014
 2 1000’ road bores and 8 conventional road
bores
 Building access roads & access points off roads
for future projects in 2014
7/2013 - 10/2013 Lead Inspector
 Marburger to Rutledge Pipeline 16,500’ 12” .
375 wall steel pipeline
5/2013 - 7/2013 Lead Inspector
 Hixon to Marburger 9500’ 12”.375 wall steel
pipeline
3/2013 - 5/2013 Lead Inspector
 Rutledge to Spang Pipeline 13,000’ 12” .375
wall steel pipeline
12/2011 - 2/2013 Assist. Lead Inspector
 Penn Cryo Facility, Ground up construction
120 MCF Natural Gas Cryogenic Plant dirt
work to bring plant online
3/2011 - 2/2013 Lead Inspector (WV)
 McClellen Compressor Station 60 MCF 4
Compressors Complete and on line
5/2010 – 3/2011 Lead Inspector
 Responsible for completion of McClellen trunk
line 16,500’ 16” .375 wall steel pipeline
Enterprise WV Complete and online
10/2010 – 5/ 2011 Lead Inspector
 WV Waterline, Enterprise WV approx..7 miles
12” poly DR7 pipe, Design and Oversee
Installation 3 pump stations for WV waterline.
Complete and online
8/2010 – 12 2010 Lead Inspector
 McIntyre Pipeline Enterprise WV 12,000’ 12” .
375 wall steel pipeline Complete and online
5/2010 – 10/2010 Lead Inspector
 Crim Pipeline WV 10,500 10” & 16” .375 wall
steel pipeline Complete and online
2010 – 2014 Butler Area Pa & WV
 Completed 12 HDD bores in area 12”&
16”From 1000’ to 2900’
 Conventional bore road crossings approx. 12
@ 80’ per bore
2/2003 – 5/2010 General Superintendent Hidalgo Industrial
Services Inc
 Managed all safety and construction activities
on XTO’s gathering fields.
 Managed all safety and constructions activities
for Bell Helicopter in plants 1, 5, 6, J and
Alliance. Estimated $6M annually.
 Managed safety and construction activities at
Lockheed Martin Fort Worth, Texas.
1/1994 - 2/2003 Field Superintendent
Trinity Contractors / Encompass Mechanical
 Responsible for installation of Extrusion line at
PACTIV, Corsicana, Texas
 Responsible for the Construction of a Coating
plant and equipment installations in Forney, TX.
4/1990 - 1/1994 Lead Man
Trinity Contractors
3/1985 - 4/1990 Equipment Maintenance Supervisor M.W.Halpern
Supervision and Leadership
 Possess clear and concise written and verbal communications skills.
 Ability to assemble and motivate a team to achieve a common goal.
 Servant / Leader style management
 Desire to train and empower others to become a cohesive safety team with one
common goal > Everyone goes home safely to their families.
Education:
OSHA 500 Train The Trainer
 OHSA 30 hour Safety Training
 Fall Protection Safety Training
 Crane Safety Training
 Smith System Driver Training
 OSHA 10 hour Safety Seminar
 Confined Space Entry/Attendant Training
 Field Engineering
 MS Excel, MS Word, MS Outlook
 FOSL Safety Leadership Training
Other Project Experience:
State Fair Foods
Pipe Support Rework $500,000.00
Professional Plaza of Arlington
Mechanical room installation $485,000.00
Corrugated Services Inc
New Coating Plant $1.5 Mil
Corrugated Services Inc.
Stock Prep Upgrades $2.0 Mil
National Semi-Conductor
New fab/sub-fab $1.3 Mil
Various other Civil/Structural and Equipment installation
Projects from $50,000-200,000
2007 - 2010 Have supervised all work done for XTO/Barnett Gathering
by Hidalgo Ind. Services for 3 ½ Years including building
foundations, ground up metal buildings including
Finish out, foundation and assembly of pig launchers/rcvrs, sound walls and
Fire water lines.
References: Mundy Vallesca Bubba Willis
Pipeline/Station Inspector Willis welding Service
Integrity Inspections 2150 County Road 3932
432-940-9397 Atlanta Texas 75551 903-276-9291
Richard Kampen Gary Polito
General Superintendent Chief Station Inspector
Trinity Contractors Ni Source
972-351-1602 214-537-4778

Resume05[1]

  • 1.
    Kevin Collins 5175 McCandlessRd Butler Pa. 16001 817-201-4510 collinsk106@gmail.com Qualifications: Twenty-five years construction experience ranging from major industrial construction, to installation of gathering pipelines for natural gas transportation ,and to building multi-millions dollar construction projects. Certified in OHSA 10 Hour and OHSA 30 Hour Employment: 5/2010 - Present Pipeline Inspector/Construction Manager for WV & PA Mountain Gathering/XTO Energy (Integrity Inspections Services LLC) 10/2013 - Present Lead Inspector  Building Job Books, scope of work & researching contractors for upcoming work in 2014  2 1000’ road bores and 8 conventional road bores  Building access roads & access points off roads for future projects in 2014 7/2013 - 10/2013 Lead Inspector  Marburger to Rutledge Pipeline 16,500’ 12” . 375 wall steel pipeline 5/2013 - 7/2013 Lead Inspector  Hixon to Marburger 9500’ 12”.375 wall steel pipeline 3/2013 - 5/2013 Lead Inspector  Rutledge to Spang Pipeline 13,000’ 12” .375 wall steel pipeline 12/2011 - 2/2013 Assist. Lead Inspector  Penn Cryo Facility, Ground up construction
  • 2.
    120 MCF NaturalGas Cryogenic Plant dirt work to bring plant online 3/2011 - 2/2013 Lead Inspector (WV)  McClellen Compressor Station 60 MCF 4 Compressors Complete and on line 5/2010 – 3/2011 Lead Inspector  Responsible for completion of McClellen trunk line 16,500’ 16” .375 wall steel pipeline Enterprise WV Complete and online 10/2010 – 5/ 2011 Lead Inspector  WV Waterline, Enterprise WV approx..7 miles 12” poly DR7 pipe, Design and Oversee Installation 3 pump stations for WV waterline. Complete and online 8/2010 – 12 2010 Lead Inspector  McIntyre Pipeline Enterprise WV 12,000’ 12” . 375 wall steel pipeline Complete and online 5/2010 – 10/2010 Lead Inspector  Crim Pipeline WV 10,500 10” & 16” .375 wall steel pipeline Complete and online 2010 – 2014 Butler Area Pa & WV  Completed 12 HDD bores in area 12”& 16”From 1000’ to 2900’  Conventional bore road crossings approx. 12 @ 80’ per bore 2/2003 – 5/2010 General Superintendent Hidalgo Industrial Services Inc  Managed all safety and construction activities on XTO’s gathering fields.  Managed all safety and constructions activities for Bell Helicopter in plants 1, 5, 6, J and Alliance. Estimated $6M annually.  Managed safety and construction activities at Lockheed Martin Fort Worth, Texas. 1/1994 - 2/2003 Field Superintendent Trinity Contractors / Encompass Mechanical  Responsible for installation of Extrusion line at PACTIV, Corsicana, Texas
  • 3.
     Responsible forthe Construction of a Coating plant and equipment installations in Forney, TX. 4/1990 - 1/1994 Lead Man Trinity Contractors 3/1985 - 4/1990 Equipment Maintenance Supervisor M.W.Halpern Supervision and Leadership  Possess clear and concise written and verbal communications skills.  Ability to assemble and motivate a team to achieve a common goal.  Servant / Leader style management  Desire to train and empower others to become a cohesive safety team with one common goal > Everyone goes home safely to their families. Education: OSHA 500 Train The Trainer  OHSA 30 hour Safety Training  Fall Protection Safety Training  Crane Safety Training  Smith System Driver Training  OSHA 10 hour Safety Seminar  Confined Space Entry/Attendant Training  Field Engineering  MS Excel, MS Word, MS Outlook  FOSL Safety Leadership Training Other Project Experience: State Fair Foods Pipe Support Rework $500,000.00 Professional Plaza of Arlington Mechanical room installation $485,000.00 Corrugated Services Inc New Coating Plant $1.5 Mil Corrugated Services Inc. Stock Prep Upgrades $2.0 Mil National Semi-Conductor New fab/sub-fab $1.3 Mil Various other Civil/Structural and Equipment installation Projects from $50,000-200,000
  • 4.
    2007 - 2010Have supervised all work done for XTO/Barnett Gathering by Hidalgo Ind. Services for 3 ½ Years including building foundations, ground up metal buildings including Finish out, foundation and assembly of pig launchers/rcvrs, sound walls and Fire water lines. References: Mundy Vallesca Bubba Willis Pipeline/Station Inspector Willis welding Service Integrity Inspections 2150 County Road 3932 432-940-9397 Atlanta Texas 75551 903-276-9291 Richard Kampen Gary Polito General Superintendent Chief Station Inspector Trinity Contractors Ni Source 972-351-1602 214-537-4778