SlideShare a Scribd company logo
Specialist in Plastic processing Industry
Working Hard towards Success attainment through correct bombardment………..
Contact:
E-Mail : s68rao_2000@yahoo.com
Vishnumythili77@gmail.com
Mobile: 91- 98419 88092,9843730503
PRESENT EMPLOYER
PERSONAL INFORMATION:
CURRICULUM VITAE
SARAVANAN.A. RAO
No.30 . SUNFLOWERAPPT, KASTURI NAGAR,
SAKTHI NAGAREXT, PEERKANKARANAI
NEW PERUNGALATUR,
CHENNAI - 600 063
INDIA.
NAME : SARAVANANANNARAMARAO
DATE OF BIRTH &AGE : 17 - 03 - 1968 & 51 YEARS
WORK EXPERIENCE : 28 YEAR PLUS
MARITIAL STATUS : MARRIED
PASSPORTNO : Z2633363 – Validtill 07/2023
QUALIFICATIONRECORDS:
INSTITUTE/UNIVERSITIY COURSE CLASS YEAR
Central Institute ofPlastics
EngineeringAndTechnology(CIPET).
Chennai ,India
PGD-PPT “B” 1989 - 1990
Sourashtra College –MKU , Madurai,
India
B.sc., Physics First 1986 - 1989
DATA powerInstitute,
Aurangabad,India
Certificat in Basic
Computer
First 1993-1994
NILAM, Chennai
Diploma in TQM
& ISO 9000
First 1998 - 99
VENUE : SEOYONEHWA AUTOMOTIVE CHENNAI PVT LTD
POSITION : SENIOR MANAGER- PLANT
TABLE : MANUFACTURING ACTIVITIES
TIME : FROM NOV 2009 - TILL DATE
Saravanan Rao
SR MANAGER - PLANT
Specialist in Plastic processing Industry
Working Hard towards Success attainment through correct bombardment………..
Seoyon Ehwa Automotive Chennai Pvt Ltd. Established: Year 2008
Outline:
GreenFieldProject : Year 2009 StartedInjectionMouldingandAssemblyforRenault&Nissan
Turn Over : INR.1,010 Million/Year
Land Area : 32,000 Square Meter
BuildArea : 9,000 Sq.M , Shopfloor– 6100 Square Meter
Machines : 1800 Tons – 2500 Tons – 5 nos
Products : Car InteriorandExteriorParts.Door Trim/Bumper/Luggage/SideTrimsassembly.
Customers : Renault/Nissan,Daimler,AshokLeylandandHyundai.
Category : Tier1
Achievements : Door Trim Sequence Year2012 / “BestSupplier”AwardedFromRenaultNissan
Responsibility Areas
 Production : InjectionMouldingandAssembly
 Maintenance : Mould,Machine and plantmaintenance
 PPC/SCM : PlanningandSupplyChainManagement,incomingStore
 Engineering : ProductionEngineering –LayoutChanges,packagingDesign ,New Building
Skills
 Corporate Strategy - Vision,StrategyformationandExecution,
 Budget - YearlybudgetplanpreparationSales/Raw material/ExpensesandBudget
for eachdepartment
 Performance improvement - Process/Product/Quality/Delivery/Pokeyoke
 SupplyChainStrategy - Planoptimization/Plannedquantity receipt
 InventoryControl - InventoryPolicysetup/DailyInventoryManagement/PlannedSpace
Utilization
 RiskManagement - Planfor failure Mode analysis/Temporary,permanentaction planfor
failuresof Production/Delivery
 Cost Analysis/Optimization - Material portionreconciliation/Rootcause analysisforcostvariation/
 Growth Management - Utilize existingsourcesforbusinessdevelopment/Salesturnoverincrease
 CustomerSatisfaction - Planfor zeroPPMand 100% Deliveryperformance
 ReductionControl - Space reduction/Manpowerreduction/Powerconsumption(servo
changes)
 Continuousimprovement - Packagingdesign/Assemblyarealayoutmodification/Natural resources
saving
 LeadershipDevelopment - LeadershipSkillimprovementtoTeamsupervisor/LeaderandManagers
 NewProductDevelopment - Trial/Manpowerplan/LayoutChangesarrangement/ET/PT1/PT2andSOP
Specialist in Plastic processing Industry
Working Hard towards Success attainment through correct bombardment………..
PREVIOUS EMPLOYER
LAST EMPLOYER
VENUE : SHREE MOTHER PLAST INDIA PVT LTD.
POSITION:MANAGER – BUSINESS DEVELOPMENT
TABLE : MANUFACTURING ANDBUSINESS DEVELOPMENT
TIME : FROM SEPT 2006 - NOV 2009.
 Customer : Whirlpool India,Godrej Sara lee
 Products : WashingMachine parts
 Achievement : Got " Best SupplierAward "
VENUE : MOTHERSON AUTOMOTIVE TECHNOLOGIESAND ENGNEERING LTD.
POSITION:PRODUCTION DEPUTY MANAGERINJECTIONMOULDING DEPARTMENT.
TABLE : INJECTIONMOLDING AND ASSEMBLY
TIME : FROM FEB 2004 - AUG 2006
Responsibilities:
 PreparingMonthlyProductionSchedule PlanwithPPCandmarketing.
 ProvidingCo-ordinationwithinternal departmentsforgoodsdeliveryinrighttime at100% satisfaction.
Achieving90% of OEE fromthe presentlevel of 73 % by continual improvement.
Special Task:
 Ledthe QualityCircle Teamsandreachedlower“ProductchangeoverTime”and“ReductiononInternal
rejectionlevel”.
 Involvedin variousactivitiesunderdifferentbannerforCOSTReduction.
Customers: FORD INDIA ,HMI,GMTKML
DADI INTERNATIONAL CO LTD – THAILAND
POSITION: PLANT INCHARGE
INJECTIONSTRETCH BLOW MOLDING/SILICONMOLDING /INJECTION MOLDING / ASSEMBLY
FROM JULY 1999 – AUG 2003 - 4 YEARS
LIST OF PREVIOUS EMPLOYERS
EMEMPLOYERS
Specialist in Plastic processing Industry
Working Hard towards Success attainment through correct bombardment………..
Responsibilities:
PreparingMonthlyProductionSchedule Plan.
 ProvidingCo-ordinationtoCustomers/vendorsforgoodsdeliveryinright time at100% satisfactionfrom
bothends.
 SourcingNewVendorsforcontinuousenhancement.
 Act as an Internal QualityAuditorforISO9002 dox.
 As a Teammemberinthe major ConsensusbetweenVendors,price negotiationandone amongthe Duo-
finalizingpanel.
OverseaTask:
 Visited to Germany for a short tripon MoldTrial –Prototype alongwiththe Customer V & A MARKETING
, UK.
Machine Acquaintance:
* ASIAN PLASTICMACHINERY * ARBURG * CHENHSONG * AOKI – StretchBlow Molding
Special Task:
 Ledthe Teamof BusinessProcessRe-Engg.(BPR)andreapedthe resultof heapsinveryshortreturns.
 Increasedthe Productivityby70%regardlessof products,andreduce the
“Throughput” time to one day.[Continuousflow manufacturing]
CustomersDealt:
JACKLEINTERATIONAL – UK, ANAKKUBABY PRODUCTS – MALAYSIA, SSL HEALTHCARE - ITALY.
BE BE JOU – FRANCE,INFANTWORLD– THAILAND,ROYALAMERICAN INDUSRIES –FLORIDA,USA
V&A MARKETING - UK
ProjectsHandled:
 VARIOUS BABY FEEDING BOTLLE. SILICON NIPPLE & SHOOTHER,FEEDING ACCESSORIES.
 BREAST PUMP,SPILL FREE CUPS
Row of Feats at DADi INTERNATIONAL:
 Recd.The BEST SUPPLIERAWARDfromANNAKU for righttime-flawlessdelivery.
 Recd.The QUALITYTEAMAWARD fromANAKKU
 Recd.The PRODUCTIVITYAWARDfromANAKKU.
Special Feat at DaDi International :
 Doubled their Turnover in a short period by performing total Re-Engg. and fine tune on Operative cycle-
time, Effective Utilization of machine and manpower.
Specialist in Plastic processing Industry
Working Hard towards Success attainment through correct bombardment………..
PHASE ONE
PLACE : VIDEOCON INTERNATIONAL LTD
Period : DEC 1990 to May 1995
Position : ProductionEngineer.
Responsibilities:
 As an In charge for the Production shop-floor, Quality/Dimensional check for spray with Spec. at Paint Shop.
 As a bridge between Molding division and the End User. (TV-Assy, Washing M/c, Audio, Cooler, etc.)
As a Team member for VALUE ADDITION group.
 As an I/C for New Mold test & trial runs.
Machine Acquaintance:
 TOSHIBA - FROM450T to 1600T, NISSEI – FROM 80T to 220T and WINDSOR-350T
MaterialsHandled: PS,HIPS, ABS,PP,ACETAL ANDETC.,
Molds: Televisionparts,WashingMachine parts,Cooler,Refrigeratorparts& Audioparts
Others: Involvedinthe erectionof CONAIRAuto-Feeder.[Material HandlingSystem]
PHASE TWO:
Place : Electro Industries – SaudiArabia
Position : PlasticsTechnologist
Period : 1995 May – 1997 May
Milestones : InjectionmoldingPlantsetup to manufacture PRECISION TELECOMproductsfor
Krone -Germany
Responsibilities:
 Confirmationof Injection moldedraw partsfromassortedheapsas withthe Spec.
 Day to day productionobservation
 CoordinationwithSheetmetal Assemblyandprinting
 Responsible forNewMoldtestingandTrial runfor Krone andCarrier
CustomersDealt:
 Saudi PT & T,UAE Telecom,KRONETelecom –Saudi,Carrier A/c – Saudi Arabia
Phase THREE
PLACE : MAINETTI INDIA PVT LTD
Period : JULY 1997 to JUNE 1999 Position : ProductionManager.
Mainetti IndiapromotedbyMs. Chandariyagroup,whichishaving worldwide business operation in various activities like
property, trading, shipping, Heavy Industries and specializations on products.
Plastichangersmanufacturingdivisionhaving brandname like “ Pendy” with 63 manufacturing setup around the world
with Three Thousand type Hangers .
Specialist in Plastic processing Industry
Working Hard towards Success attainment through correct bombardment………..
I had a mainrole to setupmanufacturing facility in India to cater world reputed garment manufactures and buying house
like WALMART & ASDA – USA.
Responsibilities:
 New Material development for existing products.
 Production planning and control.
 Development of fixture and jigs to improve cycle time.
 Software development -Took active part on development of software to connect production, assembly,
store and dispatch.
 Optimization on manpower - Reduce manpower by the application of automation and improve mold
quality to reduce secondary operation with guidance of Mainetti Srilanka.
MILE STONE:
M/s. Euronat International Ltd. Leicester, UK – from September 03 – November 2003.
Done a consultancy job for a new project set up on thin wall food container with valid work permit UK VISA
Short term Visit for Technical enhancement: Taiwan, Singapore, Germany
CORE VALUE:
o Injectionmoldingprocessing
o Assemblysetup – Printing,Assembly,Ultrasonicweldingand blisterpacking.
o Individual processset up
o Continuousprocessdevelopment
Achievement:ParticipatedinCycle expeditionfromMadurai – Mumbai 1600 kmsfor National &International peace
throughNSS.
REFERNCES
1. Mr. Muniyandi , Plastics Processing In charge. CIPET, Guindy, Madras, India Phone 0091 - 44 – 2234 2371.
2. Mr. J. B. Kalyankar, AGMr, Videocon Utility Ltd. Aurangabad, India Phone 0091 - 240 -2 33307.233308.
3. Mr. C. Lobo, Assistant Managing Director, Electro Industries, Jeddah, Saudi Arabia Ph. 00966 - 2 - 6380833
4. Mr. Suheel Saraff Chairman Sinter Plast Thai Ltd : Phone: + 66 – 36 –623 304 , Fax : +66 – 36 – 623 305
5. Mr. S.Roy , VP,Sintex Industries, India . Mobile + 91-98250 69407
6. Mr.Bae – Director, Seoyon Ehwa Automotive Chennai. +44- 37176203
I do hereby confirm that the information given in this form is true and correct to the best of my knowledge.
Date :
Place : Saravanan. Anna. Ramarao.

More Related Content

What's hot

Sreejith v resume polymer industry
Sreejith v resume polymer industrySreejith v resume polymer industry
Sreejith v resume polymer industry
Sreejith Vijayanpillai
 
JBM-NMPL TRAINING REPORT,GURGAON
JBM-NMPL TRAINING REPORT,GURGAONJBM-NMPL TRAINING REPORT,GURGAON
JBM-NMPL TRAINING REPORT,GURGAON
Pranjul Pal
 
Dissertation Report : MBA Project Management
Dissertation Report : MBA Project ManagementDissertation Report : MBA Project Management
Dissertation Report : MBA Project Management
Chetan Pandharinath Padme
 
Rvg new
Rvg newRvg new
Carlos Erasto Romero Martinez
Carlos Erasto Romero MartinezCarlos Erasto Romero Martinez
Carlos Erasto Romero MartinezCharlie Log
 
Cipet
CipetCipet
Study and improve training procedures vis a vis employee satisfaction
Study and improve training procedures vis a vis employee satisfactionStudy and improve training procedures vis a vis employee satisfaction
Study and improve training procedures vis a vis employee satisfaction
Supa Buoy
 
Quality Control & operations in Silica plant
Quality Control & operations in Silica plantQuality Control & operations in Silica plant
Quality Control & operations in Silica plant
Sunam Pal
 
KKEK3192 Industrial Training Report
KKEK3192 Industrial Training ReportKKEK3192 Industrial Training Report
KKEK3192 Industrial Training ReportBeng Leong Toh
 
Resume
ResumeResume
Resume Production
Resume ProductionResume Production
Resume ProductionKeyur Modi
 
MAHAVIR ENTERPRISES GURGAON
MAHAVIR ENTERPRISES GURGAONMAHAVIR ENTERPRISES GURGAON
MAHAVIR ENTERPRISES GURGAON
Pranjul Pal
 
Cover Letter &C.V. of Vinod Gholap
Cover Letter &C.V. of Vinod GholapCover Letter &C.V. of Vinod Gholap
Cover Letter &C.V. of Vinod GholapVinod Gholap
 

What's hot (18)

Sreejith v resume polymer industry
Sreejith v resume polymer industrySreejith v resume polymer industry
Sreejith v resume polymer industry
 
ITREPORT1
ITREPORT1ITREPORT1
ITREPORT1
 
JBM-NMPL TRAINING REPORT,GURGAON
JBM-NMPL TRAINING REPORT,GURGAONJBM-NMPL TRAINING REPORT,GURGAON
JBM-NMPL TRAINING REPORT,GURGAON
 
Dissertation Report : MBA Project Management
Dissertation Report : MBA Project ManagementDissertation Report : MBA Project Management
Dissertation Report : MBA Project Management
 
Resume
ResumeResume
Resume
 
Rvg new
Rvg newRvg new
Rvg new
 
Carlos Erasto Romero Martinez
Carlos Erasto Romero MartinezCarlos Erasto Romero Martinez
Carlos Erasto Romero Martinez
 
Cipet
CipetCipet
Cipet
 
Study and improve training procedures vis a vis employee satisfaction
Study and improve training procedures vis a vis employee satisfactionStudy and improve training procedures vis a vis employee satisfaction
Study and improve training procedures vis a vis employee satisfaction
 
Quality Control & operations in Silica plant
Quality Control & operations in Silica plantQuality Control & operations in Silica plant
Quality Control & operations in Silica plant
 
KKEK3192 Industrial Training Report
KKEK3192 Industrial Training ReportKKEK3192 Industrial Training Report
KKEK3192 Industrial Training Report
 
Resume
ResumeResume
Resume
 
Resume Production
Resume ProductionResume Production
Resume Production
 
resume new
resume newresume new
resume new
 
MAHAVIR ENTERPRISES GURGAON
MAHAVIR ENTERPRISES GURGAONMAHAVIR ENTERPRISES GURGAON
MAHAVIR ENTERPRISES GURGAON
 
Present Resume -Mohan (22.12.2016)
Present Resume -Mohan (22.12.2016)Present Resume -Mohan (22.12.2016)
Present Resume -Mohan (22.12.2016)
 
Harshal Resume
Harshal ResumeHarshal Resume
Harshal Resume
 
Cover Letter &C.V. of Vinod Gholap
Cover Letter &C.V. of Vinod GholapCover Letter &C.V. of Vinod Gholap
Cover Letter &C.V. of Vinod Gholap
 

Similar to Resume rao 28032019 v0

Krishna_weld shop 2015 feb (1)
Krishna_weld shop 2015 feb (1)Krishna_weld shop 2015 feb (1)
Krishna_weld shop 2015 feb (1)krishna kumar
 
11+ Years Experience in Murugappa groups
11+ Years Experience in Murugappa groups11+ Years Experience in Murugappa groups
11+ Years Experience in Murugappa groupskannan.v kannan
 
Sanmukh cv (2017)
Sanmukh cv (2017)Sanmukh cv (2017)
Sanmukh cv (2017)
Sanmukh Singh
 
AMIT-CURICULLAM_VITAE t2
AMIT-CURICULLAM_VITAE t2AMIT-CURICULLAM_VITAE t2
AMIT-CURICULLAM_VITAE t2amit nigam
 
Resume (November 2016)
Resume  (November 2016)Resume  (November 2016)
Resume (November 2016)Rk Maurya
 

Similar to Resume rao 28032019 v0 (20)

Resume
ResumeResume
Resume
 
karthik New
karthik Newkarthik New
karthik New
 
prashat resume
prashat resumeprashat resume
prashat resume
 
jitendra resume
jitendra resumejitendra resume
jitendra resume
 
Krishna_weld shop 2015 feb (1)
Krishna_weld shop 2015 feb (1)Krishna_weld shop 2015 feb (1)
Krishna_weld shop 2015 feb (1)
 
11+ Years Experience in Murugappa groups
11+ Years Experience in Murugappa groups11+ Years Experience in Murugappa groups
11+ Years Experience in Murugappa groups
 
sunil_resume
sunil_resumesunil_resume
sunil_resume
 
NARAYAN
NARAYANNARAYAN
NARAYAN
 
Sanmukh cv (2017)
Sanmukh cv (2017)Sanmukh cv (2017)
Sanmukh cv (2017)
 
Amit_Barjibhe - cv
Amit_Barjibhe - cvAmit_Barjibhe - cv
Amit_Barjibhe - cv
 
AMIT-CURICULLAM_VITAE t2
AMIT-CURICULLAM_VITAE t2AMIT-CURICULLAM_VITAE t2
AMIT-CURICULLAM_VITAE t2
 
mrityunjay_Tiwari
mrityunjay_Tiwarimrityunjay_Tiwari
mrityunjay_Tiwari
 
Vikas Mane cv
Vikas Mane cvVikas Mane cv
Vikas Mane cv
 
SHAJIN NDT
SHAJIN NDTSHAJIN NDT
SHAJIN NDT
 
MUSHFIQUE ALAM CV
MUSHFIQUE ALAM CVMUSHFIQUE ALAM CV
MUSHFIQUE ALAM CV
 
RESUME - UPDATED (1)
RESUME - UPDATED (1)RESUME - UPDATED (1)
RESUME - UPDATED (1)
 
resume prod.
resume prod.resume prod.
resume prod.
 
Sivamurugan__1_
Sivamurugan__1_Sivamurugan__1_
Sivamurugan__1_
 
vikas gupta. 5
vikas gupta. 5vikas gupta. 5
vikas gupta. 5
 
Resume (November 2016)
Resume  (November 2016)Resume  (November 2016)
Resume (November 2016)
 

Recently uploaded

5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
5 Red Flags Your VW Camshaft Position Sensor Might Be Failing5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
Fifth Gear Automotive Cross Roads
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
eygkup
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Precious Mvulane CA (SA),RA
 
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
Import Motorworks
 
TRANSFORMER OIL classifications and specifications
TRANSFORMER OIL classifications and specificationsTRANSFORMER OIL classifications and specifications
TRANSFORMER OIL classifications and specifications
vishnup11
 
One compartment Model Deliverdddddded.pdf
One compartment Model Deliverdddddded.pdfOne compartment Model Deliverdddddded.pdf
One compartment Model Deliverdddddded.pdf
RehanRustam2
 
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
Fifth Gear Automotive Argyle
 
TRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electricalTRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electrical
JohnCarloPajarilloKa
 
Hero Glamour Xtec Brochure | Hero MotoCorp
Hero Glamour Xtec Brochure | Hero MotoCorpHero Glamour Xtec Brochure | Hero MotoCorp
Hero Glamour Xtec Brochure | Hero MotoCorp
Hero MotoCorp
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
jennifermiller8137
 
How To Fix The Key Not Detected Issue In Mercedes Cars
How To Fix The Key Not Detected Issue In Mercedes CarsHow To Fix The Key Not Detected Issue In Mercedes Cars
How To Fix The Key Not Detected Issue In Mercedes Cars
Integrity Motorcar
 
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects
 
What Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingWhat Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop Working
Lancer Service
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
Hyundai Motor Group
 
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
ahmedendrise81
 
Renal elimination.pdf fffffffffffffffffffff
Renal elimination.pdf fffffffffffffffffffffRenal elimination.pdf fffffffffffffffffffff
Renal elimination.pdf fffffffffffffffffffff
RehanRustam2
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
bouvoy
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
mymwpc
 
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
mymwpc
 

Recently uploaded (20)

5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
5 Red Flags Your VW Camshaft Position Sensor Might Be Failing5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
 
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
 
TRANSFORMER OIL classifications and specifications
TRANSFORMER OIL classifications and specificationsTRANSFORMER OIL classifications and specifications
TRANSFORMER OIL classifications and specifications
 
One compartment Model Deliverdddddded.pdf
One compartment Model Deliverdddddded.pdfOne compartment Model Deliverdddddded.pdf
One compartment Model Deliverdddddded.pdf
 
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
 
TRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electricalTRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electrical
 
Hero Glamour Xtec Brochure | Hero MotoCorp
Hero Glamour Xtec Brochure | Hero MotoCorpHero Glamour Xtec Brochure | Hero MotoCorp
Hero Glamour Xtec Brochure | Hero MotoCorp
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
 
How To Fix The Key Not Detected Issue In Mercedes Cars
How To Fix The Key Not Detected Issue In Mercedes CarsHow To Fix The Key Not Detected Issue In Mercedes Cars
How To Fix The Key Not Detected Issue In Mercedes Cars
 
AadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) RaipurAadiShakti Projects ( Asp Cranes ) Raipur
AadiShakti Projects ( Asp Cranes ) Raipur
 
What Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingWhat Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop Working
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
 
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
 
Renal elimination.pdf fffffffffffffffffffff
Renal elimination.pdf fffffffffffffffffffffRenal elimination.pdf fffffffffffffffffffff
Renal elimination.pdf fffffffffffffffffffff
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
 
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
一比一原版(OP毕业证)奥塔哥理工学院毕业证成绩单如何办理
 

Resume rao 28032019 v0

  • 1. Specialist in Plastic processing Industry Working Hard towards Success attainment through correct bombardment……….. Contact: E-Mail : s68rao_2000@yahoo.com Vishnumythili77@gmail.com Mobile: 91- 98419 88092,9843730503 PRESENT EMPLOYER PERSONAL INFORMATION: CURRICULUM VITAE SARAVANAN.A. RAO No.30 . SUNFLOWERAPPT, KASTURI NAGAR, SAKTHI NAGAREXT, PEERKANKARANAI NEW PERUNGALATUR, CHENNAI - 600 063 INDIA. NAME : SARAVANANANNARAMARAO DATE OF BIRTH &AGE : 17 - 03 - 1968 & 51 YEARS WORK EXPERIENCE : 28 YEAR PLUS MARITIAL STATUS : MARRIED PASSPORTNO : Z2633363 – Validtill 07/2023 QUALIFICATIONRECORDS: INSTITUTE/UNIVERSITIY COURSE CLASS YEAR Central Institute ofPlastics EngineeringAndTechnology(CIPET). Chennai ,India PGD-PPT “B” 1989 - 1990 Sourashtra College –MKU , Madurai, India B.sc., Physics First 1986 - 1989 DATA powerInstitute, Aurangabad,India Certificat in Basic Computer First 1993-1994 NILAM, Chennai Diploma in TQM & ISO 9000 First 1998 - 99 VENUE : SEOYONEHWA AUTOMOTIVE CHENNAI PVT LTD POSITION : SENIOR MANAGER- PLANT TABLE : MANUFACTURING ACTIVITIES TIME : FROM NOV 2009 - TILL DATE Saravanan Rao SR MANAGER - PLANT
  • 2. Specialist in Plastic processing Industry Working Hard towards Success attainment through correct bombardment……….. Seoyon Ehwa Automotive Chennai Pvt Ltd. Established: Year 2008 Outline: GreenFieldProject : Year 2009 StartedInjectionMouldingandAssemblyforRenault&Nissan Turn Over : INR.1,010 Million/Year Land Area : 32,000 Square Meter BuildArea : 9,000 Sq.M , Shopfloor– 6100 Square Meter Machines : 1800 Tons – 2500 Tons – 5 nos Products : Car InteriorandExteriorParts.Door Trim/Bumper/Luggage/SideTrimsassembly. Customers : Renault/Nissan,Daimler,AshokLeylandandHyundai. Category : Tier1 Achievements : Door Trim Sequence Year2012 / “BestSupplier”AwardedFromRenaultNissan Responsibility Areas  Production : InjectionMouldingandAssembly  Maintenance : Mould,Machine and plantmaintenance  PPC/SCM : PlanningandSupplyChainManagement,incomingStore  Engineering : ProductionEngineering –LayoutChanges,packagingDesign ,New Building Skills  Corporate Strategy - Vision,StrategyformationandExecution,  Budget - YearlybudgetplanpreparationSales/Raw material/ExpensesandBudget for eachdepartment  Performance improvement - Process/Product/Quality/Delivery/Pokeyoke  SupplyChainStrategy - Planoptimization/Plannedquantity receipt  InventoryControl - InventoryPolicysetup/DailyInventoryManagement/PlannedSpace Utilization  RiskManagement - Planfor failure Mode analysis/Temporary,permanentaction planfor failuresof Production/Delivery  Cost Analysis/Optimization - Material portionreconciliation/Rootcause analysisforcostvariation/  Growth Management - Utilize existingsourcesforbusinessdevelopment/Salesturnoverincrease  CustomerSatisfaction - Planfor zeroPPMand 100% Deliveryperformance  ReductionControl - Space reduction/Manpowerreduction/Powerconsumption(servo changes)  Continuousimprovement - Packagingdesign/Assemblyarealayoutmodification/Natural resources saving  LeadershipDevelopment - LeadershipSkillimprovementtoTeamsupervisor/LeaderandManagers  NewProductDevelopment - Trial/Manpowerplan/LayoutChangesarrangement/ET/PT1/PT2andSOP
  • 3. Specialist in Plastic processing Industry Working Hard towards Success attainment through correct bombardment……….. PREVIOUS EMPLOYER LAST EMPLOYER VENUE : SHREE MOTHER PLAST INDIA PVT LTD. POSITION:MANAGER – BUSINESS DEVELOPMENT TABLE : MANUFACTURING ANDBUSINESS DEVELOPMENT TIME : FROM SEPT 2006 - NOV 2009.  Customer : Whirlpool India,Godrej Sara lee  Products : WashingMachine parts  Achievement : Got " Best SupplierAward " VENUE : MOTHERSON AUTOMOTIVE TECHNOLOGIESAND ENGNEERING LTD. POSITION:PRODUCTION DEPUTY MANAGERINJECTIONMOULDING DEPARTMENT. TABLE : INJECTIONMOLDING AND ASSEMBLY TIME : FROM FEB 2004 - AUG 2006 Responsibilities:  PreparingMonthlyProductionSchedule PlanwithPPCandmarketing.  ProvidingCo-ordinationwithinternal departmentsforgoodsdeliveryinrighttime at100% satisfaction. Achieving90% of OEE fromthe presentlevel of 73 % by continual improvement. Special Task:  Ledthe QualityCircle Teamsandreachedlower“ProductchangeoverTime”and“ReductiononInternal rejectionlevel”.  Involvedin variousactivitiesunderdifferentbannerforCOSTReduction. Customers: FORD INDIA ,HMI,GMTKML DADI INTERNATIONAL CO LTD – THAILAND POSITION: PLANT INCHARGE INJECTIONSTRETCH BLOW MOLDING/SILICONMOLDING /INJECTION MOLDING / ASSEMBLY FROM JULY 1999 – AUG 2003 - 4 YEARS LIST OF PREVIOUS EMPLOYERS EMEMPLOYERS
  • 4. Specialist in Plastic processing Industry Working Hard towards Success attainment through correct bombardment……….. Responsibilities: PreparingMonthlyProductionSchedule Plan.  ProvidingCo-ordinationtoCustomers/vendorsforgoodsdeliveryinright time at100% satisfactionfrom bothends.  SourcingNewVendorsforcontinuousenhancement.  Act as an Internal QualityAuditorforISO9002 dox.  As a Teammemberinthe major ConsensusbetweenVendors,price negotiationandone amongthe Duo- finalizingpanel. OverseaTask:  Visited to Germany for a short tripon MoldTrial –Prototype alongwiththe Customer V & A MARKETING , UK. Machine Acquaintance: * ASIAN PLASTICMACHINERY * ARBURG * CHENHSONG * AOKI – StretchBlow Molding Special Task:  Ledthe Teamof BusinessProcessRe-Engg.(BPR)andreapedthe resultof heapsinveryshortreturns.  Increasedthe Productivityby70%regardlessof products,andreduce the “Throughput” time to one day.[Continuousflow manufacturing] CustomersDealt: JACKLEINTERATIONAL – UK, ANAKKUBABY PRODUCTS – MALAYSIA, SSL HEALTHCARE - ITALY. BE BE JOU – FRANCE,INFANTWORLD– THAILAND,ROYALAMERICAN INDUSRIES –FLORIDA,USA V&A MARKETING - UK ProjectsHandled:  VARIOUS BABY FEEDING BOTLLE. SILICON NIPPLE & SHOOTHER,FEEDING ACCESSORIES.  BREAST PUMP,SPILL FREE CUPS Row of Feats at DADi INTERNATIONAL:  Recd.The BEST SUPPLIERAWARDfromANNAKU for righttime-flawlessdelivery.  Recd.The QUALITYTEAMAWARD fromANAKKU  Recd.The PRODUCTIVITYAWARDfromANAKKU. Special Feat at DaDi International :  Doubled their Turnover in a short period by performing total Re-Engg. and fine tune on Operative cycle- time, Effective Utilization of machine and manpower.
  • 5. Specialist in Plastic processing Industry Working Hard towards Success attainment through correct bombardment……….. PHASE ONE PLACE : VIDEOCON INTERNATIONAL LTD Period : DEC 1990 to May 1995 Position : ProductionEngineer. Responsibilities:  As an In charge for the Production shop-floor, Quality/Dimensional check for spray with Spec. at Paint Shop.  As a bridge between Molding division and the End User. (TV-Assy, Washing M/c, Audio, Cooler, etc.) As a Team member for VALUE ADDITION group.  As an I/C for New Mold test & trial runs. Machine Acquaintance:  TOSHIBA - FROM450T to 1600T, NISSEI – FROM 80T to 220T and WINDSOR-350T MaterialsHandled: PS,HIPS, ABS,PP,ACETAL ANDETC., Molds: Televisionparts,WashingMachine parts,Cooler,Refrigeratorparts& Audioparts Others: Involvedinthe erectionof CONAIRAuto-Feeder.[Material HandlingSystem] PHASE TWO: Place : Electro Industries – SaudiArabia Position : PlasticsTechnologist Period : 1995 May – 1997 May Milestones : InjectionmoldingPlantsetup to manufacture PRECISION TELECOMproductsfor Krone -Germany Responsibilities:  Confirmationof Injection moldedraw partsfromassortedheapsas withthe Spec.  Day to day productionobservation  CoordinationwithSheetmetal Assemblyandprinting  Responsible forNewMoldtestingandTrial runfor Krone andCarrier CustomersDealt:  Saudi PT & T,UAE Telecom,KRONETelecom –Saudi,Carrier A/c – Saudi Arabia Phase THREE PLACE : MAINETTI INDIA PVT LTD Period : JULY 1997 to JUNE 1999 Position : ProductionManager. Mainetti IndiapromotedbyMs. Chandariyagroup,whichishaving worldwide business operation in various activities like property, trading, shipping, Heavy Industries and specializations on products. Plastichangersmanufacturingdivisionhaving brandname like “ Pendy” with 63 manufacturing setup around the world with Three Thousand type Hangers .
  • 6. Specialist in Plastic processing Industry Working Hard towards Success attainment through correct bombardment……….. I had a mainrole to setupmanufacturing facility in India to cater world reputed garment manufactures and buying house like WALMART & ASDA – USA. Responsibilities:  New Material development for existing products.  Production planning and control.  Development of fixture and jigs to improve cycle time.  Software development -Took active part on development of software to connect production, assembly, store and dispatch.  Optimization on manpower - Reduce manpower by the application of automation and improve mold quality to reduce secondary operation with guidance of Mainetti Srilanka. MILE STONE: M/s. Euronat International Ltd. Leicester, UK – from September 03 – November 2003. Done a consultancy job for a new project set up on thin wall food container with valid work permit UK VISA Short term Visit for Technical enhancement: Taiwan, Singapore, Germany CORE VALUE: o Injectionmoldingprocessing o Assemblysetup – Printing,Assembly,Ultrasonicweldingand blisterpacking. o Individual processset up o Continuousprocessdevelopment Achievement:ParticipatedinCycle expeditionfromMadurai – Mumbai 1600 kmsfor National &International peace throughNSS. REFERNCES 1. Mr. Muniyandi , Plastics Processing In charge. CIPET, Guindy, Madras, India Phone 0091 - 44 – 2234 2371. 2. Mr. J. B. Kalyankar, AGMr, Videocon Utility Ltd. Aurangabad, India Phone 0091 - 240 -2 33307.233308. 3. Mr. C. Lobo, Assistant Managing Director, Electro Industries, Jeddah, Saudi Arabia Ph. 00966 - 2 - 6380833 4. Mr. Suheel Saraff Chairman Sinter Plast Thai Ltd : Phone: + 66 – 36 –623 304 , Fax : +66 – 36 – 623 305 5. Mr. S.Roy , VP,Sintex Industries, India . Mobile + 91-98250 69407 6. Mr.Bae – Director, Seoyon Ehwa Automotive Chennai. +44- 37176203 I do hereby confirm that the information given in this form is true and correct to the best of my knowledge. Date : Place : Saravanan. Anna. Ramarao.