SlideShare a Scribd company logo
1 of 2
Download to read offline
GustavoAlonsoCerdaLara
2015
Date of Birth: April 13th, 1993
Calle Novena # 105 Col. Pedro J. Méndez Reynosa Tam.
Phone Number (044899) 1-08-84-36
Email: tabocl@hotmail.com
E D U C A T I O N
Universidad Tamaulipeca
Technical High School Degree in Industrial Security
January 2010 – August 2011
Universidad Tecnológica de Tamaulipas Nor te
Industrial Process Technician
September 2011 – April 2014
Engineering Degree Major in Industrial Operation and Processes.
September 2014 – April 2016
E X P E R I E N C E
Panasonic Automotive Systems de México SA de CV
Engineering Assistant, New Product Launch
January 2014 – Current
 Production Runs (New Products).
 Development of improvement projects.
 Coordination of working groups
 CCORE, GLOVIA y AGILE (internal systems)
 APQP, PFMEA, PPAP and Manufacturing Aids.
 Team Work, communication between departments (Programing,
Engineering, Finance, Production, Warehouse, Document Control,
etc).
 Planning of materials based on demand sent by Program Manager.
 Creation and Management of Internal Documents
 Inventory Control.
 Internal and External Audits.
 Implementation of 5S`s
 Data Capture.
 Management Staff.
References: Ing. Marisol Villanueva Phone Number: (899)9-44-18-64
Gustavo Alonso Cerda Lara
Page 2
Material Handler
September 2011 – January 2014
 Material system transactions.
 Material control and handling.
 Material transport.
 Cycle Counts.
Reference: Ing. Rubén Sifuentes Phone Number: (044) 899-230-30
K N O W L E D G E
 Advanced Microsoft (Excel, Word, Power Point)
 AutoCAD
 SolidWorks
 MOST
 Master Planning
 Lean Manufacturing
 Discipline 5S`s
S K I L L S
 English.
 Leadership.
 Fast learning.
 Teamwork.
 Analysis and decision-making.
 Dynamic.
 Proactive.
 Responsible.
A C C O M P L I S H M E N T S
Implemented continuous improvement project, improving the assembly line
production through manufacturing aids. Performed line balances improving
production productivity and efficiency, eliminating waste times and reducing
the amount operator at the line, accomplishing:
 Prevent defects, avoid distractions during the process.
 Efficiency.
 Financial Impact 476.67 USD (monthly by increasing productivity).

More Related Content

Viewers also liked (8)

COFFEE BEAN: Full-Scale Prototype
COFFEE BEAN: Full-Scale PrototypeCOFFEE BEAN: Full-Scale Prototype
COFFEE BEAN: Full-Scale Prototype
 
Tom Chi - Rapid Prototyping at Google X - MindTheProduct 2012
Tom Chi - Rapid Prototyping at Google X - MindTheProduct 2012Tom Chi - Rapid Prototyping at Google X - MindTheProduct 2012
Tom Chi - Rapid Prototyping at Google X - MindTheProduct 2012
 
How to prototype and influence people
How to prototype and influence peopleHow to prototype and influence people
How to prototype and influence people
 
Google’s 5-Day Design Sprint: Event 4 – PROTOTYPE (Scene/Product)
Google’s 5-Day Design Sprint: Event 4 – PROTOTYPE (Scene/Product)Google’s 5-Day Design Sprint: Event 4 – PROTOTYPE (Scene/Product)
Google’s 5-Day Design Sprint: Event 4 – PROTOTYPE (Scene/Product)
 
Mobile Prototyping Essentials
Mobile Prototyping EssentialsMobile Prototyping Essentials
Mobile Prototyping Essentials
 
How to prototype like a pro
How to prototype like a proHow to prototype like a pro
How to prototype like a pro
 
Design Thinking Method Cards
Design Thinking Method CardsDesign Thinking Method Cards
Design Thinking Method Cards
 
The role of Design Thinking
The role of Design ThinkingThe role of Design Thinking
The role of Design Thinking
 

Similar to Resume Gustavo Cerda (1) (20)

CV_LFEC_pic_JUL2016V2
CV_LFEC_pic_JUL2016V2CV_LFEC_pic_JUL2016V2
CV_LFEC_pic_JUL2016V2
 
Jansen Frank R. Balobalo
Jansen Frank R. BalobaloJansen Frank R. Balobalo
Jansen Frank R. Balobalo
 
Resume
ResumeResume
Resume
 
Marcela Leos English CV
Marcela Leos English CVMarcela Leos English CV
Marcela Leos English CV
 
Ilse Camacho-Industrial and Systems Engineering 2015 (2)
Ilse Camacho-Industrial and Systems Engineering 2015 (2)Ilse Camacho-Industrial and Systems Engineering 2015 (2)
Ilse Camacho-Industrial and Systems Engineering 2015 (2)
 
CV Daniel Zuniga (English Rev11)
CV Daniel Zuniga (English Rev11)CV Daniel Zuniga (English Rev11)
CV Daniel Zuniga (English Rev11)
 
curriculum_Edgar_Montalvo_Lopez English (Autoguardado)
curriculum_Edgar_Montalvo_Lopez English (Autoguardado)curriculum_Edgar_Montalvo_Lopez English (Autoguardado)
curriculum_Edgar_Montalvo_Lopez English (Autoguardado)
 
ResumeIngles
ResumeInglesResumeIngles
ResumeIngles
 
KY Fung Resume_me
KY Fung Resume_meKY Fung Resume_me
KY Fung Resume_me
 
CV Pedro Giuseppe Mar Garcia
CV Pedro Giuseppe Mar GarciaCV Pedro Giuseppe Mar Garcia
CV Pedro Giuseppe Mar Garcia
 
Resume ivan rivera_2017-v1.0-en
Resume ivan rivera_2017-v1.0-enResume ivan rivera_2017-v1.0-en
Resume ivan rivera_2017-v1.0-en
 
Resume_Juan Rodriguez_2016
Resume_Juan Rodriguez_2016Resume_Juan Rodriguez_2016
Resume_Juan Rodriguez_2016
 
Ian Patrick Resume
Ian Patrick ResumeIan Patrick Resume
Ian Patrick Resume
 
Resume Jose C. Huerta
Resume Jose C. HuertaResume Jose C. Huerta
Resume Jose C. Huerta
 
CV-Geron JGC
CV-Geron JGCCV-Geron JGC
CV-Geron JGC
 
Resume_ D Estebat 04172016
Resume_ D Estebat 04172016Resume_ D Estebat 04172016
Resume_ D Estebat 04172016
 
C. Hagenbuch Resume 2015
C. Hagenbuch Resume 2015C. Hagenbuch Resume 2015
C. Hagenbuch Resume 2015
 
Genevieve Anne Odi
Genevieve Anne OdiGenevieve Anne Odi
Genevieve Anne Odi
 
JMG CV
JMG CVJMG CV
JMG CV
 
Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1
 

Resume Gustavo Cerda (1)

  • 1. GustavoAlonsoCerdaLara 2015 Date of Birth: April 13th, 1993 Calle Novena # 105 Col. Pedro J. Méndez Reynosa Tam. Phone Number (044899) 1-08-84-36 Email: tabocl@hotmail.com E D U C A T I O N Universidad Tamaulipeca Technical High School Degree in Industrial Security January 2010 – August 2011 Universidad Tecnológica de Tamaulipas Nor te Industrial Process Technician September 2011 – April 2014 Engineering Degree Major in Industrial Operation and Processes. September 2014 – April 2016 E X P E R I E N C E Panasonic Automotive Systems de México SA de CV Engineering Assistant, New Product Launch January 2014 – Current  Production Runs (New Products).  Development of improvement projects.  Coordination of working groups  CCORE, GLOVIA y AGILE (internal systems)  APQP, PFMEA, PPAP and Manufacturing Aids.  Team Work, communication between departments (Programing, Engineering, Finance, Production, Warehouse, Document Control, etc).  Planning of materials based on demand sent by Program Manager.  Creation and Management of Internal Documents  Inventory Control.  Internal and External Audits.  Implementation of 5S`s  Data Capture.  Management Staff. References: Ing. Marisol Villanueva Phone Number: (899)9-44-18-64
  • 2. Gustavo Alonso Cerda Lara Page 2 Material Handler September 2011 – January 2014  Material system transactions.  Material control and handling.  Material transport.  Cycle Counts. Reference: Ing. Rubén Sifuentes Phone Number: (044) 899-230-30 K N O W L E D G E  Advanced Microsoft (Excel, Word, Power Point)  AutoCAD  SolidWorks  MOST  Master Planning  Lean Manufacturing  Discipline 5S`s S K I L L S  English.  Leadership.  Fast learning.  Teamwork.  Analysis and decision-making.  Dynamic.  Proactive.  Responsible. A C C O M P L I S H M E N T S Implemented continuous improvement project, improving the assembly line production through manufacturing aids. Performed line balances improving production productivity and efficiency, eliminating waste times and reducing the amount operator at the line, accomplishing:  Prevent defects, avoid distractions during the process.  Efficiency.  Financial Impact 476.67 USD (monthly by increasing productivity).