INTRODUCTION
Resources andDevelopment is an important
chapter of Class 10 Geography. It explains the
types of resources, their distribution, sustainable
use, and the importance of conservation.
3.
WHAT ARE RESOURCES?
• Everything available in our environment which
can be used to satisfy our needs, provided it is
technologically accessible, economically feasible,
and culturally acceptable.
• Example: Land, water, minerals, forests, etc.
4.
TYPES OF RESOURCES- ON BASIS
OF ORIGIN
• Biotic: Obtained from biosphere, have life (e.g.,
flora, fauna, human beings).
• Abiotic: Non-living (e.g., rocks, minerals).
5.
TYPES OF RESOURCES- ON BASIS
OF EXHAUSTIBILITY
• Renewable Resources: Replenished through
natural processes (e.g., forests, solar energy).
• Non-Renewable Resources: Take millions of
years to form, get exhausted (e.g., coal,
petroleum).
6.
TYPES OF RESOURCES- ON BASIS
OF OWNERSHIP
• Individual: Owned by private individuals.
• Community: Accessible to all members of
community.
• National: Belong to the nation (e.g., minerals,
forests).
• International: Managed by international
institutions.
7.
TYPES OF RESOURCES- ON BASIS
OF DEVELOPMENT
• Potential Resources: Resources found in a
region but not yet utilized.
• Developed Resources: Surveyed and
quality/quantity determined.
• Stock: Resources available but technology to
use them is not developed.
• Reserves: Resources that can be used with
available technology.
8.
DEVELOPMENT OF RESOURCES
• Needed for economic growth but can lead to
many problems like overuse, pollution,
inequality.
• Resource planning is essential for sustainable
development.
9.
SUSTAINABLE DEVELOPMENT
•Development that takes place without
damaging the environment.
• Meets needs of present without compromising
future generations.
10.
RESOURCE PLANNING ININDIA
Steps:
1. Identification and inventory of resources.
2. Evolving a planning structure with technology.
3. Matching resources with development plans.
11.
RESOURCES IN INDIA
• India has varied resources: Rich in coal, iron
ore, mica, bauxite.
• Uneven distribution: Some states rich, others
deficient.
12.
LAND RESOURCES
•Land is a natural resource of utmost
importance.
• Uses: Agriculture, forestry, mining, settlement,
transport, industries.
13.
LAND UTILISATION ININDIA
Categories:
1. Forests
2. Land not available for cultivation
3. Other uncultivated land
4. Fallow land
5. Net sown area
14.
LAND DEGRADATION
•Causes: Deforestation, overgrazing, mining,
over-irrigation.
• Solutions: Afforestation, proper grazing, control
mining, check irrigation.
15.
SOIL AS ARESOURCE
• Soil is the most important renewable resource.
• Types of soil found in India: Alluvial, Black,
Red & Yellow, Laterite, Arid, Mountain soils.
16.
ALLUVIAL SOIL
•Most widespread and fertile soil.
• Found in northern plains and river valleys.
• Suitable for paddy, wheat, sugarcane, pulses.
17.
BLACK SOIL
•Also known as Regur soil.
• Ideal for cotton cultivation.
• Retains moisture, rich in calcium carbonate,
potassium, lime.
18.
RED AND YELLOWSOIL
• Found in parts of Odisha, Chhattisgarh,
southern states.
• Develops on crystalline igneous rocks.
• Low fertility but can be improved.
19.
LATERITE SOIL
•Develops in high temperature, heavy rainfall
areas.
• Poor in humus.
• Suitable for tea, coffee, cashew nut cultivation.
20.
ARID AND MOUNTAINSOILS
• Arid Soil: Sandy, saline, poor fertility, found in
Rajasthan.
• Mountain Soil: Found in hilly regions, suitable
for tea, coffee, horticulture.
21.
SOIL EROSION ANDCONSERVATION
• Soil erosion: Removal of top soil due to wind,
water.
• Methods: Contour ploughing, terrace farming,
shelter belts, afforestation.
22.
NCERT QUESTIONS -Q&A
Q1: Differentiate between renewable and non-
renewable resources.
Q2: Explain resource planning in India.
Q3: Explain land degradation and measures to
solve it.
Q4: Explain soil conservation methods.
23.
CONCLUSION
• Resourcesare vital for development but must
be used wisely.
• Sustainable development and conservation are
the key.
• Resource planning is necessary for equitable
growth in India.