SlideShare a Scribd company logo
FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 | Confidential
FATIMA FERTILIZER
COMPANY LIMITED
Internship report 2014 (07 July to 25 July)
Hafiz Ahmed Waqas ( UET Registration # 2011-civ-179 )
Email:h.a_waqas@yahoo.com, Cell: +92313-4010390
1 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
2 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
FATIMA FERTILIZER COMPANY LIMITED
Internship report 2014 (07 July to 25 July)
Table of contents
Acknowledgment…………………………………………………………………………………….. 03
Abstract…………………………………………………………………………………………………… 04
Introduction…………………………………………………………………………………………….. 05
Internship plan………………………………………………………………………………………… 05
Internship activities Schedule…….…….…………………………………………………….. 07
Introduction of company…………………….………………………………………………….. 09
Internship activities…………….……………….………………………………………………….. 11
Recommendations…………………………………………………………………………………… 27
References………………………………………………………………………………………………. 28
3 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Acknowledgment
The internship opportunity I had with Fatima Fertilizer Company was a great
chance for learning and professional development. Therefore, I consider myself
as a very lucky individual as I was provided with an opportunity to be a part of
it. I am also grateful for having a chance to meet so many wonderful people and
professionals who led me through this internship period.
Bearing in mind previous I am using this opportunity to express my deepest
gratitude and special thanks to the senior unit manager maintenance of Fatima
fertilizer who in spite of being extraordinarily busy with his duties, took time
out to hear, guide and keep me on the correct path and allowing me to carry
out my internship at their esteemed organization and extending during the
training.
I express my deepest thanks to Mr. Abdul jabbar, senior Engineer for taking
part in useful decision & giving necessary advices and guidance and arranged
all facilities to make life easier. I choose this moment to acknowledge his
contribution gratefully.
It is my radiant sentiment to place on record my best regards, deepest sense of
gratitude to Mr. Raees Ahmed, Engineer, Mr. Muaaz Khalid, Engineer, Mr.
Abdul Waheed, Associate Engineer and Mr. Muhammad Ishtiaq, Store in
charge for their careful and precious guidance which were extremely valuable
for my studies both theoretically and practically.
I perceive as this opportunity as a big milestone in my career development. I
will strive to use gained skills and knowledge in the best possible way, and I
will continue to work on their improvement, in order to attain desired career
objectives. Hope to continue cooperation with all of you in the future.
Finally, I would like to thank my parents for a lifetime of love and support.
They have taught me the most important lessons in life, and I owe all of my
achievements to them.
Sincerely,
Hafiz Ahmed Waqas
UET Reg. # 2011-civ-179
4 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Abstract
University of Engineering and technology and FFCL have a long standing
relationship, in which a selection of students in their final year of engineering
study have the opportunity to complete a one month internship program at the
Fatima Fertilizer company situated near Sadiqabad, Rahim Yaar Khan, Punjab,
Pakistan. The internship program allows the student to partake in a number of
engineering projects, providing the student with invaluable experience, as well
as the opportunity to develop both personally and professionally. This report
details the activities in which I was involved during my time at FFCL, and
includes the following:
 Safety orientation
 Brief history of the project
 Study of geotechnical report of the project
 Study of design criteria report
 Brief construction history of the project
 Plant site visit
 Understanding the procurement and execution procedure of civil works
 Understanding the Fatima Fertilizer Company’s HSE and IMS policy
 Drawing study of the project
 Recommendations and conclusions
Additionally this report will confirm the benefits of the internship program at
FFCL, which has not only been an exceptional learning experience for the
intern, but has also given him a significant base on which he can build his
professional engineering career.
5 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Introduction
This report gives an overview of the activities that I worked on during my
internship, from 7 July 2014 to 25 July 2014, at the civil department of Fatima
fertilizer company Ltd, situated near Sadiqabad, dist. Rahim Yar Khan, Punjab,
Pakistan. I worked on several activities. This report focuses for the most part of
the major activities and the smaller activities are more briefly described.
The purpose of this report is to detail the reader into the activity of the intern during
his employment as an intern between June 2014 and July 2014. The internship took
place at Fatima fertilizer company Ltd, situated near Sadiqabad, dist. Rahim Yar
Khan, Punjab, Pakistan.
Internship plan
 Safety orientation and allotment of PPE’s
 Introduction of company
 Introduction to staff members
 Study of geotechnical report of the project
 Study of general design criteria report of the project
 Understanding the scope of civil work
 Project site visits
Np plant
• NP plant
• NP prilling
tower
• NP bulk
storage
PLANT
SITE
VISITS
6 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
 Understanding the procurement and Bidding
procedure
 HSE and IMS policy study
 Study of Total Station
 Safety talk
 Overview of Mari project Drawing
 Study of basic building construction book and
preparation of Objective paper for technicians
 Verification of civil drawing of USG (Utility steam
generator)
 Inspection of foundations of pipe sleepers at O & U
 Study of maintenance report (ATA 2013)of cooling
tower
 Discussion about MOC (management of change)
 Visit to Mari gas field
 TST road Construction
 Visit to Township civil office
7 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Activities Date
Safety orientation and allotment of PPE 07-07-2014
Introduction of company
Introduction to staff members
Study of geotechnical report of the
project
07-07-2014 to 08-07-2014
Study of general design criteria report of
the project
08-07-2014
Understanding the scope of civil works at
FFCL
NP plant visit 09-07-2014
NP prilling tower
NP bulk storage
CAN plant
PHS (product handling and storage) unit 10-07-2014
Rock phosphate storage
TT (Transfer tower)
Understanding the procurement and
Bidding procedure
UREA prilling tower visit 11-07-2014
Urea + CAN bulk storage
Drawing studying of the project
Evaporation pounds problem discussion
O & U visit 14-07-2014
Study of Total Station
(PSM) HSE and IMS policy study 15-07-2014
Safety talk
Overview of Mari project Drawing
Study of basic building construction
book and preparation of Objective paper
for technicians
Verification of civil drawing of USG
(Utility steam generator)
16-07-2014
Inspection of foundations of pipe sleepers
at O & U
Study of maintenance report (ATA 2013)
of cooling tower
Discussion about MOC (management of
change)
Study of PSM elements 17-07-2014
Discussion of PSM elements 18-07-2014
Study of JSA (job safety analysis) 21-07-2014
TST Road Construction
Internship activities schedule
8 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Safety talk 22-07-2014
Visit to road construction site
Visit to Township civil office 23-07-2014
9 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Introduction to company
The Fatima Fertilizer Company Limited was
incorporated on December 24, 2003, as a joint
venture between two major business groups in
Pakistan namely, Fatima Group and Arif Habib
Group.
The fertilizer complex is a fully integrated production facility, capable of
producing two intermediate products, i.e., Ammonia and Nitric Acid and four
final products which are Urea, Calcium Ammonium Nitrate (CAN) and Nitro
Phosphate (NP) at Sadiqabad, Dist. Rahim Yar Khan.
The Complex has a 56MW captive power plant in addition to off-sites and
utilities. The Complex has been allocated 110 MMCFD of gas from the
dedicated Mari Gas fields.
Foundation stone was laid on April 26, 2006 by the Prime Minister of Pakistan.
The construction of the Complex commenced in March 2007 and is housed on
950 acres of land.
The Complex, when completed, is designed to produce:
500,000 Metric Tons of Urea per Annum
420,000 Metric Tons of Calcium Ammonium Nitrate (CAN) per Annum
10 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
And 360,000 Metric Tons of Nitro Phosphate (NP) per Annum.
The Complex, during its construction phase engaged over 4,000 engineers and
technicians from Pakistan, China, USA, Japan and Europe.
The Complex provides modern housing for its employees with all necessary
facilities. This includes a school for children of employees and the local
community, a medical Centre and sports facilities.
The fertilizer complex is a fully integrated facility, capable of producing
intermediate and final products.*
11 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Internship activities
(Daily report)
Started from 07-07-2014
07-07-2014
We arrived to plant site at 7:00 am and reached to human resources
department where we asked to provide the
data required to issue the ID card. Then we
went to T.T.C. (Technical training centre) for
introduction of the organization and to have
safety orientation. We got PPE’s (safety shoes,
glasses and helmet). After that we brought to
the maintenance department where we sent
to our respective mentors.
I met with Mr. Abdul Jabbar; he gave me the brief project history of Fatima
Fertilizer Complex. Some of the details are as follows
Project Fatima Fertilizer Complex, RAHIM YAR KHAN
Client Fatima Fertilizer Company ltd.
Consultant NESPAK & Akbar Associates
Mr. Abdul Jabbar gave me the Geotechnical investigation report of the project
to study and then there was end of the working day.
08-07-2014
Reached office at 7:00 am
Major activities of the day
 Completion of Geotechnical report study
 Study of C.B.R method for pavement design
 Discussion with Mr. Muhammad Ishtiaq regarding clerical work for
bidding and procurement purposes. I got familiar with different terms
12 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
like JR (job request), JO (job order), PR (Purchase request), PO (Purchase
order), CST (comparative statement) MIR (material inspection report) MIV
(Material issue voucher) also type of budgets are discussed e.g. Capex
(capital expenditure), Opex (operational expenditure) and store & spares
etc.
 Discussion with Engr. Muaaz Khalid about civil scope in Fatima
Fertilizer
These includes
 Maintenance of structural components (Concrete repairing work, flooring,
plastering, pavement laying and installation of anti acid tiles etc.)
 Infrastructural development and extensions
 Foundations design, construction and then accurate placement of industrial
equipment on their respective location of embedded anchors.
 Heavy design is not carried out by the civil department, for this, design
consultants are hired and during construction supervision is done by the
civil department.
 Civil department prepare BOQ's and Material statements to assist
procurement and bidding work.
At the end of working day I got design criteria report of FFCL to study.
09-07-2014
After arriving office I submitted the design criteria report which I have to study.
Then I met with Mr. Abdul Waheed, he took me with him to the plant site so
that I could get some construction history of the plant. He showed me dyke
wall, pipe sleepers, pipe racks and transfer tower. In the mean while we
reached to the CCR-2 where construction of door was started. We got inside the
CCR-2 and I came to know the procedure of issuing permit which is known as
P.T.W. (permit to work).these are of two types i.e. Hot and Cold.
Visit to NP plant
We proceed to NP (nitric phosphate) plant after wearing complete PPE’s. Mr.
Abdul Waheed briefed me about the construction stage and told me different
situations which they have encountered while construction period. Structure
was of R.C. (reinforced concrete) material and it is a multi storey frame
structure having columns, beams and slabs. Its lift shaft was firstly planed to
be constructed by brick masonry but due to the time limitations it is then
constructed seamless R.C. shaft with the help of slip form. There were anti-acid
tiles placed over the floor to protect floor from adverse existing environmental
conditions.
13 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Engr. Muaaz told me that NP plant building is under designed and overloaded
and they have done column jacketing for continuously bracing of the column
and to reduce column buckling, during visit Mr. Abdul Waheed showed me the
continuously braced column. At some locations they have cut the peripheral
struts to provide the space for easy transportations of industrial equipments
and to provide structural stability they have used embedded plates in column
at respective upper and lower struts and then two columns were strengthened
by supporting steel struts along with present beams.
Safety arrangements
In the plant safety arrangements were good, at various locations showers and
fire fighting instruments were present.
Prilling tower of NP
To get familiar with different structural components of prilling tower I first saw
the tower from the bottom where prilled product was coming from the top and
cool air was moving towards the top to dry the liquid product and a Scraper
was collecting the product and sending towards the conveyor belt which convey
the product towards the packing unit or bulk storage. With the help of lift we
moved towards the top of the tower, lift was installed in NP plant and from steel
bridges we went to the top of the tower. These bridges were purposed by the
designer as a R.C. bridges but due to their higher elevation there was
difficulties of shuttering and form work so that’s why site supervisor replaced
these R.C. bridges after getting approval, by pre cast steel bridges which were
later on placed over the span with the help of crane. At the top of tower I saw
some passages in between some partitions which
were made by cutting of seamless concrete of tower
for transportation of industrial equipments. To
make this passage they use core cutter and cut
cores.
Prilling tower was made seamless with the help of
slip form (Fig 1). According to Mr. Abdul Waheed,
they placed first floor over the arrangement of slip
form as at this significant height scaffolding and
shuttering was not possible, after setting the
concrete of first floor they constructed the walls of
next floor and then other floors were constructed
over the base of first floor. Prilling tower of NP
14 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
There were
embedded plates
present in the slab
of top floor of the
tower for the
installation of
Gantry crane which
currently was not
installed and I saw
the worker carrying
some mechanical
equipment loaded
on their hands to
send this on the top
of the tower. These
workers were facing
too much difficulties
while its
transportation.
Visit to Bulk storage of NP
Bulk storage of NP is a shell structure (Fig. 2) and designed
by Akbar associates. Walls of this storage are damp
proofed with bitumen coat and poly thin sheet to save
product from moisture.
Figure 2
Visit to CAN plan
CAN (calcium ammonium nitrate) plan is located near the NP plant, this plant
is multi storey steel frame structure and it may be due to the reason that this
product has great affinity to moisture (hygroscopic material), keep environment
wet, dirty and form crystals and cause deterioration of concrete so steel is best
Figure 1
15 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
suitable material for construction.
Visit to civil site office
It is located near the CAN plant and constructed in containers. Near the office,
construction of wash rooms was continued. The specialty of this construction
is that these wash rooms are constructed in containers, for insulation they
have built partition walls of brick masonry instead of using thermo pore and
tile fixing was done on the container’s floor.
10-07-2014
Visit to PHS
Today I have visit with Mr. Raees Ahmed to the PHS (product handling and
storage) unit. Major activities of the day are
 Visit to transfer tower 3, 4, and 5
 Visit to bulk storage of CAN and Urea
This is Gabel framed steel structure (Fig-3) to store bulk quantity of fertilizer.
There are tripper cars (Fig-4) and conveyor belts installed for effective
movement and storage of fertilizer.
16 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Visit to screening unit
In this unit prilled product is screened and then after gradation goes to storage
or packing. In CAN (calcium ammonium nitrate) and urea screening unit there
was a lot of moisture present in the building due to hygroscopic property of
CAN. This moisture is reacting with product, form different products which are
harmful for structure and causing disintegration of concrete so there is need of
periodic repair of the structure. While construction there should be the use of
some admixtures or epoxy etc. to minimize adverse effect of chemicals on
concrete.
Visit to bagging plant
In this unit product reached from transfer tower and packed. This is also a
multi storey R.C. frame structure building having 30 m height. I saw inverted
T-beam arrangement in this structure. Along the bagging plant there was a
cantilever slab of transmission tower which was supported by steel pipes
known as knee beam.
Visit to Rock phosphate storage unit
Raw material is stored here and it is a multi storey Gabel framed R.C.C.
structure. Other arrangements are like bulk storage units. Here bucket tower is
also present to raise the raw material and make piles of material so that it
could be used in rainy season.
Fig. 4
Fig. 3
17 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Discussion about bidding procedure and Budget
To initiate any civil work in the company there is some standard procedure
which is described as under.
 Necessity of the work
 Survey is conducted and BOQ is prepared
 Raising of JR (job request)
 RFQ’s (Request for quotations) after approval of JR
 Collection of tender documents and bidding
 Preparation of CST (comparative statement)
 Issuance of JO (job order)
Material for construction is generally provided by the FFCL to the contractor for
this purpose organization has its own store; respective terms are PO, PR, MIR,
and MIV.
Regarding budget, there are three types of budgets CAPEX, OPEX and store &
spare. CAPEX is related to new works, OPEX is related to maintenance and
S&S is related to store.
Before the start of new fiscal year every department has to anticipate their
expected expenditures and then has to claim budget accordingly, for approval
department has to give justifications and then they should consume their
allocated budget to hold their position. Assessment of any engineer is done on
the basis that how much budget they have consumed. Especially consumption
of CAPEX is very important which reveals their work efficiency.
Repeat order is another term which is used for the work which is required to be
executed and has amount or /and quantities equals to or less than a work
which already has been completed in the past six months. The reason of
restriction regarding amount and quantities is economy of scale (contractor
should do work with lower prices for large work).
Assessment
Engr. Muaaz Khalid took my evaluation by asking me to draw Stress strain
curve of the steel which I was able to draw successfully.
18 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
11-07-2014
Visit to maintenance workshop
Mr. Abdul Waheed showed me this building. In this building the roof is of pre
cast double Tee beams and floor is of R.C.C because of heavy movement of
equipment and machinery.
Visit to urea plant
After workshop we proceeded to urea plant, this is
framed steel structure, its floor is of R.C.C.
Outside of the plant there was a problem of
installation of an equipment, the foundation of
which was to be build exactly over the
underground raw material conveyor trench, to
solve this problem they made foundation a little
far away from the trench of conveyor and placed
an underground beam over it and then placed the
equipment. I also saw heavy pumps and valves
there, used for transportation and regulation of
different fluids.
Prilling tower of UREA
Mr. Abdul Waheed told me very interesting facts
about the construction phase of urea tower.
According to him at the time of construction the
climate was hot and concrete was setting
rapidly and sticking with slip form. The
unbalance of supply and demand of concrete
was also one of the reasons. When they reached
at the height of 14 m, due to honeycombing of
the concrete, the stability of concrete/ tower
was questionable. To overcome this problem
they built two additional R.C walls around the
existing concrete of the tower and thickness of wall increased from 800 mm to
1200 mm. These two additional walls provided stability to the existing tower
and also repaired the honey combed concrete by grouting effect. The scraper
Typical industrial pump
Honey combing of
concrete
19 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Concrete pump
roof was laid by simple shuttering instead of
slip form. Next to cope with sticking problem
of concrete to the form they managed the
difference of supply and demand by using
concrete pump and tower crane. At certain
height of urea tower there was some
cantilever portion to built, for this purpose
they extended the walls of tower from slip
form by usual shuttering and after getting
strength of this portion they used these for
scaffolding and shuttering by the means of
rope to built cantilever form. The Lift shaft and
stair case were built by slip form also along
with the construction of tower. Stairs were pre casted and of steel material. A
crane was used to install this stair which carried the parts of stair to the top
and construction was done starting from top and ending at bottom. The height
of the tower is 98 m and the height of lift shaft is 101 m. On the roof of tower I
also saw the lightening conductors. At the floor of tower anti acid tiles were
installed which were made by
china.
According to Mr. Muaaz Khalid
the curing of the tower is very
difficult for this purpose they
have used some water reducing
admixtures. There was use of
some admixtures also for
jointing (Sika flex, SBR) and
acting as accelerators and
retarders.
Revisit to NP plant
At NP plant some repair work was started, Mr. Abdul Waheed showed me a
repaired beam which was completely defected by acid. For repairing purpose
they completely remove the almost middle third part of the beam after
providing shoring/support to the structure and re-shuttering was done, after
placing reinforcement with proper lapping they poured the concrete. Near the
repaired beam there was excessive vibrations and shaking of the floor which
20 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
was needed to be controlled. Anti acid mortar was used at the locations were
adverse effect of acid was anticipated or acting.
Drawing studying
Engr. Muaaz Khalid told me the way to read the industrial drawing of the
FFCL. Every equipment in the industry has got a specific tag, if information of
any particular equipment is required, we first locate its position on the main
map, around the equipment there is some specific drawing number on which
we can see its magnified view, Near this view there is detailed drawing number
on which we can see its top view, elevations and sections etc.
Evaporation pounds Problem discussion with Engr. Muaaz.
There was complain from the people residing near the plant that there ground
water is infected by the polluted water which was intercepting into ground from
evaporation pounds. Our office staff told me that they have used polythene
sheets as a Geo membrane. As a response of these complains civil department
was intended to execute geotechnical investigation near the evaporation
pounds. For this purpose bore holes will be excavated to get samples of soil
and ground water and will be tested in the FFCL laboratory to take further
actions.
14-07-2014
Total station discussion
Mr. Muhammad Jaffar Hussain, Surveyor at FFCL
gave me important information regarding Total
station, the important points of which are as under
 Press the on button and then make a job
profile before starting any work and to have
record of your performed work
 Press STN button to set the instrument at
station point and to give information
regarding station point. (N, E, H.I etc.)
 Keep your eyes on the LCD of the instrument
and follow the instructions.
 Mr. Jaffar told me the way to lay out a building,
co-ordinates of which are given.
Total station
21 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
An over view to O & U unit
Mr. Jaffar took me with him to off sites and utilities and showed me the rain
water pit, raw water pit, Cooling tower and water treatment plant. The weather
conditions were very sewer and we were unable to continue our visit so we
came back.
15-07-2014
Safety talk
Mr. Abdul Jabbar delivered the safety talk at civil store and the agenda was
Accidents its prevention and after effects of accidents. They told us after
accidents occurrence, there should proper investigation and there should be
route cause analysis and reporting of it. After all procedures there must be
proper and adequate communication of it so that other people should get aware
of it for prevention of accidents in the future.
Overview of Mari project Drawing
I saw the drawing plan of the site and also read the memo which was written
by the Engr. Muaaz to a concern person regarding permit of the work.
Discussion and study of HSE and IMS policy of FFCL and
RCFA (root cause failure analysis report)
Any organization is how much concerned and conscious about the safety,
environmental protection and health of their employees, is judged by two
criteria namely safe million man hours and TRIR (total recordable incident rate,
safe million man hours are affected due to fatality or LWI (lost work injury i.e.
person will unable to do work for some time or forever).While working there
may be different types of probabilities which are given as under
 Fatality
 Majors
(LWIs & RWCs i.e. restricted work case )
 Recordable Injuries
 Near Misses or First Aids
 Hazards:
Unsafe Acts
Employee-Created Unsafe conditions
22 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
If there are 30000 near misses happened and no remedial measure is taken
then it may cause one fatality.
In RCFA we try to find out causes/possibilities of different incidents and take
preventive steps to stop them or if they have been occurred already then try to
find out possible reasons and in future, these events not happen again, we
suggest different conditions to implement.
Study of basic building construction book and preparation
of Objective paper for technicians.
MR. Abdul Jabbar gave me the assignment to make objective paper for
technicians. I prepared this paper after reading Basic building construction
book.
16-07-2014
Verification of civil drawing of USG (Utility Steam
generator)
For verification of USG drawing Mr. Raees and Mr. Zahoor, Senior Quantity
surveyor took me with them. We reached to the location and verified the
drawings. We found some additional foundations of pipe rakes over there which
were absent on the drawing. Mr. Zahoor marked these additions on the
drawing.
Inspection of foundations of pipe sleepers
at O & U
I with Engr. Muaaz Khalid went to the O&U and saw the
poured concrete of foundations which were built for pipe
sleepers.
Discussion about MOC (management of change)
After inspection we came back to office, and on the way to office Mr. Muaaz told
me about MOC. Whenever someone raise the MOC (raised for new work), after
its approval there will be IFR (issued for review) report so that if any party has
some issue then they should inform. After this there will be issuance of IFC
(issued for construction) report. If civil department will not have IFC then
nobody in the plant site will provide them PTW (permit to work).
Typical pipe sleeper
23 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Study of maintenance report (ATA 2013)
of cooling tower
The main points of this report are
 Concrete was in good condition
 A minor repair of column was done
 At expansion joint, some sealant was used to
repair the already placed sealant.
 Saw also the pictures attached with the ATA
(annual turn around) report.
Visit to Mari gas field
I with Mr. Obaid went to Mari gas field where
construction was carried out under the supervision
of civil department of FFCL. After about 40 minutes
of driving, vehicle was out of order and stop in the
middle of road. We were unable to reach at Mari.
We informed to civil department and asked them to
send another vehicle. The replacement came after
two and half hours later and we came back to
FFCL. The condition of vehicle was looking good but
it fails due to improper maintenance and care.
There should be proper care of vehicles, belongs to FFCL.
17-07-2014
 Study of PSM elements.
 Report writing
18-07-2014
Discussion about elements of PSM
(process safety management) with
Engr. Muaaz Khalid.
Cooling tower
24 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
21-07-2014
Study of JSA (job safety analysis) report
This kind of report is prepared for extra ordinary/out
of routine work. I read JSA of task of Bitumen heating
and spraying for admin road. The mean features of
this report are given as under
 Contains the information regarding Standard and special PPE’s required
for the job.
 Task steps
 Potential hazards
 Probability level i.e. (small, medium, high)
 Control measures to be taken while job.
In bitumen heating and spraying following measures should be
taken to avoid any undesirable incidence
 Working area should be properly barricaded
 Work should be executed under the supervision of expert
and authorized persons
 Fire fighting arrangement should available at the
site, like fire extinguishers, detergent mixed water
and sand etc.
 Proper PPE’s should be worn at working area
 Un authorized movement in the area should be
restricted/discouraged
In addition to all, traffic controllers and necessary sign
boards should be placed at start and end of project site.
TST road Construction
TST (triple surface treatment), Near the HR department,
Road construction was going on and Mr. Obaid briefed
me about its construction process. According to him we
do TST in the following manner
Preparation of sub grade by performing NGC (natural
ground compaction) is done and for this proposed top
level and cross sectional details of the road are given to
25 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
the contractor so that he may excavate or fill the
ground to have required level of sub grade.
Slope/camber is provided while NGC so that finished
surface follow the same trend. Procter test in the lab is
performed and after compaction of sub grade Field
density test of sub grade is carried out and further
work proceeds until contractor has achieved 95% of
Procter. Over the sub grade, Sub base and base layer
are laid. Over these two layers priming is done (40%
kerosene oil and 60% bitumen) and after priming, first
coat of bitumen is laid. Over first coat of bitumen dry
aggregate is thrown and spread by the labor and then
rolling is done. After rolling they check the undulation
and pits etc. with the help of string. In the similar
manor second and third layers are laid. After three
layers they also do the special treatment over the top
surface to have smooth running of the wheel. This
special treatment includes sprinkling of priming coat
over the top surface and then pouring of sand afterwards.
22-07-2014
D level meeting/Safety talk
Agenda of meeting was occupational health and this meeting was chaired by
Mr. Abdul Jabbar. They told us, what is occupational health, why it is
necessary to discuss and what are the benefits to employee and employer as
well. He emphasized on awareness of different occupational safety hazards and
their respective preventive measures.
Visit to road construction site
They were laying second layer of TST after checking the leveling of first layer
and then rolling of second layer was started.
26 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
23-07-2014
Visit to Township civil office
Township is the housing society of the FFCL. To get familiar with civil works at
township Mr. Muaaz sent me there. I met with Mr. Sikandar, GTE (Graduate
Trainee Engineer). He gave me the drawings of Masjid of township to study. I
studied that drawing and discuss with him. After that we went to construction
site and saw the construction work.
27 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
Recommendations
 Installation of Gantry crane over the prilling tower of CAN
 Use of special chemicals, add mixtures or epoxy to reduce
deterioration of the concrete at areas subjected to or prone to
chemical attacks, moisture and salts.
 The vehicles which are property of FFCL should properly maintain
to avoid their failure while traveling for important work.
 Workers while working, avoid wearing PPE, there should be proper
instructions and counseling of them.
28 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
References
 *
Intern ship report by Tariq Aziz
 https://www.google.com.pk/search?q=Slip+form&rlz=1C1VASU_enPK540P
K540&es_sm=122&source=lnms&tbm=isch&sa=X&ei=niG-
U7r6FdKA7Qaus4GoAQ&ved=0CAgQ_AUoAQ#q=shell+structure&tbm=isch
 https://www.google.com.pk/search?q=shell+structure&tbm=isch&ei=AFC-
U-2aO4y70wW3z4GwDw
 https://www.google.com.pk/search?q=tripper+car&rlz=1C1VASU_enPK540
PK540&espv=2&source=lnms&tbm=isch&sa=X&ei=s12-
U8LiKdGM7AaEtIDwCQ&sqi=2&ved=0CAYQ_AUoAQ&biw=1366&bih=667#
q=tripper+car+wear+house&tbm=isch
 https://www.google.com.pk/search?q=gabel+frame+steel+structure&tbm=
isch&ei=uF2-U5HVOeOo0wXPiYGwBw
 http://www.google.com.pk/imgres?imgurl=http%3A%2F%2Fwww.mainten
anceonline.org%2Fmaintenanceonline%2Fcontent_images%2FPage%25252
023%252520-%252520Untitled-
2%252520(2).jpg&imgrefurl=http%3A%2F%2Fwww.maintenanceonline.org
%2Farticle.asp%3Fid%3D5723&h=1917&w=4442&tbnid=Q3C7c6THX3YCsM
%3A&zoom=1&docid=T8ZMADEuXqVtTM&ei=nkTDU67vCq754QTS34HQCA
&tbm=isch&ved=0CFgQMygfMB8&iact=rc&uact=3&dur=832&page=3&star
t=31&ndsp=20
 https://www.google.com.pk/search?q=industrial+pumps&rlz=1C1VASU_en
PK540PK540&espv=2&source=lnms&tbm=isch&sa=X&ei=m0TDU-
_NC4X0OZPvgOgC&ved=0CAYQ_AUoAQ&biw=1366&bih=667#q=honey+co
mbing+in+concrete&tbm=isch
 https://www.google.com.pk/search?q=industrial+pumps&rlz=1C1VASU_en
PK540PK540&espv=2&source=lnms&tbm=isch&sa=X&ei=m0TDU-
_NC4X0OZPvgOgC&ved=0CAYQ_AUoAQ&biw=1366&bih=667#q=Concrete+
pump&tbm=isch
 https://www.google.com.pk/search?q=industrial+pumps&rlz=1C1VASU_en
PK540PK540&espv=2&source=lnms&tbm=isch&sa=X&ei=m0TDU-
29 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
_NC4X0OZPvgOgC&ved=0CAYQ_AUoAQ&biw=1366&bih=667#q=sikaflex&t
bm=isch

More Related Content

What's hot

Fauji Fertilizer Corporation
Fauji Fertilizer CorporationFauji Fertilizer Corporation
Fauji Fertilizer Corporation
Muneeb Abid
 
New new report on iffco phulpur allahabd
New new report on iffco phulpur allahabdNew new report on iffco phulpur allahabd
New new report on iffco phulpur allahabd
ABHINAV MAURYA
 
Internship Report
Internship ReportInternship Report
Internship Report
MUHAMMAD SAJID
 
Internship report Nazmul hasan
Internship report Nazmul hasanInternship report Nazmul hasan
Internship report Nazmul hasan
tuhin chowdhury
 
Jibu hmt working capital management project
Jibu hmt working capital management projectJibu hmt working capital management project
Jibu hmt working capital management project
JIBU AB
 
FFC
FFCFFC
Parco internship report
Parco internship reportParco internship report
Parco internship report
Muhammad Ashraf
 
Project report on pa 2
Project report on pa 2Project report on pa 2
Project report on pa 2
sandeep choudhary
 
Project report titles for mba in agri business management
Project report titles for mba in agri business managementProject report titles for mba in agri business management
Project report titles for mba in agri business management
mbaprojectconsultacy2014
 
Report of FFBL Fertilizer
Report of FFBL Fertilizer Report of FFBL Fertilizer
Report of FFBL Fertilizer
Muhammad Ahmed
 
iffco_report
iffco_reportiffco_report
iffco_report
Kartik Sati
 
Pel final report
Pel final reportPel final report
Pel final report
sarah101
 
On the job traning program @ bagalkot shakti cement project report mba hr
On the job traning program @ bagalkot shakti cement project report mba hrOn the job traning program @ bagalkot shakti cement project report mba hr
On the job traning program @ bagalkot shakti cement project report mba hr
Babasab Patil
 
Lupin summer training report, Ankleshwar
Lupin summer training report, AnkleshwarLupin summer training report, Ankleshwar
Lupin summer training report, Ankleshwar
Rajat Gandhi
 
Engro
EngroEngro
Engro
Ali Kamran
 
internship report
internship reportinternship report
internship report
Harish Kumar
 
Fauji fertilizers
Fauji fertilizersFauji fertilizers
Fauji fertilizers
zaraahmad22
 
Employee welfare facility upload
Employee welfare facility uploadEmployee welfare facility upload
Employee welfare facility upload
GANESH AWATADE
 
Report iffco
Report iffcoReport iffco
Report iffco
Himanshu Tyagi
 
Iffco report
Iffco reportIffco report
Iffco report
Mohit Keshav
 

What's hot (20)

Fauji Fertilizer Corporation
Fauji Fertilizer CorporationFauji Fertilizer Corporation
Fauji Fertilizer Corporation
 
New new report on iffco phulpur allahabd
New new report on iffco phulpur allahabdNew new report on iffco phulpur allahabd
New new report on iffco phulpur allahabd
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Internship report Nazmul hasan
Internship report Nazmul hasanInternship report Nazmul hasan
Internship report Nazmul hasan
 
Jibu hmt working capital management project
Jibu hmt working capital management projectJibu hmt working capital management project
Jibu hmt working capital management project
 
FFC
FFCFFC
FFC
 
Parco internship report
Parco internship reportParco internship report
Parco internship report
 
Project report on pa 2
Project report on pa 2Project report on pa 2
Project report on pa 2
 
Project report titles for mba in agri business management
Project report titles for mba in agri business managementProject report titles for mba in agri business management
Project report titles for mba in agri business management
 
Report of FFBL Fertilizer
Report of FFBL Fertilizer Report of FFBL Fertilizer
Report of FFBL Fertilizer
 
iffco_report
iffco_reportiffco_report
iffco_report
 
Pel final report
Pel final reportPel final report
Pel final report
 
On the job traning program @ bagalkot shakti cement project report mba hr
On the job traning program @ bagalkot shakti cement project report mba hrOn the job traning program @ bagalkot shakti cement project report mba hr
On the job traning program @ bagalkot shakti cement project report mba hr
 
Lupin summer training report, Ankleshwar
Lupin summer training report, AnkleshwarLupin summer training report, Ankleshwar
Lupin summer training report, Ankleshwar
 
Engro
EngroEngro
Engro
 
internship report
internship reportinternship report
internship report
 
Fauji fertilizers
Fauji fertilizersFauji fertilizers
Fauji fertilizers
 
Employee welfare facility upload
Employee welfare facility uploadEmployee welfare facility upload
Employee welfare facility upload
 
Report iffco
Report iffcoReport iffco
Report iffco
 
Iffco report
Iffco reportIffco report
Iffco report
 

Viewers also liked

ffc internship report a
ffc internship report affc internship report a
ffc internship report a
Fazal Mehmood
 
Summer Internship-Prashant dharpure
Summer Internship-Prashant dharpureSummer Internship-Prashant dharpure
Summer Internship-Prashant dharpure
PRASHANT DHARPURE
 
Engro food limited
Engro food limitedEngro food limited
Engro food limited
uroosa shah
 
Business Project Report on Nishat Textile Mills Pakistan
Business Project Report on Nishat Textile Mills PakistanBusiness Project Report on Nishat Textile Mills Pakistan
Business Project Report on Nishat Textile Mills Pakistan
Muhammad Shahid
 
Nishat Mills
Nishat MillsNishat Mills
Nishat Mills
Neelam Asad
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
ADITYA ARYAN
 
Industrial Visit Report
Industrial Visit ReportIndustrial Visit Report
Industrial Visit Report
Babu Rao
 

Viewers also liked (7)

ffc internship report a
ffc internship report affc internship report a
ffc internship report a
 
Summer Internship-Prashant dharpure
Summer Internship-Prashant dharpureSummer Internship-Prashant dharpure
Summer Internship-Prashant dharpure
 
Engro food limited
Engro food limitedEngro food limited
Engro food limited
 
Business Project Report on Nishat Textile Mills Pakistan
Business Project Report on Nishat Textile Mills PakistanBusiness Project Report on Nishat Textile Mills Pakistan
Business Project Report on Nishat Textile Mills Pakistan
 
Nishat Mills
Nishat MillsNishat Mills
Nishat Mills
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Industrial Visit Report
Industrial Visit ReportIndustrial Visit Report
Industrial Visit Report
 

Similar to Report of internship in Fatima Fertilizer Company

ALI CV NEW11
ALI CV NEW11ALI CV NEW11
ALI CV NEW11
Ali Faroug
 
MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUME
AKSHAY SHARMA
 
Company Profile of Muninmax 2015
Company Profile of Muninmax 2015Company Profile of Muninmax 2015
Company Profile of Muninmax 2015
GfK
 
Equipment for Food and Beverage Industry (update 2015) (Extractor, Sterilizat...
Equipment for Food and Beverage Industry (update 2015) (Extractor, Sterilizat...Equipment for Food and Beverage Industry (update 2015) (Extractor, Sterilizat...
Equipment for Food and Beverage Industry (update 2015) (Extractor, Sterilizat...
GfK
 
CV of S M Shahasane up dated April 2016
CV of S M Shahasane up dated April 2016CV of S M Shahasane up dated April 2016
CV of S M Shahasane up dated April 2016
snehshris
 
ChalapatiRao_Resume -1.doc
ChalapatiRao_Resume  -1.docChalapatiRao_Resume  -1.doc
ChalapatiRao_Resume -1.doc
Chalapati Rachuri
 
SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015
Saiful Amin
 
HKS 1 CV
HKS 1 CVHKS 1 CV
HKS 1 CV
Himanshu Shukla
 
Industrial visit report Greater noida
Industrial visit report Greater noidaIndustrial visit report Greater noida
Industrial visit report Greater noida
Byko Kaipeng
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
MUHAMMAD MUZZAMER
 
2014A1PS212U-Final-PS1-MOALAJAH
2014A1PS212U-Final-PS1-MOALAJAH2014A1PS212U-Final-PS1-MOALAJAH
2014A1PS212U-Final-PS1-MOALAJAH
Taqdees Wadekar
 
Energy Audit A Case Study of Pashupati Candle filter Udhyog And Country foo...
Energy Audit A Case Study of Pashupati Candle filter Udhyog  And  Country foo...Energy Audit A Case Study of Pashupati Candle filter Udhyog  And  Country foo...
Energy Audit A Case Study of Pashupati Candle filter Udhyog And Country foo...
Bikram Dahal
 
CV SHAHROL AMIN
CV SHAHROL AMINCV SHAHROL AMIN
internship report 7_B_15
internship report 7_B_15internship report 7_B_15
internship report 7_B_15
Pushp Raj
 
Finance report on alembic pharmaceuticals
Finance report on alembic pharmaceuticalsFinance report on alembic pharmaceuticals
Finance report on alembic pharmaceuticals
NMIMS
 
G S Sharma CV
G S Sharma CVG S Sharma CV
G S Sharma CV
Ghanshyam Sharma
 
AJAY KUMAR JAISWA NewL
AJAY KUMAR JAISWA NewLAJAY KUMAR JAISWA NewL
AJAY KUMAR JAISWA NewL
Ajay Jaiswal
 
Fairham Mouldings Are Fit 4 Nuclear
Fairham Mouldings Are Fit 4 Nuclear Fairham Mouldings Are Fit 4 Nuclear
Fairham Mouldings Are Fit 4 Nuclear
Amanda Eastham-Burford
 
HamzaHasanffbl
HamzaHasanffblHamzaHasanffbl
HamzaHasanffbl
Hamza Hasan
 
Sunny[1][1]
Sunny[1][1]Sunny[1][1]
Sunny[1][1]
guestdfe6afc
 

Similar to Report of internship in Fatima Fertilizer Company (20)

ALI CV NEW11
ALI CV NEW11ALI CV NEW11
ALI CV NEW11
 
MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUME
 
Company Profile of Muninmax 2015
Company Profile of Muninmax 2015Company Profile of Muninmax 2015
Company Profile of Muninmax 2015
 
Equipment for Food and Beverage Industry (update 2015) (Extractor, Sterilizat...
Equipment for Food and Beverage Industry (update 2015) (Extractor, Sterilizat...Equipment for Food and Beverage Industry (update 2015) (Extractor, Sterilizat...
Equipment for Food and Beverage Industry (update 2015) (Extractor, Sterilizat...
 
CV of S M Shahasane up dated April 2016
CV of S M Shahasane up dated April 2016CV of S M Shahasane up dated April 2016
CV of S M Shahasane up dated April 2016
 
ChalapatiRao_Resume -1.doc
ChalapatiRao_Resume  -1.docChalapatiRao_Resume  -1.doc
ChalapatiRao_Resume -1.doc
 
SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015
 
HKS 1 CV
HKS 1 CVHKS 1 CV
HKS 1 CV
 
Industrial visit report Greater noida
Industrial visit report Greater noidaIndustrial visit report Greater noida
Industrial visit report Greater noida
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
2014A1PS212U-Final-PS1-MOALAJAH
2014A1PS212U-Final-PS1-MOALAJAH2014A1PS212U-Final-PS1-MOALAJAH
2014A1PS212U-Final-PS1-MOALAJAH
 
Energy Audit A Case Study of Pashupati Candle filter Udhyog And Country foo...
Energy Audit A Case Study of Pashupati Candle filter Udhyog  And  Country foo...Energy Audit A Case Study of Pashupati Candle filter Udhyog  And  Country foo...
Energy Audit A Case Study of Pashupati Candle filter Udhyog And Country foo...
 
CV SHAHROL AMIN
CV SHAHROL AMINCV SHAHROL AMIN
CV SHAHROL AMIN
 
internship report 7_B_15
internship report 7_B_15internship report 7_B_15
internship report 7_B_15
 
Finance report on alembic pharmaceuticals
Finance report on alembic pharmaceuticalsFinance report on alembic pharmaceuticals
Finance report on alembic pharmaceuticals
 
G S Sharma CV
G S Sharma CVG S Sharma CV
G S Sharma CV
 
AJAY KUMAR JAISWA NewL
AJAY KUMAR JAISWA NewLAJAY KUMAR JAISWA NewL
AJAY KUMAR JAISWA NewL
 
Fairham Mouldings Are Fit 4 Nuclear
Fairham Mouldings Are Fit 4 Nuclear Fairham Mouldings Are Fit 4 Nuclear
Fairham Mouldings Are Fit 4 Nuclear
 
HamzaHasanffbl
HamzaHasanffblHamzaHasanffbl
HamzaHasanffbl
 
Sunny[1][1]
Sunny[1][1]Sunny[1][1]
Sunny[1][1]
 

Report of internship in Fatima Fertilizer Company

  • 1. FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 | Confidential FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 (07 July to 25 July) Hafiz Ahmed Waqas ( UET Registration # 2011-civ-179 ) Email:h.a_waqas@yahoo.com, Cell: +92313-4010390
  • 2. 1 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014
  • 3. 2 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 (07 July to 25 July) Table of contents Acknowledgment…………………………………………………………………………………….. 03 Abstract…………………………………………………………………………………………………… 04 Introduction…………………………………………………………………………………………….. 05 Internship plan………………………………………………………………………………………… 05 Internship activities Schedule…….…….…………………………………………………….. 07 Introduction of company…………………….………………………………………………….. 09 Internship activities…………….……………….………………………………………………….. 11 Recommendations…………………………………………………………………………………… 27 References………………………………………………………………………………………………. 28
  • 4. 3 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Acknowledgment The internship opportunity I had with Fatima Fertilizer Company was a great chance for learning and professional development. Therefore, I consider myself as a very lucky individual as I was provided with an opportunity to be a part of it. I am also grateful for having a chance to meet so many wonderful people and professionals who led me through this internship period. Bearing in mind previous I am using this opportunity to express my deepest gratitude and special thanks to the senior unit manager maintenance of Fatima fertilizer who in spite of being extraordinarily busy with his duties, took time out to hear, guide and keep me on the correct path and allowing me to carry out my internship at their esteemed organization and extending during the training. I express my deepest thanks to Mr. Abdul jabbar, senior Engineer for taking part in useful decision & giving necessary advices and guidance and arranged all facilities to make life easier. I choose this moment to acknowledge his contribution gratefully. It is my radiant sentiment to place on record my best regards, deepest sense of gratitude to Mr. Raees Ahmed, Engineer, Mr. Muaaz Khalid, Engineer, Mr. Abdul Waheed, Associate Engineer and Mr. Muhammad Ishtiaq, Store in charge for their careful and precious guidance which were extremely valuable for my studies both theoretically and practically. I perceive as this opportunity as a big milestone in my career development. I will strive to use gained skills and knowledge in the best possible way, and I will continue to work on their improvement, in order to attain desired career objectives. Hope to continue cooperation with all of you in the future. Finally, I would like to thank my parents for a lifetime of love and support. They have taught me the most important lessons in life, and I owe all of my achievements to them. Sincerely, Hafiz Ahmed Waqas UET Reg. # 2011-civ-179
  • 5. 4 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Abstract University of Engineering and technology and FFCL have a long standing relationship, in which a selection of students in their final year of engineering study have the opportunity to complete a one month internship program at the Fatima Fertilizer company situated near Sadiqabad, Rahim Yaar Khan, Punjab, Pakistan. The internship program allows the student to partake in a number of engineering projects, providing the student with invaluable experience, as well as the opportunity to develop both personally and professionally. This report details the activities in which I was involved during my time at FFCL, and includes the following:  Safety orientation  Brief history of the project  Study of geotechnical report of the project  Study of design criteria report  Brief construction history of the project  Plant site visit  Understanding the procurement and execution procedure of civil works  Understanding the Fatima Fertilizer Company’s HSE and IMS policy  Drawing study of the project  Recommendations and conclusions Additionally this report will confirm the benefits of the internship program at FFCL, which has not only been an exceptional learning experience for the intern, but has also given him a significant base on which he can build his professional engineering career.
  • 6. 5 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Introduction This report gives an overview of the activities that I worked on during my internship, from 7 July 2014 to 25 July 2014, at the civil department of Fatima fertilizer company Ltd, situated near Sadiqabad, dist. Rahim Yar Khan, Punjab, Pakistan. I worked on several activities. This report focuses for the most part of the major activities and the smaller activities are more briefly described. The purpose of this report is to detail the reader into the activity of the intern during his employment as an intern between June 2014 and July 2014. The internship took place at Fatima fertilizer company Ltd, situated near Sadiqabad, dist. Rahim Yar Khan, Punjab, Pakistan. Internship plan  Safety orientation and allotment of PPE’s  Introduction of company  Introduction to staff members  Study of geotechnical report of the project  Study of general design criteria report of the project  Understanding the scope of civil work  Project site visits Np plant • NP plant • NP prilling tower • NP bulk storage PLANT SITE VISITS
  • 7. 6 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014  Understanding the procurement and Bidding procedure  HSE and IMS policy study  Study of Total Station  Safety talk  Overview of Mari project Drawing  Study of basic building construction book and preparation of Objective paper for technicians  Verification of civil drawing of USG (Utility steam generator)  Inspection of foundations of pipe sleepers at O & U  Study of maintenance report (ATA 2013)of cooling tower  Discussion about MOC (management of change)  Visit to Mari gas field  TST road Construction  Visit to Township civil office
  • 8. 7 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Activities Date Safety orientation and allotment of PPE 07-07-2014 Introduction of company Introduction to staff members Study of geotechnical report of the project 07-07-2014 to 08-07-2014 Study of general design criteria report of the project 08-07-2014 Understanding the scope of civil works at FFCL NP plant visit 09-07-2014 NP prilling tower NP bulk storage CAN plant PHS (product handling and storage) unit 10-07-2014 Rock phosphate storage TT (Transfer tower) Understanding the procurement and Bidding procedure UREA prilling tower visit 11-07-2014 Urea + CAN bulk storage Drawing studying of the project Evaporation pounds problem discussion O & U visit 14-07-2014 Study of Total Station (PSM) HSE and IMS policy study 15-07-2014 Safety talk Overview of Mari project Drawing Study of basic building construction book and preparation of Objective paper for technicians Verification of civil drawing of USG (Utility steam generator) 16-07-2014 Inspection of foundations of pipe sleepers at O & U Study of maintenance report (ATA 2013) of cooling tower Discussion about MOC (management of change) Study of PSM elements 17-07-2014 Discussion of PSM elements 18-07-2014 Study of JSA (job safety analysis) 21-07-2014 TST Road Construction Internship activities schedule
  • 9. 8 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Safety talk 22-07-2014 Visit to road construction site Visit to Township civil office 23-07-2014
  • 10. 9 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Introduction to company The Fatima Fertilizer Company Limited was incorporated on December 24, 2003, as a joint venture between two major business groups in Pakistan namely, Fatima Group and Arif Habib Group. The fertilizer complex is a fully integrated production facility, capable of producing two intermediate products, i.e., Ammonia and Nitric Acid and four final products which are Urea, Calcium Ammonium Nitrate (CAN) and Nitro Phosphate (NP) at Sadiqabad, Dist. Rahim Yar Khan. The Complex has a 56MW captive power plant in addition to off-sites and utilities. The Complex has been allocated 110 MMCFD of gas from the dedicated Mari Gas fields. Foundation stone was laid on April 26, 2006 by the Prime Minister of Pakistan. The construction of the Complex commenced in March 2007 and is housed on 950 acres of land. The Complex, when completed, is designed to produce: 500,000 Metric Tons of Urea per Annum 420,000 Metric Tons of Calcium Ammonium Nitrate (CAN) per Annum
  • 11. 10 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 And 360,000 Metric Tons of Nitro Phosphate (NP) per Annum. The Complex, during its construction phase engaged over 4,000 engineers and technicians from Pakistan, China, USA, Japan and Europe. The Complex provides modern housing for its employees with all necessary facilities. This includes a school for children of employees and the local community, a medical Centre and sports facilities. The fertilizer complex is a fully integrated facility, capable of producing intermediate and final products.*
  • 12. 11 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Internship activities (Daily report) Started from 07-07-2014 07-07-2014 We arrived to plant site at 7:00 am and reached to human resources department where we asked to provide the data required to issue the ID card. Then we went to T.T.C. (Technical training centre) for introduction of the organization and to have safety orientation. We got PPE’s (safety shoes, glasses and helmet). After that we brought to the maintenance department where we sent to our respective mentors. I met with Mr. Abdul Jabbar; he gave me the brief project history of Fatima Fertilizer Complex. Some of the details are as follows Project Fatima Fertilizer Complex, RAHIM YAR KHAN Client Fatima Fertilizer Company ltd. Consultant NESPAK & Akbar Associates Mr. Abdul Jabbar gave me the Geotechnical investigation report of the project to study and then there was end of the working day. 08-07-2014 Reached office at 7:00 am Major activities of the day  Completion of Geotechnical report study  Study of C.B.R method for pavement design  Discussion with Mr. Muhammad Ishtiaq regarding clerical work for bidding and procurement purposes. I got familiar with different terms
  • 13. 12 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 like JR (job request), JO (job order), PR (Purchase request), PO (Purchase order), CST (comparative statement) MIR (material inspection report) MIV (Material issue voucher) also type of budgets are discussed e.g. Capex (capital expenditure), Opex (operational expenditure) and store & spares etc.  Discussion with Engr. Muaaz Khalid about civil scope in Fatima Fertilizer These includes  Maintenance of structural components (Concrete repairing work, flooring, plastering, pavement laying and installation of anti acid tiles etc.)  Infrastructural development and extensions  Foundations design, construction and then accurate placement of industrial equipment on their respective location of embedded anchors.  Heavy design is not carried out by the civil department, for this, design consultants are hired and during construction supervision is done by the civil department.  Civil department prepare BOQ's and Material statements to assist procurement and bidding work. At the end of working day I got design criteria report of FFCL to study. 09-07-2014 After arriving office I submitted the design criteria report which I have to study. Then I met with Mr. Abdul Waheed, he took me with him to the plant site so that I could get some construction history of the plant. He showed me dyke wall, pipe sleepers, pipe racks and transfer tower. In the mean while we reached to the CCR-2 where construction of door was started. We got inside the CCR-2 and I came to know the procedure of issuing permit which is known as P.T.W. (permit to work).these are of two types i.e. Hot and Cold. Visit to NP plant We proceed to NP (nitric phosphate) plant after wearing complete PPE’s. Mr. Abdul Waheed briefed me about the construction stage and told me different situations which they have encountered while construction period. Structure was of R.C. (reinforced concrete) material and it is a multi storey frame structure having columns, beams and slabs. Its lift shaft was firstly planed to be constructed by brick masonry but due to the time limitations it is then constructed seamless R.C. shaft with the help of slip form. There were anti-acid tiles placed over the floor to protect floor from adverse existing environmental conditions.
  • 14. 13 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Engr. Muaaz told me that NP plant building is under designed and overloaded and they have done column jacketing for continuously bracing of the column and to reduce column buckling, during visit Mr. Abdul Waheed showed me the continuously braced column. At some locations they have cut the peripheral struts to provide the space for easy transportations of industrial equipments and to provide structural stability they have used embedded plates in column at respective upper and lower struts and then two columns were strengthened by supporting steel struts along with present beams. Safety arrangements In the plant safety arrangements were good, at various locations showers and fire fighting instruments were present. Prilling tower of NP To get familiar with different structural components of prilling tower I first saw the tower from the bottom where prilled product was coming from the top and cool air was moving towards the top to dry the liquid product and a Scraper was collecting the product and sending towards the conveyor belt which convey the product towards the packing unit or bulk storage. With the help of lift we moved towards the top of the tower, lift was installed in NP plant and from steel bridges we went to the top of the tower. These bridges were purposed by the designer as a R.C. bridges but due to their higher elevation there was difficulties of shuttering and form work so that’s why site supervisor replaced these R.C. bridges after getting approval, by pre cast steel bridges which were later on placed over the span with the help of crane. At the top of tower I saw some passages in between some partitions which were made by cutting of seamless concrete of tower for transportation of industrial equipments. To make this passage they use core cutter and cut cores. Prilling tower was made seamless with the help of slip form (Fig 1). According to Mr. Abdul Waheed, they placed first floor over the arrangement of slip form as at this significant height scaffolding and shuttering was not possible, after setting the concrete of first floor they constructed the walls of next floor and then other floors were constructed over the base of first floor. Prilling tower of NP
  • 15. 14 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 There were embedded plates present in the slab of top floor of the tower for the installation of Gantry crane which currently was not installed and I saw the worker carrying some mechanical equipment loaded on their hands to send this on the top of the tower. These workers were facing too much difficulties while its transportation. Visit to Bulk storage of NP Bulk storage of NP is a shell structure (Fig. 2) and designed by Akbar associates. Walls of this storage are damp proofed with bitumen coat and poly thin sheet to save product from moisture. Figure 2 Visit to CAN plan CAN (calcium ammonium nitrate) plan is located near the NP plant, this plant is multi storey steel frame structure and it may be due to the reason that this product has great affinity to moisture (hygroscopic material), keep environment wet, dirty and form crystals and cause deterioration of concrete so steel is best Figure 1
  • 16. 15 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 suitable material for construction. Visit to civil site office It is located near the CAN plant and constructed in containers. Near the office, construction of wash rooms was continued. The specialty of this construction is that these wash rooms are constructed in containers, for insulation they have built partition walls of brick masonry instead of using thermo pore and tile fixing was done on the container’s floor. 10-07-2014 Visit to PHS Today I have visit with Mr. Raees Ahmed to the PHS (product handling and storage) unit. Major activities of the day are  Visit to transfer tower 3, 4, and 5  Visit to bulk storage of CAN and Urea This is Gabel framed steel structure (Fig-3) to store bulk quantity of fertilizer. There are tripper cars (Fig-4) and conveyor belts installed for effective movement and storage of fertilizer.
  • 17. 16 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Visit to screening unit In this unit prilled product is screened and then after gradation goes to storage or packing. In CAN (calcium ammonium nitrate) and urea screening unit there was a lot of moisture present in the building due to hygroscopic property of CAN. This moisture is reacting with product, form different products which are harmful for structure and causing disintegration of concrete so there is need of periodic repair of the structure. While construction there should be the use of some admixtures or epoxy etc. to minimize adverse effect of chemicals on concrete. Visit to bagging plant In this unit product reached from transfer tower and packed. This is also a multi storey R.C. frame structure building having 30 m height. I saw inverted T-beam arrangement in this structure. Along the bagging plant there was a cantilever slab of transmission tower which was supported by steel pipes known as knee beam. Visit to Rock phosphate storage unit Raw material is stored here and it is a multi storey Gabel framed R.C.C. structure. Other arrangements are like bulk storage units. Here bucket tower is also present to raise the raw material and make piles of material so that it could be used in rainy season. Fig. 4 Fig. 3
  • 18. 17 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Discussion about bidding procedure and Budget To initiate any civil work in the company there is some standard procedure which is described as under.  Necessity of the work  Survey is conducted and BOQ is prepared  Raising of JR (job request)  RFQ’s (Request for quotations) after approval of JR  Collection of tender documents and bidding  Preparation of CST (comparative statement)  Issuance of JO (job order) Material for construction is generally provided by the FFCL to the contractor for this purpose organization has its own store; respective terms are PO, PR, MIR, and MIV. Regarding budget, there are three types of budgets CAPEX, OPEX and store & spare. CAPEX is related to new works, OPEX is related to maintenance and S&S is related to store. Before the start of new fiscal year every department has to anticipate their expected expenditures and then has to claim budget accordingly, for approval department has to give justifications and then they should consume their allocated budget to hold their position. Assessment of any engineer is done on the basis that how much budget they have consumed. Especially consumption of CAPEX is very important which reveals their work efficiency. Repeat order is another term which is used for the work which is required to be executed and has amount or /and quantities equals to or less than a work which already has been completed in the past six months. The reason of restriction regarding amount and quantities is economy of scale (contractor should do work with lower prices for large work). Assessment Engr. Muaaz Khalid took my evaluation by asking me to draw Stress strain curve of the steel which I was able to draw successfully.
  • 19. 18 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 11-07-2014 Visit to maintenance workshop Mr. Abdul Waheed showed me this building. In this building the roof is of pre cast double Tee beams and floor is of R.C.C because of heavy movement of equipment and machinery. Visit to urea plant After workshop we proceeded to urea plant, this is framed steel structure, its floor is of R.C.C. Outside of the plant there was a problem of installation of an equipment, the foundation of which was to be build exactly over the underground raw material conveyor trench, to solve this problem they made foundation a little far away from the trench of conveyor and placed an underground beam over it and then placed the equipment. I also saw heavy pumps and valves there, used for transportation and regulation of different fluids. Prilling tower of UREA Mr. Abdul Waheed told me very interesting facts about the construction phase of urea tower. According to him at the time of construction the climate was hot and concrete was setting rapidly and sticking with slip form. The unbalance of supply and demand of concrete was also one of the reasons. When they reached at the height of 14 m, due to honeycombing of the concrete, the stability of concrete/ tower was questionable. To overcome this problem they built two additional R.C walls around the existing concrete of the tower and thickness of wall increased from 800 mm to 1200 mm. These two additional walls provided stability to the existing tower and also repaired the honey combed concrete by grouting effect. The scraper Typical industrial pump Honey combing of concrete
  • 20. 19 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Concrete pump roof was laid by simple shuttering instead of slip form. Next to cope with sticking problem of concrete to the form they managed the difference of supply and demand by using concrete pump and tower crane. At certain height of urea tower there was some cantilever portion to built, for this purpose they extended the walls of tower from slip form by usual shuttering and after getting strength of this portion they used these for scaffolding and shuttering by the means of rope to built cantilever form. The Lift shaft and stair case were built by slip form also along with the construction of tower. Stairs were pre casted and of steel material. A crane was used to install this stair which carried the parts of stair to the top and construction was done starting from top and ending at bottom. The height of the tower is 98 m and the height of lift shaft is 101 m. On the roof of tower I also saw the lightening conductors. At the floor of tower anti acid tiles were installed which were made by china. According to Mr. Muaaz Khalid the curing of the tower is very difficult for this purpose they have used some water reducing admixtures. There was use of some admixtures also for jointing (Sika flex, SBR) and acting as accelerators and retarders. Revisit to NP plant At NP plant some repair work was started, Mr. Abdul Waheed showed me a repaired beam which was completely defected by acid. For repairing purpose they completely remove the almost middle third part of the beam after providing shoring/support to the structure and re-shuttering was done, after placing reinforcement with proper lapping they poured the concrete. Near the repaired beam there was excessive vibrations and shaking of the floor which
  • 21. 20 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 was needed to be controlled. Anti acid mortar was used at the locations were adverse effect of acid was anticipated or acting. Drawing studying Engr. Muaaz Khalid told me the way to read the industrial drawing of the FFCL. Every equipment in the industry has got a specific tag, if information of any particular equipment is required, we first locate its position on the main map, around the equipment there is some specific drawing number on which we can see its magnified view, Near this view there is detailed drawing number on which we can see its top view, elevations and sections etc. Evaporation pounds Problem discussion with Engr. Muaaz. There was complain from the people residing near the plant that there ground water is infected by the polluted water which was intercepting into ground from evaporation pounds. Our office staff told me that they have used polythene sheets as a Geo membrane. As a response of these complains civil department was intended to execute geotechnical investigation near the evaporation pounds. For this purpose bore holes will be excavated to get samples of soil and ground water and will be tested in the FFCL laboratory to take further actions. 14-07-2014 Total station discussion Mr. Muhammad Jaffar Hussain, Surveyor at FFCL gave me important information regarding Total station, the important points of which are as under  Press the on button and then make a job profile before starting any work and to have record of your performed work  Press STN button to set the instrument at station point and to give information regarding station point. (N, E, H.I etc.)  Keep your eyes on the LCD of the instrument and follow the instructions.  Mr. Jaffar told me the way to lay out a building, co-ordinates of which are given. Total station
  • 22. 21 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 An over view to O & U unit Mr. Jaffar took me with him to off sites and utilities and showed me the rain water pit, raw water pit, Cooling tower and water treatment plant. The weather conditions were very sewer and we were unable to continue our visit so we came back. 15-07-2014 Safety talk Mr. Abdul Jabbar delivered the safety talk at civil store and the agenda was Accidents its prevention and after effects of accidents. They told us after accidents occurrence, there should proper investigation and there should be route cause analysis and reporting of it. After all procedures there must be proper and adequate communication of it so that other people should get aware of it for prevention of accidents in the future. Overview of Mari project Drawing I saw the drawing plan of the site and also read the memo which was written by the Engr. Muaaz to a concern person regarding permit of the work. Discussion and study of HSE and IMS policy of FFCL and RCFA (root cause failure analysis report) Any organization is how much concerned and conscious about the safety, environmental protection and health of their employees, is judged by two criteria namely safe million man hours and TRIR (total recordable incident rate, safe million man hours are affected due to fatality or LWI (lost work injury i.e. person will unable to do work for some time or forever).While working there may be different types of probabilities which are given as under  Fatality  Majors (LWIs & RWCs i.e. restricted work case )  Recordable Injuries  Near Misses or First Aids  Hazards: Unsafe Acts Employee-Created Unsafe conditions
  • 23. 22 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 If there are 30000 near misses happened and no remedial measure is taken then it may cause one fatality. In RCFA we try to find out causes/possibilities of different incidents and take preventive steps to stop them or if they have been occurred already then try to find out possible reasons and in future, these events not happen again, we suggest different conditions to implement. Study of basic building construction book and preparation of Objective paper for technicians. MR. Abdul Jabbar gave me the assignment to make objective paper for technicians. I prepared this paper after reading Basic building construction book. 16-07-2014 Verification of civil drawing of USG (Utility Steam generator) For verification of USG drawing Mr. Raees and Mr. Zahoor, Senior Quantity surveyor took me with them. We reached to the location and verified the drawings. We found some additional foundations of pipe rakes over there which were absent on the drawing. Mr. Zahoor marked these additions on the drawing. Inspection of foundations of pipe sleepers at O & U I with Engr. Muaaz Khalid went to the O&U and saw the poured concrete of foundations which were built for pipe sleepers. Discussion about MOC (management of change) After inspection we came back to office, and on the way to office Mr. Muaaz told me about MOC. Whenever someone raise the MOC (raised for new work), after its approval there will be IFR (issued for review) report so that if any party has some issue then they should inform. After this there will be issuance of IFC (issued for construction) report. If civil department will not have IFC then nobody in the plant site will provide them PTW (permit to work). Typical pipe sleeper
  • 24. 23 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Study of maintenance report (ATA 2013) of cooling tower The main points of this report are  Concrete was in good condition  A minor repair of column was done  At expansion joint, some sealant was used to repair the already placed sealant.  Saw also the pictures attached with the ATA (annual turn around) report. Visit to Mari gas field I with Mr. Obaid went to Mari gas field where construction was carried out under the supervision of civil department of FFCL. After about 40 minutes of driving, vehicle was out of order and stop in the middle of road. We were unable to reach at Mari. We informed to civil department and asked them to send another vehicle. The replacement came after two and half hours later and we came back to FFCL. The condition of vehicle was looking good but it fails due to improper maintenance and care. There should be proper care of vehicles, belongs to FFCL. 17-07-2014  Study of PSM elements.  Report writing 18-07-2014 Discussion about elements of PSM (process safety management) with Engr. Muaaz Khalid. Cooling tower
  • 25. 24 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 21-07-2014 Study of JSA (job safety analysis) report This kind of report is prepared for extra ordinary/out of routine work. I read JSA of task of Bitumen heating and spraying for admin road. The mean features of this report are given as under  Contains the information regarding Standard and special PPE’s required for the job.  Task steps  Potential hazards  Probability level i.e. (small, medium, high)  Control measures to be taken while job. In bitumen heating and spraying following measures should be taken to avoid any undesirable incidence  Working area should be properly barricaded  Work should be executed under the supervision of expert and authorized persons  Fire fighting arrangement should available at the site, like fire extinguishers, detergent mixed water and sand etc.  Proper PPE’s should be worn at working area  Un authorized movement in the area should be restricted/discouraged In addition to all, traffic controllers and necessary sign boards should be placed at start and end of project site. TST road Construction TST (triple surface treatment), Near the HR department, Road construction was going on and Mr. Obaid briefed me about its construction process. According to him we do TST in the following manner Preparation of sub grade by performing NGC (natural ground compaction) is done and for this proposed top level and cross sectional details of the road are given to
  • 26. 25 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 the contractor so that he may excavate or fill the ground to have required level of sub grade. Slope/camber is provided while NGC so that finished surface follow the same trend. Procter test in the lab is performed and after compaction of sub grade Field density test of sub grade is carried out and further work proceeds until contractor has achieved 95% of Procter. Over the sub grade, Sub base and base layer are laid. Over these two layers priming is done (40% kerosene oil and 60% bitumen) and after priming, first coat of bitumen is laid. Over first coat of bitumen dry aggregate is thrown and spread by the labor and then rolling is done. After rolling they check the undulation and pits etc. with the help of string. In the similar manor second and third layers are laid. After three layers they also do the special treatment over the top surface to have smooth running of the wheel. This special treatment includes sprinkling of priming coat over the top surface and then pouring of sand afterwards. 22-07-2014 D level meeting/Safety talk Agenda of meeting was occupational health and this meeting was chaired by Mr. Abdul Jabbar. They told us, what is occupational health, why it is necessary to discuss and what are the benefits to employee and employer as well. He emphasized on awareness of different occupational safety hazards and their respective preventive measures. Visit to road construction site They were laying second layer of TST after checking the leveling of first layer and then rolling of second layer was started.
  • 27. 26 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 23-07-2014 Visit to Township civil office Township is the housing society of the FFCL. To get familiar with civil works at township Mr. Muaaz sent me there. I met with Mr. Sikandar, GTE (Graduate Trainee Engineer). He gave me the drawings of Masjid of township to study. I studied that drawing and discuss with him. After that we went to construction site and saw the construction work.
  • 28. 27 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 Recommendations  Installation of Gantry crane over the prilling tower of CAN  Use of special chemicals, add mixtures or epoxy to reduce deterioration of the concrete at areas subjected to or prone to chemical attacks, moisture and salts.  The vehicles which are property of FFCL should properly maintain to avoid their failure while traveling for important work.  Workers while working, avoid wearing PPE, there should be proper instructions and counseling of them.
  • 29. 28 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 References  * Intern ship report by Tariq Aziz  https://www.google.com.pk/search?q=Slip+form&rlz=1C1VASU_enPK540P K540&es_sm=122&source=lnms&tbm=isch&sa=X&ei=niG- U7r6FdKA7Qaus4GoAQ&ved=0CAgQ_AUoAQ#q=shell+structure&tbm=isch  https://www.google.com.pk/search?q=shell+structure&tbm=isch&ei=AFC- U-2aO4y70wW3z4GwDw  https://www.google.com.pk/search?q=tripper+car&rlz=1C1VASU_enPK540 PK540&espv=2&source=lnms&tbm=isch&sa=X&ei=s12- U8LiKdGM7AaEtIDwCQ&sqi=2&ved=0CAYQ_AUoAQ&biw=1366&bih=667# q=tripper+car+wear+house&tbm=isch  https://www.google.com.pk/search?q=gabel+frame+steel+structure&tbm= isch&ei=uF2-U5HVOeOo0wXPiYGwBw  http://www.google.com.pk/imgres?imgurl=http%3A%2F%2Fwww.mainten anceonline.org%2Fmaintenanceonline%2Fcontent_images%2FPage%25252 023%252520-%252520Untitled- 2%252520(2).jpg&imgrefurl=http%3A%2F%2Fwww.maintenanceonline.org %2Farticle.asp%3Fid%3D5723&h=1917&w=4442&tbnid=Q3C7c6THX3YCsM %3A&zoom=1&docid=T8ZMADEuXqVtTM&ei=nkTDU67vCq754QTS34HQCA &tbm=isch&ved=0CFgQMygfMB8&iact=rc&uact=3&dur=832&page=3&star t=31&ndsp=20  https://www.google.com.pk/search?q=industrial+pumps&rlz=1C1VASU_en PK540PK540&espv=2&source=lnms&tbm=isch&sa=X&ei=m0TDU- _NC4X0OZPvgOgC&ved=0CAYQ_AUoAQ&biw=1366&bih=667#q=honey+co mbing+in+concrete&tbm=isch  https://www.google.com.pk/search?q=industrial+pumps&rlz=1C1VASU_en PK540PK540&espv=2&source=lnms&tbm=isch&sa=X&ei=m0TDU- _NC4X0OZPvgOgC&ved=0CAYQ_AUoAQ&biw=1366&bih=667#q=Concrete+ pump&tbm=isch  https://www.google.com.pk/search?q=industrial+pumps&rlz=1C1VASU_en PK540PK540&espv=2&source=lnms&tbm=isch&sa=X&ei=m0TDU-
  • 30. 29 FATIMA FERTILIZER COMPANY LIMITED Internship report 2014 _NC4X0OZPvgOgC&ved=0CAYQ_AUoAQ&biw=1366&bih=667#q=sikaflex&t bm=isch