Discussion Points Protocols Multi-Branding Strategies Standards of Accreditation Professional Certifications Cost Segregation Study Balanced Scorecard/Benchmarking
Protocols Different professions have their own definition.  From Houghton Mifflin Dictionary, defined as: Forms of ceremony and etiquette observed by diplomats and heads of state,  Code of correct conduct: safety protocols; academic protocol, etc., or Plan for a course of medical treatment or for a scientific experiment.
Why, Why, Why? Franchise business owners know their success came easier as someone prior to them took the time to  IDENTIFY  and  DOCUMENT  each and every business process to secure success. Written protocols protect against the bus coming!!!
The Protocol Process Identify the processes in areas of practice responsibility. Break each process into smallest pieces. Solicit team member input. Document/Revise/Follow/Improve Repeat 3 and 4 continuously
RETAIL MANAGEMENT TRAINING PLAN Brand Training & Orientation  In-Store Evaluation  Integrated Brand Training (Combo/Trombo)  “ Servsafe “ Cake Decorating  Production Training  Shift Leader Training & Certification  Basic Management Training  Human Resource Training  Store Management Training  Franchisee Business Course
Symptoms-rapid heart rate >150 bpm with A-Flutter or A-Fib on 12 Lead EKG. Treatment-If patient is hemodynamically unstable with decreased mental status: Sedate with Diazepam, 2-5 mg increments, SIVP as appropriate up to a total dose of 0.2 mg/kg). If Atrial Fibrillation-Synchronized cardioversion at: Standard 100 joules; proceed to 200, 300, 360 joules. Zoll Biphasic 30 joules; proceed to 50, 75, 100, 120, 150, 200 joules. If Atrial Flutter- Synchronized cardioversion at: Standard 50 joules; proceed to 100, 200, 300, 360 joules. Zoll Biphasic 10 joules; proceed to 20, 30, 50, 75, 100, 120, 150, 200  joules. If patient is hemodynamically stable w/severe Chest pain or SOB see  Chest Pain/CHF protocols. Albuquerque Paramedic Protocol AC-4 for Atrial Fibrillation & Atrial Flutter treatment:
Multi-Branding Strategies The process of incorporating two or more partners in a location. Examples in the franchise food industry: Bain Capital’s  Dunkin Donuts ,  Baskin Robbins  ice cream stores, and  Togo’s  sandwich stores. 53% of all new Dunkin Donuts locations are multi-branded units.  YUM! Brands varies combinations of  Taco Bell ,  Pizza Hut ,  KFC ,  A&W  and  Long John Silvers
Multi-Branding Benefits Consumer perception of satisfaction greatly improved when multiple brand choices under one roof Two brands occupying same location save on facility purchase and occupancy costs. Multi-branded restaurants in YUM! family have higher average unit sales volumes and cash flow than singles Multi-branding in the franchise arena experiences greater local capture when each brand has a complementary  “daypart”  (breakfast, lunch, dinner) orientation.
Multi-Brand Challenges A sacrifice of identity and possible confusion when different brands share locations. Duplication of equipment/staffing=higher costs. Staffing difficult if both brands share employees. Some brands are just no meant to go together . Multi-branding cannot be used to hide operational, brand or menu problems.
Will it work in vet practice? Multi-branding strategies can consist of complementary ancillary services owned by separate, unrelated entities sharing the same physical location such as: Kennels, boarding, grooming, day/” date ” care Veterinary pharmacies Specialists Rehabilitation facilities Alternative therapy practices Retail facilities Crematorium (rather “funeral home”) Diagnostic imaging Obedience training Behavioral Counseling
National Examples Some retail providers have employed a multi-branding strategy But usually one predominant entity in the strategy Ancillary service providers are subject to significant operating restrictions.  Practice owners who enter into multi-branding  agreements should strive to have  equal  representation for optimal functioning.
Standards of Accreditation Companies of all sizes strive for recognized accreditations for growth.  ISO’s (International Organization Standards) are voluntary technical agreements which provide the framework for compatible technology worldwide. Manufacturing businesses spend significant time, effort and money to obtain ISO 9000 and ISO 14000 certifications. Enables them to better participate in international trade.
Franchise Example Dunkin Donuts uses their own internal, proprietary accreditation models to evaluate store compliance with company financial, operational, and customer service objectives. The parent entity regularly reviews a franchisee’s: Written systems in place covering all areas of business operations (customer service, HR, training, management) Formal Business Plan (historical and projected) Growth Plan (territory additions, outside expansions, etc)
“ A” –company allows you to do whatever you wish within territory & provide you with CEO’s cellphone # “ B” –company places a “development hold” on any growth plans and CEO places a block on his cellphone number “ C” –company forces franchisee into a transition phase of improvement or else they change the locks on your door!!!! Not many second chances are given… Dunkin Donuts Rating System
Human Medicine Joint Commission on Accreditation of Healthcare Organizations (JCAHO) evaluates and accredits 15,000 health care organizations and programs in the US. Independent and predominant accrediting body in U.S. health care. Organizations must undergo on-site survey by a JCAHO survey team at least every three years. In 2006 will make unannounced evaluation visits (by request or complaint).
American Animal Hospital Association (AAHA) International association of more than 33,000 veterinary care providers who treat companion animals. AAHA Standards of Accreditation are benchmarks of excellence to raise the care levels provided. Over 3,000 veterinary hospitals voluntarily participate in AAHA hospital evaluation program.
AAHA Benefits Standards are not a punitive measure but a set of guidelines to raise, maintain, and improve veterinary care to or above accepted practice standards Tools are already in place to assist vets Evaluations and care guidelines are an easy way to obtain advice on designing protocols and a framework for operations (see the recent Dental Care Guidelines)
AAHA Perspective Practices that choose to become AAHA-accredited typically want an objective, third-party review of their practice to ensure that they are meeting or exceeding high standards of medical delivery, utilize cutting-edge management, and recognized as such. Dr. John Albers, AAHA Executive Director, “Just let us come in to see if what you say is really going on truly is.”
AAHA Problems? Within a 50 mile radius of my office, there are only  51  AAHA-accredited practices (including 2 in Boston). One complaint-public does not recognize, or even know about, the differentiation factor among haves & have nots. Some fault attributed to practices themselves for not using all kinds of patient contact (ads, video, DVM and staff) to publicize the AAHA standard.   Some may be institutional-”Build it and they will come.” (but who will come?).
Professional Certifications In certain fields of professional study, there are individual achievements that denote technical competence. For example: DVM (Doctor of Veterinary Medicine) MD (Doctor of Medicine) CPA (Certified Public Accountant), and JD (Doctorate of Jurisprudence) CFP ® (Certified Financial Planner™)
Professional Certifications But once you or your staff attain a certain level or designation, are you all “educated out”? Franchisees in different industries have a multitude of distance learning and on-site programs to keep regular, third-party training in force (as opposed to “train-the-trainer” approaches) See how some franchise operators keep up in their own industry
Nation's largest retail provider of prescriptions operating 4,100 stores in 29 states.  Employs 16,000 pharmacy technicians who serve as primary contacts daily for hundreds of thousands of customers. CVS pharmacy technicians: verify insurance and billing information note customer medication/product preferences direct customer inquiries to pharmacists,  handle many among other duties.
Training Problems Pharmacy technician training materials were not used consistently by each location. Most instruction given via unstructured OJT In 1999, CVS/pharmacy centralized and standardized its pharmacy practices and workflow, including using the THINQ Training Server Learning Management System (LMS), a web-based, distance-learning format integrated with CVS/pharmacy's testing and assessment information.  Huge success, promotes uniform & regular training schedules.
John Deere’s Initiative Problem   Lack of qualified personnel who could take charge and lead a John Deere Dealership. Result   Formation of the John Deere Dealership Management Program, a cooperative partnership between John Deere and the University of Missouri’s  College of Agriculture, Food and Natural Resources.
Learning paths on John Deere University’s web-based program provide a blueprint for continuing education in each functional area and are divided into five training courses: Core (i.e. Hydraulic Certification) Selling & Marketing (i.e. Partnering for Customer Value) Resource Utilization (i.e. Service Advisor Certification) Product Application (i.e. Air Conditioning Systems) Management Advanced & Master Certifications are given-need 16 credits (4 days) for annual recertification
Other Certifications You’ve Seen? The Funny Ones CBT (Certified  Bagel  Technician-yes, on Cape Cod) CASIT (Certified Auto Sound Installation Technician) The Elusive Ones 75 AVMA board diplomates in Veterinary Dentistry 43 AVMA board diplomates in Veterinary Pharmacology
DVM Specialty Designations According to AVMA, there were only 7,970 AVMA recognized board-certified diplomates as of December 2004. Introduction of a board-certified practitioner into a practice is a great achievement by itself, but the combination of various specialties can only bring patient care  geometric  dividends.  Anesthesiologists   148 Dentists     75 Canine & Feline Practitioners   408  Internal Medicine Small Animal    788  Emergency and Critical care   156 Pharmacology     43 Radiologists   264 Veterinary Surgeons   1,041 Animal Behaviorists   36 Nutrition     47
New Certification Ideas Other areas for veterinary practitioners to acquire knowledge themselves or to have staff gain talents: UC Davis School of Veterinary Medicine has a one-year residency in clinical veterinary pharmacy that provides practical training in the principles of animal medicine for graduates of accredited human schools of pharmacy. Some veterinary practices are now employing human pharmacy-trained technicians to staff their own veterinary pharmacy in a fully-dedicated model patterned after human pharmacies. Practices could form joint “training” ventures among area practices to upgrade training and share ideas.
Cost Segregation Study A comprehensive engineering-based analysis of the total cost or value of building and site improvements. Allows building owners to re-allocate Code Sec. 1250 (real property depreciated over 39 years) to Code Sec. 1245 (personal property depreciated over 5 to 15 years). Results in  increased  depreciation deductions. Generally, the more specialized and unique an asset is, like a veterinary practice facility, the greater the tax benefits derived.
Thank’s Judge Billings  Learned Hand! ( January 27, 1872 – August 18, 1961)   Cost Segregation results need to be disclosed to the IRS by the taxpayer filing Form 3115 (Change of Accounting Method). IRS Revenue Procedure 2004-11 allows property owners to retroactively catch-up on missed depreciation on assets owned back to 1987 with a one-time catch-up provision under an IRC Section 481(a) adjustment, precluding preparation of amended tax returns.
Saved by 1997 Tax Court Case! Hospital Corporation of America v. Commissioner Defines the nebulous “permanence” issue regarding tangible personal property.  Court concluded that property, which qualified as tangible personal property for investment tax credit purposes under pre-1981 case law also qualifies as tangible personal property.  Different tests are used to determine whether an asset is an inherently permanent structural component or tangible personal property.
Three Essential Steps… Detailed engineering review of project invoices, drawings and specifications and a non-intrusive engineering study of a building's walls, flooring, ceiling, plumbing, electrical, lighting, telecommunications, heating, and cooling systems. Property inspection for comprehension of function, nature and operation of various building components and verify accuracy of construction or property documents. IRS specifies: written "cost segregation study" for legal basis "logical and objective measure" to support "tangible personal property” a study not based upon "non-contemporaneous records, reconstructed data, or taxpayer estimates or assumptions that have no supporting records."
Real-World Examples According to firm that wrote IRS cost seg. audit guidelines, veterinary practices that undergo cost segregation analysis are of two types: Free-standing facilities which average 18% reclassification from 39 year to 15 year property and 20% from 39 year to 5 year property. Projected tax benefits average $81,000. Large retail practice facilities (mall locations) which average $650,000 in build-out costs. 35% of costs can be reclassified from 39 year to 5 year property generating $52,325 in estimated tax benefits.
One Dunkin Donuts Location Cost segregation plan for $1.3 million facility purchase shows $346,000 allocation to 5yr and 15yr assets 2004 Depreciation Deductions: Pre-study $ 17,000 Post-study $ 48,000* add’l deduction $ 31,000 *unable to take bonus depreciation due to extenuating circumstances
% Impact on Asset Base Now 27% of total assets are reclassified to 5 & 15 yr property!
Balanced Scorecard/Benchmarking Franchise owners and chain management have utilized benchmarking to highlight financial strengths and weaknesses in store-to-store and intra-store measurements. But the true progressives utilize intra-entity benchmarking and metrics to measure their progress. Financial metrics are typically only a component. Customer Service is measured in all aspects. But how can we be cutting edge?
Balanced Scorecard Robert Kaplan and David Norton developed a technique called the Balanced Scorecard in 1997. Process integrated strategy execution, performance management, and facilitated organization learning. Kaplan argued  traditional  benchmarking based on production and financial indicators provided limited insight into business’s key strategies and that comparisons were generally made to the  average  of a group of practices. Perfect for situations such as lack of focus or direction, a new strategy, or a need to achieve organizational alignment to a common vision.
Balanced Scorecard A Balanced Scorecard approach helps practices develop primary goals directly from a mission statement, practice vision, and defined critical business strategies to implement your practice vision. The approach takes a pulse of: the financial and non-financial measures of your practice,  its leading and lagging indicators,  employee and patient satisfaction, and short- and long-term strategy. Kaplan’s approach utilizes a strategy map (the “Scorecard) to develop a practice’s key strategies. The map shows cause and effect linkages between the various parts of the strategy.
Sample Scorecard -Implement PetCare TV dental programs in waiting areas -Document!!! -Develop staff communication plan (DVM, tech, kennel, recept., other) 100% DVM recommended (PMS review) Compliance Year 1-45% Year 2-60% Year 3-75% Percentage of patients compliant with semi-annual screenings Encourage compliance with AAHA dental screening recommendations over current 30% standard Initiatives Target Key Performance Measure Objective
Key Points To Incorporate Develop strategic objectives incorporating each of the following perspectives: Financial, Customer, Internal Process, and Learning and Growth. Team members directly affected by the vision should be involved. Develop both leading and lagging indicators for each of the above strategic objectives, agreed to by team members. Responsibility s/b assigned to  someone  for completion of the initiative developed. Provide regular progress reports (charts, graphs and reports) Provide meaningful feedback to employees on accomplishment with incentives to reward achievement. A special thanks to Elizabeth Bellavance, DVM for her expert knowledge on the Balanced Scorecard!
Practice Progress Reports

Remaking Your Practice Using Franchise Business Financial Concepts

  • 1.
    Re-making Your PracticeUsing Franchise Business Financial Concepts
  • 2.
    Contact Information MarkJ. M c Gaunn, CPA/PFS, CFP ® President MJM Financial Advisors, LLC 114 Turnpike Road, Suite 107 Westborough, MA 01581-2861 phone: (978) 405-3133 e-fax: (978) 776-2609 e-mail: [email_address] web: www.mjmfa.com
  • 3.
    Discussion Points ProtocolsMulti-Branding Strategies Standards of Accreditation Professional Certifications Cost Segregation Study Balanced Scorecard/Benchmarking
  • 4.
    Protocols Different professionshave their own definition. From Houghton Mifflin Dictionary, defined as: Forms of ceremony and etiquette observed by diplomats and heads of state, Code of correct conduct: safety protocols; academic protocol, etc., or Plan for a course of medical treatment or for a scientific experiment.
  • 5.
    Why, Why, Why?Franchise business owners know their success came easier as someone prior to them took the time to IDENTIFY and DOCUMENT each and every business process to secure success. Written protocols protect against the bus coming!!!
  • 6.
    The Protocol ProcessIdentify the processes in areas of practice responsibility. Break each process into smallest pieces. Solicit team member input. Document/Revise/Follow/Improve Repeat 3 and 4 continuously
  • 7.
    RETAIL MANAGEMENT TRAININGPLAN Brand Training & Orientation In-Store Evaluation Integrated Brand Training (Combo/Trombo) “ Servsafe “ Cake Decorating Production Training Shift Leader Training & Certification Basic Management Training Human Resource Training Store Management Training Franchisee Business Course
  • 8.
    Symptoms-rapid heart rate>150 bpm with A-Flutter or A-Fib on 12 Lead EKG. Treatment-If patient is hemodynamically unstable with decreased mental status: Sedate with Diazepam, 2-5 mg increments, SIVP as appropriate up to a total dose of 0.2 mg/kg). If Atrial Fibrillation-Synchronized cardioversion at: Standard 100 joules; proceed to 200, 300, 360 joules. Zoll Biphasic 30 joules; proceed to 50, 75, 100, 120, 150, 200 joules. If Atrial Flutter- Synchronized cardioversion at: Standard 50 joules; proceed to 100, 200, 300, 360 joules. Zoll Biphasic 10 joules; proceed to 20, 30, 50, 75, 100, 120, 150, 200 joules. If patient is hemodynamically stable w/severe Chest pain or SOB see Chest Pain/CHF protocols. Albuquerque Paramedic Protocol AC-4 for Atrial Fibrillation & Atrial Flutter treatment:
  • 9.
    Multi-Branding Strategies Theprocess of incorporating two or more partners in a location. Examples in the franchise food industry: Bain Capital’s Dunkin Donuts , Baskin Robbins ice cream stores, and Togo’s sandwich stores. 53% of all new Dunkin Donuts locations are multi-branded units. YUM! Brands varies combinations of Taco Bell , Pizza Hut , KFC , A&W and Long John Silvers
  • 10.
    Multi-Branding Benefits Consumerperception of satisfaction greatly improved when multiple brand choices under one roof Two brands occupying same location save on facility purchase and occupancy costs. Multi-branded restaurants in YUM! family have higher average unit sales volumes and cash flow than singles Multi-branding in the franchise arena experiences greater local capture when each brand has a complementary “daypart” (breakfast, lunch, dinner) orientation.
  • 11.
    Multi-Brand Challenges Asacrifice of identity and possible confusion when different brands share locations. Duplication of equipment/staffing=higher costs. Staffing difficult if both brands share employees. Some brands are just no meant to go together . Multi-branding cannot be used to hide operational, brand or menu problems.
  • 12.
    Will it workin vet practice? Multi-branding strategies can consist of complementary ancillary services owned by separate, unrelated entities sharing the same physical location such as: Kennels, boarding, grooming, day/” date ” care Veterinary pharmacies Specialists Rehabilitation facilities Alternative therapy practices Retail facilities Crematorium (rather “funeral home”) Diagnostic imaging Obedience training Behavioral Counseling
  • 13.
    National Examples Someretail providers have employed a multi-branding strategy But usually one predominant entity in the strategy Ancillary service providers are subject to significant operating restrictions. Practice owners who enter into multi-branding agreements should strive to have equal representation for optimal functioning.
  • 14.
    Standards of AccreditationCompanies of all sizes strive for recognized accreditations for growth. ISO’s (International Organization Standards) are voluntary technical agreements which provide the framework for compatible technology worldwide. Manufacturing businesses spend significant time, effort and money to obtain ISO 9000 and ISO 14000 certifications. Enables them to better participate in international trade.
  • 15.
    Franchise Example DunkinDonuts uses their own internal, proprietary accreditation models to evaluate store compliance with company financial, operational, and customer service objectives. The parent entity regularly reviews a franchisee’s: Written systems in place covering all areas of business operations (customer service, HR, training, management) Formal Business Plan (historical and projected) Growth Plan (territory additions, outside expansions, etc)
  • 16.
    “ A” –companyallows you to do whatever you wish within territory & provide you with CEO’s cellphone # “ B” –company places a “development hold” on any growth plans and CEO places a block on his cellphone number “ C” –company forces franchisee into a transition phase of improvement or else they change the locks on your door!!!! Not many second chances are given… Dunkin Donuts Rating System
  • 17.
    Human Medicine JointCommission on Accreditation of Healthcare Organizations (JCAHO) evaluates and accredits 15,000 health care organizations and programs in the US. Independent and predominant accrediting body in U.S. health care. Organizations must undergo on-site survey by a JCAHO survey team at least every three years. In 2006 will make unannounced evaluation visits (by request or complaint).
  • 18.
    American Animal HospitalAssociation (AAHA) International association of more than 33,000 veterinary care providers who treat companion animals. AAHA Standards of Accreditation are benchmarks of excellence to raise the care levels provided. Over 3,000 veterinary hospitals voluntarily participate in AAHA hospital evaluation program.
  • 19.
    AAHA Benefits Standardsare not a punitive measure but a set of guidelines to raise, maintain, and improve veterinary care to or above accepted practice standards Tools are already in place to assist vets Evaluations and care guidelines are an easy way to obtain advice on designing protocols and a framework for operations (see the recent Dental Care Guidelines)
  • 20.
    AAHA Perspective Practicesthat choose to become AAHA-accredited typically want an objective, third-party review of their practice to ensure that they are meeting or exceeding high standards of medical delivery, utilize cutting-edge management, and recognized as such. Dr. John Albers, AAHA Executive Director, “Just let us come in to see if what you say is really going on truly is.”
  • 21.
    AAHA Problems? Withina 50 mile radius of my office, there are only 51 AAHA-accredited practices (including 2 in Boston). One complaint-public does not recognize, or even know about, the differentiation factor among haves & have nots. Some fault attributed to practices themselves for not using all kinds of patient contact (ads, video, DVM and staff) to publicize the AAHA standard. Some may be institutional-”Build it and they will come.” (but who will come?).
  • 22.
    Professional Certifications Incertain fields of professional study, there are individual achievements that denote technical competence. For example: DVM (Doctor of Veterinary Medicine) MD (Doctor of Medicine) CPA (Certified Public Accountant), and JD (Doctorate of Jurisprudence) CFP ® (Certified Financial Planner™)
  • 23.
    Professional Certifications Butonce you or your staff attain a certain level or designation, are you all “educated out”? Franchisees in different industries have a multitude of distance learning and on-site programs to keep regular, third-party training in force (as opposed to “train-the-trainer” approaches) See how some franchise operators keep up in their own industry
  • 24.
    Nation's largest retailprovider of prescriptions operating 4,100 stores in 29 states. Employs 16,000 pharmacy technicians who serve as primary contacts daily for hundreds of thousands of customers. CVS pharmacy technicians: verify insurance and billing information note customer medication/product preferences direct customer inquiries to pharmacists, handle many among other duties.
  • 25.
    Training Problems Pharmacytechnician training materials were not used consistently by each location. Most instruction given via unstructured OJT In 1999, CVS/pharmacy centralized and standardized its pharmacy practices and workflow, including using the THINQ Training Server Learning Management System (LMS), a web-based, distance-learning format integrated with CVS/pharmacy's testing and assessment information. Huge success, promotes uniform & regular training schedules.
  • 26.
    John Deere’s InitiativeProblem Lack of qualified personnel who could take charge and lead a John Deere Dealership. Result Formation of the John Deere Dealership Management Program, a cooperative partnership between John Deere and the University of Missouri’s College of Agriculture, Food and Natural Resources.
  • 27.
    Learning paths onJohn Deere University’s web-based program provide a blueprint for continuing education in each functional area and are divided into five training courses: Core (i.e. Hydraulic Certification) Selling & Marketing (i.e. Partnering for Customer Value) Resource Utilization (i.e. Service Advisor Certification) Product Application (i.e. Air Conditioning Systems) Management Advanced & Master Certifications are given-need 16 credits (4 days) for annual recertification
  • 28.
    Other Certifications You’veSeen? The Funny Ones CBT (Certified Bagel Technician-yes, on Cape Cod) CASIT (Certified Auto Sound Installation Technician) The Elusive Ones 75 AVMA board diplomates in Veterinary Dentistry 43 AVMA board diplomates in Veterinary Pharmacology
  • 29.
    DVM Specialty DesignationsAccording to AVMA, there were only 7,970 AVMA recognized board-certified diplomates as of December 2004. Introduction of a board-certified practitioner into a practice is a great achievement by itself, but the combination of various specialties can only bring patient care geometric dividends. Anesthesiologists 148 Dentists 75 Canine & Feline Practitioners 408 Internal Medicine Small Animal 788 Emergency and Critical care 156 Pharmacology 43 Radiologists 264 Veterinary Surgeons 1,041 Animal Behaviorists 36 Nutrition 47
  • 30.
    New Certification IdeasOther areas for veterinary practitioners to acquire knowledge themselves or to have staff gain talents: UC Davis School of Veterinary Medicine has a one-year residency in clinical veterinary pharmacy that provides practical training in the principles of animal medicine for graduates of accredited human schools of pharmacy. Some veterinary practices are now employing human pharmacy-trained technicians to staff their own veterinary pharmacy in a fully-dedicated model patterned after human pharmacies. Practices could form joint “training” ventures among area practices to upgrade training and share ideas.
  • 31.
    Cost Segregation StudyA comprehensive engineering-based analysis of the total cost or value of building and site improvements. Allows building owners to re-allocate Code Sec. 1250 (real property depreciated over 39 years) to Code Sec. 1245 (personal property depreciated over 5 to 15 years). Results in increased depreciation deductions. Generally, the more specialized and unique an asset is, like a veterinary practice facility, the greater the tax benefits derived.
  • 32.
    Thank’s Judge Billings Learned Hand! ( January 27, 1872 – August 18, 1961) Cost Segregation results need to be disclosed to the IRS by the taxpayer filing Form 3115 (Change of Accounting Method). IRS Revenue Procedure 2004-11 allows property owners to retroactively catch-up on missed depreciation on assets owned back to 1987 with a one-time catch-up provision under an IRC Section 481(a) adjustment, precluding preparation of amended tax returns.
  • 33.
    Saved by 1997Tax Court Case! Hospital Corporation of America v. Commissioner Defines the nebulous “permanence” issue regarding tangible personal property. Court concluded that property, which qualified as tangible personal property for investment tax credit purposes under pre-1981 case law also qualifies as tangible personal property. Different tests are used to determine whether an asset is an inherently permanent structural component or tangible personal property.
  • 34.
    Three Essential Steps…Detailed engineering review of project invoices, drawings and specifications and a non-intrusive engineering study of a building's walls, flooring, ceiling, plumbing, electrical, lighting, telecommunications, heating, and cooling systems. Property inspection for comprehension of function, nature and operation of various building components and verify accuracy of construction or property documents. IRS specifies: written "cost segregation study" for legal basis "logical and objective measure" to support "tangible personal property” a study not based upon "non-contemporaneous records, reconstructed data, or taxpayer estimates or assumptions that have no supporting records."
  • 35.
    Real-World Examples Accordingto firm that wrote IRS cost seg. audit guidelines, veterinary practices that undergo cost segregation analysis are of two types: Free-standing facilities which average 18% reclassification from 39 year to 15 year property and 20% from 39 year to 5 year property. Projected tax benefits average $81,000. Large retail practice facilities (mall locations) which average $650,000 in build-out costs. 35% of costs can be reclassified from 39 year to 5 year property generating $52,325 in estimated tax benefits.
  • 36.
    One Dunkin DonutsLocation Cost segregation plan for $1.3 million facility purchase shows $346,000 allocation to 5yr and 15yr assets 2004 Depreciation Deductions: Pre-study $ 17,000 Post-study $ 48,000* add’l deduction $ 31,000 *unable to take bonus depreciation due to extenuating circumstances
  • 37.
    % Impact onAsset Base Now 27% of total assets are reclassified to 5 & 15 yr property!
  • 38.
    Balanced Scorecard/Benchmarking Franchiseowners and chain management have utilized benchmarking to highlight financial strengths and weaknesses in store-to-store and intra-store measurements. But the true progressives utilize intra-entity benchmarking and metrics to measure their progress. Financial metrics are typically only a component. Customer Service is measured in all aspects. But how can we be cutting edge?
  • 39.
    Balanced Scorecard RobertKaplan and David Norton developed a technique called the Balanced Scorecard in 1997. Process integrated strategy execution, performance management, and facilitated organization learning. Kaplan argued traditional benchmarking based on production and financial indicators provided limited insight into business’s key strategies and that comparisons were generally made to the average of a group of practices. Perfect for situations such as lack of focus or direction, a new strategy, or a need to achieve organizational alignment to a common vision.
  • 40.
    Balanced Scorecard ABalanced Scorecard approach helps practices develop primary goals directly from a mission statement, practice vision, and defined critical business strategies to implement your practice vision. The approach takes a pulse of: the financial and non-financial measures of your practice, its leading and lagging indicators, employee and patient satisfaction, and short- and long-term strategy. Kaplan’s approach utilizes a strategy map (the “Scorecard) to develop a practice’s key strategies. The map shows cause and effect linkages between the various parts of the strategy.
  • 41.
    Sample Scorecard -ImplementPetCare TV dental programs in waiting areas -Document!!! -Develop staff communication plan (DVM, tech, kennel, recept., other) 100% DVM recommended (PMS review) Compliance Year 1-45% Year 2-60% Year 3-75% Percentage of patients compliant with semi-annual screenings Encourage compliance with AAHA dental screening recommendations over current 30% standard Initiatives Target Key Performance Measure Objective
  • 42.
    Key Points ToIncorporate Develop strategic objectives incorporating each of the following perspectives: Financial, Customer, Internal Process, and Learning and Growth. Team members directly affected by the vision should be involved. Develop both leading and lagging indicators for each of the above strategic objectives, agreed to by team members. Responsibility s/b assigned to someone for completion of the initiative developed. Provide regular progress reports (charts, graphs and reports) Provide meaningful feedback to employees on accomplishment with incentives to reward achievement. A special thanks to Elizabeth Bellavance, DVM for her expert knowledge on the Balanced Scorecard!
  • 43.

Editor's Notes

  • #2 Seagulls in “Finding Nemo”-we think we are all unique in our own industry, but change the name (doctor, layer, CPA, and we have the same exact problems