RowanStricklandhascompletedathree weeksecondmentwiththe MEPteam, here in
Dubai. Throughoutthistime,Rowanhasshowna goodunderstandingof the basicprinciplesof
mechanical engineering. Rowanhaspickedupconceptsquicklyandwasable to complete the
taskshe wasgivenaccurately. Rowanhasprovedhimself able toworkautonomously,butwill
ask forguidance whenunsure of how to progress.
Overthe pastthree weeksRowanhasworkedonthe followingelementsof mechanical design:
First principle heatgaincalculationsincluding
o Fabric gains,andthe role U-value playsinthese gains
o Occupancy gains
o Equipmentandlightinggains
o Use ASHRAEand CIBSE guidesasa reference tothe above
First principle conversionof energyto heating/coolingmediaflow rate (Q= m.Cp.ΔT)
Pipe sizing,andusingthistocalculate the requiredpumpperformance
Duct sizing,andusingthistocalculate the requiredfanperformance
Modellingandanalysingbuildingenergy/heating/cooling/ventilation(usingHAP)
Productionof basicschematicdrawings
Productionof basiclayoutdrawings
Rowan hasalso beenexposedtothe following:
An overviewof the constructionindustry,andthe relationshipbetweenthe buildingservice
engineerandotherprofessionals
An overviewof the buildingdesignprocess
An overviewof the role of abuildingservicesengineer
Use of AutoCAD,HAP,andMS excel.
Designteammeeting
Contractor meeting
Technical meetingswithmanufacturers.
Rowanhas workedona shoppingmall anda hospital duringhistenure withHyder. Bothtype of
projectprovidedsignificantexperience inthe designof ventilationandairconditioning
systems. Thisexperiencewillstandhimingoodsteadif he choosesto continue hiscareerasa
buildingservicesengineerinthe Middle East.
Rowan hasbeenof great benefittothe teamandhissupporton Al Musalla,and SecurityForces
Medical Cityshouldnotbe underestimated.
Kindregards

More Related Content

What's hot

Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...SimScale
 
Cfd investigation of cyclic mode operation in a heat recovery steam generator
Cfd investigation of cyclic mode operation in a heat recovery steam generatorCfd investigation of cyclic mode operation in a heat recovery steam generator
Cfd investigation of cyclic mode operation in a heat recovery steam generatorJan Rusås
 
SimScale Demo and Discussion on External AEC
SimScale Demo and Discussion on External AECSimScale Demo and Discussion on External AEC
SimScale Demo and Discussion on External AECSimScale
 
IFS General Presentation 120315
IFS General Presentation 120315IFS General Presentation 120315
IFS General Presentation 120315Bill Marsh
 

What's hot (7)

Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
 
AWalters Resume
AWalters ResumeAWalters Resume
AWalters Resume
 
Cfd investigation of cyclic mode operation in a heat recovery steam generator
Cfd investigation of cyclic mode operation in a heat recovery steam generatorCfd investigation of cyclic mode operation in a heat recovery steam generator
Cfd investigation of cyclic mode operation in a heat recovery steam generator
 
Resume - Sdong
Resume - SdongResume - Sdong
Resume - Sdong
 
SimScale Demo and Discussion on External AEC
SimScale Demo and Discussion on External AECSimScale Demo and Discussion on External AEC
SimScale Demo and Discussion on External AEC
 
IFS General Presentation 120315
IFS General Presentation 120315IFS General Presentation 120315
IFS General Presentation 120315
 
ResumeATR
ResumeATRResumeATR
ResumeATR
 

Similar to Reference letter from James Selby

M2T Starter Model - A Rethink of How to Get New Users Going
M2T Starter Model - A Rethink of How to Get New Users GoingM2T Starter Model - A Rethink of How to Get New Users Going
M2T Starter Model - A Rethink of How to Get New Users GoingIEA-ETSAP
 
Czero Engineering - Feb 2017
Czero Engineering  - Feb 2017Czero Engineering  - Feb 2017
Czero Engineering - Feb 2017Czero
 
Thermodynamic Simulation of Steam Power Cycles using GUIMatLab Interfaces
Thermodynamic Simulation of Steam Power Cycles using GUIMatLab InterfacesThermodynamic Simulation of Steam Power Cycles using GUIMatLab Interfaces
Thermodynamic Simulation of Steam Power Cycles using GUIMatLab InterfacesIJERA Editor
 
Advanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and TroubleshootingAdvanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and TroubleshootingpetroEDGE
 
Load calculation
Load calculationLoad calculation
Load calculationImranbhvac
 
Universal Engineering Model for Cooling Towers
Universal Engineering Model for Cooling TowersUniversal Engineering Model for Cooling Towers
Universal Engineering Model for Cooling TowersIJERA Editor
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedAbbas Saeidi
 
Estimating the cost of novel (pre-commercial) systems for CO2 capture - Ed Ru...
Estimating the cost of novel (pre-commercial) systems for CO2 capture - Ed Ru...Estimating the cost of novel (pre-commercial) systems for CO2 capture - Ed Ru...
Estimating the cost of novel (pre-commercial) systems for CO2 capture - Ed Ru...Global CCS Institute
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Air-Liquide-benefits-from-next-generation-MPC.pdf
Air-Liquide-benefits-from-next-generation-MPC.pdfAir-Liquide-benefits-from-next-generation-MPC.pdf
Air-Liquide-benefits-from-next-generation-MPC.pdfDWNLDUSRML
 
Scarabeus Project
Scarabeus ProjectScarabeus Project
Scarabeus ProjectAbengoa
 
Heat Load Calculation and Coordination of Multispecialty Hospital Using Revit...
Heat Load Calculation and Coordination of Multispecialty Hospital Using Revit...Heat Load Calculation and Coordination of Multispecialty Hospital Using Revit...
Heat Load Calculation and Coordination of Multispecialty Hospital Using Revit...IRJET Journal
 

Similar to Reference letter from James Selby (20)

M2T Starter Model - A Rethink of How to Get New Users Going
M2T Starter Model - A Rethink of How to Get New Users GoingM2T Starter Model - A Rethink of How to Get New Users Going
M2T Starter Model - A Rethink of How to Get New Users Going
 
NS_CV_2016_7122016
NS_CV_2016_7122016NS_CV_2016_7122016
NS_CV_2016_7122016
 
Czero Engineering - Feb 2017
Czero Engineering  - Feb 2017Czero Engineering  - Feb 2017
Czero Engineering - Feb 2017
 
Thermodynamic Simulation of Steam Power Cycles using GUIMatLab Interfaces
Thermodynamic Simulation of Steam Power Cycles using GUIMatLab InterfacesThermodynamic Simulation of Steam Power Cycles using GUIMatLab Interfaces
Thermodynamic Simulation of Steam Power Cycles using GUIMatLab Interfaces
 
Advanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and TroubleshootingAdvanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and Troubleshooting
 
Load calculation
Load calculationLoad calculation
Load calculation
 
Universal Engineering Model for Cooling Towers
Universal Engineering Model for Cooling TowersUniversal Engineering Model for Cooling Towers
Universal Engineering Model for Cooling Towers
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
Resume aerothermo-updatedzil
Resume aerothermo-updatedzilResume aerothermo-updatedzil
Resume aerothermo-updatedzil
 
Resume-Aerothermo-updatedzil
Resume-Aerothermo-updatedzilResume-Aerothermo-updatedzil
Resume-Aerothermo-updatedzil
 
Estimating the cost of novel (pre-commercial) systems for CO2 capture - Ed Ru...
Estimating the cost of novel (pre-commercial) systems for CO2 capture - Ed Ru...Estimating the cost of novel (pre-commercial) systems for CO2 capture - Ed Ru...
Estimating the cost of novel (pre-commercial) systems for CO2 capture - Ed Ru...
 
G05094145
G05094145G05094145
G05094145
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Latest
LatestLatest
Latest
 
Trebble CV 2016
Trebble CV 2016Trebble CV 2016
Trebble CV 2016
 
Air-Liquide-benefits-from-next-generation-MPC.pdf
Air-Liquide-benefits-from-next-generation-MPC.pdfAir-Liquide-benefits-from-next-generation-MPC.pdf
Air-Liquide-benefits-from-next-generation-MPC.pdf
 
Re con
Re conRe con
Re con
 
Scarabeus Project
Scarabeus ProjectScarabeus Project
Scarabeus Project
 
Heat Load Calculation and Coordination of Multispecialty Hospital Using Revit...
Heat Load Calculation and Coordination of Multispecialty Hospital Using Revit...Heat Load Calculation and Coordination of Multispecialty Hospital Using Revit...
Heat Load Calculation and Coordination of Multispecialty Hospital Using Revit...
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 

Reference letter from James Selby

  • 1. RowanStricklandhascompletedathree weeksecondmentwiththe MEPteam, here in Dubai. Throughoutthistime,Rowanhasshowna goodunderstandingof the basicprinciplesof mechanical engineering. Rowanhaspickedupconceptsquicklyandwasable to complete the taskshe wasgivenaccurately. Rowanhasprovedhimself able toworkautonomously,butwill ask forguidance whenunsure of how to progress. Overthe pastthree weeksRowanhasworkedonthe followingelementsof mechanical design: First principle heatgaincalculationsincluding o Fabric gains,andthe role U-value playsinthese gains o Occupancy gains o Equipmentandlightinggains o Use ASHRAEand CIBSE guidesasa reference tothe above First principle conversionof energyto heating/coolingmediaflow rate (Q= m.Cp.ΔT) Pipe sizing,andusingthistocalculate the requiredpumpperformance Duct sizing,andusingthistocalculate the requiredfanperformance Modellingandanalysingbuildingenergy/heating/cooling/ventilation(usingHAP) Productionof basicschematicdrawings Productionof basiclayoutdrawings Rowan hasalso beenexposedtothe following: An overviewof the constructionindustry,andthe relationshipbetweenthe buildingservice engineerandotherprofessionals An overviewof the buildingdesignprocess An overviewof the role of abuildingservicesengineer Use of AutoCAD,HAP,andMS excel. Designteammeeting Contractor meeting Technical meetingswithmanufacturers.
  • 2. Rowanhas workedona shoppingmall anda hospital duringhistenure withHyder. Bothtype of projectprovidedsignificantexperience inthe designof ventilationandairconditioning systems. Thisexperiencewillstandhimingoodsteadif he choosesto continue hiscareerasa buildingservicesengineerinthe Middle East. Rowan hasbeenof great benefittothe teamandhissupporton Al Musalla,and SecurityForces Medical Cityshouldnotbe underestimated. Kindregards