1. RAJNIKANT DILIP SHINDE
Email: shinde.rajnikant@yahoo.co.in
Contact No.: +91-9820951209
Professional Objective
To accelerate my career with an organization that provides excellent training and paves
the way for early assumption of responsibilities
Professional summary:
Mechanical Draughtsman with over 12 years of experience in the field of Heating,
ventilation and air-conditioning (HVAC) projects, Design and drafting, MEP Co-ordination
activities related to Airports, Hotel towers, commercial complex, Industrial Ventilation
system and drafting of mechanical equipments.
Technical Qualification:
Passed I.T.I.Examination in year 2003 securing First Class (74.92%) From Maharashtra
Board.(From A.T.I. Sion, Mumbai-22)
Passed N.C.T.V.T. Examination in year 2004 securing First Class (73.80%) From
Maharashtra Board.(From TCE Consulting Engineers Ltd. Worli, Mumbai)
Diploma in Mechanical in year Jan 2013 securing First Class (73.67) from KSOU.
Educational Qualification:
Passed S.S.C..Examination in year 2001 securing First Class (60.93%) From Mumbai
Divisional Board.(State Maharashtra)
Career outline:
Duration Organization Designation
2 Feb 2015 to till Dar Al Handasah (Shair & Partners) Cad Designer (MEP REVIT)
1 Dec to 30 Jan 2015 Neilsoft Ltd Sr. HVAC Designer
Feb 2008 to 28 Nov 2014 Larsen & Toubro – ECC division HVAC Draughtsman (revit)
Jun 2005 to Feb 2008 Saitech HVAC Project (P) Ltd HVAC Draughtsman
Oct 2003 to Jun 2005 TCE Consulting Engineers Ltd. HVAC & Piping Draughtsman
Technical Skill:
Working on Revit MEP – 2012, 2014 for HVAC, FIRE FIGHTING & Co-ordination with
Architectural, Structural and other MEP Services, Families creation.
Concept, scheme, design development & Detailed in Auto-CAD for HVAC services.
Computer software’s like AUTOCAD 2010(2D and 3D), Duct sizer, Pipesizer and MS
office.
Preparation of plant/equipment layouts, duct/piping layouts, air flow diagrams,
Chilled water schematic layouts, zoning layouts, good for construction drawings.
Client interaction for getting approval & queries solving.
Project execution activities like co-ordination and interaction with clients/
contractors/ consultants.
Preparation of Bill of quantities.
Calculations of Duct size and pipe size.
Site Inspection for Respective Companies
Design, Drafting of Basement / Toilet Ventilation and Staircase Pressurization, Fume
Extraction system, Dust collection System.
2. Work Experience:
Organization DAR AL-HANDSAH CONSULTANTS (SHAIR & PARTENERS)
INDIA PVT. LTD
Duration FEB 2015 to till date
Role: Mep Modeller, Co-ordination with Architectural, Structural.
Projects done:
• MADINAH HAJJ CITY – SAUDI AREBIA
T5- 4 Nos. 40 STOREY HOTEL TOWER – MEP Revit modeling for HVAC, Co-ordination
with Architectural, Structural.
• ERBIL - IRAQ
5 Nos. College Buildings (Admin eco, Islamic study, Law, Mosque, neighborhood
center) – Mep modeler for Heating system.
• Dubai airport – expansion – HVAC & Fire Fighting.
Organization Larsen & Toubro Limited, Mumbai. ECC-EDRC Division
Duration January 2008 to till date
Role: Scheme, Detailed draughting and engineering of HVAC Systems for Airports and
commercial buildings.
Projects done:
• MUMBAI International Airport Ltd –New Domestic Terminal-1 C.
Equipment’s: Centrifugal chillers of 2500TR: 6nos, cooling towers, Primary and
condenser water pumps: 6 nos., secondary pumps: 6 nos. with AHU, CAHU and TFA
units, Staircase Pressurization Fan Selection as per scheme and Lift-well Pressurization.
• MUMBAI International Airport Ltd – TERMINAL-2
Equipment’s: Centrifugal chillers of 1350TR: 2nos, cooling towers, Primary and
condenser water pumps: 2 nos., secondary pumps: 4 nos.(50% capacity) with AHU,
CAHU and TFA units, Staircase Pressurization Fan Selection as per scheme and Lift-well
Pressurization.
• New Line maintenance Hangar & Annexure building Facility.
Equipment’s: 2nos. air-cooled screw chillers of 106TR, 3 nos. Primary pumps with 4
nos., Air handling units.
• Air traffic Control Tower & Electrical substation.
Air-conditioning with Package and CRAC units, Vane axial fans (7 nos.) for ventilation of
substation and UG sump room Lift well and staircase pressurization system.
Proposed Integrated Complex At Seawoods Railway Station At Navi Mumbai.
Equipment’s: Centrifugal chillers of 1800TR: 8nos, with Primary, secondary Pumping
system. Prepare BIM Model in Revit for Retail Area, Commercial Office Tower with MEP
Co-ordination.
3. Organization Saitech HVAC Project (P) Ltd.
Duration Jun 2005 to Feb 2008
Role: Site visit, Preparing ISO Record of Design Dept., Designing of Duct, Line Drawing,
G.A. Drawing, P & ID Digram, P & ID, G.A. Drawing. Air Pollution Control System.
Preparing Preliminary drawing, Revision Drawing & AS-BUILT Drawing of Ventilation
System, Fume Extraction system, Dust collection System,
Projects done:
• BAJAJ AUTO LTD., AKURDI
• MAHINDRA & MAHINDRA LTD., Mumbai & Nashik Plant
• MAHINDRA RENAULT PVT. LTD., NASHIK
• GOODLAS NEROLAC PAINTS LTD., BAWAL
Organization TCE Consulting Engineers Ltd.
Duration Oct 2003 to June 2005
Role: Drawing Piping layout, P & ID, Ducting layout, Piping Support drawing G.A.
Drawing, Pipe Rack Layout
Projects done:
• RANBAXY LABORATORIES LTD.
• TATA CONSULTANCY SERVICES
• JUBILANT ORGANISYS LTD.
Miscellaneous Information:
Permanent Address: 401, Maharana co-op hsg soc., M. P. nagar, near Gajanan
Colony (Dhorwada), Dharavi, Mumbai - 400017
Date of Birth: Oct 25, 1985
Known Languages: English, Hindi, Marathi.
Gender: Male
Marital Status: Married
Hobbies: Reading, Playing Cricket, Listening Music.
DECLARATION
I hereby declare that the above information is true to the best of my knowledge and
understanding
(RAJANIKANT D. SHINDE)