P e r s o n a l i n f o r m a t i o n
 Date/place of birth: 04/02/1984 / INDIA
 Nationality: Indian
 Marital status: Married
 Mobil no : 0971 551420678 ( Dubai) / 00918809576120 ( India )
O b j e c t i v e & p e r s o n a l m a k e u p
 Seeking a Good position at your respected company that requires a strong hand to develop and implement strategy, guide
growth and foster a corporate culture of success.
 A self-starter strongly focused on results. Very persistent,doing whatever is necessary to overcome or reshape any obstacles.
Generally direct and forceful, but capable of careful planning and strategic manipulation of people and situations to ensure
goals are met.
P r o f e s s i o n a l E x p e r i e n c e
Start
14/12/2014
Till Date
Dubai Alquz
Start
Set’ 26 2011
10/10/2014
U.A.E. SHARJAH
Concorde Corodex Group.
PIPE FITTER :-
Role and gained experience:
 ENQIURE ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.
 GIVEN JOB SHOULD BE COMPLETED ON TIME.
 FIRE PIPING JOINT SHOULD BE CHECK BEFORE PAINT OR ASSAMBLING.
 Assemble and secure pipes, tubes, fittings, and related equipment, according to specifications,
by welding, brazing, cementing, soldering, and threading joints.
 Measure and mark pipes for cutting and threading.
 Attach pipes to walls, structures and fixtures, such as radiators or tanks, using brackets,
clamps, tools or welding equipment.
 Gain how to installed fire piping equipment’s.
Al Shabia Group of company.
( Hamriyah Free Zone Sharjah)
PIPE FIBRICATOR :-
Role and gained experience:
 GIVEN JOB SHOULD BE COMPLETED ON TIME.
 SHOULD REPORT TO THE FORMEN FOR ENQUIRE?
 ENQIURE ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.
 AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN.
 GAIN TO LEARN ABOUT STRUTURE WORK AND DIFFEERNT TYPE OF PIPING WORK.
 MORE OF DRWING DIFFERENT OF DRAWINGS ECT.
RAJ KUMAR PARIT
U A E – SH A R J A H
• MO B I LE: 0 0 9 7 1 5 5 1 4 2 0 6 7 8 • E- MA I L: R A J KU MA R P A R I T7 8 6 @ G MA I L . C O M
Start
May’ 26 2006
Up to
OCT’ 15 2010
Gujarat Surat
INDIA
Oct” 02 2008
Up to
March’ 07 2009
INDIA
June’10 2007
Up to
Aug ’08 2008
South Africa
May’10. 2005
Up to
Dec’09. 2006
Chembur
( Mumbai)
JECKSON ENGG FAB L/T HAZIRA.
PIPE FIBRICATOR :-
Role and gained experience:
 GIVEN JOB SHOULD BE COMPLETED ON TIME.
 SHOULD REPORT TO THE FORMEN FOR ENQUIRE.
 ENQIURE ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.
 AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN.
 GAIN HOW TO CONTROL PRESURE TEST AND PAINTING WORK.
PLUS TECH ENFF ESSAR HAZIRS.
PIPE FIBRICATOR :-
Role and gained experience:
 GIVEN JOB SHOULD BE COMPLETED ON TIME.
 SHOULD REPORT TO THE FORMEN FOR ENQUIRE?
 ENQIURER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.
 AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN
 WELDING JOB SHOULD BE CHECK AFTER GIVEN JOB.
DMCE: PROJECTS PVT LTD.
MULTI PUPOSE JOB: PIPE FITTER / WELDING JOB :-
Role and gained experience:
 GIVEN JOB SHOULD BE COMPLETED ON TIME.
 SHOULD REPORT TO THE FORMEN FOR ENQUIRE.
 ENQIURER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.
 AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN
 WELDING JOB SHOULD BE CHECK AFTER.
 HELP WELDER TO DO PROPER WELDING FOR JOB.
 ALL JOB SHOULD HAVE CLEAN FINISHING WELDING OR PIPEING.
PETRO ENGG CONT LTD ( JAMNAGER)
Role and gained experience:
PIPE FIBRICATOR :-
 GIVEN JOB SHOULD BE COMPLETED ON TIME.
 SHOULD REPORT TO THE FORMEN FOR ENQUIRE.
 ENQIURER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.
 AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN
Nov’04 2003.
Up to
May’23 2005
Pune India
Nov’ 23 2002
Up to
Sep’ 12 2003
Chennai India
Feb’ 09 2011
Up to
Sep’ 12 2002
Gujarat India
UB ENGG CONT TED ESSAR HAZIRA
PIPE FITTER
 GIVEN JOB SHOULD BE COMPLETED ON TIME.
 SHOULD REPORT TO THE FORMEN FOR ENQUIRE.
 ENQIUER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.
 AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN
TECH SHARP ENFF PVT LTD L&T HAZIRA
PIPE FITTER :-
 GIVEN JOB SHOULD BE COMPLETED ON TIME.
 SHOULD REPORT TO THE FORMEN FOR ENQUIRE.
 ENQIUER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.
 AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN.
 GAIN WELDING KNOWLEDGE
 HOW TO MAINTEND JOB STATUS.
NEO STRUTO CONST LTD RIL HAZIRA
PIPE FITTER
 GIVEN JOB SHOULD BE COMPLETED ON TIME.
 SHOULD REPORT TO THE FORMEN FOR ENQUIRE.
 ENQIUER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.
AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN.
T r a i n i n g c o u r s e s
Aug ‘1998
To
July 2000
Industrial Training Institute Gopalarj (Bihar)
E d u c a t i o n
12 +
S.P High School Bhimpur ( Bihar India )
E x p e r i e n c e
 9 years in India
 4 years in Aboard
L a n g u a g e s a n d N o t e s
> Languages: English , Hind, Bhojpuri ,
P a s s p o r t D e t a i l s
No : F - 9702343
Place of issue : Patna.
Date of issue :23/02/2013
Date of Exp :22/02/2017

RAJ update CV ON 18-08-2015

  • 1.
    P e rs o n a l i n f o r m a t i o n  Date/place of birth: 04/02/1984 / INDIA  Nationality: Indian  Marital status: Married  Mobil no : 0971 551420678 ( Dubai) / 00918809576120 ( India ) O b j e c t i v e & p e r s o n a l m a k e u p  Seeking a Good position at your respected company that requires a strong hand to develop and implement strategy, guide growth and foster a corporate culture of success.  A self-starter strongly focused on results. Very persistent,doing whatever is necessary to overcome or reshape any obstacles. Generally direct and forceful, but capable of careful planning and strategic manipulation of people and situations to ensure goals are met. P r o f e s s i o n a l E x p e r i e n c e Start 14/12/2014 Till Date Dubai Alquz Start Set’ 26 2011 10/10/2014 U.A.E. SHARJAH Concorde Corodex Group. PIPE FITTER :- Role and gained experience:  ENQIURE ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.  GIVEN JOB SHOULD BE COMPLETED ON TIME.  FIRE PIPING JOINT SHOULD BE CHECK BEFORE PAINT OR ASSAMBLING.  Assemble and secure pipes, tubes, fittings, and related equipment, according to specifications, by welding, brazing, cementing, soldering, and threading joints.  Measure and mark pipes for cutting and threading.  Attach pipes to walls, structures and fixtures, such as radiators or tanks, using brackets, clamps, tools or welding equipment.  Gain how to installed fire piping equipment’s. Al Shabia Group of company. ( Hamriyah Free Zone Sharjah) PIPE FIBRICATOR :- Role and gained experience:  GIVEN JOB SHOULD BE COMPLETED ON TIME.  SHOULD REPORT TO THE FORMEN FOR ENQUIRE?  ENQIURE ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.  AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN.  GAIN TO LEARN ABOUT STRUTURE WORK AND DIFFEERNT TYPE OF PIPING WORK.  MORE OF DRWING DIFFERENT OF DRAWINGS ECT. RAJ KUMAR PARIT U A E – SH A R J A H • MO B I LE: 0 0 9 7 1 5 5 1 4 2 0 6 7 8 • E- MA I L: R A J KU MA R P A R I T7 8 6 @ G MA I L . C O M
  • 2.
    Start May’ 26 2006 Upto OCT’ 15 2010 Gujarat Surat INDIA Oct” 02 2008 Up to March’ 07 2009 INDIA June’10 2007 Up to Aug ’08 2008 South Africa May’10. 2005 Up to Dec’09. 2006 Chembur ( Mumbai) JECKSON ENGG FAB L/T HAZIRA. PIPE FIBRICATOR :- Role and gained experience:  GIVEN JOB SHOULD BE COMPLETED ON TIME.  SHOULD REPORT TO THE FORMEN FOR ENQUIRE.  ENQIURE ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.  AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN.  GAIN HOW TO CONTROL PRESURE TEST AND PAINTING WORK. PLUS TECH ENFF ESSAR HAZIRS. PIPE FIBRICATOR :- Role and gained experience:  GIVEN JOB SHOULD BE COMPLETED ON TIME.  SHOULD REPORT TO THE FORMEN FOR ENQUIRE?  ENQIURER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.  AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN  WELDING JOB SHOULD BE CHECK AFTER GIVEN JOB. DMCE: PROJECTS PVT LTD. MULTI PUPOSE JOB: PIPE FITTER / WELDING JOB :- Role and gained experience:  GIVEN JOB SHOULD BE COMPLETED ON TIME.  SHOULD REPORT TO THE FORMEN FOR ENQUIRE.  ENQIURER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.  AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN  WELDING JOB SHOULD BE CHECK AFTER.  HELP WELDER TO DO PROPER WELDING FOR JOB.  ALL JOB SHOULD HAVE CLEAN FINISHING WELDING OR PIPEING. PETRO ENGG CONT LTD ( JAMNAGER) Role and gained experience: PIPE FIBRICATOR :-  GIVEN JOB SHOULD BE COMPLETED ON TIME.  SHOULD REPORT TO THE FORMEN FOR ENQUIRE.  ENQIURER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.  AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN
  • 3.
    Nov’04 2003. Up to May’232005 Pune India Nov’ 23 2002 Up to Sep’ 12 2003 Chennai India Feb’ 09 2011 Up to Sep’ 12 2002 Gujarat India UB ENGG CONT TED ESSAR HAZIRA PIPE FITTER  GIVEN JOB SHOULD BE COMPLETED ON TIME.  SHOULD REPORT TO THE FORMEN FOR ENQUIRE.  ENQIUER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.  AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN TECH SHARP ENFF PVT LTD L&T HAZIRA PIPE FITTER :-  GIVEN JOB SHOULD BE COMPLETED ON TIME.  SHOULD REPORT TO THE FORMEN FOR ENQUIRE.  ENQIUER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN.  AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN.  GAIN WELDING KNOWLEDGE  HOW TO MAINTEND JOB STATUS. NEO STRUTO CONST LTD RIL HAZIRA PIPE FITTER  GIVEN JOB SHOULD BE COMPLETED ON TIME.  SHOULD REPORT TO THE FORMEN FOR ENQUIRE.  ENQIUER ABOUT THE DRAWING WHICH WE RECEIVED BY FORMEN. AFTER JOB GET’S OVER SHOULD BE REPORT TO THE FORMEN. T r a i n i n g c o u r s e s Aug ‘1998 To July 2000 Industrial Training Institute Gopalarj (Bihar) E d u c a t i o n 12 + S.P High School Bhimpur ( Bihar India ) E x p e r i e n c e  9 years in India  4 years in Aboard L a n g u a g e s a n d N o t e s > Languages: English , Hind, Bhojpuri , P a s s p o r t D e t a i l s No : F - 9702343 Place of issue : Patna. Date of issue :23/02/2013 Date of Exp :22/02/2017