Worked with reputed engineering and architectural consultancy firms. I would like to join the esteemed
organization, which is Best project manager and construction developer, with a will to work hard and face
new challenges.

I have 18 years of total working experience in various projects from design stage to the execution stage,
coordination works, has sound control on MS Excel, Auto CAD and MS Project. I am interested to work in
the field of Building Construction as a MANAGER Quantity Survey and Planning.

Herewith I am putting forward my candidature with a confidence to meet the high standards of the esteemed
organization.

Anticipating a positive and early reply from you.




Anup Kumar Pathak
RESUME


ANUP KUMAR PATHAK
# 1-10-237, Brahmanwadi, Begumpet,
Hyderabad, Andhra Pradesh,
India - 500 016.
Land Phone:040-27760851 / Handy +91-9440832414
Location: 17°26’18” N 78°27’37” E

E- mail: anup.pathak70@gmail.com



EXECUTIVE SUMMARY                    A Professional in CIVIL ENGINEERING, with interest and
                                     skills in construction activity, planning, execution and
                                     seeking challenging assignment in Dynamic Construction/
                                     Consulting Company.

ACADEMIC QUALIFICATIONS

Course     Institution        Board/Univ.           Passed            Div.         Percentage

A.D.S.T    ECIL, Hyd          ECIL                  2000

D.C.E.     S.E.S.S.N.M.       State Board of     1991                 First        74%
           Polytechnic,       Technical Education
           Khammam, A.P.      and Training, A.P.

S.S.C      Vidyodaya High     Board of Secondary 1986                 Second       59%
           School,            Education, A.P.
           Hyderabad.


COMPUTER SKILLS
Packages                      -      AutoCAD R14/2K8, 3D Home Architect, MS Office 2K
                                     Open Office 3.0
Operating Systems             -      Ms-DOS, Windows’95/98, & UNIX.
Programming languages         -      C, C++, VB 6.0, Java
Databases                     -      Ms Access 2K, Oracle 8.0, M.S.Project

PERSONAL PROFILE
Father’s Name                 -      Murlidhar Pathak
Date of Birth                 -      13th, July 1970.
Marital Status                -      Married
Nationality                   -      Indian
Passport No.                  -      A 7280481
Languages Known               -      English, Telugu, Tamil, Kannada, Hindi, and Marathi.
WORK EXPERIENCE

Working as Coordinator - Projects with M/s. Satya Vani Projects & Consultants (P) Ltd., 203
A Block, Kushal Towers, Hyderabad. A Project Management Consultants and Structural based in
Hyderabad.

Period of Work: March 2005 – till date

Coordination Jobs with our PMC Division:
Projects in progress are

           Indian School of Business – Housing Tower One (2 Parking + 18 Floors) – Shell and Core works
           under progress. (Project Duration 1/12/2008 – 31/3/2011) (Value of Project: 43 Crores)

           Indo American Cancer Hospital at Banjara hills – New Block (2 Cellars + 4 Floors) in Phase I.

           Directorate General of Married Accommodation Project - PH-II – Prepared Project Pre-qualification
           evaluation, and Project Monitoring Plan. (Value of Project: 490 Crores)

Projects successfully completed are
         Ashoka Metropolitan Mall of ADBL, Prestige Towers of Prestige Avenues– (Shopping Malls)
         Manufacturing facility for Schneider Electric (I) Limited – (Pre Engineered Structure) of AMECO
         Infrastructure Pvt Ltd.,

My Involvement in the Projects Prestige Towers, Panjagutta, Hyderabad, Ashoka Metropolitan Mall, Banjara
Hills Road No 1, Hyderabad and Manufacturing facility for Schneider Electric (I) Limited at RR Dist, A.P.

       •   Processing of Liaisoning work on our organization behalf.
       •   Maintain all the drawings and documents of the sites at the base office.
       •   Tracking with the schedule of work
       •   Making all the correspondences regarding the sites.
       •   Organizing meetings with client, consultants and contractors.
       •   Getting the drawings from the consultants and issuing to the sites/contractors
       •   Processing the Bills submitted by the contractor and forwarding the certified bills to the client.


Coordination jobs with our Structural Consultancy Division:
Projects includes at Hyderabad are
Dell, Laxmi cyber city – (Software Units)
GVK One, Mid town – (Shopping Malls)
My Involvement in these projects: will be going to pre concrete checking for all the sites on behalf of our
consultancy, participating with site meetings.

Ref:       Mr. Karunakar, Deputy General Manager – Projects. Mobile: 9848518177.


Worked with M/s. Emas Engineers & Contractors (P) Ltd., Hyderabad. A Private Contracting
Company based in Chennai.

Period of Work: Sept 2003 – March 2005
As QS / Billing Engineer

Projects include construction of Vanenburg IT Park Phase III at Hitech City, Madapur, Hyderabad.
As QA / QC Engineer

Projects include construction of Vanenburg IT Park Phase IV at Hitech City, Madapur, Hyderabad. And
Polaris Software Lab Ltd., at Gachibowli R.R. Dist, Andhra Pradesh.
Jobs generally includes preparing the Estimates, Cash flow statements, Work orders to the Sub contractors,
Sub-contractors and client’s Bills.
Ref:
         Mr. Sailesh Ajri, D.G.M – Projects. Mobile: 9848542799
         Mr. SVN Rao, D.G.M - Works. Mobile: 9848516730.



Worked as Quantity Surveyor with M/s. Doyen Constructions (P) Ltd., Hyderabad. A Private
Developing and Contracting Company based in Hyderabad.

Period of Work: Sept 2002 – Aug 2003


Projects include construction of Residential Multistoried complexes and Township development projects.

And the Contract Projects of MES at Secunderabad and Bangalore (upto 10 crores each).



Jobs generally includes preparing the Estimates, Time Schedules, Cash flow statements, Work orders to the

Suppliers and Sub contractors, Sub-contractors and client’s Bills.

Ref:
         Mr. Prasad, Admin Manager, Office:04023733267
         Mr. Minu D Vesigara, Marketing Manager, Mobile: 9848302929



Worked as Site Manager with M/s. Ram Interiors, Hyderabad. A Private Contracting company
based in Hyderabad and works at all over A.P.

Period of Work: June 2000 – Aug 2002

Projects dealt include construction of retail out-lets of HPCL comprising construction of new outlets, repair /

renovation of existing outlets all over Andhra Pradesh.



Jobs generally includes of erection of steel structures for canopy and RCC Framed structures for sales

building and V.R.C.C drive-ways and development works such as yard lighting and kerb walls, hoardings,

Grand Id and Id pole works, Pump island works and Pipeline works including pipeline and cable trenches.

.

Time-bound projects of Tata Cellular Limited & Hutchison Essar South Limited for their land and roof top

sites for the cellular transmission towers comprising of all civil works at site in and around Hyderabad.
Duties include construction supervision, co-ordination with the architect, clients, preparation of bills, quantity

schedules using Excel, and time schedules using MS-Project, working drawings using Auto Cad R2000.

Ref:     Mr. N.S.Rama Rao, M D, Mobile :9849005535




Worked as Site Engineer with M/s. Suja & Associates, Secunderabad.
Period of Work: Sep’95 – May 2000

Using AutoCAD R14 extensively for the preparation of different civil engineering drawings. Major jobs on

CAD includes preparation of drawings right from conceptual stage to execution for different residential

buildings, engineering and working drawings for a dam project under the consultancy of JNTU, Hyd.

Using Ms Excel 97 for preparation of different spreadsheet applications including estimates and analyses.

Proficiency in using Ms Word and Ms Access 97 for various in house applications.


Major works executed:
•   Supervised the layout of Western Industries at Kompally, R.R. District.

•   Handled major survey works and plotting of lands in and around the sub-urban areas of Hyderabad.

•   Done surveys for Farmhouses around the twin cities of Hyderabad and Secunderabad.

•   Executing the construction of Independent Houses.

•   Building regularisation works of Local Municipal body M.C.H – Purely Liasoning work.

•   Construction of individual residential buildings.

Ref:     Mr. N.V.Ranga Reddy, Chief Consultant, Mobile: 9246587577


Worked as Site Supervisor in M.V.S.Rao & Associates, Hyderabad, and a reputed
architectural consultancy firm.
Period of Work: Jan’93 - Aug’95.
Major works executed:

•   I.O.C. Officers residential complex (Multi storeyed), Hyderabad.

•   Supervised the layout of Goutami Enclave, at Jubilee Hills, Hyderabad.

•   Construction of independent residences and bungalows at Gunrock Enclave, Secunderabad.
Ref:     Mr. G.N. Venkateshwarlu, Sr Engineer, Mobile: 9848067328


Worked as Surveyor in M/s. Standard Surveys, Secunderabad.
Period of Work: Jun’91 - Dec’92.
Major works executed:
•   Land & Topographical Survey of A.P. Sports School, Tumkunta, R.R.Dist.,

•   Route & Topographical Survey of proposed Light Rail System at Hyderabad.

•   Handled Major Surveys and Plotting of 30 acres & above in the suburban areas of
    Hyderabad.
    Ref:              Mr. Karunakar, Co- Surveyor Mobile: 9848518177



NATURE OF JOB                               Organizing Contractor Consultants Review Meetings with
                                            client, Quantity control, Project Scheduling & tracking,
                                            Preparation of Contract Documents, and Certification of Bills.
                                            Preparing Status Reports.

STRENGTHS
Self-initiative, Hard working
Acquainted with the Quality Management System.
Excellent Planning of Material and Ability to control Manpower and delegate responsibility.
Good team interaction (communication skills & reporting skills).


    •      EXECUTED   PROJECTS UP TO   10 LAKH SQ.FT   IN   2004-2006 WITH M/S.EMAS ENGINEERS & CONTRACTORS AS A QS /

           BILLING ENGINEER & QA / QC ENGINEER

    •      EXECUTED   PROJECTS UP TO   5 LAKH SQ.FT   IN   2006-2007 WITH M/S.SATYAVANI PROJECTS & CONSULTANTS PMC -

           DIVISION AS A PROJECT COORDINATOR

    •      EXECUTED   PROJECTS UP TO   8 LAKH SQ.FT   IN   2007-2008 WITH M/S.SATYAVANI PROJECTS & CONSULTANTS PMC -

           DIVISION AS A PROJECT COORDINATOR

    •      EXECUTED   PROJECTS UP TO   4 LAKH SQ.FT   IN   2007-2008 WITH M/S.SATYAVANI PROJECTS & CONSULTANTS PMC -

           DIVISION AS A PROJECT COORDINATOR

References:
Ar. Prasad Muller Pathan
Associate Architect – Architect Hafeez Contractor – Mumbai.
Mobile: +91-98211-22741

Ar C.S Rao
Chief Architect – C.S.Rao & Associates
Mobile: +91-9849006118

Ar. Sridhar
Chief Architect – C-Con Consultants
Mobile: +91-9246536529

Mr. Prasad.P
Chairman – N.R.D.C.S
Mobile: +91-9848083445

Er. Ramesh
Project Engineer – Polaris Software Park
Mobile: +91-9866335213

Er. Rajesh
Project Engineer – Vanenburg IT Park Phase II & III
Mobile: +91-9885307002

Worked on the creations of renowned Ar. Hafeez contractor (M/s. Ar. Hafeez
contractor, Mumbai), Ar. Uday Joshi & Associates, Mumbai), Ar. Prasad. T.V (M/s.
VKT & Associates, Bangalore), Ar. Kiran Venkatesh (M/s. Inform Architects,
Bangalore). Ar. Sudheer Reddy (M/s. Sudheer and Associates, Hyderabad). Ar.
Pramod balakrishnan, (M/s Edifice Architects Chennai).


Some of the Recent Projects involved myself in HYDERABAD

                           Shopping mall / commercial complex




          Ashoka Metropolitan Mall                                 GVK ONE




             Prestige Rai Towers                   facility for M/s Schneider Electric (I) ltd
                                            IT Parks




                Polaris IT Park                              Oracle IT Park Phase I
Vanenburg IT Park Phase IV             Vanenburg IT Park Phase III


Indo American Cancer Hospital- New Block   Indian School of Business – HT-1

Resume 281109

  • 1.
    To, M/s. Amara RajaInfra (P) Ltd HiTech City, Kondapur Hyderabad – 500038. Andhra Pradesh Kind Attention: HR Manager Dear Sir, Please find attached herewith my CV for the post of MANAGER Quantity Survey and Planning. Worked with reputed engineering and architectural consultancy firms. I would like to join the esteemed organization, which is Best project manager and construction developer, with a will to work hard and face new challenges. I have 18 years of total working experience in various projects from design stage to the execution stage, coordination works, has sound control on MS Excel, Auto CAD and MS Project. I am interested to work in the field of Building Construction as a MANAGER Quantity Survey and Planning. Herewith I am putting forward my candidature with a confidence to meet the high standards of the esteemed organization. Anticipating a positive and early reply from you. Anup Kumar Pathak
  • 2.
    RESUME ANUP KUMAR PATHAK #1-10-237, Brahmanwadi, Begumpet, Hyderabad, Andhra Pradesh, India - 500 016. Land Phone:040-27760851 / Handy +91-9440832414 Location: 17°26’18” N 78°27’37” E E- mail: anup.pathak70@gmail.com EXECUTIVE SUMMARY A Professional in CIVIL ENGINEERING, with interest and skills in construction activity, planning, execution and seeking challenging assignment in Dynamic Construction/ Consulting Company. ACADEMIC QUALIFICATIONS Course Institution Board/Univ. Passed Div. Percentage A.D.S.T ECIL, Hyd ECIL 2000 D.C.E. S.E.S.S.N.M. State Board of 1991 First 74% Polytechnic, Technical Education Khammam, A.P. and Training, A.P. S.S.C Vidyodaya High Board of Secondary 1986 Second 59% School, Education, A.P. Hyderabad. COMPUTER SKILLS Packages - AutoCAD R14/2K8, 3D Home Architect, MS Office 2K Open Office 3.0 Operating Systems - Ms-DOS, Windows’95/98, & UNIX. Programming languages - C, C++, VB 6.0, Java Databases - Ms Access 2K, Oracle 8.0, M.S.Project PERSONAL PROFILE Father’s Name - Murlidhar Pathak Date of Birth - 13th, July 1970. Marital Status - Married Nationality - Indian Passport No. - A 7280481 Languages Known - English, Telugu, Tamil, Kannada, Hindi, and Marathi.
  • 3.
    WORK EXPERIENCE Working asCoordinator - Projects with M/s. Satya Vani Projects & Consultants (P) Ltd., 203 A Block, Kushal Towers, Hyderabad. A Project Management Consultants and Structural based in Hyderabad. Period of Work: March 2005 – till date Coordination Jobs with our PMC Division: Projects in progress are Indian School of Business – Housing Tower One (2 Parking + 18 Floors) – Shell and Core works under progress. (Project Duration 1/12/2008 – 31/3/2011) (Value of Project: 43 Crores) Indo American Cancer Hospital at Banjara hills – New Block (2 Cellars + 4 Floors) in Phase I. Directorate General of Married Accommodation Project - PH-II – Prepared Project Pre-qualification evaluation, and Project Monitoring Plan. (Value of Project: 490 Crores) Projects successfully completed are Ashoka Metropolitan Mall of ADBL, Prestige Towers of Prestige Avenues– (Shopping Malls) Manufacturing facility for Schneider Electric (I) Limited – (Pre Engineered Structure) of AMECO Infrastructure Pvt Ltd., My Involvement in the Projects Prestige Towers, Panjagutta, Hyderabad, Ashoka Metropolitan Mall, Banjara Hills Road No 1, Hyderabad and Manufacturing facility for Schneider Electric (I) Limited at RR Dist, A.P. • Processing of Liaisoning work on our organization behalf. • Maintain all the drawings and documents of the sites at the base office. • Tracking with the schedule of work • Making all the correspondences regarding the sites. • Organizing meetings with client, consultants and contractors. • Getting the drawings from the consultants and issuing to the sites/contractors • Processing the Bills submitted by the contractor and forwarding the certified bills to the client. Coordination jobs with our Structural Consultancy Division: Projects includes at Hyderabad are Dell, Laxmi cyber city – (Software Units) GVK One, Mid town – (Shopping Malls) My Involvement in these projects: will be going to pre concrete checking for all the sites on behalf of our consultancy, participating with site meetings. Ref: Mr. Karunakar, Deputy General Manager – Projects. Mobile: 9848518177. Worked with M/s. Emas Engineers & Contractors (P) Ltd., Hyderabad. A Private Contracting Company based in Chennai. Period of Work: Sept 2003 – March 2005 As QS / Billing Engineer Projects include construction of Vanenburg IT Park Phase III at Hitech City, Madapur, Hyderabad.
  • 4.
    As QA /QC Engineer Projects include construction of Vanenburg IT Park Phase IV at Hitech City, Madapur, Hyderabad. And Polaris Software Lab Ltd., at Gachibowli R.R. Dist, Andhra Pradesh. Jobs generally includes preparing the Estimates, Cash flow statements, Work orders to the Sub contractors, Sub-contractors and client’s Bills. Ref: Mr. Sailesh Ajri, D.G.M – Projects. Mobile: 9848542799 Mr. SVN Rao, D.G.M - Works. Mobile: 9848516730. Worked as Quantity Surveyor with M/s. Doyen Constructions (P) Ltd., Hyderabad. A Private Developing and Contracting Company based in Hyderabad. Period of Work: Sept 2002 – Aug 2003 Projects include construction of Residential Multistoried complexes and Township development projects. And the Contract Projects of MES at Secunderabad and Bangalore (upto 10 crores each). Jobs generally includes preparing the Estimates, Time Schedules, Cash flow statements, Work orders to the Suppliers and Sub contractors, Sub-contractors and client’s Bills. Ref: Mr. Prasad, Admin Manager, Office:04023733267 Mr. Minu D Vesigara, Marketing Manager, Mobile: 9848302929 Worked as Site Manager with M/s. Ram Interiors, Hyderabad. A Private Contracting company based in Hyderabad and works at all over A.P. Period of Work: June 2000 – Aug 2002 Projects dealt include construction of retail out-lets of HPCL comprising construction of new outlets, repair / renovation of existing outlets all over Andhra Pradesh. Jobs generally includes of erection of steel structures for canopy and RCC Framed structures for sales building and V.R.C.C drive-ways and development works such as yard lighting and kerb walls, hoardings, Grand Id and Id pole works, Pump island works and Pipeline works including pipeline and cable trenches. . Time-bound projects of Tata Cellular Limited & Hutchison Essar South Limited for their land and roof top sites for the cellular transmission towers comprising of all civil works at site in and around Hyderabad.
  • 5.
    Duties include constructionsupervision, co-ordination with the architect, clients, preparation of bills, quantity schedules using Excel, and time schedules using MS-Project, working drawings using Auto Cad R2000. Ref: Mr. N.S.Rama Rao, M D, Mobile :9849005535 Worked as Site Engineer with M/s. Suja & Associates, Secunderabad. Period of Work: Sep’95 – May 2000 Using AutoCAD R14 extensively for the preparation of different civil engineering drawings. Major jobs on CAD includes preparation of drawings right from conceptual stage to execution for different residential buildings, engineering and working drawings for a dam project under the consultancy of JNTU, Hyd. Using Ms Excel 97 for preparation of different spreadsheet applications including estimates and analyses. Proficiency in using Ms Word and Ms Access 97 for various in house applications. Major works executed: • Supervised the layout of Western Industries at Kompally, R.R. District. • Handled major survey works and plotting of lands in and around the sub-urban areas of Hyderabad. • Done surveys for Farmhouses around the twin cities of Hyderabad and Secunderabad. • Executing the construction of Independent Houses. • Building regularisation works of Local Municipal body M.C.H – Purely Liasoning work. • Construction of individual residential buildings. Ref: Mr. N.V.Ranga Reddy, Chief Consultant, Mobile: 9246587577 Worked as Site Supervisor in M.V.S.Rao & Associates, Hyderabad, and a reputed architectural consultancy firm. Period of Work: Jan’93 - Aug’95. Major works executed: • I.O.C. Officers residential complex (Multi storeyed), Hyderabad. • Supervised the layout of Goutami Enclave, at Jubilee Hills, Hyderabad. • Construction of independent residences and bungalows at Gunrock Enclave, Secunderabad. Ref: Mr. G.N. Venkateshwarlu, Sr Engineer, Mobile: 9848067328 Worked as Surveyor in M/s. Standard Surveys, Secunderabad. Period of Work: Jun’91 - Dec’92. Major works executed:
  • 6.
    Land & Topographical Survey of A.P. Sports School, Tumkunta, R.R.Dist., • Route & Topographical Survey of proposed Light Rail System at Hyderabad. • Handled Major Surveys and Plotting of 30 acres & above in the suburban areas of Hyderabad. Ref: Mr. Karunakar, Co- Surveyor Mobile: 9848518177 NATURE OF JOB Organizing Contractor Consultants Review Meetings with client, Quantity control, Project Scheduling & tracking, Preparation of Contract Documents, and Certification of Bills. Preparing Status Reports. STRENGTHS Self-initiative, Hard working Acquainted with the Quality Management System. Excellent Planning of Material and Ability to control Manpower and delegate responsibility. Good team interaction (communication skills & reporting skills). • EXECUTED PROJECTS UP TO 10 LAKH SQ.FT IN 2004-2006 WITH M/S.EMAS ENGINEERS & CONTRACTORS AS A QS / BILLING ENGINEER & QA / QC ENGINEER • EXECUTED PROJECTS UP TO 5 LAKH SQ.FT IN 2006-2007 WITH M/S.SATYAVANI PROJECTS & CONSULTANTS PMC - DIVISION AS A PROJECT COORDINATOR • EXECUTED PROJECTS UP TO 8 LAKH SQ.FT IN 2007-2008 WITH M/S.SATYAVANI PROJECTS & CONSULTANTS PMC - DIVISION AS A PROJECT COORDINATOR • EXECUTED PROJECTS UP TO 4 LAKH SQ.FT IN 2007-2008 WITH M/S.SATYAVANI PROJECTS & CONSULTANTS PMC - DIVISION AS A PROJECT COORDINATOR References: Ar. Prasad Muller Pathan Associate Architect – Architect Hafeez Contractor – Mumbai. Mobile: +91-98211-22741 Ar C.S Rao Chief Architect – C.S.Rao & Associates Mobile: +91-9849006118 Ar. Sridhar Chief Architect – C-Con Consultants Mobile: +91-9246536529 Mr. Prasad.P Chairman – N.R.D.C.S Mobile: +91-9848083445 Er. Ramesh
  • 7.
    Project Engineer –Polaris Software Park Mobile: +91-9866335213 Er. Rajesh Project Engineer – Vanenburg IT Park Phase II & III Mobile: +91-9885307002 Worked on the creations of renowned Ar. Hafeez contractor (M/s. Ar. Hafeez contractor, Mumbai), Ar. Uday Joshi & Associates, Mumbai), Ar. Prasad. T.V (M/s. VKT & Associates, Bangalore), Ar. Kiran Venkatesh (M/s. Inform Architects, Bangalore). Ar. Sudheer Reddy (M/s. Sudheer and Associates, Hyderabad). Ar. Pramod balakrishnan, (M/s Edifice Architects Chennai). Some of the Recent Projects involved myself in HYDERABAD Shopping mall / commercial complex Ashoka Metropolitan Mall GVK ONE Prestige Rai Towers facility for M/s Schneider Electric (I) ltd IT Parks Polaris IT Park Oracle IT Park Phase I
  • 8.
    Vanenburg IT ParkPhase IV Vanenburg IT Park Phase III Indo American Cancer Hospital- New Block Indian School of Business – HT-1