This document outlines the key steps in the research process:
1. Formulating the research problem by precisely defining the issue to be studied and determining its significance.
2. Conducting an extensive literature review to understand previous work.
3. Developing testable hypotheses to address the research problem.
4. Designing the research methodology including sampling, data collection methods, and data analysis.
5. Collecting and analyzing data to test the hypotheses.
6. Interpreting the findings, conclusions, and limitations to determine how the research adds to knowledge.
The overall goal is to systematically investigate an issue to produce generalizable answers.