1
QC GSLIS 730 -- EAD
Welcome!
1. Login to the Mac OS (not the Windows OS)
2. Go to this link: http://bit.ly/RfHtuL
3. Download the file to the desktop
File -> Download original
4. Unzip the file to the desktop
Queens College GSLIS
2
Outline
I. The Basics
II. Finding Aid
III. Implementation
Break
IV. Exercises
3
Relax!
4
I. The Basics
5
What is EAD?
XML standard for encoding finding aids
I. Basics
6
7
XML standard for encoding finding aids
I. Basics - What is EAD?
XML (eXtensible Markup Language):
a set of rules for structuring data via markup
8
XML standard for encoding finding aids
I. Basics - What is EAD?
Tag:
<unitdate era=“ce”>2011</unitdate>
Attribute:
<unitdate era=“ce”>2011</unitdate>
Element:
<unitdate era=“ce”>2011</unitdate>
Elements and attributes defined by a
Document Type Definition (DTD) or a
Schema
<bioghist> <bionote>
9
I. Basics - What is EAD?
XML standard for encoding finding aids
<ead>
<eadheader>
<titleproper>Guide to the
Papers of Joseph Roth
</titleproper>
</eadheader>
</ead>
10
XML standard for encoding finding aids
I. Basics - What is EAD?
XML standard for encoding finding aids
Defined set of containers for descriptive data
EAD : DACS = MARC : AACR2
11
I. Basics - What is EAD?
XML standard for encoding finding aids
A description of records that gives the
repository physical and intellectual control over
the materials and that assists users to gain
access to and understand the materials (SAA)
Describing Archives: A Content Standard (DACS)
12
I. Basics - What is EAD?
What is EAD?
XML standard for encoding finding aids
I. Basics
13
What is EAD?
EAD encoding is not a substitute for
sound archival description!
I. Basics
14
A Brief Aside: DACS
Describing Archives: A Content Standard
“rules to ensure the creation of
consistent, appropriate, and self-
explanatory descriptions of archival
material.”
I. Basics
15
A Brief Aside: DACS
“DACS defines twenty-five elements that
are useful in creating systems for
describing archival materials.”
“Not all of the DACS elements are
required in every archival description.”
I. Basics
16
A Brief Aside: DACS
3.1 Scope and Content Element
“This element provides information
about the nature of the materials and
activities reflected in the unit being
described to enable users to judge its
potential relevance. …”
I. Basics
17
A Brief Aside: DACS
DACS revision underway
I. Basics
18
II. Finding Aid
19
EAD Finding Aid Structure
<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ead SYSTEM "ead.dtd">
or
<ead xsi:schemaLocation="urn:isbn:1-931666-22-9
http://www.loc.gov/ead/ead.xsd">
II. Finding Aid
20
EAD Finding Aid Structure
<ead>
<eadheader>Information about repository and
finding aid</eadheader>
<archdesc>Description of archival
materials</archdesc>
</ead>
II. Finding Aid
21
Common Tags <eadheader>
• Finding aid author
<filedesc><titlestmt>
<author>Processed by Stanislav Pejša.</author>
</titlestmt></filedesc>
II. Finding Aid
22
Common Tags <archdesc>
• Minimum required description – “high-level did”
<did>
<origination>Roth, Joseph</origination>
<unittitle>Joseph Roth Collection</unittitle>
<unitdate>undated, 1890-2005</unitdate>
<abstract>[short descriptive text]</abstract>
[…]
II. Finding Aid
23
Common Tags <archdesc>
• Minimum required description – “high-level did”
<did>
[…]
<langmaterial>In German and English</langmaterial>
<physdesc>1 linear foot</physdesc>
<unitid>AR 10254</unitid>
<repository>Leo Baeck Institute</repository>
<physloc>V 11/2</physloc>
</did>
II. Finding Aid
24
Common Tags <archdesc>
• Biographical information
<bioghist><p>Joseph Roth was one of the most prominent
Austrian writers of the first half of the 20th
century.</p></bioghist>
• Controlled vocabulary
<geogname encodinganalog="651$a" source="lcsh"
authfilenumber="n 79040121">Austria</geogname>
II. Finding Aid
25
Common Tags <archdesc>
• Description of Subordinate Components
<dsc>
<c01 level="series">
<c02>Folder 1
<c03>Item 1</c03>
<c03>Item 2</c03>
</c02>
<c02>Folder 2</c02>
</c01>
II. Finding Aid
26
Common Tags <archdesc>
• Description of Subordinate Components
A Component <c> provides information about the content,
context, and extent of a subordinate body of materials.
Each <c> element identifies an intellectually logical section
of the described materials. The physical filing
separations between components do not always
coincide with the intellectual separations.
From EAD Tag library <http://www.loc.gov/ead/tglib/elements/c.html>
II. Finding Aid
27
Common Tags <archdesc>
• Description of Subordinate Components
<dsc>
<c01 level="series">
<did>
<unittitle id="serII">Series II: Publications</unittitle>
<unitdate normal="1985/1996">1985-1996</unitdate>
</did>
<c02>Subordinate intellectual parts, e.g. folders</c02>
</c01>
II. Finding Aid
28
Common Tags <archdesc>
• Description of Subordinate Components
<c02>
<did>
<container type="box">2</container>
<container type="folder">1</container>
<unittitle>Articles</unittitle>
<unitdate>1985-1994</unitdate>
</did>
</c02>
II. Finding Aid
29
Common Tags <archdesc>
• Description of Subordinate Components
<c02>
<did>
<container type="box">OS 145</container>
<container type="folder">1</container>
<unittitle>Newspaper foldout</unittitle>
<unitdate>1996</unitdate>
</did>
</c02>
II. Finding Aid
30
Common Tags <archdesc>
• Digital Archival Object (<dao>)
<c02>
<did> […]
<unittitle>Articles</unittitle>
</did>
<dao
href="http://www.archive.org/stream/josephroth_07_r
eel07#page/n218/mode/1up" actuate="onrequest"
linktype="simple" show="new"/>
</c02>
II. Finding Aid
31
Common Tags – Human Readable?
<dimensions>
II. Finding Aid
32
Common Tags – Human Readable?
<dimensions>
A subelement of <physdesc> for information
about the size of the materials being
described; usually includes numerical data.
II. Finding Aid
33
Common Tags – Human Readable?
<famname>
II. Finding Aid
34
Common Tags – Human Readable?
<famname>
The proper noun designation for a group of
persons closely related by blood or persons
who form a household. Includes single
families and family groups, e.g., Patience
Parker Family and Parker Family.
II. Finding Aid
35
Common Tags – Human Readable?
<revisiondesc>
II. Finding Aid
36
Common Tags – Human Readable?
<revisiondesc>
An optional subelement of the <eadheader>
for information about changes or
alterations that have been made to the
encoded finding aid.
II. Finding Aid
37
EAD Finding Aid
II. Finding Aid
38
III. Implementation
39
III. Implementation:
Creating EAD
40
III. Implementation: Creating EAD
41
Archivists’ Toolkit Archon
ArchivesSpace
ICA-AtoM
III. Implementation: Creating EAD
42
oXygen
III. Implementation: Creating EAD
43
III. Implementation: Creating EAD
44
NoteTab Dreamweaver
EADitor Note Pad
PASCL spreadsheet
III. Implementation: Creating EAD
45
“the spreadsheet from heaven”
Our Workflow
III. Implementation: Creating EAD
46
III. Implementation:
Using EAD
47
Now What?
III. Implementation: Using EAD
48
XSLT
III. Implementation: Using EAD
49
XSLT
50
III. Implementation: Using EAD
EAD to HTML
III. Implementation: Using EAD
51
EAD to HTML with DC
III. Implementation: Using EAD
52
EAD to PDF
III. Implementation: Using EAD
53
EAD to MARC
III. Implementation: Using EAD
54
Other Uses
• Integration with other standards (e.g. EAC-CPF)
• Open Archives Initiative – Protocol for Metadata
Harvesting (OAI-PMH)
• EAD consortia
• Metadata for digitized collections
III. Implementation: Using EAD
55
Other Uses
• Flexible search and display
III. Implementation: Using EAD
56
The Future of EAD
(pre) Alpha release of EAD revision, August 2012
• Reduce semantic overload
• Simplify links
• Reduce mixed content
• Add, deprecate, and delete elements
III. Implementation: Using EAD
57
The Future of EAD
III. Implementation: Using EAD
58
• Revision is schema-based -- goodbye, DTD
• LC stylesheet: dtd2schema.xsl
• “Attribute validation errors indicate that the
attribute value does not conform to the ruling
ISO standard”
The Future of EAD
• Beta release of schema, documentation, and
migration tools, January 15, 2013
• New version of EAD released with tag library and
migration tools, July 1, 2013
slideshare.net/mikerush/ead-revision-progress-report-20120808
III. Implementation: Using EAD
59
Relax!
III. Implementation: Using EAD
60
IV. Exercises
61
Exercise Setup
62
IV. Exercises
1. Login to the Mac OS (not the Windows OS)
2. Go to http://bit.ly/RfHtuL and download the
file to desktop (File -> download original)
3.Unzip the file to desktop
4. Start Dreamweaver and a browser
Preferably Firefox, but IE should work
6. Open “JosephRoth.xml” in Dreamweaver
7. Open “JosephRoth.xml” in browser
63
IV. Exercises
1. Make edits to “JosephRoth.xml” in
Dreamweaver
2. Save
File -> Save or Cmd+S
3. Refresh “JosephRoth.xml” in browser
•F5 or the button to right of the address bar
•Or hit the Globe button in Dreamweaver to
preview in browser
Exercise How To
Type a “<“
character,
and the
program
prompts you
with a list of
possible
tags
IV. Exercises
Exercise How To
Hit the
spacebar
within an
opening tag
to see a list
of possible
attributes
IV. Exercises
Exercise How To
Exercise How To
66
IV. Exercises
How does this work? XSLT!
67
IV. Exercises
IV. Exercises
Exercise How To - Tips
1. Be very careful with quotation marks and
angle brackets
<unitdate era="ce">2011</unitdate>
2. Copy and paste carefully - know where the
cursor is
3. O/o are not the same as 0
4. Look up while typing
Processing the
Joseph Roth Addendum
You are a processing
archivist at the Leo Baeck
Institute. You have been
asked to process an
addendum to the Joseph
Roth Collection, and to
update the EAD finding
aid accordingly.
IV. Exercises
69
Austrian writer Joseph Roth (1894-1939)
Exercise 1: Housekeeping
Update the information in the <eadheader>
section to reflect your contribution.
IV. Exercises
70
Exercise 1: Housekeeping
<ead><eadheader><filedesc><titlestmt>
<author>Processed by Stanislav Pejša.
Addendum processed by [your name].</author>
IV. Exercises
71
The head archivist tells you that there is an error in
the biographical information. Roth’s mother’s
first name is Maria, not Mario.
Fix this typo.
IV. Exercises
72
Exercise 2:
Biographical Information
<ead><archdesc>
<bioghist><p>
Find “Mario” and replace with “Maria”
</p></bioghist>
IV. Exercises
73
Exercise 2:
Biographical Information
Looking at the existing controlled access points,
you realize that the subject term for Roth’s
birthplace, “Brody, Galicia” is incorrect. The
proper LC term is “Brody (Ukraine)”.
Correct the term.
IV. Exercises
74
Exercise 3a:
Geographic Information
<ead><archdesc><controlaccess>
<geogname>
Find “Brody, Galicia” and replace with “Brody
(Ukraine)”
</geogname>
IV. Exercises
75
Exercise 3a:
Geographic Information
Add the LC authority file number for “Brody
(Ukraine)”.
IV. Exercises
76
Exercise 3b:
Geographic Information
Go to LC authorities: http://id.loc.gov
Search for Brody (Ukraine)
<ead><archdesc><controlaccess>
<geogname encodinganalog="651bb0$a"
role="subject" source="lcsh"
authfilenumber="n88212572">Brody
(Ukraine)</geogname>
IV. Exercises
77
Exercise 3b:
Geographic Information
The addendum you are given is one folder,
consisting of material in Polish from a 2002
conference about Roth.
Add this folder to Series II: Addenda, and update
the rest of the finding aid accordingly.
IV. Exercises
78
Exercise 4:
Adding a New Folder
The addendum you are given is one folder,
consisting of material in Polish from a 2002
conference about Roth.
Add this folder to Series II: Addenda, and update
the rest of the finding aid accordingly.
IV. Exercises
79
Exercise 4:
Adding a New Folder
"
What needs to be added?
Where in the finding aid?
IV. Exercises
80
Exercise 4a:
Adding the Folder
<ead><archdesc><dsc><c01 level="series">
<c02>
<did>
<container type="box">2</container>
<container type="folder">3</container>
<unittitle>Polish conference</unittitle>
<unitdate>2002</unitdate>
</did>
</c02>
IV. Exercises
81
Exercise 4a:
Adding the Folder
Does the date information need to be updated?
IV. Exercises
82
Exercise 4b:
Updating the Dates
Series-level date:
<ead><archdesc><dsc><c01 level="series"><did>
<unitdate normal="1985/2002"
type="inclusive">1985-2002</unitdate>
NB: Also at the collection level (high-level did), in
the arrangement note, and in the title.
IV. Exercises
83
Exercise 4b:
Updating the Dates
Collection-level date:
<ead><archdesc><did>
Arrangement note date:
<ead><archdesc><arrangement>
Title date:
<ead><eadheader><filedesc><titlestmt>
IV. Exercises
84
Exercise 4b:
Updating the Dates
Find the existing language information, and see if
you can understand the format. Add Polish to
the list of languages, at both the series and the
collection levels.
IV. Exercises
85
Exercise 4c:
Updating the Language
<language langcode="pol">Polish</language>
ISO639-2 code
(id.loc.gov)
IV. Exercises
86
Exercise 4c:
Updating the Language
<ead><archdesc><did> and
<ead><archdesc><dsc><c01 level="series"><did>
<langmaterial>This series is in <language
langcode="ger">German</language>,
<language langcode="eng">English</language>, and
<language
langcode="pol">Polish</language>.</langmaterial>
IV. Exercises
87
Exercise 4c:
Updating the Language
Add one sentence to the Series II scope note
reflecting the additional folder.
IV. Exercises
88
Exercise 4d:
Updating the Series II Scope Note
<ead><archdesc><dsc><c01
level="series"><scopecontent><p>This series
consists of material that was added to the
collection after the inventory was drafted and
the bulk of the collection organized. […] Also
included are materials from a 2002 conference in
Poland.</p></scopecontent>
IV. Exercises
89
Exercise 4d:
Updating the Series II Scope Note
Link to the digitized version of the material in the
additional folder using this link:
http://bit.ly/x7944b
IV. Exercises
90
Exercise 5:
Adding a link to the digital object
<ead><archdesc><dsc><c01 level="series">
<c02>
<did>[…]</did>
<dao href="http://bit.ly/x7944b"
actuate="onrequest" show="new"/>
</c02>
IV. Exercises
91
Exercise 5:
Adding a link to the digital object
The head archivist has asked you to print out
copies of your EAD finding aid for the reading
room. Create a print-friendly HTML file.
IV. Exercises
92
Exercise 6:
Creating a Print-Friendly File
Find a stylesheet and save it in your EAD folder.
(We’ve done this for you – thanks Syracuse!)
Change the stylesheet declaration:
<?xml-stylesheet type="text/xsl" href="eadprint-su.xsl"?>
IV. Exercises
93
Exercise 6:
Creating a Print-Friendly File
IV. Exercises
94
Exercise 6:
Creating a Print-Friendly File
IV. Exercises
95
Questions?
Resources
96
EAD Tag Library
III. Implementation: Creating EAD
97
SAA Standards Portal
III. Implementation: Creating EAD
98
EAD Tools
Resources
99
Tinker!
• Download the free trial of oXygen XML editor,
the schema, an EAD finding aid, and a stylesheet.
• Try some basic actions: add a folder, change a
controlled vocabulary term, remove a series.
Resources
100
Download via Slideshare:
http://www.slideshare.net/archivistkevin/XXX
Thank you!
101

QC EAD 11-07-12

  • 1.
    1 QC GSLIS 730-- EAD Welcome! 1. Login to the Mac OS (not the Windows OS) 2. Go to this link: http://bit.ly/RfHtuL 3. Download the file to the desktop File -> Download original 4. Unzip the file to the desktop
  • 2.
  • 3.
    Outline I. The Basics II.Finding Aid III. Implementation Break IV. Exercises 3
  • 4.
  • 5.
  • 6.
    What is EAD? XMLstandard for encoding finding aids I. Basics 6
  • 7.
    7 XML standard forencoding finding aids I. Basics - What is EAD? XML (eXtensible Markup Language): a set of rules for structuring data via markup
  • 8.
    8 XML standard forencoding finding aids I. Basics - What is EAD? Tag: <unitdate era=“ce”>2011</unitdate> Attribute: <unitdate era=“ce”>2011</unitdate> Element: <unitdate era=“ce”>2011</unitdate>
  • 9.
    Elements and attributesdefined by a Document Type Definition (DTD) or a Schema <bioghist> <bionote> 9 I. Basics - What is EAD? XML standard for encoding finding aids
  • 10.
    <ead> <eadheader> <titleproper>Guide to the Papersof Joseph Roth </titleproper> </eadheader> </ead> 10 XML standard for encoding finding aids I. Basics - What is EAD?
  • 11.
    XML standard forencoding finding aids Defined set of containers for descriptive data EAD : DACS = MARC : AACR2 11 I. Basics - What is EAD?
  • 12.
    XML standard forencoding finding aids A description of records that gives the repository physical and intellectual control over the materials and that assists users to gain access to and understand the materials (SAA) Describing Archives: A Content Standard (DACS) 12 I. Basics - What is EAD?
  • 13.
    What is EAD? XMLstandard for encoding finding aids I. Basics 13
  • 14.
    What is EAD? EADencoding is not a substitute for sound archival description! I. Basics 14
  • 15.
    A Brief Aside:DACS Describing Archives: A Content Standard “rules to ensure the creation of consistent, appropriate, and self- explanatory descriptions of archival material.” I. Basics 15
  • 16.
    A Brief Aside:DACS “DACS defines twenty-five elements that are useful in creating systems for describing archival materials.” “Not all of the DACS elements are required in every archival description.” I. Basics 16
  • 17.
    A Brief Aside:DACS 3.1 Scope and Content Element “This element provides information about the nature of the materials and activities reflected in the unit being described to enable users to judge its potential relevance. …” I. Basics 17
  • 18.
    A Brief Aside:DACS DACS revision underway I. Basics 18
  • 19.
  • 20.
    EAD Finding AidStructure <?xml version="1.0" encoding="UTF-8"?> <!DOCTYPE ead SYSTEM "ead.dtd"> or <ead xsi:schemaLocation="urn:isbn:1-931666-22-9 http://www.loc.gov/ead/ead.xsd"> II. Finding Aid 20
  • 21.
    EAD Finding AidStructure <ead> <eadheader>Information about repository and finding aid</eadheader> <archdesc>Description of archival materials</archdesc> </ead> II. Finding Aid 21
  • 22.
    Common Tags <eadheader> •Finding aid author <filedesc><titlestmt> <author>Processed by Stanislav Pejša.</author> </titlestmt></filedesc> II. Finding Aid 22
  • 23.
    Common Tags <archdesc> •Minimum required description – “high-level did” <did> <origination>Roth, Joseph</origination> <unittitle>Joseph Roth Collection</unittitle> <unitdate>undated, 1890-2005</unitdate> <abstract>[short descriptive text]</abstract> […] II. Finding Aid 23
  • 24.
    Common Tags <archdesc> •Minimum required description – “high-level did” <did> […] <langmaterial>In German and English</langmaterial> <physdesc>1 linear foot</physdesc> <unitid>AR 10254</unitid> <repository>Leo Baeck Institute</repository> <physloc>V 11/2</physloc> </did> II. Finding Aid 24
  • 25.
    Common Tags <archdesc> •Biographical information <bioghist><p>Joseph Roth was one of the most prominent Austrian writers of the first half of the 20th century.</p></bioghist> • Controlled vocabulary <geogname encodinganalog="651$a" source="lcsh" authfilenumber="n 79040121">Austria</geogname> II. Finding Aid 25
  • 26.
    Common Tags <archdesc> •Description of Subordinate Components <dsc> <c01 level="series"> <c02>Folder 1 <c03>Item 1</c03> <c03>Item 2</c03> </c02> <c02>Folder 2</c02> </c01> II. Finding Aid 26
  • 27.
    Common Tags <archdesc> •Description of Subordinate Components A Component <c> provides information about the content, context, and extent of a subordinate body of materials. Each <c> element identifies an intellectually logical section of the described materials. The physical filing separations between components do not always coincide with the intellectual separations. From EAD Tag library <http://www.loc.gov/ead/tglib/elements/c.html> II. Finding Aid 27
  • 28.
    Common Tags <archdesc> •Description of Subordinate Components <dsc> <c01 level="series"> <did> <unittitle id="serII">Series II: Publications</unittitle> <unitdate normal="1985/1996">1985-1996</unitdate> </did> <c02>Subordinate intellectual parts, e.g. folders</c02> </c01> II. Finding Aid 28
  • 29.
    Common Tags <archdesc> •Description of Subordinate Components <c02> <did> <container type="box">2</container> <container type="folder">1</container> <unittitle>Articles</unittitle> <unitdate>1985-1994</unitdate> </did> </c02> II. Finding Aid 29
  • 30.
    Common Tags <archdesc> •Description of Subordinate Components <c02> <did> <container type="box">OS 145</container> <container type="folder">1</container> <unittitle>Newspaper foldout</unittitle> <unitdate>1996</unitdate> </did> </c02> II. Finding Aid 30
  • 31.
    Common Tags <archdesc> •Digital Archival Object (<dao>) <c02> <did> […] <unittitle>Articles</unittitle> </did> <dao href="http://www.archive.org/stream/josephroth_07_r eel07#page/n218/mode/1up" actuate="onrequest" linktype="simple" show="new"/> </c02> II. Finding Aid 31
  • 32.
    Common Tags –Human Readable? <dimensions> II. Finding Aid 32
  • 33.
    Common Tags –Human Readable? <dimensions> A subelement of <physdesc> for information about the size of the materials being described; usually includes numerical data. II. Finding Aid 33
  • 34.
    Common Tags –Human Readable? <famname> II. Finding Aid 34
  • 35.
    Common Tags –Human Readable? <famname> The proper noun designation for a group of persons closely related by blood or persons who form a household. Includes single families and family groups, e.g., Patience Parker Family and Parker Family. II. Finding Aid 35
  • 36.
    Common Tags –Human Readable? <revisiondesc> II. Finding Aid 36
  • 37.
    Common Tags –Human Readable? <revisiondesc> An optional subelement of the <eadheader> for information about changes or alterations that have been made to the encoded finding aid. II. Finding Aid 37
  • 38.
    EAD Finding Aid II.Finding Aid 38
  • 39.
  • 40.
  • 41.
    III. Implementation: CreatingEAD 41 Archivists’ Toolkit Archon ArchivesSpace
  • 42.
  • 43.
  • 44.
    III. Implementation: CreatingEAD 44 NoteTab Dreamweaver EADitor Note Pad
  • 45.
    PASCL spreadsheet III. Implementation:Creating EAD 45 “the spreadsheet from heaven”
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
    EAD to HTML III.Implementation: Using EAD 51
  • 52.
    EAD to HTMLwith DC III. Implementation: Using EAD 52
  • 53.
    EAD to PDF III.Implementation: Using EAD 53
  • 54.
    EAD to MARC III.Implementation: Using EAD 54
  • 55.
    Other Uses • Integrationwith other standards (e.g. EAC-CPF) • Open Archives Initiative – Protocol for Metadata Harvesting (OAI-PMH) • EAD consortia • Metadata for digitized collections III. Implementation: Using EAD 55
  • 56.
    Other Uses • Flexiblesearch and display III. Implementation: Using EAD 56
  • 57.
    The Future ofEAD (pre) Alpha release of EAD revision, August 2012 • Reduce semantic overload • Simplify links • Reduce mixed content • Add, deprecate, and delete elements III. Implementation: Using EAD 57
  • 58.
    The Future ofEAD III. Implementation: Using EAD 58 • Revision is schema-based -- goodbye, DTD • LC stylesheet: dtd2schema.xsl • “Attribute validation errors indicate that the attribute value does not conform to the ruling ISO standard”
  • 59.
    The Future ofEAD • Beta release of schema, documentation, and migration tools, January 15, 2013 • New version of EAD released with tag library and migration tools, July 1, 2013 slideshare.net/mikerush/ead-revision-progress-report-20120808 III. Implementation: Using EAD 59
  • 60.
  • 61.
  • 62.
    Exercise Setup 62 IV. Exercises 1.Login to the Mac OS (not the Windows OS) 2. Go to http://bit.ly/RfHtuL and download the file to desktop (File -> download original) 3.Unzip the file to desktop 4. Start Dreamweaver and a browser Preferably Firefox, but IE should work 6. Open “JosephRoth.xml” in Dreamweaver 7. Open “JosephRoth.xml” in browser
  • 63.
    63 IV. Exercises 1. Makeedits to “JosephRoth.xml” in Dreamweaver 2. Save File -> Save or Cmd+S 3. Refresh “JosephRoth.xml” in browser •F5 or the button to right of the address bar •Or hit the Globe button in Dreamweaver to preview in browser Exercise How To
  • 64.
    Type a “<“ character, andthe program prompts you with a list of possible tags IV. Exercises Exercise How To
  • 65.
    Hit the spacebar within an openingtag to see a list of possible attributes IV. Exercises Exercise How To
  • 66.
  • 67.
    How does thiswork? XSLT! 67 IV. Exercises
  • 68.
    IV. Exercises Exercise HowTo - Tips 1. Be very careful with quotation marks and angle brackets <unitdate era="ce">2011</unitdate> 2. Copy and paste carefully - know where the cursor is 3. O/o are not the same as 0 4. Look up while typing
  • 69.
    Processing the Joseph RothAddendum You are a processing archivist at the Leo Baeck Institute. You have been asked to process an addendum to the Joseph Roth Collection, and to update the EAD finding aid accordingly. IV. Exercises 69 Austrian writer Joseph Roth (1894-1939)
  • 70.
    Exercise 1: Housekeeping Updatethe information in the <eadheader> section to reflect your contribution. IV. Exercises 70
  • 71.
    Exercise 1: Housekeeping <ead><eadheader><filedesc><titlestmt> <author>Processedby Stanislav Pejša. Addendum processed by [your name].</author> IV. Exercises 71
  • 72.
    The head archivisttells you that there is an error in the biographical information. Roth’s mother’s first name is Maria, not Mario. Fix this typo. IV. Exercises 72 Exercise 2: Biographical Information
  • 73.
    <ead><archdesc> <bioghist><p> Find “Mario” andreplace with “Maria” </p></bioghist> IV. Exercises 73 Exercise 2: Biographical Information
  • 74.
    Looking at theexisting controlled access points, you realize that the subject term for Roth’s birthplace, “Brody, Galicia” is incorrect. The proper LC term is “Brody (Ukraine)”. Correct the term. IV. Exercises 74 Exercise 3a: Geographic Information
  • 75.
    <ead><archdesc><controlaccess> <geogname> Find “Brody, Galicia”and replace with “Brody (Ukraine)” </geogname> IV. Exercises 75 Exercise 3a: Geographic Information
  • 76.
    Add the LCauthority file number for “Brody (Ukraine)”. IV. Exercises 76 Exercise 3b: Geographic Information
  • 77.
    Go to LCauthorities: http://id.loc.gov Search for Brody (Ukraine) <ead><archdesc><controlaccess> <geogname encodinganalog="651bb0$a" role="subject" source="lcsh" authfilenumber="n88212572">Brody (Ukraine)</geogname> IV. Exercises 77 Exercise 3b: Geographic Information
  • 78.
    The addendum youare given is one folder, consisting of material in Polish from a 2002 conference about Roth. Add this folder to Series II: Addenda, and update the rest of the finding aid accordingly. IV. Exercises 78 Exercise 4: Adding a New Folder
  • 79.
    The addendum youare given is one folder, consisting of material in Polish from a 2002 conference about Roth. Add this folder to Series II: Addenda, and update the rest of the finding aid accordingly. IV. Exercises 79 Exercise 4: Adding a New Folder "
  • 80.
    What needs tobe added? Where in the finding aid? IV. Exercises 80 Exercise 4a: Adding the Folder
  • 81.
    <ead><archdesc><dsc><c01 level="series"> <c02> <did> <container type="box">2</container> <containertype="folder">3</container> <unittitle>Polish conference</unittitle> <unitdate>2002</unitdate> </did> </c02> IV. Exercises 81 Exercise 4a: Adding the Folder
  • 82.
    Does the dateinformation need to be updated? IV. Exercises 82 Exercise 4b: Updating the Dates
  • 83.
    Series-level date: <ead><archdesc><dsc><c01 level="series"><did> <unitdatenormal="1985/2002" type="inclusive">1985-2002</unitdate> NB: Also at the collection level (high-level did), in the arrangement note, and in the title. IV. Exercises 83 Exercise 4b: Updating the Dates
  • 84.
    Collection-level date: <ead><archdesc><did> Arrangement notedate: <ead><archdesc><arrangement> Title date: <ead><eadheader><filedesc><titlestmt> IV. Exercises 84 Exercise 4b: Updating the Dates
  • 85.
    Find the existinglanguage information, and see if you can understand the format. Add Polish to the list of languages, at both the series and the collection levels. IV. Exercises 85 Exercise 4c: Updating the Language
  • 86.
  • 87.
    <ead><archdesc><did> and <ead><archdesc><dsc><c01 level="series"><did> <langmaterial>Thisseries is in <language langcode="ger">German</language>, <language langcode="eng">English</language>, and <language langcode="pol">Polish</language>.</langmaterial> IV. Exercises 87 Exercise 4c: Updating the Language
  • 88.
    Add one sentenceto the Series II scope note reflecting the additional folder. IV. Exercises 88 Exercise 4d: Updating the Series II Scope Note
  • 89.
    <ead><archdesc><dsc><c01 level="series"><scopecontent><p>This series consists ofmaterial that was added to the collection after the inventory was drafted and the bulk of the collection organized. […] Also included are materials from a 2002 conference in Poland.</p></scopecontent> IV. Exercises 89 Exercise 4d: Updating the Series II Scope Note
  • 90.
    Link to thedigitized version of the material in the additional folder using this link: http://bit.ly/x7944b IV. Exercises 90 Exercise 5: Adding a link to the digital object
  • 91.
    <ead><archdesc><dsc><c01 level="series"> <c02> <did>[…]</did> <dao href="http://bit.ly/x7944b" actuate="onrequest"show="new"/> </c02> IV. Exercises 91 Exercise 5: Adding a link to the digital object
  • 92.
    The head archivisthas asked you to print out copies of your EAD finding aid for the reading room. Create a print-friendly HTML file. IV. Exercises 92 Exercise 6: Creating a Print-Friendly File
  • 93.
    Find a stylesheetand save it in your EAD folder. (We’ve done this for you – thanks Syracuse!) Change the stylesheet declaration: <?xml-stylesheet type="text/xsl" href="eadprint-su.xsl"?> IV. Exercises 93 Exercise 6: Creating a Print-Friendly File
  • 94.
  • 95.
  • 96.
  • 97.
    EAD Tag Library III.Implementation: Creating EAD 97
  • 98.
    SAA Standards Portal III.Implementation: Creating EAD 98
  • 99.
  • 100.
    Tinker! • Download thefree trial of oXygen XML editor, the schema, an EAD finding aid, and a stylesheet. • Try some basic actions: add a folder, change a controlled vocabulary term, remove a series. Resources 100
  • 101.

Editor's Notes

  • #2 https://docs.google.com/folder/d/0Bz47u1MKmo18bFlTa21za1JXejg/edit
  • #4 http://www.flickr.com/photos/carowallis1/2314716161/sizes/m/in/photostream/ Will be available on slideshare – many links on images and in text in the later portion of the presentation
  • #5 http://www.flickr.com/photos/e_ubon/4312466853/sizes/l/in/photostream/
  • #8 Familiar with html? Similar (tags aka mark-up), but data structure, not display XML (eXtensible Markup Language): set of rules for structuring data via markup
  • #10 DTD and schema define the buckets; the list of tags in the tag library (we’ll see later) is defined here. Move to schema is coming; more flexible; not something you need to know right away http://www.flickr.com/photos/linneberg/4481309196/sizes/m/in/photostream/
  • #11 http://www.flickr.com/photos/johnkay/3539126525/sizes/m/in/photostream/ Note that it is hierarchical – nested. Parent elements apply to child elements.
  • #12 Encoding standards are rules for defining buckets; content standards are rules for the information inside http://www.flickr.com/photos/linneberg/4481309196/sizes/m/in/photostream/ Xml, EAD, MARC are ways to structure your data, they are not the same as the descriptive data such as the finding aid, the catalog record, etc.
  • #13  http://www.archivists.org/glossary/term_details.asp?DefinitionKey=66 http://www.flickr.com/photos/osuarchives/3427510628/sizes/m/in/photostream/
  • #15 EAD cookbook
  • #17 7 principles; rules for minimum information; names and dates. Revision (tip – free way to get text!), and link.
  • #18 7 principles; rules for minimum information; names and dates. Revision (tip – free way to get text!), and link.
  • #19 7 principles; rules for minimum information; names and dates. Revision (tip – free way to get text!), and link.
  • #22 An EAD-encoded finding aid is split into info about institution/FA (metametadata) and info about materials (the finding aid)
  • #26 id.loc.gov <p> to structure text
  • #32 So-called “empty element” – all the data is within the tag
  • #39 Looking at the real thing
  • #41 Extremely unlikely you will be asked to type it all out by hand. Temples, programs, guidance.
  • #42 Software is free (like kittens, not like beer) Designed by archivists: interface is intuitive Manages most common archival processes Designed for metadata standards Output – html, ead Built on a database (MySQL)
  • #43 “ICA-AtoM is web-based archival description software that is based on International Council on Archives ('ICA') standards. 'AtoM' is an acronymn for 'Access to Memory'.”
  • #44 Basic, powerful XML editor. You can safely ignore about 95% of the buttons and drop-downs, but will do things like suggest valid tags and attributes, close tags, and validate as you go. This is what we use.
  • #45 Software is free (like kittens, not like beer) Designed by archivists: interface is intuitive Manages most common archival processes Designed for metadata standards Output – html, ead Built on a database (MySQL)
  • #46 http://clir.pacscl.org/2012/03/19/excel-to-xml-the-spreadsheet-from-heaven/
  • #47 http://www2.archivists.org/standards
  • #50 XSLT (Extensible Stylesheet Language Transformations) is a declarative, XML-based language used for the transformation of XML documents. Here, the EAD tag processinfo is converted into HTML.
  • #51 XSLT (Extensible Stylesheet Language Transformations) is a declarative, XML-based language used for the transformation of XML documents. Here, the EAD tag processinfo is converted into HTML.
  • #57 Results returned a correct level of hierarchy, linking back to full finding aid.
  • #58 http://www.slideshare.net/mikerush/ead-revision-progress-report-20120808
  • #59 http://www.slideshare.net/mikerush/ead-revision-progress-report-20120808
  • #60 http://www.slideshare.net/mikerush/ead-revision-progress-report-20120808
  • #61 https://secure.flickr.com/photos/flik/172629460/sizes/z/in/photostream/
  • #62 http://www.loc.gov/pictures/collection/cph/item/2005681364/resource/
  • #68 XSLT (Extensible Stylesheet Language Transformations) is a declarative, XML-based language used for the transformation of XML documents. Here, the EAD tag processinfo is converted into HTML.
  • #70 We’ll be logically consistent, but in real world there are more things to correct and consider.
  • #91 http://www.archive.org/stream/josephroth_07_reel07#page/n563/mode/1up
  • #94 Stylesheet created by Michele Combs of Syracuse.
  • #95 Stylesheet created by Michele Combs of Syracuse.
  • #96 https://secure.flickr.com/photos/loneblackrider/315302588/sizes/l/in/photostream/
  • #97 https://secure.flickr.com/photos/elnegro/233434144/sizes/z/in/photostream/
  • #98 http://www.loc.gov/ead/tglib/element_index.html
  • #99 http://www2.archivists.org/standards
  • #100 http://www.oclc.org/research/publications/library/2010/2010-04.pdf
  • #102 Links are in comments and in slides