They say that beauty is more than skin deep,
and that you can’t judge a book by its cover.
But maybe home exteriors are the exception.
After all, most passers-by and other people in
your neighborhood will only know your home
by how it looks from the outside. Or why not
think about a house front as the start of a great
conversation: something makes you look,
and then a relationship develops!
So in this issue, we’ve rounded up all of our favorite plans that exhibit great design, both inside
and out. You’ll find plenty of welcoming porches, lots of striking stone, and tips for creating
dazzling window walls.
Our clients requested an entertainment area that was relaxing with the atmosphere of a Cape Cod vacation. We were able to give our clients their desires for a TV area, a bar, a playroom, an exercise room, a full bath and a guest bedroom.
This is my master portfolio as of the end of 2013. I am an Industrial Designer that likes to play in all industries and design realms, as you will see.
Exemplo de Projeto Arquitetônico aprovado em Curitiba - Projeto PDFteixeiracosta
Exemplo de Projeto Arquitetônico aprovado na cidade de Curitiba para construção em Condomínio Fechado. Arquivo em PDF para que profissionais e não-profissionais possam baixá-lo,
www.teixeiracosta.com
Our clients requested an entertainment area that was relaxing with the atmosphere of a Cape Cod vacation. We were able to give our clients their desires for a TV area, a bar, a playroom, an exercise room, a full bath and a guest bedroom.
This is my master portfolio as of the end of 2013. I am an Industrial Designer that likes to play in all industries and design realms, as you will see.
Exemplo de Projeto Arquitetônico aprovado em Curitiba - Projeto PDFteixeiracosta
Exemplo de Projeto Arquitetônico aprovado na cidade de Curitiba para construção em Condomínio Fechado. Arquivo em PDF para que profissionais e não-profissionais possam baixá-lo,
www.teixeiracosta.com
Apresentação do Case de Santa Casa no Evento do Grupo de Planejamento, em 06/10/2011.
Case recebeu Prata no Jay Chiat Strategy Excellence
Agência: Young&Rubicam
For some lawyers, especially litigators, social media is a tool that helps them provide better representation to their clients. Whether it’s mining social media for evidence or researching jurors online, social media is helping them to make their clients’ cases in court. Learn about Lawyers and Social Media in 2016 in this MyCase Legal Infographic.
How to design an open-plan home to maximise space Mohit Bansal Chandigarh.pdfMohit Bansal Chandigarh
Open plan home is one the common designs or architects nowadays and it is for sure that how will have a lot of gun designing it. Here are some tips on which you can maximise your space in open plan design.
How to maximise your space with clever open living room ideasHFR
This piece provides information for people looking for open living room ideas. It includes ideas on planning and how to use islands and colours effectively.
Top 5 Home Design Trends of 2017 in Western MA and beyond!Lesley Lambert
The current trends are all about utilizing rich color, maximizing texture and creating comfortable interiors you can’t wait to relax in. Use these trends to get inspired to makeover your home’s interiors and create spaces you love that also appeal to your personal style. Remember, if you plan to sell in the next few years, you may want to avoid doing anything dramatic and instead incorporate small changes that would appeal to buyers.
www.westernmahomes.net
#westernma #westernmass #realestate #design #renovations #lesleylambert #parksquarerealty #homeimprovements
Best Home Remodeling Tips For Decorating Your Homes - WebblogersWeb Blogers
In this presentation, you will get to know more about home remodeling for decorating your homes. This slide will help you to get the best home remodeling ideas. Home renovation means a new design to your home that enhances the beauty of your home. If you have content related to home improvement or home remodeling and want to promote your content then Webblogers is the best platform for you. We provide guest post submission services for the home improvement category as well as other categories. For more details feel free to contact us or visit our website.https://webblogers.com/best-home-remodeling-tips-for-decorating-your-homes/
Having a home is everyone’s dream in life. This is because it means being successful, especially in the financial aspect. Now, when planning to build your own home, there are many considerations you should make, the first of which is its design. It is important to have a home design that fits your lifestyle. This is where good home builders come in - to customize homes to suit a homebuyer’s unique needs. - http://www.cdobuilders.com
Boomers preparing to move into smaller spaces may be in for a surprise, says a couple who invested in two transformational townhome makeovers. Going down to the studs to get what you want takes courage, vision and confidence in a team say the Hunts who chose Glen Ellyn Homes as their builder and Drury Design Kitchen and Bath Studio as their contractors.
The Debra West Team's Staging Presentationdebrawesthomes
Debra West has earned her ASP (accredited staging professional) designation and offers a complimentary staging session for all of her sellers. We are in a beauty pageant and price war market, entering correctly is imperative to a successful sale. Remember, the overall goal of staging is to highlight the space, features and special qualities of a home. In order to do this, the home must appear neat and orderly. Correct furniture placement and decor are essential in ‘showing off’ a home’s best assets.
Stone has a unique intricacy that is simply captivating. With
such diversity in shape, color and texture it’s easy to see why it
can dramatically enhance any exterior or interior space.
Our commitment to craftsmanship can be seen within every
textural detail, countless hours spent hand-chiseling each and
every natural stone before it was carefully replicated through
our proprietary mold techniques. At StoneCraft we honor the
masonry traditions of the past and promise to deliver quality
and affordability with every stone we make.
This Guide addresses generally accepted
methods and details for the installation of
Adhered Manufactured Stone Veneer. To the
best of our knowledge, it is correct and up
to date. However, the document is designed
only as a guide; and it is not intended for any
specific construction project. The MVMA and
NCMA makes no express or implied warranty
or guarantee of the techniques, construction
methods or materials identified herein.
Meticulous care for details.
Heritage stones are carefully selected from unique geographic regions and then skillfully
molded and cast. Special care is taken to maximize nature’s beauty of the undercut for
stunning realism. Once the mold creation process has been completed and it moves into
production, stones are meticulously colorized using raw pigments and oxides providing
richness to every stone.
We use nothing but the finest materials in our products including
superior shale aggregates. Each mixture of base material is quality
controlled for batch-to-batch consistency. Our leading edge
processes and equipment ensure that every step in the creation
of our products is optimized for aesthetics and consistency. A
relentless pursuit of quality excellence in products and services
distinguishes us from other stone manufacturers and helps us
deliver real value to every customer, every day.
No matter the locale, there will always be cool evenings to enjoy the warmth of a backyard fire.
Necessories’ Fire Rings and Pits add charm to any backyard design.
At more than eight feet high and up to twelve feet wide (with Wood Boxes), the Grand
Fireplace is the perfect centerpiece for your outdoor living room. Its appeal comes from
its large profile, universal design, and aged appearance.
Due to our commitment to providing the highest quality and broadest product offerings, EP Henry is the oldest family-owned and operated manufacturer of unit concrete products in North America. Aside from our commitment to quality products, EP Henry is committed to providing you with the best finished project. As a market leader in both consumer and commercial Hardscaping™, EP Henry is 100% American made, owned, and operated. From humble beginnings in Edward P. Henry's Woodbury, NJ basement, we have evolved into the recognized industry leader in paver product innovation.
Due to our commitment to providing the highest quality and broadest product offerings, EP Henry is the oldest family-owned and operated manufacturer of unit concrete products in North America. Aside from our commitment to quality products, EP Henry is committed to providing you with the best finished project. As a market leader in both consumer and commercial Hardscaping™, EP Henry is 100% American made, owned, and operated. From humble beginnings in Edward P. Henry's Woodbury, NJ basement, we have evolved into the recognized industry leader in paver product innovation.
Whether you’re replacing, remodeling or building, Andersen® 100 Series windows and patio doors are a smart step up
from vinyl. They provide uncommon value, combining time-tested performance with long-lasting beauty. Our 100 Series
products are made with our revolutionary Fibrex® composite material, which comes in deep, rich colors that can dramatically
enhance any project. In addition, Fibrex material is environmentally responsible and energy effi cient, making 100 Series
products a winning choice for anyone considering vinyl windows and doors.
Select from over 30 door styles featuring Full-Lite, ¾ Lite or ½ Lite glass, decorative lower panels or grille options.
Interchangeable storm doors provide seasonal ventilation when the insect screen is in place. Self-storing storm doors
offer convenient anytime ventilation.
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...BrickAndBolt
Load-bearing walls are the backbone of any home construction, providing crucial structural support that carries the weight of the house above. For companies like Brick and Bolt Mysore and Bricknbolt Faridabad, understanding and properly implementing these elements are key to constructing safe and durable buildings.
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...JagadishKR1
Experience unmatched luxury at Elegant Evergreen Homes, offering exquisite 2, 3, and 4 BHK apartments in the serene locality of Yelahanka, Bangalore. These meticulously crafted homes blend modern design with timeless elegance, providing a harmonious living environment. Enjoy top-tier amenities and a prime location, making Elegant Evergreen Homes the ideal choice for discerning homeowners.
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Volition Properties
=== Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szeto) ===
Ever been curious about Real Estate Investing in the US?? At Volition, for the past 14 years, we have been focused on helping investors invest in over $250M of real estate and generate $100M of wealth in the Toronto market, but we are always open to learning more about other business models and learning from other investors.
The US has always been an intriguing market to invest in. But the US is a big place… if you’re interested in investing in the US, you probably have a lot of questions, like:
☑️ Specifically WHERE should you invest?
☑️ What are the best markets to invest in and why?
☑️ How much are property prices there?
☑️ What are the returns like?
☑️ What is cashflow like?
☑️ Compared to investing in Toronto or other cities in Ontario, what are the benefits / tradeoffs?
☑️ What ownership structure should I use?
☑️ What are the tax implications?
☑️ Can I get financing?
☑️ What are tenants like?
Enter Erwin Szeto, a longtime friend of Volition. Since 2005, Erwin Szeto and his team have navigated the challenging landscape of being landlords in Ontario. Now, they are shifting their focus and guiding their clients' investments toward the more landlord-friendly environment of the USA. This decision comes after assisting Canadian clients in transacting over $440,000,000 in income properties. Faced with issues like affordability constraints, tenant-friendly laws, rent control, and rental licensing in Canada, Erwin sees a clear opportunity in the U.S. Here, there is a significant influx of investments leading to the creation of high-paying manufacturing jobs. Erwin and his clients are poised to capitalize on these opportunities where landlord rights are stronger and there is no rent control.
To facilitate this transition, Erwin has partnered with and become a client of SHARE, a one-stop-shop U.S. Asset Manager. Founded by Canadians for Canadians, SHARE enables as passive an ownership experience as possible for landlords in the U.S., while still maintaining direct, 100% ownership.
Erwin is “Making Real Estate Investing Great Again”!!
Website: https://www.infinitywealth.ca/
Facebook: https://www.facebook.com/iwinrealestate and https://www.facebook.com/ErwinSzetoOfficial
Podcast: https://www.truthaboutrealestateinvesting.ca/
Instagram: https://www.instagram.com/iwinrealestate/ and https://www.instagram.com/erwinszeto/
Simpolo Tiles & Bathware
Tile ho,
toh Simpolo.
Since the first steps were taken in 1977, Simpolo Ceramics has carved its niche as a consistently growing organisation with unparalleled innovation and passion rooted in simplicity.
We endure gratification for every experience we offer, created to share something meaningful. It may not resonate with the majority, but that makes us a class apart. If only a handful were to understand the purpose of our existence, we would be proud to have found our believers. Rather, people with whom we can share our beliefs.
VISUALIZER
Design your space in your style with our very own Visualizer. Now, you can choose the tiles of your liking from our wide selection and see how they would look in a space. Select the tile from the multiple options and the visualiser will replace the surfaces in the image with the selected tiles. This way, instead of just your imagination, you can choose the tiles for your place by getting an actual picture of how they would look in a space. So, design your space the way you desire digitally and implement it in real life to get the best results!
You can also share this visualiser with others to help them design their space.
Committed to delighting customers with world-class ceramic products and services. Make Simpolo synonymous with the best quality and set new benchmarks of excellence for all stakeholders. Pursue best business practices with utmost integrity to make Simpolo an exciting organisation to work with, for vendors, channel partners, investors and employees alike.
Gain worldwide recognition in the field of ceramic building products through Research and Innovation and bring an enhanced lifestyle within reach for every household.
Omaxe Sports City Dwarka stands out as a premier residential and recreational destination, offering a blend of luxury and sports-centric living. Located in the thriving area of Dwarka, this project by Omaxe Limited is designed to cater to modern lifestyle needs while promoting a healthy, active living environment.
Flat available for sale
Location- Tupudana, Ranchi
Savitri enclave
Area- 3BHK
Rate- 4000/sq.ft.
Super Build Up Area-1629 sq.ft.
Build-up area-1253 sq.ft.
Rate- 65lakh16k(approx)
Floor available- Flat available in all floor(G+12)
Balcony- 2
Washroom- 2
Parking - CAR PARKING
Amenities- Joggers track,temple, children's park,gym,banquet hall (5 Lakh)
Possession year (Handover year)- Dec 2025
Outside View from the apartment and flat balcony is very beautiful.
For more information contact AASHIYANA STAR PROPERTIES
7766900371
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...Newman George Leech
Oeiras Tech City, a historic development in the Oeiras municipality of Lisbon, is acquired by RE Capital and REIG. It is located on a 93,000-square-meter plot of land and combines co-living, business, and residential areas. It highlights ESG principles and is close to Tagus Park, which improves the urban landscape of Lisbon.
Keep Your Home Naturally Cool and Warm Out Change in Seasons
Vinra Construction is a private limited company registered under the ROC. The management has an experience of over 15 years of understanding the needs and delivering apt solutions to the end users We are providing turnkey solutions in construction fields. like Construction, Interior Designing Facility Management, Plantation Management, etc..
Vinra Construction Tech Enabled Company for Eco-Friendly Home Construction
Contact With Vinra for a Greener Future >>> Call us @ 888 4898 765
Need MCA leads? No sweat! MCAs are great for small biz funding. Learn how to snag top-notch leads: businesses needing cash, with repayment ability, decision-makers, and accurate contacts. Use content, social ads, lead platforms, partnerships, and capture processes for quality leads.
https://www.leadgeneration.media/blog/b/streamline-your-mca-sales-process-with-pre-qualified-leads
Lixin Azarmehr, a Los Angeles-based real estate development trailblazer, co-founded JL Real Estate Development (JL RED) in 2015 and serves as its CEO. Her expertise has propelled the firm to specialize in luxury residential and mixed-use commercial projects, with a portfolio that features upscale retail spaces and sophisticated care facilities.
Referans Bahcesehir which is being constructed, in the center of the most regional destination as Bahçeşehir, shines out with its central location and unique landscape including social facilities such as a fitness center, sauna, sports facilities, children’s playground and recreational areas.
Not only drawing attention for immediate surroundings including commercial centers and private schools but also providing the easily accessible location with closeness to Tem Highway and connection roads, ongoing construction of 3rd Bridge Connection roads and Metro Projects
Bahcesehir is a rising value in the great city of Istanbul… Located at a new transportation junction in the northwest of the City… Located at such a spot that the access roads for the 3rd bridge and for the 3rd Airport will reach the region in 2016. The Marmaray and the Subway will extend all the way to Referans Bahcesehir respectively in 2018 and 2019.
465 flats and 34 stores are designed with an outstanding approach and arranged with a unique perspective offering the following options: 1 plus 1, 2 plus 1, 3 plus 1, 3.5 plus 1, 4 plus 1, and 4.5 plus 1. It is planned so as to safeguard you and your loved ones based upon a modern, technological safety approach. As you experience the joy and luxury here, you will be content and feet at ease.
It is worth seeing both inside and outside with heart-warming cafes, tasty restaurants and elegant stores… And it is ready to offer a vivacious social life with a warm and cozy space design.
A folding swimming pool and indoor swimming pools, playgrounds, Turkish bath, sauna… It has them all. Everything you need for your well-being and for having a pleasant time will be at your service. You simply need to align the rhythm of life with the rhythm of Referans Bahcesehir.
https://listingturkey.com/property/referans-bahcesehir/
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...JagadishKR1
Immerse yourself in the epitome of luxury living at Urbanrise Paradise on Earth. These opulent 4 BHK villas, nestled off the prestigious Kanakapura Road in Bangalore, redefine elegance and sophistication. With meticulous craftsmanship, breathtaking design, and unparalleled amenities, Urbanrise Paradise on Earth offers a sanctuary where every moment is infused with luxury and serenity. Experience a life of grandeur and indulgence at this exclusive residential enclave.
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdfListing Turkey
Tersane Suites Residences is a luxurious real estate project located in the heart of Istanbul, next to the beautiful Golden Horn. This unique development offers hotel concept residences with Rixos management, making it the perfect choice for both homeowners and investors.
The Tersane Suites Residences offers a wide range of options, from studio apartments to spacious four-bedroom units, all designed to the highest standard. The suites are finished with high-quality materials and feature modern, open-plan living spaces, fully-equipped kitchens, and large balconies with stunning views of the city and sea.
One of the standout features of Tersane Suites Residences is the Rixos management, which provides a truly exclusive and upscale living experience. Residents will have access to a range of luxury amenities, including a fitness center, spa, and indoor and outdoor swimming pools. Plus, the on-site restaurants and cafes provide a taste of the local and international cuisine.
The Tersane Suites Residences also offers a great opportunity for investors, as it provides a rental guarantee program. This means that investors can enjoy a steady income stream, with the peace of mind that their property is being managed by a reputable and experienced team.
The location of Tersane Suites Residences is also unbeatable, with easy access to the city’s main transportation links and within close proximity to the historic center, making it the perfect base for exploring all that Istanbul has to offer.
Torun Center Residences Istanbul - Listing TurkeyListing Turkey
THERE IS LIFE IN ITS CENTER!
The most energetic spot of the city that will add utterly different pleasures to your life, with a park that will make Istanbul breathe, delighting indoor and outdoor bistros, cafes, restaurants, the brand-new Food Hall concept, where dozens of unique tastes are served together, market area, cinema, theater, fitness club, SPA and event venue...
All the pleasures that will enrich your lives are awaiting you on the most beautiful side of the city, at Torun Center Residences. In Mecidiyeköy, where the heart of Istanbul beats, business, life and entertainment opportunities are located at the exact center, at Torun Center, the most beautiful side of the city.
Penthouse apartments and different styles of flats from 1 + 1 to 4 + 1, from 100 to 425 square meters in a 42-story residence tower, have been designed for those who want to live in the center of magnificence. Torun Center is the redefinition of a better life with specially landscaped floor gardens, apartment options with private balconies, and automatic glass systems equipped with Trickle Ventilation that offers clean air comfort.
Business and life in the same place
Excellent service
Torun Center has many delightful details, from a swimming pool to sunbathing and resting terrace. With 24/7 concierge services, 24/7 security, valet, technical service, closed-circuit camera system (CCTV), central heating and cooling system, it makes your life easier.
Delightful details
The two-story Torun Center Lounge, with its indoor and outdoor seating areas, children's playroom, private dining and TV lounge, promises unforgettable memories to you and your loved ones with its unique Istanbul view.
Neighboring to the most pleasant square of Istanbul
A few steps from the Torun Center Residences, you can reach the city's most modern city square and open the doors of a quality city life. Torun Center Residences brings together on the same project the long-awaited city life for Istanbul and gourmet restaurants, cafes, gym and SPA, and state-of-the-art cinema and Artı Stage, hosting the most famous plays of the season.
Located at the intersection of alternative public transportation options such as the metro and Metrobus, Torun Center comes to the fore as the most accessible office for both sides of Istanbul. With a central location and rich transportation lines, Torun Center offices make life easier for employees and increase productivity.
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG
One FNG by Group 108 is launching a new commercial project in Sector 142 Noida. Office space and high street retail shops on the FNG and Noida Expressway. For more information visit the website https://www.onefng.com/
Scanning tenants in NYC requires a thorough and compliant approach to ensure you find reliable renters. For a positive rental experience, consider hiring a property management service. Belgium Management LLC specializes in NYC rental property management and tenant relationship management. We prioritize tenant satisfaction, making us a trusted name in New York property management. Our dedicated team ensures tenants feel valued and supported throughout their lease.
Avrupa Konutlari Yenimahalle - Listing TurkeyListing Turkey
Welcome to Avrupa Konutları Yenimahalle, where luxury living meets unparalleled convenience in the heart of Istanbul. Developed by Artaş Holding, one of Turkey’s leading construction companies, this prestigious residential project offers a contemporary lifestyle experience like no other.
https://listingturkey.com/property/avrupa-konutlari-yenimahalle/
The SVN® organization shares a portion of their new weekly listings via their SVN Live® Weekly Property Broadcast. Visit https://svn.com/svn-live/ if you would like to attend our weekly call, which we open up to the brokerage community.
1. 2
• How to Create Drama with Big Windows
• Made You Look: Beautiful (and Functional) Elevations
customa home plan portfolio
custom
6666HOT
PLANS
with Cool Features
Including:
NEIGHBORHOOD-FRIENDLY PORCHES
FLEXIBLE FLOOR PLANS
FAMILY-SIZE STORAGE
KITCHEN HUBS
Brought to you by
See inside this
striking home
on page 8!
THE CURB
APPEAL ISSUE!
2. It’s our mission—to serve by caring for details in ways others won’t—that ensures the highest
manufacturing standards.
We’re building our products and our company to last a lifetime. That’s the Professional Way.
Bernie Goodin of our
Cherry Ridge facility in Ohio
cares about stone details
no one might ever see.
4. Marlin Troyer of our
Walnut Creek, OH facility
cares about door details
no one might ever see.
It’s our mission—to serve by caring for details in ways others won’t—that ensures the highest
manufacturing standards.
We’re building our products and our company to last a lifetime. That’s the Professional Way.
5. 3
Letter from the Editor
Welcome!
They say that beauty is more than skin deep,
and that you can’t judge a book by its cover.
But maybe home exteriors are the exception.
After all, most passers-by and other people in
your neighborhood will only know your home
by how it looks from the outside. Or why not
think about a house front as the start of a great
conversation: something makes you look,
and then a relationship develops!
So in this issue, we’ve rounded up all of our favorite plans that exhibit great design, both inside
and out. You’ll find plenty of welcoming porches, lots of striking stone, and tips for creating
dazzling window walls.
If your priority is a home with tons of storage to keep your family organized, turn straight to page
36. Obsessed with kitchens? Skip over to page 27 and check out all the counter space. And if
you don’t have a particular goal in mind but want to see what’s popular right now, head on over
to page 41 to see all the hottest designs.
Now, introduce yourself to some great plans!
Cheers,
Senior Content Manager
SEE THIS UNIQUE DESIGN ON PAGE 24
6. 4
It may be obvious that windows make or break a room, but it’s important to keep in mind as you
browse house plans. Windows not only bring in daylight but also establish scale: whether a room
feels dark and cramped or bright and airy. The shape, dimensions, and placement of windows are key
to establishing the character and comfort of a home. If windows are too small they can make a house
feel more like a prison; if they are too large and oriented the wrong way they can ruin your sense of
privacy or make a room too cold or hot at certain times of year. Here are some pointers for using tall
windows, floor-to-ceiling windows, and window walls.
ADDING DRAMA WITH
WINDOWS
Tips and tricks for creating memorable and liveable spaces with large windows
By Dan Gregory & Aurora Zeledon
PHOTOBYSUMMITPROMEDIA/MICHAELCUMMINGS
A dramatic window wall nicely complements
a vaulted ceiling and large features in plan
HWEPL77156
Get a similar look
with ProVia’s Endure
Window Series,
designed for energy
efficiency.
7. 5
Even if they don’t take up a whole wall,
windows can be used to entice you
to step outside. The dining room in
plan CDE0500009 (turn to page 27
to see the layout) provides a tantalizing
glimpse of the screened porch and its
cozy fireplace.
Today’s open floor plans create large
spaces that can feel like caves if
not properly lighted. Cleverly placed
clerestory windows can help draw light
deeper into a room to help deal with
this issue. In plan HWEPL75737, the
high windows bring additional light into
the large great room.
PHOTO BY WAYNE C. MOORE
In a smaller space, keeping
the windows the same
height as the door creates
a pleasingly consistent
effect. The French doors
and screened openings
in the porch of plan
CDE0500031 by Visbeen
Architects rise to the same
height to establish the
room’s outdoor-oriented
character. Turn to page 41
to see more of this home.
PHOTOBYBRADGILLETTEPHOTOBYMERRICKALES
plan CDE0500009
plan HWEPL75737
Capture the view
with ProVia’s Aeris
sliding glass patio
doors, which can
be customized in
a variety of ways
to complement
your home.
8. 6
Another great way to bring light into a
room is to include windows on more
than one side. A second look at
plan CDE0500031 (flip to page 41
to see the layout) shows how doing
so creates a bright and inviting dining
room that shares a connection with
nature.
As long as they are well-proportioned,
tall windows work in every architectural
style and can even draw attention
to that style’s special details. For
example, take European-style plan
HWEPL76050, where rows of
windows on the top and bottom
of the turret draw your eye to this
unique feature and also bring light
into the rooms inside (the dining room
downstairs and a bedroom above).
PHOTOBYWAYNEC.MOORE
PHOTOBYBOBGREENSPAN
plan CDE0500031
plan HWEPL76050
The Aspect series
of vinyl windows
from ProVia
creates a similar
light and airy look.
9. 7
In two-and three-story homes the
stairwell often sports tall windows so
that it can become a major light source
for the entire home, like a large lantern,
as shown here in plan CDE0500003
(see more of this home on page 23).
Rustic homes in scenic locations
particularly benefit from large windows,
since you’ve got a view to show off.
The great room windows in
plan HWEPL68910 display wood
frames that nicely continue the rugged
theme of the home, avoiding an overly
contemporary look.
Depending on the orientation, some tall
windows should be sheltered in some
way, to prevent glare, or excessive heat
loss or gain. As with so many things,
a little common sense is required as
you think about how the siting of your
house will affect window placement.
PHOTOBYJEFFREYDEROULET
PHOTOBYPAULMURAILLE
plan CDE0500003
plan HWEPL68910
10. 8
Both luxurious and practical, this family-friendly home
features a remarkable amount of storage.
The laundry room’s convenient location on the second floor makes it easy to throw
in a load of laundry. A large shower in the master retreat provides another touch of
contemporary luxury. For a boomerang kid or live-in relative, bedroom two offers extra
living space with an attached sitting room and private balcony. Nearby, the loft can be
used for homework, video games, or simply another lounge space away from the more-
open great room downstairs. Don’t miss the kitchen’s spacious island and huge pantry.
Cover Home
EVERYDAY ELEGANCE
11. 9
RIGHT: What do you
need for a truly functional
outdoor living area? Lots
of shade and a great
layout. This lanai passes
both tests with flying
colors, providing an area
for outdoor cooking and
a large covered space for
dining or lounging.
BELOW: The generous
island provides a
multi-level surface for
entertaining and prepping
food (perhaps at the
same time) in the open
kitchen.
12. 10
LEFT: The master suite
brings in lots of light with
windows on two walls.
BELOW: Eye-catching
exposed beams draw
your eye up and along the
length of the great room
and add a special (but
not overly formal) touch.
Cover Home
PHOTOSBYGIOVANNIPHOTOGRAPHY.THISHOME,ASSHOWNINTHEPHOTO-
GRAPH,MAYDIFFERFROMTHEACTUALBLUEPRINTS.FORMOREDETAILED
INFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Love the look of white
window frames? Check
out ProVia’s ecoLite
series, made with white
Sunshield vinyl and
insulated glass.
13. 11
Style: Low Country
Bedrooms: 3
Bathrooms: 3 1/2 + 1/2
Square Footage: 3,445
Dimensions: 64' 2"W x 64' 10"D
Foundation: Stem Wall
REPRO CAD PDF
$1,800 $1,800 $1,800
Visit eplans.com to see more
detailed images of this plan
CDE0500001PLAN#
MAIN LEVEL
SECOND LEVEL
14. 12
Jeremiah Miller of our Walnut Creek, OH facility
cares about door details no one might ever see.
It’s our mission—to serve by caring for details in ways others won’t—that ensures the highest
manufacturing standards.
We’re building our products and our company to last a lifetime. That’s the Professional Way.
Visit www.provia.com to find out how you can experience The Professional Way.
15. 13
When you’re deciding on a home design, form should follow function. But when it comes to the
outside of the home, the best designs nicely balance both with features that are designed for real
life – not just good looks. Here, some of our favorite eye-catching designs show us how it’s done.
MADE YOU LOOK:
ELEVATIONS WITH BEAUTY + FUNCTION
PHOTOBYBRADGILLETTE
ARCHES LEAD THE WAY
These aren’t your sky-high entry arches from
90s-era McMansions. Rather, today’s most
dramatic entryways capture attention with their
use of texture, like the stone adorning plan
CDE0500009 (see more of this home on page
27). Notice here how the window wall to the right
of the entry nicely balances the scale of the arch
without either element dominating.
Stone can also be used to achieve a more
romantic, almost storybook-like charm, such as
on plan HWEPL11790 (on next page). Here, a
series of arches draw you in past a courtyard. This
feature is so eye-catching, in fact, that you hardly
notice that you’re passing by a garage (charming
windows with shutters help, too).
plan CDE0500009
Achieve a similar rugged
look with ProVia’s Dry
Stack manufactured
stone, available in eleven
different color palettes.
16. 14
PHOTO COURTESY OF DESIGN BASICS, LLC
Speaking of courtyards, these spaces can add to
curb appeal while still maintaining some privacy.
Plan HWEPL77444 provides a tantalizing glimpse
of the courtyard through a dramatic squared-off
archway. At just 33 feet wide, this design does a
great job of carving out outdoor living space on a
small lot.
PRETTY PRACTICAL
PORCHES
Perhaps the most useful
exterior amenity is the
porch. When placed in front
of the home, it projects a
welcoming, neighborhood-
friendly vibe (see a number
of plans that do this well
beginning on page 55)
and—provided it’s sized
generously enough for at
least a couple of seats and
a table—provides covered,
comfortable outdoor
living space.
FOUR WALLS PHOTOGRAPHY
GIOVANNI PHOTOGRAPHY
plan HWEPL11790 plan HWEPL77444
plan HWEPL77805
For an organic look with
a lot of texture, take a
look at the Natural Cut
manufactured stone
collection from ProVia.
17. 15
PHOTO BY ERIC TAYLOR
Traditional Charleston-style houses featured
narrow footprints and stacked porches to
let breezes flow through the home. While
this home, plan HWEPL77805 (previous
page), tweaks the proportions a bit (because
if you’re not building on a narrow urban lot,
why not spread out a bit more?) the porches
remain as functional as ever. Every bedroom
upstairs accesses a balcony – even the guest
suite above the garage.
A wraparound porch gives you views on
two sides, so you can move if the sun is
shining a little too intensely in your direction.
With its trim 53’ x 53’ dimensions, plan
HWEPL09991 is a great choice for a not-
super-big lot.
The porch wrapping around plan
HWEPL09758 stretches all the way around
to open at the breakfast nook, making it easy
to step outside with your coffee to greet
the day.
PHOTO COURTESY OF DONALD A. GARDNER ARCHITECTS, INC.
plan HWEPL09991
plan HWEPL09758
Variation and natural-looking
imperfections create a lot of visual
interest with ProVia’s Ledgestone
Manufactured Stone.
18. 16
It’s our mission—to serve by caring for details in ways others won’t—that ensures the highest
manufacturing standards.
We’re building our products and our company to last a lifetime. That’s the Professional Way.
Visit www.provia.com to find out how you can experience The Professional Way.
Ruel Carpenter of our
Booneville, MS facility
cares about siding details
no one might ever see.
19. 17
M.E. PARKER PHOTOGRAPHY
PHOTO BY RON RESSLER
plan HWEPL76118
plan HWEPL76063
HEAD-TURNING TURRETS
Projecting spaces with windows aren’t just for
show, but can draw quite a bit of light into a variety
of living spaces in the home. Plan HWEPL76118
shows off a turret that nicely balances the stacked
gables on the side-facing garage. Inside, that turret
holds the den, creating a well-lighted work space.
Plan HWEPL76063 displays a cascading series
of windows down the turret that light up the
stairwell within.
By Aurora Zeledon
20. 18
It’s our mission—to serve by caring for details in ways others won’t—that ensures the highest
manufacturing standards.
We’re building our products and our company to last a lifetime. That’s the Professional Way.
Visit www.provia.com to find out how you can experience The Professional Way.
Toby Miller of our
Sugarcreek, OH facility
cares about window
details no one
might ever see.
Window Performance. It’s in the details.
21. 19
PHOTOSBYALANBRANDTANDDESIGNHAUS.THISHOME,ASSHOWNIN
THEPHOTOGRAPH,MAYDIFFERFROMTHEACTUALBLUEPRINTS.FORMORE
DETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
CONTEMPORARY CHIC
With large windows and a terrace that stretches across
much of the footprint of the home, this plan encourages
outdoor living.
The great room presents a clear view from front to back, making it an airy and inviting space. An
island provides space for casual meals in the kitchen, not far from the open dining room (also opening
outside) and a network of organizational spaces that connect to the garage. Across the home, the
master suite presents a relaxing space with a large private bathroom, a walk-in closet, and a view of
the terrace. In addition to the two secondary bedrooms, another guest space upstairs lets older kids
or visitors stretch out with a den/studio and a bathroom.
Feature Home
22. 20
LEFT: The rear terrace flows
along the back of the home
and its various corners to
create a number of zones for
different outdoor activities
(dining, lounging, grilling,
etc.).
BELOW: Here’s the home’s
“wow” moment: the great
room’s wall of windows.
Capture a big
view with ProVia’s
Aspect line of
vinyl windows.
23. 21
RIGHT: You can never have
too much counter space
and storage in the master
bathroom. Note the handy
linen cabinet placed directly
across from the shower,
making it easy to grab a fresh
towel to dry off.
BELOW: Although it opens
to the dining room and the
stairway, the kitchen is well
defined and offers a spacious,
sleek hangout at the island.
24. 22
MAIN LEVEL
Style: Contemporary
Bedrooms: 4
Bathrooms: 3 1/2
Square Footage: 3,275
Dimensions: 76' x 120'
Foundation: Crawlspace
5-SET 8-SET REPRO CAD PDF
$2,095 $2,195 $2,195 $2,795 $1,995
Visit eplans.com to see more
detailed images of this plan
CDE0500002PLAN#
SECOND LEVEL
25. 23
Compelling
Curb Appeal
SECOND LEVEL
Style: Prairie
Bedrooms: 4
Bathrooms: 4 1/2
Square Footage: 4,750
Dimensions: 83' x 168'
Foundation: Crawlspace
5-SET 8-SET REPRO CAD PDF
$1,350 $1,450 $1,950 $2,950 $1,950
Visit eplans.com to see more
detailed images of this plan
From the dramatic curving staircase to
walls of glass in many rooms (even the
laundry room!), this home brings beauty to
everyday living. The master suite in partic-
ular surrounds you with comfort and views
from the spa-like bathroom (check out the
windows above the tub), the bright walk-in
closet, and even a private deck. Two of the
three additional bedrooms feature box-bay
windows. Car enthusiasts will love the
additional detached garage and shop.
CDE0500003PLAN#
Sponsored by
MAIN LEVEL
PHOTOBYJEFFREYDEROULET.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTUAL
BLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
26. 24
Style: Prairie
Bedrooms: 4
Bathrooms: 4 1/2
Square Footage: 4,185
Dimensions: 115' x 81' 4"
Foundation: Slab
5-SET 8-SET PDF
$1,550 $1,700 $1,350
Visit eplans.com to see more
detailed images of this plan
With porches stretching along both the front
and back, this award-winning family home
plays up a scenic lot. Even the main-level
master suite features a private outdoor retreat
that boasts its own fireplace. A study on this
floor can also serve as an easy-to-reach
guest suite. In the great room, a coffered
ceiling adds luxurious detail and doors lead
to the porch. Two more bedrooms and a
game room create a spacious center for kids
or visitors upstairs.
CDE0500004PLAN#
MAIN LEVEL
SECOND LEVEL
PHOTOBYDCMPHOTOGRAPHY.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTU-
ALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Compelling
Curb Appeal
27. 25
Style: Contemporary
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,557
Dimensions: 78' x 62' 6"
Foundation: Crawlspace
5-SET CAD PDF
$1,150 $2,200 $1,100
Visit eplans.com to see more
detailed images of this plan
CDE0500006PLAN#
SECOND LEVEL
MAIN LEVEL
Style: Neoclassical
Bedrooms: 3
Bathrooms: 4 1/2
Square Footage: 4,134
Dimensions: 38' x 99' 6"
Foundation: Crawlspace
REPRO CAD PDF
$2,687 $4,754 $2,687
CDE0500005PLAN#
Compelling
Curb Appeal
Sponsored by
28. 26
MAIN LEVEL
OPTIONAL BONUS SPACE
Style: French Country
Bedrooms: 4
Bathrooms: 3 1/2
Square Footage: 3,423
Bonus Space: 325 sq. ft.
Dimensions: 112' x 81' 6"
Foundation: Crawlspace, Slab
5-SET 8-SET REPRO PDF
$1,395 $1,535 $1,685 $1,685
Visit eplans.com to see more
detailed images of this plan
CDE0500008PLAN#
Style: Contemporary
Bedrooms: 3
Bathrooms: 2
Square Footage: 2,470
Dimensions: 55' 2" x 64' 8"
Foundation: Crawlspace, Slab
5-SET 8-SET REPRO CAD PDF
$830 $1,020 $1,560 $2,400 $1,560
CDE0500007PLAN#
MAIN LEVEL
SECOND LEVEL
Compelling
Curb Appeal
29. 27
Click to see the
lower level plan
PHOTOBYBRADGILLETTE.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTU-
ALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Kitchen Hubs
MAIN LEVEL
SECOND LEVEL
Style: Contemporary
Bedrooms: 4
Bathrooms: 3 1/2
Square Footage: 4,983
Dimensions: 131' 2" x 94' 7"
Foundation: Optional Finished
Basement
CAD PDF
$3,995 $1,995
Visit eplans.com to see more
detailed images of this plan
A wide island joins forces with a built-in
banquette and nearby dining room to create
a food-focused entertaining center in this
contemporary home by Visbeen Architects.
The latter also opens to a side covered
patio, which flows into the screened porch
with a fireplace to warm chilly nights. On the
opposite side of the home, the master suite
offers a unique layout with a huge walk-in
closet between the bedroom and the
spacious bathroom. Just outside the double
doors, a cozy hearth room encourages
snuggling. Kids will enjoy the roomy second
level, where a loft separates a private suite
(ideal for an older child) from two additional
bedrooms sharing a Jack and Jill bath. The
basement can be finished to become a fun
retreat for visitors.
CDE0500009PLAN#
Sponsored by
30. 28
Style: Craftsman
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 3,815
Bonus Space: 525 sq. ft.
Dimensions: 134' 11" x 87' 5"
Foundation: Crawlspace
5-SET 8-SET CAD PDF
$1,175 $1,235 $2,475 $2,260
Visit eplans.com to see more
detailed images of this plan
Here's a stunning Craftsman home with
tons of flexibility. Depending on the weather
and time of year, people can congregate in
the kitchen and vaulted great room, out on
the vaulted patio by the fireplace, or in front
on the wide porch. Covered walkways and
patios create seamless indoor/outdoor living.
On the main level, the luxurious owner’s suite
boasts two large walk-in closets plus a spa-
cious bathroom with a walk-in shower, deep
soaking tub, private toilet, and access to the
back patio. Don't miss the bright den (perfect
for working from home), the huge laundry/
utility room, and the ultra-organized "mud
hall." Upstairs, a bunk room and bedroom
suite provide comfortable quarters for family
or friends. A bonus room above the garage
would make a handy home gym or studio.
CDE0500010PLAN#
MAIN LEVEL
SECOND LEVEL
OPTIONAL BONUS
SPACE
PHOTOBYJUSTINKRUGTHISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTUAL
BLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Kitchen Hubs
31. 29
MAIN LEVEL
OPTIONAL BONUS SPACE
Style: Craftsman
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,619
Bonus Space: 414 sq. ft.
Dimensions: 70' x 81'
Foundation: Optional Finished
Basement
5-SET CAD PDF
$1,065 $1,830 $1,215
Visit eplans.com to see more
detailed images of this plan
With its amenity-filled kitchen, luxurious
master suite, extensive outdoor living areas,
and lots of room to expand, this home
surrounds you with comfort. On the exterior,
tapered columns, decorative trusses, and
accents of stone create charming curb
appeal. The open layout inside encourages
family interaction. In the kitchen, a prep
sink and seating for four make the island
the undisputed hangout. Two huge walk-in
closets add impressive storage to the spa-
like master bathroom. A variety of porches
(as closed or open as you choose) offer
outdoor fun. For more space, finish the
walkout basement or the bonus room above
the garage.
CDE0500011PLAN#
Kitchen Hubs
Click to see the
lower level plan
Sponsored by
32. 30
Style: Ranch
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,971
Dimensions: 60' x 64'
Foundation: Unfinished Basement
5-SET 8-SET PDF
$770 $835 $935
Visit eplans.com to see more
detailed images of this plan
Upscale details abound inside this one-story
home, including the master suite’s sitting
room, a well-planned mudroom on the way
in from the garage, and a curving snack bar
in the kitchen. The master suite also features
easy access to the laundry room and a pri-
vate bathroom with a large shower and dual
sinks. On the opposite side of the home, two
additional bedrooms share a full hall bath. A
fireplace provides a cozy focal point in the
great room. Linen storage in each bathroom
plus a variety of additional closets throughout
the home (including the kitchen’s walk-in
pantry) make it simple to stay organized.
CDE0500012PLAN#
Kitchen Hubs
33. 31
PHOTOBYHOUSEPLANGALLERY.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHE
ACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Style: Ranch
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,657
Dimensions: 59' x 55'
Foundation: Unfinished Basement
5-SET REPRO CAD PDF
$920 $1,085 $1,525 $1,020
Visit eplans.com to see more
detailed images of this plan
A spacious island adds plenty of prep
space in the kitchen of this one-story home.
Nearby, the open eating area creates a
relaxed vibe with double doors to the back
porch making it easy to take the party
outside. Another porch in front opens to the
great room, where a gas fireplace creates
cozy ambiance. The master suite presents
a relaxing retreat with a walk-in closet,
two vanities, a separate tub and shower,
and convenient proximity to the laundry
room. Extra storage in the garage provides
room for tools, holiday decorations, or yard
equipment.
CDE0500013PLAN#
Kitchen Hubs
Sponsored by
34. 32
Style: Contemporary
Bedrooms: 5
Bathrooms: 5 1/2
Square Footage: 5,884
Dimensions: 165’ x 115’ 8”
Foundation: Crawlspace
5-SET CAD PDF
$1,825 $3,500 $1,750
Visit eplans.com to see more
detailed images of this plan
A unique X-shaped floor plan manages
to accommodate over 5,000 square feet
of living space and amenities on one level.
Clever design brings the outdoors in through
window walls in many rooms, especially the
luxurious master suite with its impressive
view of the backyard from both the bedroom
and spa-like bathroom. Friends and family
can relax in the vaulted living room or in the
more-casual family zone near the kitchen.
Built-in shelves throughout the home display
your treasures.
CDE0500015PLAN#
Statements
in Stone
PHOTOBYBOBGREENSPAN.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTU-
ALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
35. 33
MAIN LEVEL
SECOND LEVEL
Style: French Country
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,443
Bonus Space: 260 sq. ft.
Dimensions: 55' 10" x 63' 6"
Foundation: Crawlspace
REPRO CAD PDF
$1,250 $2,500 $1,250
Visit eplans.com to see more
detailed images of this plan
CDE0500016PLAN#
MAIN LEVEL
SECOND LEVEL
PHOTOCOURTESYOFLIVINGCONCEPTS.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHE
ACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
PHOTOBYDOUGTHOMPSON.TTHISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTU-
ALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Style: Mediterranean
Bedrooms: 4
Bathrooms: 5
Square Footage: 3,031
Dimensions: 45’ x 95’ 8”
Foundation: Slab
REPRO CAD PDF
$1,516 $2,728 $1,516
CDE0500014PLAN#
Statements
in Stone
Sponsored by
36. 34
Style: Craftsman
Bedrooms: 3
Bathrooms: 2
Square Footage: 2,291
Dimensions: 57' 8" x 79' 6"
5-SET 8-SET REPRO PDF
$965 $1,030 $1,335 $1,335
Visit eplans.com to see more
detailed images of this plan
CDE0500018PLAN#
Style: Craftsman
Bedrooms: 3
Bathrooms: 3 1/2
Square Footage: 3,899
Dimensions: 82' 4" x 95' 6"
5-SET 8-SET REPRO CAD PDF
$2,144 $2,263 $2,913 $5,825 $2,913
CDE0500017PLAN#
MAIN LEVEL
LOWER LEVEL
Statements
in Stone
37. 35
Style: European
Bedrooms: 4
Bathrooms: 2 1/2
Square Footage: 2,470
Bonus Space: 602 sq. ft.
Dimensions: 85' 6" x 61' 3"
Foundation: Crawlspace, Slab
5-SET 8-SET REPRO CAD PDF
$880 $1,095 $1,685 $2,595 $1,685
Visit eplans.com to see more
detailed images of this plan
CDE0500020PLAN#
MAIN LEVEL
OPTIONAL BONUS SPACE
OPTIONAL BONUS SPACE
MAIN LEVEL
Style: Ranch
Bedrooms: 4
Bathrooms: 2 1/2
Square Footage: 2,258
Bonus Space: 454 sq. ft.
Dimensions: 70' 6" x 67'
Foundation: Unfinished Basement
5-SET REPRO CAD PDF
$1,060 $1,270 $1,820 $1,200
CDE0500019PLAN#
Statements
in Stone
Sponsored by
38. 36
MAIN LEVEL
OPTIONAL BONUS SPACE
G.FRANKHARTPHOTOGRAPHY.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTUAL
BLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Style: French Country
Bedrooms: 4
Bathrooms: 4
Square Footage: 3,047
Bonus Space: 795 sq. ft.
Dimensions: 88' 6" x 75' 8"
5-SET 8-SET REPRO PDF
$1,045 $1,105 $1,430 $1,430
Visit eplans.com to see more
detailed images of this plan
CDE0500022PLAN#
Style: Craftsman
Bedrooms: 4
Bathrooms: 4
Square Footage: 3,290
Dimensions: 79' x 53' 8"
Foundation: Unfinished Walkout
Basement
CAD PDF
$1,595 $1,395
CDE0500021PLAN#
PHOTOBYTODDW.REED.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTUAL
BLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
MAIN LEVEL
SECOND LEVEL
Family-Size
Storage
39. 37
Style: Contemporary
Bedrooms: 4
Bathrooms: 4
Square Footage: 3,708
Dimensions: 94' x 79' 11"
Foundation: Slab
REPRO CAD PDF
$1,854 $3,337 $1,854
Visit eplans.com to see more
detailed images of this plan
CDE0500024PLAN#
MAIN LEVEL
SECOND LEVEL
SECOND LEVEL
MAIN LEVEL
Style: Craftsman
Bedrooms: 4
Bathrooms: 3 1/2
Square Footage: 4,266
Dimensions: 98' 6" x 82' 4"
Foundation: Unfinished Basement
5-SET 8-SET REPRO CAD PDF
$1,579 $1,664 $2,090 $3,200 $2,090
CDE0500023PLAN#
Family-Size
Storage
Sponsored by
40. 38
SECOND
LEVEL
MAIN LEVEL
PHOTOBYMYERSSMITH.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTUAL
BLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Style: Cottage
Bedrooms: 4
Bathrooms: 3
Square Footage: 2,899
Bonus Space: 385 sq. ft.
Dimensions: 62' 4" x 64'
Foundation: Crawlspace, Slab,
Unfinished Walkout
Basement
5-SET 8-SET REPRO CAD PDF
$1,085 $1,165 $1,400 $2,415 $1,400
Visit eplans.com to see more
detailed images of this plan
CDE0500026PLAN#
Style: Country
Bedrooms: 3
Bathrooms: 3
Square Footage: 2,097
Bonus Space: 452 sq. ft.
Dimensions: 70' 2" x 59'
Foundation: Crawlspace, Slab,
Unfinished Basement
5-SET 8-SET REPRO CAD PDF
$1,045 $1,095 $1,145 $1,495 $995
CDE0500025PLAN#
PHOTOBYELIZABETHBIRDWELLANDDITRAKEMMER.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROM
THEACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Family-Size
Storage
41. 39
Style: Craftsman
Bedrooms: 4
Bathrooms: 2 1/2
Square Footage: 2,199
Bonus Space: 436 sq. ft.
Dimensions: 70' 6" x 62'
Foundation: Crawlspace, Slab
5-SET REPRO CAD PDF
$1,060 $1,270 $1,820 $1,200
Visit eplans.com to see more
detailed images of this plan
CDE0500028PLAN#
MAIN LEVEL
OPTIONAL BONUS SPACE
OPTIONAL BONUS SPACE
MAIN LEVEL
Style: Craftsman
Bedrooms: 4
Bathrooms: 3
Square Footage: 2,863
Bonus Space: 648 sq. ft.
Dimensions: 80' 4" x 89' 7"
5-SET 8-SET REPRO PDF
$1,045 $1,105 $1,430 $1,430
CDE0500027PLAN#
Family-Size
Storage
Sponsored by
42. 40
Style: Craftsman
Bedrooms: 3
Bathrooms: 2
Square Footage: 2,497
Dimensions: 99' 11" x 51' 5"
Foundation: Slab
5-SET 8-SET PDF
$1,500 $1,700 $1,100
Visit eplans.com to see more
detailed images of this plan
CDE0500030PLAN#
Style: Craftsman
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,528
Bonus Space: 455 sq. ft.
Dimensions: 100' 7" x 68' 11"
Foundation: Crawlspace
5-SET CAD PDF
$1,150 $2,200 $1,100
Visit eplans.com to see more
CDE0500029PLAN#
MAIN LEVEL
SECOND LEVEL
Family-Size
Storage
43. 41
Hot Plans With
Cool Features
PHOTOBYWAYNEC.MOORE.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEAC-
TUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
MAIN LEVEL
SECOND LEVEL
OPTIONAL BONUS SPACE
Style: Low Country
Bedrooms: 3
Bathrooms: 3 1/2
Square Footage: 2,946
Bonus Space: 732 sq. ft.
Dimensions: 81' 3" x 87' 6"
Foundation: Slab
CAD PDF
$3,495 $1,495
Visit eplans.com to see more
detailed images of this plan
Almost every room opens to outside on
the main floor of this farmhouse-inspired
home from Visbeen Architects. A covered
patio unites the living room, dining room,
and master suite, with all of them opening to
this outdoor space via French doors. Inside,
the kitchen’s layout is made for socializing,
with a cooktop island with room to seat six
guests. The serene master suite features a
large window to the rear, a luxurious bath,
and two walk-in closets. Other special
areas include the optional guest apartment
upstairs and the flexible brew pub and
bike shop in the garage.
CDE0500031PLAN#
Sponsored by
44. 42
Style: Craftsman
Bedrooms: 4
Bathrooms: 4 1/2 + 1/2
Square Footage: 3,878
Bonus Space: 649 sq. ft.
Dimensions: 69' x 85' 6"
Foundation: Crawlspace, Slab,
Unfinished Walkout
Basement
5-SET 8-SET REPRO CAD PDF
$1,285 $1,400 $1,665 $2,840 $1,665
Visit eplans.com to see more
detailed images of this plan
Spacious luxury living is the hallmark of this
Craftsman home. The exterior is immediately
appealing, but the real treat awaits you
inside. A coffered ceiling in the family room
adds an elegant touch. The bayed breakfast
nook overlooks the rear deck, beckoning for
outdoor meals. The master suite extends the
entire length of the plan and features a private
sitting room complete with deck access. The
second floor houses three additional bed-
rooms, each with a private bath. An optional
bonus room above the garage encourages
future expansion.
CDE0500032PLAN#
MAIN LEVEL
SECOND LEVEL
PHOTOBYCAROLYNERANEY,SIMPLYIRRESISTIBLEPHOTOGRAPHY.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFER
FROMTHEACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Hot Plans With
Cool Features
45. 43
Click to see the
lower level layout
PHOTOCOURTESYOFDESIGNSBYTODDW.REED,INC.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHE
ACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
MAIN LEVEL
SECOND LEVEL
Style: New American
Bedrooms: 4
Bathrooms: 3 1/2
Square Footage: 3,187
Dimensions: 68' x 67' 8"
Foundation: Optional Finished
Basement
CAD PDF
$1,450 $1,195
Visit eplans.com to see more
detailed images of this plan
A wraparound porch welcomes you to this
striking home. The large country kitchen has
a breakfast nook with a built-in banquette
and opens to the screened porch, where
you'll find a cozy fireplace. Decks flank this
space to give you a variety of outdoor living
spaces. Back inside, the great room features
another fireplace, built-in shelves, and easy
access to the generously sized dining room.
The master suite is conveniently located on
this level and invites you to relax in the huge
shower, the corner tub, or out on another
porch. Don't miss the roomy study, com-
plete with double doors to the front porch.
Upstairs, three more bedrooms (one with a
private bathroom) have use of the loft. The
walkout lower level can be completed to
hold even more living and sleeping space.
CDE0500033PLAN#
Hot Plans With
Cool Features
Sponsored by
46. 44
Style: Craftsman
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,735
Bonus Space: 379 sq. ft.
Dimensions: 72' x 58'
Foundation: Crawlspace
5-SET CAD PDF
$1,300 $2,500 $1,250
Visit eplans.com to see more
detailed images of this plan
Here's an elegant one-story home designed
for comfortable living. Gathering rooms flow
into one another for seamless transitions
between activities, whether you're grabbing a
bite at the kitchen's snack bar or kicking back
in the vaulted great room. A private foyer
buffers the master suite from the rest of
the home. In this relaxing area, you'll find a
large bedroom, double doors to the back-
yard, a luxurious bathroom with two sinks,
and a generous walk-in closet. An office and
two more bedrooms provide room for family,
friends, and hobbies.
CDE0500034PLAN#
MAIN LEVEL
OPTIONAL
BONUS SPACE
PHOTOCOURTESYOFALANMASCORDDESIGNASSOCIATES,INC.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFER
FROMTHEACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Hot Plans With
Cool Features
47. 45
PHOTOBYBOBGREENSPAN.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTUAL
BLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
MAIN LEVEL
OPTIONAL BONUS SPACE
Style: Craftsman
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,233
Bonus Space: 426 sq. ft.
Dimensions: 84' 4" x 69' 10"
Foundation: Crawlspace
5-SET CAD PDF
$1,150 $2,200 $1,100
Visit eplans.com to see more
detailed images of this plan
The angled garage of this Craftsman
ranch (modified in the photographed home
to include a third bay) keeps the focus on
the striking entry. Step into the foyer to
immediately get a great view of the vaulted
great room with its fireplace and built-in
media center. The great room then flows
out, through a set of double doors, to the
vaulted outdoor living room with a fire-
place of its own. Get work or studying done
in the office, complete with built-in shelves
and a window seat. A short hall leads to the
two secondary bedrooms and their Jack and
Jill bath. The island kitchen looks into both
the dining room and great room. Don't miss
the master suite's spacious bathroom and
walk-in closet.
CDE0500035PLAN#
Hot Plans With
Cool Features
Sponsored by
48. 46
Style: Craftsman
Bedrooms: 4
Bathrooms: 3
Square Footage: 2,338
Bonus Space: 305 sq. ft.
Dimensions: 56' x 48'
Foundation: Crawlspace, Unfinished
Walkout Basement
5-SET 8-SET REPRO CAD PDF
$1,010 $1,090 $1,290 $2,220 $1,290
Visit eplans.com to see more
detailed images of this plan
Craftsman-style columns add an authentic
touch to this graceful home. An elegant entry
opens to the vaulted family room, where a
fireplace warms and bright windows illumi-
nate. Nearby, the kitchen's serving bar and
the adjacent breakfast nook provide room for
relaxed meals. A bedroom nearby could serve
as a home office. The master suite features
a vaulted bath and an enormous walk-in
closet. Two bedrooms upstairs share a full
bath and an optional bonus room.
CDE0500036PLAN#
MAIN LEVEL
SECOND LEVEL
PHOTOCOURTESYOFFRANKBETZASSOCIATES,INC.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHE
ACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Hot Plans With
Cool Features
49. 47
Click to see the
lower level layout
Style: Craftsman
Bedrooms: 3
Bathrooms: 3
Square Footage: 2,156
Bonus Space: 1,535 sq. ft.
Dimensions: 71' 1" x 64' 6"
Foundation: Optional Finished
Basement
5-SET 8-SET REPRO CAD PDF
$1,045 $1,095 $1,145 $1,495 $995
Visit eplans.com to see more
detailed images of this plan
CDE0500038PLAN#
MAIN LEVEL
OPTIONAL BONUS SPACE
SECOND LEVEL
MAIN LEVEL
PHOTOCOURTESYOFFRANKBETZASSOCIATES,INC.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHE
ACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Style: Country
Bedrooms: 4
Bathrooms: 2 1/2
Square Footage: 2,443
Bonus Space: 46 sq. ft.
Dimensions: 52' 4" x 55' 10"
Foundation: Crawlspace, Slab,
Unfinished Walkout
Basement
5-SET 8-SET REPRO CAD PDF
$1,010 $1,090 $1,290 $2,220 $1,290
CDE0500037PLAN#
Hot Plans With
Cool Features
Sponsored by
50. 48
MAIN LEVEL
ALTERNATE LAYOUT
Style: Cape Cod
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,492
Dimensions: 56' x 45' 8"
Foundation: Crawlspace, Slab,
Unfinished Basement
5-SET 8-SET CAD PDF
$800 $860 $1,800 $1,000
Visit eplans.com to see more
detailed images of this plan
CDE0500040PLAN#
Style: Ranch
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,769
Dimensions: 62' 6" x 49' 8"
Foundation: Crawlspace, Slab
5-SET REPRO CAD PDF
$745 $945 $1,345 $895
CDE0500039PLAN#
Hot Plans With
Cool Features
51. 49
Flexible
Floor Plans
MAIN LEVEL
OPTIONAL BONUS SPACE
Style: Craftsman
Bedrooms: 3
Bathrooms: 3 1/2
Square Footage: 2,531
Bonus Space: 1,064 sq. ft.
Dimensions: 107' x 73'
Foundation: Slab
5-SET CAD PDF
$1,450 $2,500 $1,875
Visit eplans.com to see more
detailed images of this plan
Here's a remarkably flexible floor plan, with
room to expand both into the finished base-
ment and upstairs (including an optional
in-law apartment). For day-to-day living, the
main floor offers a very open layout. Hang
out at the kitchen's cooktop island, enjoy
the ambiance by the fireplace in the nearby
great room, or step out to one of the many
porches. The master suite invites you to kick
back in its ultra-luxurious bathroom.
CDE0500041PLAN#
Sponsored by
Click to see the
lower level layout
52. 50
Style: Craftsman
Bedrooms: 4
Bathrooms: 4 1/2
Square Footage: 3,691
Dimensions: 74' 6" x 100'
Foundation: Crawlspace
5-SET 8-SET REPRO CAD PDF
$2,095 $2,195 $2,195 $2,895 $1,995
Visit eplans.com to see more
detailed images of this plan
This rugged mountain lodge home displays
a dramatic entry with stone columns and
exposed brackets. Inside, the foyer presents
an uninterrupted sightline through the great
room and back to the wall of windows. The
plan features three suites downstairs (includ-
ing the luxurious master suite with its deluxe
bathroom and access to the terrace) and an
additional suite upstairs that can share its
bath with the bonus room area. Don't miss
the dining nook, where windows on three
sides present mealtime views, or the kitchen's
cooktop island with snack-bar seating.
CDE0500042PLAN#
MAIN LEVEL
SECOND LEVEL
PHOTOBYSUMMITPROMEDIA.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTU-
ALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Flexible
Floor Plans
53. 51
PHOTOBYTWISTTOURS.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTUAL
BLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Style: Country
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,693
Dimensions: 126' x 54'
Foundation: Slab
5-SET 8-SET REPRO PDF
$747 $835 $972 $972
Visit eplans.com to see more
detailed images of this plan
With porches stretching along much of
the home in front and completely around
the back and sides, this one-story design is
ready for serious indoor/outdoor living. The
open kitchen flows into the casual dining
space and the living room for a totally relaxed
environment. On the right side, the master
suite enjoys a huge bedroom, spacious
walk-in closet, and luxurious bathroom with
a large shower. An office (or nursery) opens
to the porch for plenty of fresh air. Two more
bedrooms share the opposite (and very
private) wing of the home, connected to the
main gathering area with a screened porch.
CDE0500043PLAN#
Flexible
Floor Plans
Sponsored by
54. 52
MAIN LEVEL
OPTIONAL BONUS SPACE
Style: Craftsman
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,912
Bonus Space: 411 sq. ft.
Dimensions: 71' 2" x 64' 2"
5-SET 8-SET REPRO PDF
$915 $985 $1,260 $1,260
Visit eplans.com to see more
detailed images of this plan
CDE0500045PLAN#
Style: Craftsman
Bedrooms: 3
Bathrooms: 2
Square Footage: 2,320
Dimensions: 62' x 66'
Foundation: Crawlspace
5-SET 8-SET REPRO CAD PDF
$800 $900 $1,250 $1,950 $1,250
CDE0500044PLAN#
Flexible
Floor Plans
55. 53
Style: French Country
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,495
Bonus Space: 625 sq. ft.
Dimensions: 90' 11" x 83' 11"
Foundation: Monolithic Slab
5-SET 8-SET CAD PDF
$1,345 $1,645 $2,995 $1,845
Visit eplans.com to see more
detailed images of this plan
CDE0500047PLAN#
MAIN LEVEL
OPTIONAL BONUS SPACE
OPTIONAL BONUS SPACE
MAIN LEVEL
Style: Craftsman
Bedrooms: 3
Bathrooms: 3
Square Footage: 2,267
Bonus Space: 439 sq. ft.
Dimensions: 72' 1" x 64' 1"
Foundation: Monolithic Slab
5-SET 8-SET CAD PDF
$995 $1,145 $1,995 $1,245
CDE0500046PLAN#
Flexible
Floor Plans
Sponsored by
56. 54
MAIN LEVEL
OPTIONAL BONUS SPACE
PHOTOCOURTESYOFFRANKBETZASSOCIATES,INC.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROM
THEACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Style: Craftsman
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,325
Bonus Space: 725 sq. ft.
Dimensions: 64' 6" x 88' 4"
Foundation: Crawlspace, Slab,
Unfinished Walkout
Basement
5-SET 8-SET REPRO CAD PDF
$1,010 $1,090 $1,290 $2,220 $1,290
Visit eplans.com to see more
detailed images of this plan
CDE0500049PLAN#
Style: Cottage
Bedrooms: 4
Bathrooms: 3 1/2
Square Footage: 2,281
Dimensions: 57' 6" x 63'
Foundation: Crawlspace,
Unfinished Daylight
Basement
5-SET 8-SET REPRO CAD PDF
$975 $1,015 $1,195 $2,055 $1,195
CDE0500048PLAN#
MAIN LEVEL
SECOND LEVEL
Flexible
Floor Plans
57. 55
Neighborhood-
Friendly Porches
MAIN LEVEL
SECOND LEVEL
Style: Country
Bedrooms: 5
Bathrooms: 4
Square Footage: 3,039
Bonus Space: 343 sq. ft.
Dimensions: 67' 8" x 63' 6"
Foundation: Crawlspace, Unfinished
Basement
5-SET 8-SET REPRO PDF
$920 $1,010 $1,200 $1,200
Visit eplans.com to see more
detailed images of this plan
Whether used as a vacation home or pri-
mary residence, this beautiful rustic design
offers plenty of space for family and friends.
A wraparound porch invites comfortable
outdoor living on three sides of the home,
with the back portion screened for extra
protection against the elements. Inside,
everyone will love to gather in the open
kitchen, where a central island plus a snack
bar with seating gives you tons of prep
space. The luxurious master suite (check out
that shower) and a guest suite are located
on this floor for convenience, while upstairs,
you’ll find three large bedrooms with two
bathrooms and a huge bonus space.
CDE0500050PLAN#
Sponsored by
58. 56
Style: Country
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,150
Dimensions: 81' x 56'
Foundation: Crawlspace
5-SET 8-SET REPRO CAD PDF
$975 $1,020 $1,080 $1,738 $950
Visit eplans.com to see more
detailed images of this plan
Elegant and open, this home exudes country
charm. Porches in front and back create more
living space outdoors. Inside, the kitchen fea-
tures a large island with a cooktop and snack
bar. Built-in storage here and in the nearby
living room keeps your household organized.
Easy to reach on this level, the master suite
displays two walk-in closets, double sinks, a
separate shower and tub, and close proximity
to the deck. Two more bedrooms share a
bathroom and the library space upstairs.
Designed for accessibility, all the interior and
exterior doors are three feet wide.
CDE0500051PLAN#
MAIN LEVEL
SECOND LEVEL
Neighborhood-
Friendly Porches
59. 57
Style: Craftsman
Bedrooms: 4
Bathrooms: 3 1/2
Square Footage: 2,253
Dimensions: 35' 10" x 60' 4"
Foundation: Crawlspace
5-SET 8-SET REPRO CAD PDF
$853 $902 $1,100 $1,392 $1,100
Visit eplans.com to see more
detailed images of this plan
CDE0500053PLAN#
MAIN LEVEL
SECOND LEVEL
SECOND LEVEL
MAIN LEVEL
Style: Low Country
Bedrooms: 3
Bathrooms: 3 1/2
Square Footage: 2,756
Dimensions: 66' x 50'
Foundation: Island Basement
REPRO CAD PDF
$1,378 $2,480 $1,378
CDE0500052PLAN#
Neighborhood-
Friendly Porches
Sponsored by
Click to see the
lower level layout
60. 58
MAIN LEVEL
OPTIONAL BONUS
SPACE
Style: Low Country
Bedrooms: 3
Bathrooms: 2 1/2
Square Footage: 2,010
Bonus Space: 347 sq. ft.
Dimensions: 68' x 63' 8"
Foundation: Crawlspace, Unfinished
Basement
5-SET 8-SET REPRO PDF
$800 $900 $1,100 $1,100
Visit eplans.com to see more
detailed images of this plan
CDE0500055PLAN#
Style: Bungalow
Bedrooms: 4
Bathrooms: 2 1/2
Square Footage: 2,707
Dimensions: 36' x 50'
Foundation: Crawlspace
5-SET 8-SET REPRO CAD PDF
$875 $950 $1,150 $2,300 $1,150
CDE0500054PLAN#
MAIN LEVEL
SECOND LEVEL
Neighborhood-
Friendly Porches
61. 59
Style: Country
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,965
Dimensions: 57' x 51' 8"
Foundation: Crawlspace, Slab,
Unfinished Basement
5-SET 8-SET REPRO PDF
$695 $795 $995 $995
Visit eplans.com to see more
detailed images of this plan
CDE0500057PLAN#
MAIN LEVEL
ALTERNATE LAYOUT
OPTIONAL BONUS SPACE
MAIN LEVEL
Style: French Country
Bedrooms: 4
Bathrooms: 3 1/2
Square Footage: 2,500
Bonus Space: 346 sq. ft.
Dimensions: 80' 8" x 51'
Foundation: Crawlspace, Slab
5-SET REPRO CAD PDF
$845 $1,045 $1,545 $995
CDE0500056PLAN#
Neighborhood-
Friendly Porches
Sponsored by
62. 60
SECOND LEVEL
MAIN LEVEL
Style: Farmhouse
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,673
Dimensions: 52' x 56'
Foundation: Crawlspace
5-SET 8-SET REPRO CAD PDF
$770 $835 $980 $1,510 $935
Visit eplans.com to see more
detailed images of this plan
CDE0500059PLAN#
Style: Traditional
Bedrooms: 3
Bathrooms: 3
Square Footage: 2,296
Dimensions: 63' 8" x 58' 8"
Foundation: Slab
5-SET 8-SET REPRO PDF
$745 $846 $1,011 $1,011
CDE0500058PLAN#
MAIN LEVEL
SECOND LEVEL
Neighborhood-
Friendly Porches
63. 61
PHOTOCOURTESYOFLARRYGARNETT.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHE
ACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Style: Country
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,990
Dimensions: 84' x 63'
Foundation: Slab
5-SET 8-SET REPRO CAD PDF
$770 $835 $980 $1,470 $935
Visit eplans.com to see more
detailed images of this plan
CDE0500062PLAN#
Style: Cottage
Bedrooms: 4
Bathrooms: 3
Square Footage: 2,097
Bonus Space: 352 sq. ft.
Dimensions: 64' 10" x 59' 6"
5-SET 8-SET REPRO PDF
$915 $985 $1,260 $1,260
CDE0500061PLAN#
PHOTOBYMATTHEWSCOTTPHOTOGRAPHER,INC.,COURTESYOFDONALDA.GARDNERARCHITECTS,INC.THISHOME,ASSHOWNINTHEPHOTO-
GRAPH,MAYDIFFERFROMTHEACTUALBLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
OPTIONAL BONUS SPACE
MAIN LEVEL
Sponsored by
Smaller Homes
that Live Large
64. 62
Style: Craftsman
Bedrooms: 3
Bathrooms: 3
Square Footage: 2,175
Dimensions: 30' x 52'
Foundation: Unfinished Basement
PDF
$1,495
Visit eplans.com to see more
detailed images of this plan
Good things come in small packages, as
this delightful home from Visbeen Architects
proves. Inside, the first level includes both
public spaces (the fireplace-warmed living
room, open kitchen with an oval island, and
the casual dining room), and a generous
guest suite. At night, relax on the roomy
screened porch or the patio. Head upstairs
to reach two spacious bedrooms, including
the versatile master suite with its office/
reading room that would also make a great
nursery.
CDE0500060PLAN#
MAIN LEVEL
Smaller Homes
that Live Large
66. 64
Style: Ranch
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,600
Dimensions: 55' 8" x 64' 6"
Foundation: Crawlspace, Slab
5-SET REPRO CAD PDF
$745 $945 $1,345 $895
Visit eplans.com to see more
detailed images of this plan
CDE0500064PLAN#
PHOTOBYJONATHANBOONE.THISHOME,ASSHOWNINTHEPHOTOGRAPH,MAYDIFFERFROMTHEACTUAL
BLUEPRINTS.FORMOREDETAILEDINFORMATION,PLEASECHECKTHEFLOORPLANSCAREFULLY.
Style: Traditional
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,396
Dimensions: 31' 6" x 60'
Foundation: Crawlspace, Slab
5-SET REPRO CAD PDF
$695 $895 $1,245 $845
CDE0500063PLAN#
Smaller Homes
that Live Large
67. 65
MAIN LEVEL
OPTIONAL BONUS SPACE
Style: Craftsman
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,487
Bonus Space: 318 sq. ft.
Dimensions: 40' x 75' 6"
Foundation: Slab
6-SET CAD PDF
$825 $1,550 $1,350
Visit eplans.com to see more
detailed images of this plan
CDE0500066PLAN#
Style: Craftsman
Bedrooms: 3
Bathrooms: 2
Square Footage: 1,445
Dimensions: 52' x 50'
Foundation: Crawlspace, Slab
5-SET 8-SET REPRO CAD PDF
$659 $716 $843 $1,295 $803
PLAN# CDE0500065
Sponsored by
Smaller Homes
that Live Large
68. 66
ePlans.comis owned and operated by Hanley Wood, the premier information, media, event, and strategic marketing services company
serving the residential and commercial design and construction industries.
Our industry-leading publications include:
With more than 65 years of experience in the stock home plans industry, our Home Plans Group is the market leader in providing high-quality, high-value,
pre-drawn home plans. We operate six e-commerce websites including ePlans.com, Houseplans.com, Homeplans.com, and BuilderHousePlans.com.
Why Shop at
ePlans.com
The Lowest Price,
Guaranteed!
If you find the same plan elsewhere
for a better price, we’ll match it.
Free Shipping!
We offer FREE ground shipping, and FREE
modification quotes for most plans.
28,000+ Designs from More
Than 300 Designers
Our vast selection of high-quality plans means
you’re sure to find the perfect plan.
Experienced Customer
Service Team
Have questions? Our experienced customer
service representatives can help. Just call,
email, or visit www.eplans.com to chat with
a live person.
Satisfaction
Guaranteed
We offer the best exchange
policy in the industry, so you can buy with
confidence.
We’re the Industry’s #1 Choice
Professional builders buy more plans from
us than from anyone else.
Discounts for Professional
Builders
Our Builder Advantage program rewards
you for repeat purchases—up to 15% off!
UPGRADES: We offer a 90-day upgrade
policy. We will be happy to upgrade blueprint
orders to CAD, PDF, and Reproducible plan
packages (price differences may apply). Orders
originating as CAD, PDF, and Reproducible
Plan Packages cannot be upgraded. Please
note that the entire content of your original
order must be returned before the upgrade
will be processed. Call our customer service
department at 1.888.690.1116 for your return
authorization number and shipping instructions.
EXCHANGES: With the exception of CAD,
PDF, and Reproducible Plan Packages, we
will exchange your blueprint order for another
plan from our collection within 90 days of the
original order.
Please call our customer service department at
1.888.690.1116 for your return authorization
number and shipping instructions. A restocking
fee of 20% of the amount of the original order
will be applied, plus the difference in cost if
exchanging for a higher-priced plan. Shipping
and handling charges are not refundable.
Please note that you will need to place your
new order before your credit is processed.
If the returned blueprints show signs that
they have been used, redlined, or copied, we
cannot process the exchange. CAD, PDF, and
Reproducible Plan Packages are not eligible
for exchange.
ADDITIONAL SERVICES:
Modifications
Our full-service design professionals can
customize just about any plan that is available
in Repro, PDF, or CAD format. A cost estimate
can be provided within two business days, and
is free for most plans.
Lighting Design and AV Planning
Take your homes to the next level with
21st-century technology solutions from
Assurity Design Group. ADG provides
professional lighting design, lighting control,
and top notch audio-video systems. Plus, save
money by receiving low, pre-negotiated prices
on all equipment including pre-wire material
from Neowatt.
Cost-to-Build Calculator
Our Cost-to-Build Calculator gives you a
personalized estimate. Experiment with different
material choices and change home features with
a few clicks. All estimates are specific to your
geographic region.
ADDITIONAL PRODUCTS:
Many plans include the following options:
Right-Reading Reverse
Materials List
Alternate Foundations
Alternate Wall Framing
We also offer:
Garage Plans
Deck Plans
Landscape Plans
Outbuilding and Project Plans
Order online at www.ePlans.com or call 1-800-406-6009
ANNUAL
PRODUCT
ISSUE
ANNUAL PRODUCT ISSUE
AL
INSIDE: STREETLIGHTING
-ON-
YEARS
MAR/APR 2016
GAINING
GROUND
MFE
DEDICATION TO GROWTH
AND VARIED PRODUCT
HAVE DENNIS TREADAWAY’S
FPI MANAGEMENT
JOINING THE INDUSTRY’S
BIGGEST PLAYERS. inside:
THE TOP FIRMS
OF 2016
PROFILES OF
SOME OF THE
MOSTCOMPELLING
COMPANIES IN
THIS YEAR’S
NMHC RANKINGS
may 2016
volume 21, issue 6
multifamilyexecutive.com
MAY 2016 / remodelingmag.com
Y O U R T O O L B O X F
ARMED
AND READY
Scott Liseno and Steve Meierdiercks
of Omnia Construction exemplify
our newest class of top remodelers.
architectmagazine.com
The Journal of the American
Institute of Architects
AIA Awards Issue
Denise Scott Brown
and Robert Venturi
“To Question How We Look at Things”
The official magazine of the
American Institute of Architects
The Magazine of
The National Association
of Home Builders
The official magazine of the
National Association of Home Builders
69. 67
Order online at www.ePlans.com or call 1-800-406-6009
What’s In a Set
While the contents of each blueprint package may vary, each contains
detailed, high-quality working drawings that show you exactly how
your house is to be built. You can expect to find the following standard
elements in most plan sets:
1. Detailed Floor Plans
2. Exterior Elevations
Depending on the home you choose, your order may also include:
3. Front Perspective
4. Foundation and Basement Plans
5. Detailed Cross-Sections
6. Structural Information
1.
2.
3.
5.
4.
6.
Important
Building Codes and Zoning Requirements
Each plan was designed to meet or exceed the requirements of a
nationally recognized model building code in effect at the time and
place the plan was drawn. However, plans may need to be modified
to comply with local requirements. In addition, you may need to obtain
permits or inspections from local governments before and in the course
of construction.
Architectural and Engineering Seals
Some cities and states require that a licensed architect or engineer
review and seal a blueprint prior to construction. Before applying for
a building permit or starting construction, you must consult your local
building official who can tell you if such a review is required.
Nevada residents
Nevada law requires your plans to be redrawn by a Nevada registered
professional. Consult your local building official for more information.
Disclaimer
Our licensed designers have put substantial care and effort into the
creation of their blueprints. However, because we cannot provide on-site
consultation, supervision, and control over actual construction, and
because of the great variance in local building requirements, building
practices, and soil, seismic, weather, and other conditions, we make no
warranty of any kind, expressed or implied, with respect to the content
or use of the blueprints, including but not limited to any warranty of
merchantability or fitness for a particular purpose. Photographed homes
may have been modified from original design. Please check floor plans
carefully. Items, prices, terms and conditions are subject to change
without notice.
Copyright
These designs are intellectual property and as such are protected
under the terms of United States copyright law. It is ILLEGAL to do
any of the following:
◾ Copy designs or floor plans from any publication, electronic
media, or existing home
◾ Make copies of or modifications to your plan (unless you have
purchased a package that includes a license to do so)
◾ Build more than one home from your plan (unless you have
purchased a multiple or unlimited use license)
Any of these actions may incur substantial penalties. Avoid legal action
by purchasing any home plan that you intend to use in any way, along
with the proper license for your intended use.
SOURCE CODE: CDE05
70. We’re building our products and our company to last a lifetime. That’s the Professional Way.
DOORS
WINDOWS
SIDING
STONE