Project planning
document
James cooper-abel
merch design plans 1
For this merch
design it will have
my character
playing video
games with his
Pokémon whilst
sitting together on
a comfy couch
with the halo font
of “I never” and
the Pokémon font
“game alone”.
ART STYLE
Basic Design idea
The art style I
plan on using
for this shirt
design is a art
style like the
artist GD-058
who use
simple colors
and his own
interpretation
of Pokémon's
art style
Fonts being used: haloand Pokemon Hollow
For Stephany’s, the braxin on the couch who's design on
my first merch design will be different from a regular
braxin and help her stand out allowing the shirt design to
stand out I will take aspect from the image on the left from
a program that allows you to create your own custom
braxin done by the creator InDarkWaters and the aspect
of the image I will be using is.
Color pallet for my
character
Color pallet for Stephany
character
Aspects Stephaney's design
will have
• Marks on her left ear
• Blue eyes instead of
orange red
• Ear fur will have three
points instead of one
• Hair Mohawk partially
covering left eye with
the tip being aqua blue
• Earrings but they will be
a mega stone inside fire
• Red eye shadow
For the design aspect of my character the
design will include.
• Prosthetic arm
• Mjolnir mk4 helmet
• Pajama shirt with a sleeping rowlet saying
wake me when I evolve
• Pajama shorts
Design aspects for my character
Merch design plan 2
For this merch
design it will have
me dressed as
Jacob frye with my
gauntleted hand
going across my
chest with a
hidden blade
sticking out with
the words “looks
like its stabby
stabby time written
in blood”.
Art style
Basic design idea
The art style I'm going for my second merch
design is the art style shown above being a
mixture of realistic but also cartoonish and to do
this I have found tutorial to help me achieve this
look for my image in photoshop.
Font being used: bloodlust
expanded
An aspect of the design I will add to my design is
to have my face replaced by the mk4 helmet
from design 1 to add consistency to the designs.
Color scheme
Merchandise website design plans
The reason for this
idea being scrapped is
because it is to like
the set up that the
website Teespring has
which can cause copy
right issues which
most creators want to
avoid, and I want to
avoid as well so it is
back to the drawing
board for merchandise
website design
Scraped design idea
Merchandise website design plans
For my website the design will
have in the subheading the button
for home, catalog, contact us and
make your own radness with the
name of the website and its
slogan in the middle with the site's
mascot above with my merch
page below with an image of my
channel logo with their own page
buttons of clothing, key chains
and plushy with my merch below
of looks like it stabby stabby time
on a shirt hoodie and jacket with I
never game alone being the same
with their name color options and
Fonts the websites
will use: the font my
merchandise
websites is the font
Dream MMA
The reason I chose to have the mascot be a
shark with sunglasses and the website being
called rad shark.com is because it meant to have
a chickee jab at the cheesiness of the 90s, but
also rad shark rolled of the tongue and stood out
as a title making it more memorable and allow it
to stand out, among others.
Color scheme for
header
Why did I do the background the way it
is: the reason for the background being
the way it is that I felt an evening sky
mixed with the bright blue sea would
allow the mascot to stand out but also
all for the background to be more
visually interesting.
Color scheme
for mascot
Video background
music
For my review series I want to have music subtilty
playing in the background as in a previous project
I was informed it would help make the video more
entertaining during quite bits, but I also wanted to
avoid copyright claims so I couldn't use any
existing music made by either halo or star wars
so I typed in royalty free music into the search
bar of YouTube and found “Western Background
Music for Videos I Wild West Instrumental
Themes I No Copyright Music” by the channel
MrSnooze I Background Music for Videos with
one track in particular being the one I feel will fit
my video that track being digital gunslinger and
the reason for choosing western music I because
the Mandalorian is part western so it make sense
that I use a western style song for my review
Review series review plan board episode 1
part 1
Introduction of myself to the audience before moving to the
right to transition to machinima.
Introduction of the review series and the episode that’ll be
reviewed in that review episode.
Talk about the beginning of the episode with Mando
meeting a contact getting betrayed and getting what he
wants in the end and traveling to Tatooine.
Talk about Mando arriving on Tatooine and being shown
were to go and heading to moss pelgo meeting the marshal
and the problem the towns has with a crait dragon.
Talk about Mando and the marshel riding to the crait dragon
lair and eventually meeting with some tusken raiders who
are having the same problem and are willing to help.
Talk about Mando and the marshal making a deal with the
tusken raider to help kill the crait dragon and going to moss
pelgo to inform the people of the town about the deal.
Review series review plan board episode 1
part 2
Talk about the town and the tusken raiders preparing to kill
the crait dragon by going to its lair setting up traps to blow
the creature up with ballista to hold the dragon in place.
Talk about the town and the tusken raiders along with
mando fighting the crait dragon and having trouble killing it
with it spraying deadly acid.
Talk about Mando trickig the crait dragon into swallowing
him with a bantha covered in explosives then flying out of
the crait dragons' mouth and blowing it up killing it.
Talk about Mando and the marshal saying their goodbyes
with Mando being given the marshals armor as per their
deal for mando aiding in killing the crait dragon.
Talk about Mando riding off into the sunset on his speeders
with the newly acquired armor whilst a mysterious figure
watches on reviled to be boba fett.
Finish of review with a score and the reason for that score
like how well were the was the action and plot entertaining.
Review series review plan board episode 2
part 1
Begin review with introduction to audience and which
episode is being reviewed.
Talk about Mando riding back to mos isly on his speeder
then getting ambushed by bandits recking his speed and him
killing them with ease and having to walk the rest of the way.
Talk about mando reaching mos isly and meeting up with his
contact in the middle of a card game with a fellow patron
with her agreeing to help in if he bets in.
Talk about Mando being told that if he delivers this frog lady
to the planet where her husband has set up shop then
Mando will be able to get the information he needs.
Talk about Mando getting into trouble with some new
republic pilots with him eventually crashing his ship the razor
back on an icy planet.
Talk about Mando discussing his and the frog lady option
eventually getting guilt tripped into fixing the ship enough to
get them to their destination.
Review series review plan board episode 2
part 2
Finish of review with a score and the reason for that score
like how well were the was the action and plot entertaining.
Talk about Mando fixing the ship eventually going off to find
the frog lady who is bathing in a hot spring with her eggs
with them getting ready to leave.
Talk about baby yoda wandering off and waking up a hive of
space spiders resulting in everyone having to bolt back to the
ship to not get eaten alive.
Talk about Mando and crew making it back to the ship and
trying to hold the hoard of space spider from getting in with
find new way to get in.
Talk about how when all hope seems lost the pilots from
earlier swoop back in and save the day and let Mando off
with a warning.
Talk about Mando finishing repairing the ship then launching
the razor crest to get them off the ice plant and moving onto
their intended destination.
Review series review plan board episode 3
part 1
Begin review with introduction to audience and which
episode is being reviewed.
Talk about Mando reaching his intended location and nearly
crashing but managing to land safely and reunite the frog
lady with her husband who gives Mando the info he needs.
Talk about Mando going to a local restaurant and trying to
acquire more information on a Mandalorian coven and being
approached by a fisher men who can take him there.
Talk about Mando traveling on the fishing boat with baby
yoda with the fisher men showing them a catch they have
eventually tricking Mando and trying to drown and kill him.
Talk about Mando and baby yoda being saved by bo katan
and her group but ending up in an argument after she and
her group remove their helmet with Mando taking off
Talk about Mando being back in town and being ambushed
by a brother of one of the fisher men and being saved by bo
and her group and convinc him to talk to them.
Review series review plan board episode 3
part 2
Finish of review with a score and the reason for that score
like how well were the was the action and plot entertaining.
Talk about bo discussing with Mando on how her and her
group want to steal a weapon cache to help liberate
mandolore and offering Mando information if he helps.
Talk about Mando leaving baby yoda with the frog lady until
he get back as bay yoda watches one of the eggs the frog
lady was carrying hatch.
Talk about mando and bo with her crew blasting their way
through the cruiser eventually reaching the cargo bay and bo
katan altering her deal with them now taking the whole ship.
Talk about Mando and bo reaching the bridge taking care of
the captain and stopping him from crashing the ship and bo
giving Mando information on where to find a jedi.
Talk about Mando retreating grogu from the frog lady and
going back to the repaired razor crest and heading off to
corves.
Review series review plan board episode 4
part 1
Begin review with introduction to audience and which
episode is being reviewed
Talk about episode starting with cara dunn taking down a
gang of criminals and saving a ferret like creature the
criminal were going to cook.
Talk about mando and baby yoda trying to fix their ship but
being unsuccessful and deciding to stop off on a near by
planet to get the ship properly fixed then go to corves.
Talk about Mando landing on nevaro meeting up with some
friend their and asking to get his ship repaired and being
given a tour of town after season one.
Talk about grief leaving baby yoda at the local school to
discuss business with Mando wanting his aid in destroying an
imperial outpost still on the planet.
Talk about the group making a plan of attack and going to
the imperial facility and breaking into the elevator to get in
whilst Mando clears the upper platform.
Review series review plan board episode 4
part 2
Finish of review with a score and the reason for that score
like how well were the was the action and plot entertaining
Talk about the group going into and blasting their through
the imperial base reaching the reactor and setting it to blow
destroying the whole base.
Talk about the group blasting their way out of the facility
eventually stumbling across a cloning lab and finding a
message from doctor pershing.
Talk about Mando going off to retrieve baby yoda with the
rest of the group acquiring and imperial transport escaping
the facility but being chased by remaining imperial forces.
Talk about the group taking out the pursuing speeders but
being saved by Mando from the tie fighter after which taking
off with grief being interviewed later by the new republic.
Talk about the episode ending with the scene cutting to and
imperial cruiser and an officer receiving and message and
giving it to moff Gideon who is looking into room of figures
Review series review plan board episode 5
part 1
Begin review with introduction to audience and which
episode is being reviewed
Talk about episode starting with Ahsoka tano killing some
mercenary's and making her demand to the magistrate to
release the prisoners and the town she has enslaved.
Talk about Mando landing on corves and making his way into
town seeing people scared and hiding eventually reaching
the magistrates seeing people being tortured.
Talk about Mando meeting the magistrate with her offering
him her beskar spear if Mando kills Ahsoka tano for her
which Mando agrees to only for her location
Talk about Mando going to find Ahsoka and finding her but
ends up fighting her for a while but stops after mentioning
bo katan sent him.
Talk about Ahsoka communicating with baby yoda then
telling Mando his backstory like how he was trained at the
jedi temple and real name being grogu
Review series review plan board episode 5
part 2
Finish of review with a score and the reason for that score
like how well were the was the action and plot entertaining
Talk about Ahsoka testing grogu by having him catch a rock
then have him send it back to her which doesn’t do but pull
the small knob Mando has out of his hand with the force.
Talk about Ahsoka refusing to train grogu because of hi
connection to Mando but Mando makes a deal that if he
helps her liberate the town then she’ll train grogu.
Talk about Mando going back to the town a telling the
magistrate he’s killed Ahsoka then Ahsoka reveals herself
and starts clearing the town with the help of Mando.
Talk about Ahsoka fighting the magistrate and winning
demanding to know where grand admiral thrawn is whilst
Mando kills the magistrates second in command in a duel.
Talk about ahsoka liberating the town and giving Mando the
beskar spear and telling him that she wont train grogu but
there is a place he can find a teacher on the plant typhon.
Review series review plan board episode 6
part 1
Begin review with introduction to audience and which
episode is being reviewed
Talk about Mando playing with grogu by having grogu force
pull the ball out of Mando's hand to his own and getting very
emotional whilst talking to him showing their connection
Talk about Mando landing on typhon and taking grogu to the
seeing stone so he can connect with another force user to
become his teacher which doesn’t work at first.
Talk about Mando seeing an iconic ship fly over head and try
to retrieve grogu but failing deciding to instead find out who
just landed and if they’re friend or foe.
Talk about Mando finding out the pilot of the ship is boba
fett who want his armor back leading to a small near
confrontation which boba gets quickly stopped.
Talk about how the discussion get cut short with imperial
forces showing up to kidnap grogu with Mando going to
retrieve grogu whilst boba and fenec set up defenses.
Review series review plan board episode 6
part 2
Finish of review with a score and the reason for that score
like how well were the was the action and plot entertaining.
Talk about Mando trying to retrieve grogu but failing due to
the force shield around grogu so he decides to go help boba
and fence defend from the stormtroopers.
Talk about boba and fenec shan decimating empireial forces
with fence sniping trooper left and right and boba brutally
whacking away with his gafey stick and seeing Mando’s ship.
Talk about Mando joining fenec but getting out numbered
until boba show back up in his armor and gos one man army
making the imperials retreat and destroying their transport.
Talk about moff Giedion showing up and blowing Mando's
ship and using his dark troopers to kid nap grogu and them
getting away and boba offering to help get grogu back.
Talk about mando enlisting the help of cara to help get
grogu back before cutting to moff Giedion taunting grogu
with the dark saber then having a trooper stun grogu.
Review series review plan board episode 7
part 1
Begin review with introduction to audience and which
episode is being reviewed.
Talk about the episode starting with a prison chopping yard
and Mayfield being told by a security droid he is being taken
into the custody of cara dunn.
Talk about Mayfield being escorted to slave one and being
scared when Mando come out after fence and boba in his
repainted armor.
Talk about Mayfield telling Mando and crew to find Giedion
they need to access an imperial terminal in a secret imperial
mining facility on morak with slave jumping to morak
Talk about boba telling the group the empire would be
mining rhydonium which I highly volatile and explosive and
that the facility is protected by anti air cannon
Talk about Mando and crew discussing how they are going
to get into the mining facility in which it decided Mayfield
and Mando will hijack a transport and disguise themselves.
Review series review plan board episode 7
part 2
Talk about Mando at first having the terminal scanning his
face with the helmet on but having to show his real face to
get access breaking his Mandalorian creed for grogu.
Talk about Mando and the group hijacking an imperial
transport then Mayfield and Mando dressing in the imperial
drivers armor as disguises.
Talk about Mando and Mayfield driving to the facility whilst
Mayfield has a deep discussion with Mando about codes
people will follow and what make some people break them.
Talk about Mando having to defend the transport from
pirates trying to blow up the rhydonium whilst Mayfield try's
to keep the transport steady to not blow up the rhdonium.
Talk about Mando and Mayfield being saved by imperial
defense forces before being overrun by the pirate’s and
getting into the base cheered as heroes.
Talk about Mayfield going to the terminal but turning back
once he see’s a previous superior officer meaning Mando
will have to access the terminal.
Review series review plan board episode 7
part 3
Finish of review with a score and the reason for that score
like how well were the was the action and plot entertaining.
Talk about Mando getting the info on moff Giedion he needs
but before he leaves, he is stoped by the same officer from
before with Mayfield having to swoop in and save Mando.
Talk about the officer getting Mayfield and Mando to sit
with him and share a drink before going full psycho speech
about operation cinder and how the empire bring order..
Talk about Mayfield having enough and shooting the
imperial officer then a nearby shore trooper resulting in
Mando and Mayfield having to escape the facility.
Talk about Mando and Mayfield escaping and destroying the
facility with cara allowing Mayfield to go free stating he died
in the facility explosion.
Talk about Mando sending a message to moff Gideon telling
him he's coming for him and he’s going to get grogu back
flipping moff Gideons own words on him.
Review series review plan board episode 8
part 1
Begin review with introduction to audience and which
episode is being reviewed
Talk about slave1 following out of and disabling an imperial
shuttle with doctor perishing on it and demanding to be able
to board to which the pilots agree to.
Mando and crew board the shuttle with one of the pilots
taking doctor pershing hostage and killing the other and
taunting cara on the destruction of aldrean.
Talk about the pilot saying he’s the real victim then cara
shooting the pilot at point blank range killing him and taking
doctor pershing.
Talk about Mando finding bo katan to aid in recusing grogu
however an altercation ends up happening between boba
and bo second in command however she agree to help.
Talk about mando and crew formulating a plan with the help
of doctor pershing in which mando will disable the dark
troopers and bo and her team will take the bridge.
Review series review plan board episode 8
part 2
Talk about slave 1 and the captured imperial shuttle jumping
out of hyper space and putting on a show to make it look
like the shuttle needs to land on the cruiser now.
Talk about Mando and crew crashing onto the cruiser and
the girls splitting off from Mando blasting their way to the
bridge whilst Mando goes to disable the dark troopers
Talk about Mando reaching the dark trooper room as he
shut the door, but one get out and he fights it and nearly
dying but being able to defeat it and eject the others.
Talk about bo and the girls clearing the bridge killing
everyone there except for moff Giedion who is no where to
be found.
Talk about mando going to grogu’s cell only to find moff
Gideon holding grogu at dark saber point and offer to let
Mando take grogu if Mando leave him alone.
Talk about Mando agreeing but moff Gideon then tries to kill
Mando with the two ending up in a scuffle which Mando
wins with his beskar spear.
Review series review plan board episode 8
part 3
Finish of review with a score and the reason for that score
like how well were the was the action and plot entertaining
and a score of the season as a whole.
Talk about Mando taking moff gideion to the bridge with the
dark saber in toe with bo katan not looking to happy that
Mando beat moff Giedion
Talk about moff gidieon taunting bo katan that she doesn’t
hold the dark saber and will have to fight Mando for it
whilst Mando just want to give it to her.
Talk about moff Giedion taunting the group on how his dark
trooper will kill them and he will have what he wants back
which after an xwing flies into the cruiser.
Talk about Luke coming to the groups rescue destroying the
dark troopers and taking grogu with him to be trained as a
jedi with mando showing grogu his face before he leaves
Talk about boba fetts end credits scene where he kills bib
Fortuna and takes the thrown as king of the star wars
underworld with fenec shan.
Plan of attack
Weeks and days What needs to be done
Week one Work on reviews of episode 1 and 2
Day one Record audio, game play footage and collect episode images for review of episode one.
Day two Edit footage, audio and image together in adobe premiere making episode one of the reviews series, then begin recording audio and
collecting images for review of episode two.
Day three Edit footage, audio and images together in adobe premiere making episode two of the review series then import both episode of review
series over to YouTube and place on channel.
Week two Work on reviews of episodes 3 and 4
Day one Record audio and collect episode images for review of episode three.
Day two Edit footage, audio and image together in adobe premiere making episode three of the review's series, then begin recording audio and
collecting images for review of episode four.
Day three Edit footage, audio and images together in adobe premiere making episode four of the review series then import both episode of review
series over to YouTube and place on channel.
Week three Work on reviews of episodes 5 and 6
Day one Record audio and collect episode images for review of episode three.
Day two Edit footage, audio and image together in adobe premiere making episode five of the review's series, then begin recording audio and
collecting images for review of episode six.
Day three Edit footage, audio and images together in adobe premiere making episode six of the review series then import both episode of review series
over to YouTube and place on channel.
Plan of attack
Weeks and days What needs to be done
Week four Work on merchandise designs for merchandise website
Day one Begin work on I never game alone merch design by designing base using existing images then over lapping base with first layer of line work
then overlapping that layer with the color layer.
Day two Finish work on I never game alone merch design by adding shading the image then adding the text saying I never game alone then placing
the design on a base shirt image then move onto merch design two by taking a picture of myself dress as Jacob frye.
Day three Begin work on design two by importing the picture of myself then using the editing technique I learned from the tutorial on YouTube to
make the image look more cartoony then replace my face with the mk 4 helmet in the same art style then add the text looks like its stabby
stabby time then place the finished design on a base shirt image.
Week five Work on merchandise website design
Day one Begin work on design for merchandise web site by first designing the layout from color and style to how many page there will be using basic
font for base text which will be changed later.
Day two Continue work on merchandise website by changing font of base text to a font which is eye catching and allow the web site to stand out
more to the viewer
Day three Finish work on merchandise website by importing finished merchandise design images over to the website and adding text below each
image with its name and price.
Week six Work on reviews for episode 7 and 8
Day one Record audio and collect episode images for review of episode seven.
Day two Edit footage, audio and image together in adobe premiere making episode seven of the review's series, then begin recording audio and
collecting images for review of episode eight.

Project planning document

  • 1.
  • 2.
    merch design plans1 For this merch design it will have my character playing video games with his Pokémon whilst sitting together on a comfy couch with the halo font of “I never” and the Pokémon font “game alone”. ART STYLE Basic Design idea The art style I plan on using for this shirt design is a art style like the artist GD-058 who use simple colors and his own interpretation of Pokémon's art style Fonts being used: haloand Pokemon Hollow
  • 3.
    For Stephany’s, thebraxin on the couch who's design on my first merch design will be different from a regular braxin and help her stand out allowing the shirt design to stand out I will take aspect from the image on the left from a program that allows you to create your own custom braxin done by the creator InDarkWaters and the aspect of the image I will be using is. Color pallet for my character Color pallet for Stephany character Aspects Stephaney's design will have • Marks on her left ear • Blue eyes instead of orange red • Ear fur will have three points instead of one • Hair Mohawk partially covering left eye with the tip being aqua blue • Earrings but they will be a mega stone inside fire • Red eye shadow
  • 4.
    For the designaspect of my character the design will include. • Prosthetic arm • Mjolnir mk4 helmet • Pajama shirt with a sleeping rowlet saying wake me when I evolve • Pajama shorts Design aspects for my character
  • 5.
    Merch design plan2 For this merch design it will have me dressed as Jacob frye with my gauntleted hand going across my chest with a hidden blade sticking out with the words “looks like its stabby stabby time written in blood”. Art style Basic design idea The art style I'm going for my second merch design is the art style shown above being a mixture of realistic but also cartoonish and to do this I have found tutorial to help me achieve this look for my image in photoshop. Font being used: bloodlust expanded
  • 6.
    An aspect ofthe design I will add to my design is to have my face replaced by the mk4 helmet from design 1 to add consistency to the designs. Color scheme
  • 7.
    Merchandise website designplans The reason for this idea being scrapped is because it is to like the set up that the website Teespring has which can cause copy right issues which most creators want to avoid, and I want to avoid as well so it is back to the drawing board for merchandise website design Scraped design idea
  • 8.
    Merchandise website designplans For my website the design will have in the subheading the button for home, catalog, contact us and make your own radness with the name of the website and its slogan in the middle with the site's mascot above with my merch page below with an image of my channel logo with their own page buttons of clothing, key chains and plushy with my merch below of looks like it stabby stabby time on a shirt hoodie and jacket with I never game alone being the same with their name color options and Fonts the websites will use: the font my merchandise websites is the font Dream MMA
  • 9.
    The reason Ichose to have the mascot be a shark with sunglasses and the website being called rad shark.com is because it meant to have a chickee jab at the cheesiness of the 90s, but also rad shark rolled of the tongue and stood out as a title making it more memorable and allow it to stand out, among others. Color scheme for header Why did I do the background the way it is: the reason for the background being the way it is that I felt an evening sky mixed with the bright blue sea would allow the mascot to stand out but also all for the background to be more visually interesting. Color scheme for mascot
  • 10.
    Video background music For myreview series I want to have music subtilty playing in the background as in a previous project I was informed it would help make the video more entertaining during quite bits, but I also wanted to avoid copyright claims so I couldn't use any existing music made by either halo or star wars so I typed in royalty free music into the search bar of YouTube and found “Western Background Music for Videos I Wild West Instrumental Themes I No Copyright Music” by the channel MrSnooze I Background Music for Videos with one track in particular being the one I feel will fit my video that track being digital gunslinger and the reason for choosing western music I because the Mandalorian is part western so it make sense that I use a western style song for my review
  • 11.
    Review series reviewplan board episode 1 part 1 Introduction of myself to the audience before moving to the right to transition to machinima. Introduction of the review series and the episode that’ll be reviewed in that review episode. Talk about the beginning of the episode with Mando meeting a contact getting betrayed and getting what he wants in the end and traveling to Tatooine. Talk about Mando arriving on Tatooine and being shown were to go and heading to moss pelgo meeting the marshal and the problem the towns has with a crait dragon. Talk about Mando and the marshel riding to the crait dragon lair and eventually meeting with some tusken raiders who are having the same problem and are willing to help. Talk about Mando and the marshal making a deal with the tusken raider to help kill the crait dragon and going to moss pelgo to inform the people of the town about the deal.
  • 12.
    Review series reviewplan board episode 1 part 2 Talk about the town and the tusken raiders preparing to kill the crait dragon by going to its lair setting up traps to blow the creature up with ballista to hold the dragon in place. Talk about the town and the tusken raiders along with mando fighting the crait dragon and having trouble killing it with it spraying deadly acid. Talk about Mando trickig the crait dragon into swallowing him with a bantha covered in explosives then flying out of the crait dragons' mouth and blowing it up killing it. Talk about Mando and the marshal saying their goodbyes with Mando being given the marshals armor as per their deal for mando aiding in killing the crait dragon. Talk about Mando riding off into the sunset on his speeders with the newly acquired armor whilst a mysterious figure watches on reviled to be boba fett. Finish of review with a score and the reason for that score like how well were the was the action and plot entertaining.
  • 13.
    Review series reviewplan board episode 2 part 1 Begin review with introduction to audience and which episode is being reviewed. Talk about Mando riding back to mos isly on his speeder then getting ambushed by bandits recking his speed and him killing them with ease and having to walk the rest of the way. Talk about mando reaching mos isly and meeting up with his contact in the middle of a card game with a fellow patron with her agreeing to help in if he bets in. Talk about Mando being told that if he delivers this frog lady to the planet where her husband has set up shop then Mando will be able to get the information he needs. Talk about Mando getting into trouble with some new republic pilots with him eventually crashing his ship the razor back on an icy planet. Talk about Mando discussing his and the frog lady option eventually getting guilt tripped into fixing the ship enough to get them to their destination.
  • 14.
    Review series reviewplan board episode 2 part 2 Finish of review with a score and the reason for that score like how well were the was the action and plot entertaining. Talk about Mando fixing the ship eventually going off to find the frog lady who is bathing in a hot spring with her eggs with them getting ready to leave. Talk about baby yoda wandering off and waking up a hive of space spiders resulting in everyone having to bolt back to the ship to not get eaten alive. Talk about Mando and crew making it back to the ship and trying to hold the hoard of space spider from getting in with find new way to get in. Talk about how when all hope seems lost the pilots from earlier swoop back in and save the day and let Mando off with a warning. Talk about Mando finishing repairing the ship then launching the razor crest to get them off the ice plant and moving onto their intended destination.
  • 15.
    Review series reviewplan board episode 3 part 1 Begin review with introduction to audience and which episode is being reviewed. Talk about Mando reaching his intended location and nearly crashing but managing to land safely and reunite the frog lady with her husband who gives Mando the info he needs. Talk about Mando going to a local restaurant and trying to acquire more information on a Mandalorian coven and being approached by a fisher men who can take him there. Talk about Mando traveling on the fishing boat with baby yoda with the fisher men showing them a catch they have eventually tricking Mando and trying to drown and kill him. Talk about Mando and baby yoda being saved by bo katan and her group but ending up in an argument after she and her group remove their helmet with Mando taking off Talk about Mando being back in town and being ambushed by a brother of one of the fisher men and being saved by bo and her group and convinc him to talk to them.
  • 16.
    Review series reviewplan board episode 3 part 2 Finish of review with a score and the reason for that score like how well were the was the action and plot entertaining. Talk about bo discussing with Mando on how her and her group want to steal a weapon cache to help liberate mandolore and offering Mando information if he helps. Talk about Mando leaving baby yoda with the frog lady until he get back as bay yoda watches one of the eggs the frog lady was carrying hatch. Talk about mando and bo with her crew blasting their way through the cruiser eventually reaching the cargo bay and bo katan altering her deal with them now taking the whole ship. Talk about Mando and bo reaching the bridge taking care of the captain and stopping him from crashing the ship and bo giving Mando information on where to find a jedi. Talk about Mando retreating grogu from the frog lady and going back to the repaired razor crest and heading off to corves.
  • 17.
    Review series reviewplan board episode 4 part 1 Begin review with introduction to audience and which episode is being reviewed Talk about episode starting with cara dunn taking down a gang of criminals and saving a ferret like creature the criminal were going to cook. Talk about mando and baby yoda trying to fix their ship but being unsuccessful and deciding to stop off on a near by planet to get the ship properly fixed then go to corves. Talk about Mando landing on nevaro meeting up with some friend their and asking to get his ship repaired and being given a tour of town after season one. Talk about grief leaving baby yoda at the local school to discuss business with Mando wanting his aid in destroying an imperial outpost still on the planet. Talk about the group making a plan of attack and going to the imperial facility and breaking into the elevator to get in whilst Mando clears the upper platform.
  • 18.
    Review series reviewplan board episode 4 part 2 Finish of review with a score and the reason for that score like how well were the was the action and plot entertaining Talk about the group going into and blasting their through the imperial base reaching the reactor and setting it to blow destroying the whole base. Talk about the group blasting their way out of the facility eventually stumbling across a cloning lab and finding a message from doctor pershing. Talk about Mando going off to retrieve baby yoda with the rest of the group acquiring and imperial transport escaping the facility but being chased by remaining imperial forces. Talk about the group taking out the pursuing speeders but being saved by Mando from the tie fighter after which taking off with grief being interviewed later by the new republic. Talk about the episode ending with the scene cutting to and imperial cruiser and an officer receiving and message and giving it to moff Gideon who is looking into room of figures
  • 19.
    Review series reviewplan board episode 5 part 1 Begin review with introduction to audience and which episode is being reviewed Talk about episode starting with Ahsoka tano killing some mercenary's and making her demand to the magistrate to release the prisoners and the town she has enslaved. Talk about Mando landing on corves and making his way into town seeing people scared and hiding eventually reaching the magistrates seeing people being tortured. Talk about Mando meeting the magistrate with her offering him her beskar spear if Mando kills Ahsoka tano for her which Mando agrees to only for her location Talk about Mando going to find Ahsoka and finding her but ends up fighting her for a while but stops after mentioning bo katan sent him. Talk about Ahsoka communicating with baby yoda then telling Mando his backstory like how he was trained at the jedi temple and real name being grogu
  • 20.
    Review series reviewplan board episode 5 part 2 Finish of review with a score and the reason for that score like how well were the was the action and plot entertaining Talk about Ahsoka testing grogu by having him catch a rock then have him send it back to her which doesn’t do but pull the small knob Mando has out of his hand with the force. Talk about Ahsoka refusing to train grogu because of hi connection to Mando but Mando makes a deal that if he helps her liberate the town then she’ll train grogu. Talk about Mando going back to the town a telling the magistrate he’s killed Ahsoka then Ahsoka reveals herself and starts clearing the town with the help of Mando. Talk about Ahsoka fighting the magistrate and winning demanding to know where grand admiral thrawn is whilst Mando kills the magistrates second in command in a duel. Talk about ahsoka liberating the town and giving Mando the beskar spear and telling him that she wont train grogu but there is a place he can find a teacher on the plant typhon.
  • 21.
    Review series reviewplan board episode 6 part 1 Begin review with introduction to audience and which episode is being reviewed Talk about Mando playing with grogu by having grogu force pull the ball out of Mando's hand to his own and getting very emotional whilst talking to him showing their connection Talk about Mando landing on typhon and taking grogu to the seeing stone so he can connect with another force user to become his teacher which doesn’t work at first. Talk about Mando seeing an iconic ship fly over head and try to retrieve grogu but failing deciding to instead find out who just landed and if they’re friend or foe. Talk about Mando finding out the pilot of the ship is boba fett who want his armor back leading to a small near confrontation which boba gets quickly stopped. Talk about how the discussion get cut short with imperial forces showing up to kidnap grogu with Mando going to retrieve grogu whilst boba and fenec set up defenses.
  • 22.
    Review series reviewplan board episode 6 part 2 Finish of review with a score and the reason for that score like how well were the was the action and plot entertaining. Talk about Mando trying to retrieve grogu but failing due to the force shield around grogu so he decides to go help boba and fence defend from the stormtroopers. Talk about boba and fenec shan decimating empireial forces with fence sniping trooper left and right and boba brutally whacking away with his gafey stick and seeing Mando’s ship. Talk about Mando joining fenec but getting out numbered until boba show back up in his armor and gos one man army making the imperials retreat and destroying their transport. Talk about moff Giedion showing up and blowing Mando's ship and using his dark troopers to kid nap grogu and them getting away and boba offering to help get grogu back. Talk about mando enlisting the help of cara to help get grogu back before cutting to moff Giedion taunting grogu with the dark saber then having a trooper stun grogu.
  • 23.
    Review series reviewplan board episode 7 part 1 Begin review with introduction to audience and which episode is being reviewed. Talk about the episode starting with a prison chopping yard and Mayfield being told by a security droid he is being taken into the custody of cara dunn. Talk about Mayfield being escorted to slave one and being scared when Mando come out after fence and boba in his repainted armor. Talk about Mayfield telling Mando and crew to find Giedion they need to access an imperial terminal in a secret imperial mining facility on morak with slave jumping to morak Talk about boba telling the group the empire would be mining rhydonium which I highly volatile and explosive and that the facility is protected by anti air cannon Talk about Mando and crew discussing how they are going to get into the mining facility in which it decided Mayfield and Mando will hijack a transport and disguise themselves.
  • 24.
    Review series reviewplan board episode 7 part 2 Talk about Mando at first having the terminal scanning his face with the helmet on but having to show his real face to get access breaking his Mandalorian creed for grogu. Talk about Mando and the group hijacking an imperial transport then Mayfield and Mando dressing in the imperial drivers armor as disguises. Talk about Mando and Mayfield driving to the facility whilst Mayfield has a deep discussion with Mando about codes people will follow and what make some people break them. Talk about Mando having to defend the transport from pirates trying to blow up the rhydonium whilst Mayfield try's to keep the transport steady to not blow up the rhdonium. Talk about Mando and Mayfield being saved by imperial defense forces before being overrun by the pirate’s and getting into the base cheered as heroes. Talk about Mayfield going to the terminal but turning back once he see’s a previous superior officer meaning Mando will have to access the terminal.
  • 25.
    Review series reviewplan board episode 7 part 3 Finish of review with a score and the reason for that score like how well were the was the action and plot entertaining. Talk about Mando getting the info on moff Giedion he needs but before he leaves, he is stoped by the same officer from before with Mayfield having to swoop in and save Mando. Talk about the officer getting Mayfield and Mando to sit with him and share a drink before going full psycho speech about operation cinder and how the empire bring order.. Talk about Mayfield having enough and shooting the imperial officer then a nearby shore trooper resulting in Mando and Mayfield having to escape the facility. Talk about Mando and Mayfield escaping and destroying the facility with cara allowing Mayfield to go free stating he died in the facility explosion. Talk about Mando sending a message to moff Gideon telling him he's coming for him and he’s going to get grogu back flipping moff Gideons own words on him.
  • 26.
    Review series reviewplan board episode 8 part 1 Begin review with introduction to audience and which episode is being reviewed Talk about slave1 following out of and disabling an imperial shuttle with doctor perishing on it and demanding to be able to board to which the pilots agree to. Mando and crew board the shuttle with one of the pilots taking doctor pershing hostage and killing the other and taunting cara on the destruction of aldrean. Talk about the pilot saying he’s the real victim then cara shooting the pilot at point blank range killing him and taking doctor pershing. Talk about Mando finding bo katan to aid in recusing grogu however an altercation ends up happening between boba and bo second in command however she agree to help. Talk about mando and crew formulating a plan with the help of doctor pershing in which mando will disable the dark troopers and bo and her team will take the bridge.
  • 27.
    Review series reviewplan board episode 8 part 2 Talk about slave 1 and the captured imperial shuttle jumping out of hyper space and putting on a show to make it look like the shuttle needs to land on the cruiser now. Talk about Mando and crew crashing onto the cruiser and the girls splitting off from Mando blasting their way to the bridge whilst Mando goes to disable the dark troopers Talk about Mando reaching the dark trooper room as he shut the door, but one get out and he fights it and nearly dying but being able to defeat it and eject the others. Talk about bo and the girls clearing the bridge killing everyone there except for moff Giedion who is no where to be found. Talk about mando going to grogu’s cell only to find moff Gideon holding grogu at dark saber point and offer to let Mando take grogu if Mando leave him alone. Talk about Mando agreeing but moff Gideon then tries to kill Mando with the two ending up in a scuffle which Mando wins with his beskar spear.
  • 28.
    Review series reviewplan board episode 8 part 3 Finish of review with a score and the reason for that score like how well were the was the action and plot entertaining and a score of the season as a whole. Talk about Mando taking moff gideion to the bridge with the dark saber in toe with bo katan not looking to happy that Mando beat moff Giedion Talk about moff gidieon taunting bo katan that she doesn’t hold the dark saber and will have to fight Mando for it whilst Mando just want to give it to her. Talk about moff Giedion taunting the group on how his dark trooper will kill them and he will have what he wants back which after an xwing flies into the cruiser. Talk about Luke coming to the groups rescue destroying the dark troopers and taking grogu with him to be trained as a jedi with mando showing grogu his face before he leaves Talk about boba fetts end credits scene where he kills bib Fortuna and takes the thrown as king of the star wars underworld with fenec shan.
  • 29.
    Plan of attack Weeksand days What needs to be done Week one Work on reviews of episode 1 and 2 Day one Record audio, game play footage and collect episode images for review of episode one. Day two Edit footage, audio and image together in adobe premiere making episode one of the reviews series, then begin recording audio and collecting images for review of episode two. Day three Edit footage, audio and images together in adobe premiere making episode two of the review series then import both episode of review series over to YouTube and place on channel. Week two Work on reviews of episodes 3 and 4 Day one Record audio and collect episode images for review of episode three. Day two Edit footage, audio and image together in adobe premiere making episode three of the review's series, then begin recording audio and collecting images for review of episode four. Day three Edit footage, audio and images together in adobe premiere making episode four of the review series then import both episode of review series over to YouTube and place on channel. Week three Work on reviews of episodes 5 and 6 Day one Record audio and collect episode images for review of episode three. Day two Edit footage, audio and image together in adobe premiere making episode five of the review's series, then begin recording audio and collecting images for review of episode six. Day three Edit footage, audio and images together in adobe premiere making episode six of the review series then import both episode of review series over to YouTube and place on channel.
  • 30.
    Plan of attack Weeksand days What needs to be done Week four Work on merchandise designs for merchandise website Day one Begin work on I never game alone merch design by designing base using existing images then over lapping base with first layer of line work then overlapping that layer with the color layer. Day two Finish work on I never game alone merch design by adding shading the image then adding the text saying I never game alone then placing the design on a base shirt image then move onto merch design two by taking a picture of myself dress as Jacob frye. Day three Begin work on design two by importing the picture of myself then using the editing technique I learned from the tutorial on YouTube to make the image look more cartoony then replace my face with the mk 4 helmet in the same art style then add the text looks like its stabby stabby time then place the finished design on a base shirt image. Week five Work on merchandise website design Day one Begin work on design for merchandise web site by first designing the layout from color and style to how many page there will be using basic font for base text which will be changed later. Day two Continue work on merchandise website by changing font of base text to a font which is eye catching and allow the web site to stand out more to the viewer Day three Finish work on merchandise website by importing finished merchandise design images over to the website and adding text below each image with its name and price. Week six Work on reviews for episode 7 and 8 Day one Record audio and collect episode images for review of episode seven. Day two Edit footage, audio and image together in adobe premiere making episode seven of the review's series, then begin recording audio and collecting images for review of episode eight.