What is a Project
 It is a sequence of unique,
complex, and connected activities
having one goal or purpose and
that must be completed by a
specific time, within budget, and
according to specification.
ITGS AKAM 2015
Project Management
 Project Management is a set of
principles and tools for defining,
planning, and executing,
controlling, and completing a
project.
ITGS AKAM 2015
Why is this important?
 Organizes your approach
 Generate a credible schedule
 Track progress and control your
project
 Identify where to focus your efforts
 Identify problems early-before there
are crises
 Saves you TIME (and MONEY)
ITGS AKAM 2015
Theoretical fundamentals
In every project there should be a client,
end-user and developer
 Client: Is the person or company
requesting for the development of the
product to make work easier replacing the
old system
 End user: Is the person who uses the
information system directly or uses the
information produced by the system
 Developer: is the systems analyst who will
evaluate the existing system, design the
new one, develop it, and evaluate it
ITGS AKAM 2015
 Data collection techniques for content
and product design, citing of sources.
Document review
Interview
Questionnaire
Observation
ITGS AKAM 2015
 Role of testing and processes used
Final products can be tested using
 Normal Data e.g Age 0-130
 Invalid Data e.g Age -15
 Extreme Data e.g Age 167
 Testing usually occurs before a system is
delivered to the client after 'live data' has
been used
 If the system were to fail the testing phase,
the analyst would have to re-research, re-
analyse and re-design the system.
ITGS AKAM 2015
 Product development and technical documentation.
Two documentation can be produced
 User Documentation: Is written to help the user of
the new system work with the new system and how
to fix any problems.
 Technical Documentation: Is written to help other
system analyst who at a later point in time might be
hired to update the system. This may include
hardware, software, data structures, expected
inputs, data validation/verification methods, and
processing details.
 End-user training: Once a system has been
completed, the system analyst should develop a
simple training manual.
ITGS AKAM 2015
The product development life
cycle (PDLC)
 Investigation of existing system (s)
 Feasibility study
 Requirements specification
 Project schedule
 Product design
 Product development and technical
documentation
 Client and end-user evaluation
Investigation of Existing System
ITGS AKAM 2015
•There are four main ways a system analyst
can use to investigate existing systems:
•Reading existing documentation
•Interview existing users
•Questionnaires
•Watching the existing software in use
Feasibility Study
ITGS AKAM 2015
A feasibility study encapsulates various topics which
discuss whether or not it is possible to create the
new system.
The system analyst usually discusses if the
proposed system is economically viable, if the
technology exists to create the new system, and
time it will take to plan, design and manufacture the
new system.
Requirements Specification
ITGS AKAM 2015
The requirements specification is a document
produced by the system analyst which is created
after all the primary and secondary data have been
recorded and analysed.
The requirements specification specifies what the
new systems capability and limitations should be,
and is used to evaluate whether or not the new
system is deemed a success or a failure.
Project Schedule
ITGS AKAM 2015
As the name suggests project schedule is
the time frame, drawn up by the systems
analyst, in which he will have to complete the
new system.
Product design
ITGS AKAM 2015
When designing the new system, the system analyst needs to
decide on the method of input used in the new system.
• Manually: Paper forms, or directly inputting data into an on-
screen form.
• Automatically: Using a bar-code scanner or a card scanner.
After which, the system analyst needs to draw up some
prototypes of the input forms and present it to his client, which
will then accept the prototype as it is or ask the systems
analyst to make any changes the client deems necessary.
After the input form has been created, the systems analyst
then needs to create the system itself. The system should
include data validation and verification methods, and the
output methods, (on-screen or printed).
Product Development and
Documentation
ITGS AKAM 2015
Product is developed and two user documents
produced:
• User Documentation: User documentation is written
to help the user of the new system work with the new
system and how to fix any problems.
• Technical Documentation: Technical
documentation is written to help other system analyst
who at a later point in time might be hired to update
the system.
Client and end user evaluation
ITGS AKAM 2015
The end-user evaluation consists of evaluating how efficient,
how easy to use and if the system is appropriate for the
business and if it meets the standards. By
• Checking against the requirements specification to check
if the system does everything it was set out to do in the
beginning.
• Checking the users' response. Is the system easy to use?
Does it make work easier? Can any improvements be
made?
The evaluation can be made through the use of
questionnaires, interviews and by observing the users in
action. The data can then be analysed and evaluated to help
in the improvement of the system.
ITGS AKAM 2015
Criterion A: Initial investigation and initial
consultation with client
The key questions in this stage;
 Who is your client?
 What is the present situation?
 What are the inadequacies of the present
situation?
The above is obtained in a written record of
the interview, a sound file, a video, or an
exchange of emails supported by a
questionnaire.
ITGS AKAM 2015
The investigation will have the following
important independent sections
a) Interview question and responses (not
graded)
b) Interview Summary (not graded)
c) Criterion A: Initial investigation (Appro.
250 words and graded)
Criterion A is built from a) and b)
ITGS AKAM 2015
Interview Questions Activity
Interview questions should be open ended
 Each student to write down any two
interview questions that you have or will
use with their clients
ITGS AKAM 2015
Interview Summary
After the interview response have been written
the a interview summary should be written
Activity
 Use the handout provided to write down some
questions that you think were used to develop
the interview summary.
ITGS AKAM 2015
Compare the Questions
 What problem (s) does do you face in
your position as Head of ICT?
 Do you know of any examples of
students breaking the rules that had
serious consequences?
 How could an IT solution solve the
problem?
 Do you have any ideas ?
ITGS AKAM 2015
Criterion A: Initial Investigation
Read the sample initial investigation posted
Use your some of your interview responses
to draft the initial investigation in pairs.

More Related Content

Similar to Project Mahhhhhhhhhhhhhhhhnagement ppt1.ppt

System Engineering with Project & Risk Management
System Engineering with Project & Risk ManagementSystem Engineering with Project & Risk Management
System Engineering with Project & Risk Management
RAMKUMAR P
 
CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2
Ahmad Ammari
 
Systems development
Systems developmentSystems development
Systems development
Elijah Liu
 
System development life cycle(SDLC) .pdf
System development life cycle(SDLC) .pdfSystem development life cycle(SDLC) .pdf
System development life cycle(SDLC) .pdf
NipunVindula
 
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {Manual}
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {Manual}Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {Manual}
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {Manual}
Mumbai B.Sc.IT Study
 
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Mumbai B.Sc.IT Study
 
Software development life cycle
Software development life cycleSoftware development life cycle
Software development life cycle
Manindra Simhadri
 
Software testing and introduction to quality
Software testing and introduction to qualitySoftware testing and introduction to quality
Software testing and introduction to quality
DhanashriAmbre
 
A CASE Lab Report - Project File on "ATM - Banking System"
A CASE Lab Report - Project File on  "ATM - Banking System"A CASE Lab Report - Project File on  "ATM - Banking System"
A CASE Lab Report - Project File on "ATM - Banking System"
joyousbharat
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )
eshtiyak
 
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docxCRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
faithxdunce63732
 
Requirements Analysis
Requirements AnalysisRequirements Analysis
Requirements Analysis
Sibel Kuzgun AKIN
 
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile ProjectsDOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
Gene Kim
 
Aim crisp handout
Aim crisp handoutAim crisp handout
Aim crisp handout
Surya Maddiboina
 
Software Testing and Quality Assurance Assignment 3
Software Testing and Quality Assurance Assignment 3Software Testing and Quality Assurance Assignment 3
Software Testing and Quality Assurance Assignment 3
Gurpreet singh
 
Quality assuarance bharath anche (1)
Quality assuarance bharath anche (1)Quality assuarance bharath anche (1)
Quality assuarance bharath anche (1)
bharathanche
 
Presentation2
Presentation2Presentation2
Presentation2
Ashams Joseph
 
OpenERP Management system modules
OpenERP Management system modulesOpenERP Management system modules
OpenERP Management system modules
Maxime Chambreuil
 
Problem Solving Methodology 2011 - 2014
Problem Solving Methodology 2011 - 2014Problem Solving Methodology 2011 - 2014
Problem Solving Methodology 2011 - 2014
snoonan
 
7 Tips from Siemens Energy for Success with Automation
7 Tips from Siemens Energy for Success with Automation7 Tips from Siemens Energy for Success with Automation
7 Tips from Siemens Energy for Success with Automation
Worksoft
 

Similar to Project Mahhhhhhhhhhhhhhhhnagement ppt1.ppt (20)

System Engineering with Project & Risk Management
System Engineering with Project & Risk ManagementSystem Engineering with Project & Risk Management
System Engineering with Project & Risk Management
 
CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2
 
Systems development
Systems developmentSystems development
Systems development
 
System development life cycle(SDLC) .pdf
System development life cycle(SDLC) .pdfSystem development life cycle(SDLC) .pdf
System development life cycle(SDLC) .pdf
 
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {Manual}
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {Manual}Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {Manual}
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {Manual}
 
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
Project Management (Practical Qustion Paper) [CBSGS - 75:25 Pattern] {2013-20...
 
Software development life cycle
Software development life cycleSoftware development life cycle
Software development life cycle
 
Software testing and introduction to quality
Software testing and introduction to qualitySoftware testing and introduction to quality
Software testing and introduction to quality
 
A CASE Lab Report - Project File on "ATM - Banking System"
A CASE Lab Report - Project File on  "ATM - Banking System"A CASE Lab Report - Project File on  "ATM - Banking System"
A CASE Lab Report - Project File on "ATM - Banking System"
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )
 
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docxCRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
CRJS466 – Psychopathology and CriminalityUnit 5 Individual Proje.docx
 
Requirements Analysis
Requirements AnalysisRequirements Analysis
Requirements Analysis
 
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile ProjectsDOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
 
Aim crisp handout
Aim crisp handoutAim crisp handout
Aim crisp handout
 
Software Testing and Quality Assurance Assignment 3
Software Testing and Quality Assurance Assignment 3Software Testing and Quality Assurance Assignment 3
Software Testing and Quality Assurance Assignment 3
 
Quality assuarance bharath anche (1)
Quality assuarance bharath anche (1)Quality assuarance bharath anche (1)
Quality assuarance bharath anche (1)
 
Presentation2
Presentation2Presentation2
Presentation2
 
OpenERP Management system modules
OpenERP Management system modulesOpenERP Management system modules
OpenERP Management system modules
 
Problem Solving Methodology 2011 - 2014
Problem Solving Methodology 2011 - 2014Problem Solving Methodology 2011 - 2014
Problem Solving Methodology 2011 - 2014
 
7 Tips from Siemens Energy for Success with Automation
7 Tips from Siemens Energy for Success with Automation7 Tips from Siemens Energy for Success with Automation
7 Tips from Siemens Energy for Success with Automation
 

More from DarrajBrahim1

addieclassedistance-091013042745-phpapp01 (2).ppt
addieclassedistance-091013042745-phpapp01 (2).pptaddieclassedistance-091013042745-phpapp01 (2).ppt
addieclassedistance-091013042745-phpapp01 (2).ppt
DarrajBrahim1
 
cours anatomie et de neurologie de sémiologie de physiologie
cours anatomie et de neurologie de sémiologie de physiologiecours anatomie et de neurologie de sémiologie de physiologie
cours anatomie et de neurologie de sémiologie de physiologie
DarrajBrahim1
 
Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
DarrajBrahim1
 
13. 111111111111111111111Project Management (1).ppt
13. 111111111111111111111Project Management (1).ppt13. 111111111111111111111Project Management (1).ppt
13. 111111111111111111111Project Management (1).ppt
DarrajBrahim1
 
12. 55555555555555Supply Chain Management.ppt
12. 55555555555555Supply Chain Management.ppt12. 55555555555555Supply Chain Management.ppt
12. 55555555555555Supply Chain Management.ppt
DarrajBrahim1
 
08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.ppt08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.ppt
DarrajBrahim1
 
07. 666666666666666666666666666Inventory.ppt
07. 666666666666666666666666666Inventory.ppt07. 666666666666666666666666666Inventory.ppt
07. 666666666666666666666666666Inventory.ppt
DarrajBrahim1
 
06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt
DarrajBrahim1
 
05. 888888888888888888Facility Layout.ppt
05. 888888888888888888Facility Layout.ppt05. 888888888888888888Facility Layout.ppt
05. 888888888888888888Facility Layout.ppt
DarrajBrahim1
 
04. 777777777777777777777Facility Location.ppt
04. 777777777777777777777Facility Location.ppt04. 777777777777777777777Facility Location.ppt
04. 777777777777777777777Facility Location.ppt
DarrajBrahim1
 
03. 333333333333333333333Capacity Planning.ppt
03. 333333333333333333333Capacity Planning.ppt03. 333333333333333333333Capacity Planning.ppt
03. 333333333333333333333Capacity Planning.ppt
DarrajBrahim1
 
01. Forecas333333333333333333333333333333333333333333ting.ppt
01. Forecas333333333333333333333333333333333333333333ting.ppt01. Forecas333333333333333333333333333333333333333333ting.ppt
01. Forecas333333333333333333333333333333333333333333ting.ppt
DarrajBrahim1
 
495144444444444444448888855579986464583.ppt
495144444444444444448888855579986464583.ppt495144444444444444448888855579986464583.ppt
495144444444444444448888855579986464583.ppt
DarrajBrahim1
 
4965464548975554554554455587895468947.ppt
4965464548975554554554455587895468947.ppt4965464548975554554554455587895468947.ppt
4965464548975554554554455587895468947.ppt
DarrajBrahim1
 
Le_Management_d_entreprise_Integrahfl.ppt
Le_Management_d_entreprise_Integrahfl.pptLe_Management_d_entreprise_Integrahfl.ppt
Le_Management_d_entreprise_Integrahfl.ppt
DarrajBrahim1
 
alimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
alimentation dfddddddddddddddddddddddddddddddddddddddddd.pptalimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
alimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
DarrajBrahim1
 

More from DarrajBrahim1 (16)

addieclassedistance-091013042745-phpapp01 (2).ppt
addieclassedistance-091013042745-phpapp01 (2).pptaddieclassedistance-091013042745-phpapp01 (2).ppt
addieclassedistance-091013042745-phpapp01 (2).ppt
 
cours anatomie et de neurologie de sémiologie de physiologie
cours anatomie et de neurologie de sémiologie de physiologiecours anatomie et de neurologie de sémiologie de physiologie
cours anatomie et de neurologie de sémiologie de physiologie
 
Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
 
13. 111111111111111111111Project Management (1).ppt
13. 111111111111111111111Project Management (1).ppt13. 111111111111111111111Project Management (1).ppt
13. 111111111111111111111Project Management (1).ppt
 
12. 55555555555555Supply Chain Management.ppt
12. 55555555555555Supply Chain Management.ppt12. 55555555555555Supply Chain Management.ppt
12. 55555555555555Supply Chain Management.ppt
 
08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.ppt08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.ppt
 
07. 666666666666666666666666666Inventory.ppt
07. 666666666666666666666666666Inventory.ppt07. 666666666666666666666666666Inventory.ppt
07. 666666666666666666666666666Inventory.ppt
 
06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt
 
05. 888888888888888888Facility Layout.ppt
05. 888888888888888888Facility Layout.ppt05. 888888888888888888Facility Layout.ppt
05. 888888888888888888Facility Layout.ppt
 
04. 777777777777777777777Facility Location.ppt
04. 777777777777777777777Facility Location.ppt04. 777777777777777777777Facility Location.ppt
04. 777777777777777777777Facility Location.ppt
 
03. 333333333333333333333Capacity Planning.ppt
03. 333333333333333333333Capacity Planning.ppt03. 333333333333333333333Capacity Planning.ppt
03. 333333333333333333333Capacity Planning.ppt
 
01. Forecas333333333333333333333333333333333333333333ting.ppt
01. Forecas333333333333333333333333333333333333333333ting.ppt01. Forecas333333333333333333333333333333333333333333ting.ppt
01. Forecas333333333333333333333333333333333333333333ting.ppt
 
495144444444444444448888855579986464583.ppt
495144444444444444448888855579986464583.ppt495144444444444444448888855579986464583.ppt
495144444444444444448888855579986464583.ppt
 
4965464548975554554554455587895468947.ppt
4965464548975554554554455587895468947.ppt4965464548975554554554455587895468947.ppt
4965464548975554554554455587895468947.ppt
 
Le_Management_d_entreprise_Integrahfl.ppt
Le_Management_d_entreprise_Integrahfl.pptLe_Management_d_entreprise_Integrahfl.ppt
Le_Management_d_entreprise_Integrahfl.ppt
 
alimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
alimentation dfddddddddddddddddddddddddddddddddddddddddd.pptalimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
alimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
 

Recently uploaded

一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
02tygie
 
UXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdfUXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdf
anthonylin333
 
一比一原版美国北卡罗来纳大学教堂山分校毕业证(UNC学位证)如何办理
一比一原版美国北卡罗来纳大学教堂山分校毕业证(UNC学位证)如何办理一比一原版美国北卡罗来纳大学教堂山分校毕业证(UNC学位证)如何办理
一比一原版美国北卡罗来纳大学教堂山分校毕业证(UNC学位证)如何办理
mjjbdpo2
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
881evgn0
 
一比一原版澳洲查理斯特大学毕业证(CSU学位证)如何办理
一比一原版澳洲查理斯特大学毕业证(CSU学位证)如何办理一比一原版澳洲查理斯特大学毕业证(CSU学位证)如何办理
一比一原版澳洲查理斯特大学毕业证(CSU学位证)如何办理
qa8dk1wm
 
一比一原版(UofT毕业证)加拿大多伦多大学毕业证如何办理
一比一原版(UofT毕业证)加拿大多伦多大学毕业证如何办理一比一原版(UofT毕业证)加拿大多伦多大学毕业证如何办理
一比一原版(UofT毕业证)加拿大多伦多大学毕业证如何办理
bel9p89b
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
Kyungeun Sung
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NishantRathi18
 
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
wkip62b
 
Introduction to User experience design for beginner
Introduction to User experience design for beginnerIntroduction to User experience design for beginner
Introduction to User experience design for beginner
ellemjani
 
一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样
tobbk6s8
 
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
67n7f53
 
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
sf3cfttw
 
一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样
k4krdgxx
 
一比一原版澳洲科廷科技大学毕业证(Curtin毕业证)如何办理
一比一原版澳洲科廷科技大学毕业证(Curtin毕业证)如何办理一比一原版澳洲科廷科技大学毕业证(Curtin毕业证)如何办理
一比一原版澳洲科廷科技大学毕业证(Curtin毕业证)如何办理
bz42w9z0
 
一比一原版(UofM毕业证)美国密歇根大学毕业证如何办理
一比一原版(UofM毕业证)美国密歇根大学毕业证如何办理一比一原版(UofM毕业证)美国密歇根大学毕业证如何办理
一比一原版(UofM毕业证)美国密歇根大学毕业证如何办理
yk5hdsnr
 
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
k4krdgxx
 
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
21uul8se
 
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
wkip62b
 
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
67n7f53
 

Recently uploaded (20)

一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
一比一原版美国加州大学欧文分校毕业证(UCI学位证)如何办理
 
UXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdfUXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdf
 
一比一原版美国北卡罗来纳大学教堂山分校毕业证(UNC学位证)如何办理
一比一原版美国北卡罗来纳大学教堂山分校毕业证(UNC学位证)如何办理一比一原版美国北卡罗来纳大学教堂山分校毕业证(UNC学位证)如何办理
一比一原版美国北卡罗来纳大学教堂山分校毕业证(UNC学位证)如何办理
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
 
一比一原版澳洲查理斯特大学毕业证(CSU学位证)如何办理
一比一原版澳洲查理斯特大学毕业证(CSU学位证)如何办理一比一原版澳洲查理斯特大学毕业证(CSU学位证)如何办理
一比一原版澳洲查理斯特大学毕业证(CSU学位证)如何办理
 
一比一原版(UofT毕业证)加拿大多伦多大学毕业证如何办理
一比一原版(UofT毕业证)加拿大多伦多大学毕业证如何办理一比一原版(UofT毕业证)加拿大多伦多大学毕业证如何办理
一比一原版(UofT毕业证)加拿大多伦多大学毕业证如何办理
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
 
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
 
Introduction to User experience design for beginner
Introduction to User experience design for beginnerIntroduction to User experience design for beginner
Introduction to User experience design for beginner
 
一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样
 
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
 
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
一比一原版美国明尼苏达大学双城分校毕业证(UMTC学位证)如何办理
 
一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样
 
一比一原版澳洲科廷科技大学毕业证(Curtin毕业证)如何办理
一比一原版澳洲科廷科技大学毕业证(Curtin毕业证)如何办理一比一原版澳洲科廷科技大学毕业证(Curtin毕业证)如何办理
一比一原版澳洲科廷科技大学毕业证(Curtin毕业证)如何办理
 
一比一原版(UofM毕业证)美国密歇根大学毕业证如何办理
一比一原版(UofM毕业证)美国密歇根大学毕业证如何办理一比一原版(UofM毕业证)美国密歇根大学毕业证如何办理
一比一原版(UofM毕业证)美国密歇根大学毕业证如何办理
 
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
一比一原版(Deakin毕业证书)澳洲迪肯大学毕业证文凭如何办理
 
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
 
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
一比一原版(UC毕业证书)堪培拉大学毕业证如何办理
 
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
一比一原版(OU毕业证)美国俄克拉荷马大学毕业证如何办理
 

Project Mahhhhhhhhhhhhhhhhnagement ppt1.ppt

  • 1. ITGS AKAM 2015 What is a Project  It is a sequence of unique, complex, and connected activities having one goal or purpose and that must be completed by a specific time, within budget, and according to specification.
  • 2. ITGS AKAM 2015 Project Management  Project Management is a set of principles and tools for defining, planning, and executing, controlling, and completing a project.
  • 3. ITGS AKAM 2015 Why is this important?  Organizes your approach  Generate a credible schedule  Track progress and control your project  Identify where to focus your efforts  Identify problems early-before there are crises  Saves you TIME (and MONEY)
  • 4. ITGS AKAM 2015 Theoretical fundamentals In every project there should be a client, end-user and developer  Client: Is the person or company requesting for the development of the product to make work easier replacing the old system  End user: Is the person who uses the information system directly or uses the information produced by the system  Developer: is the systems analyst who will evaluate the existing system, design the new one, develop it, and evaluate it
  • 5. ITGS AKAM 2015  Data collection techniques for content and product design, citing of sources. Document review Interview Questionnaire Observation
  • 6. ITGS AKAM 2015  Role of testing and processes used Final products can be tested using  Normal Data e.g Age 0-130  Invalid Data e.g Age -15  Extreme Data e.g Age 167  Testing usually occurs before a system is delivered to the client after 'live data' has been used  If the system were to fail the testing phase, the analyst would have to re-research, re- analyse and re-design the system.
  • 7. ITGS AKAM 2015  Product development and technical documentation. Two documentation can be produced  User Documentation: Is written to help the user of the new system work with the new system and how to fix any problems.  Technical Documentation: Is written to help other system analyst who at a later point in time might be hired to update the system. This may include hardware, software, data structures, expected inputs, data validation/verification methods, and processing details.  End-user training: Once a system has been completed, the system analyst should develop a simple training manual.
  • 8. ITGS AKAM 2015 The product development life cycle (PDLC)  Investigation of existing system (s)  Feasibility study  Requirements specification  Project schedule  Product design  Product development and technical documentation  Client and end-user evaluation
  • 9. Investigation of Existing System ITGS AKAM 2015 •There are four main ways a system analyst can use to investigate existing systems: •Reading existing documentation •Interview existing users •Questionnaires •Watching the existing software in use
  • 10. Feasibility Study ITGS AKAM 2015 A feasibility study encapsulates various topics which discuss whether or not it is possible to create the new system. The system analyst usually discusses if the proposed system is economically viable, if the technology exists to create the new system, and time it will take to plan, design and manufacture the new system.
  • 11. Requirements Specification ITGS AKAM 2015 The requirements specification is a document produced by the system analyst which is created after all the primary and secondary data have been recorded and analysed. The requirements specification specifies what the new systems capability and limitations should be, and is used to evaluate whether or not the new system is deemed a success or a failure.
  • 12. Project Schedule ITGS AKAM 2015 As the name suggests project schedule is the time frame, drawn up by the systems analyst, in which he will have to complete the new system.
  • 13. Product design ITGS AKAM 2015 When designing the new system, the system analyst needs to decide on the method of input used in the new system. • Manually: Paper forms, or directly inputting data into an on- screen form. • Automatically: Using a bar-code scanner or a card scanner. After which, the system analyst needs to draw up some prototypes of the input forms and present it to his client, which will then accept the prototype as it is or ask the systems analyst to make any changes the client deems necessary. After the input form has been created, the systems analyst then needs to create the system itself. The system should include data validation and verification methods, and the output methods, (on-screen or printed).
  • 14. Product Development and Documentation ITGS AKAM 2015 Product is developed and two user documents produced: • User Documentation: User documentation is written to help the user of the new system work with the new system and how to fix any problems. • Technical Documentation: Technical documentation is written to help other system analyst who at a later point in time might be hired to update the system.
  • 15. Client and end user evaluation ITGS AKAM 2015 The end-user evaluation consists of evaluating how efficient, how easy to use and if the system is appropriate for the business and if it meets the standards. By • Checking against the requirements specification to check if the system does everything it was set out to do in the beginning. • Checking the users' response. Is the system easy to use? Does it make work easier? Can any improvements be made? The evaluation can be made through the use of questionnaires, interviews and by observing the users in action. The data can then be analysed and evaluated to help in the improvement of the system.
  • 16. ITGS AKAM 2015 Criterion A: Initial investigation and initial consultation with client The key questions in this stage;  Who is your client?  What is the present situation?  What are the inadequacies of the present situation? The above is obtained in a written record of the interview, a sound file, a video, or an exchange of emails supported by a questionnaire.
  • 17. ITGS AKAM 2015 The investigation will have the following important independent sections a) Interview question and responses (not graded) b) Interview Summary (not graded) c) Criterion A: Initial investigation (Appro. 250 words and graded) Criterion A is built from a) and b)
  • 18. ITGS AKAM 2015 Interview Questions Activity Interview questions should be open ended  Each student to write down any two interview questions that you have or will use with their clients
  • 19. ITGS AKAM 2015 Interview Summary After the interview response have been written the a interview summary should be written Activity  Use the handout provided to write down some questions that you think were used to develop the interview summary.
  • 20. ITGS AKAM 2015 Compare the Questions  What problem (s) does do you face in your position as Head of ICT?  Do you know of any examples of students breaking the rules that had serious consequences?  How could an IT solution solve the problem?  Do you have any ideas ?
  • 21. ITGS AKAM 2015 Criterion A: Initial Investigation Read the sample initial investigation posted Use your some of your interview responses to draft the initial investigation in pairs.