Capacity Planning
Capacity refers to an upper limit or ceiling on the
load that an operating unit can handle
The basic questions are:
• What kind of capacity is needed?
• How much is needed?
• When it is needed?
 Impact on the ability of the organization to meet future
demands for products & services
 Major determinant of initial cost – greater the capacity,
larger the investment
 Can affect competitiveness – excess capacity or flexible
capacity
 Affects the ease of management
Design Capacity: maximum attainable output
Effective Capacity: maximum possible output with
scheduling difficulties, machine maintenance & so on
Utilization is always less than efficiency
capacity
Effective
output
Actual
Efficiency 
capacity
Design
output
Actual
n
Utilizatio 
Capacity Planning
Determinants of Effective Capacity
Facilities
• Design – including size & provision of expansion
• Location – transportation cost, distance to market, labor supply
• Layout – smoothness of flow, as will as lighting & ventilation
Capacity Planning
Product / services
• Design – easier the design, easier to produce
• Product Mix – varieties of product reduce capacity
Process
• Quantity – obvious determinant of capacity
• Quality – low quality will require inspection & rework
Determinants of Effective Capacity
Human Factor
• Job content
• Training/Experience
• Motivation
• Compensation
Capacity Planning
Operational
• Scheduling differences in equipment capabilities
• Materials management – shortage of materials/ complaints
• Quality assurance – in process & incoming materials
External
• Product standard – can restricts increasing capacity
• Safety regulations
• Unions
Capacity Requirement
Long term – relates to overall level of capacity e.g., facility size
Short term – relates to probable variations e.g., seasonal, random
Determined by forecasting demand over a time horizon, and then
converting those forecasts into capacity requirement
Trend
- How long
- Slope of trend
Deviations are important as they can place severe strain to satisfy
demand at sometimes & yet result in idle capacity at other times
Capacity Planning
Developing Capacity Alternatives
Design flexibility into systems
Provisions for future expansions in the original design
Capacity Planning
Differentiate between new and matured products/services
Matured product/services tends to be more predictable
Prepare to deal with capacity chunks
Capacity increases are often acquired in fairly large chunks
Attempt to smooth out capacity requirement
Need to identify products which can offset each other
Identify the optimal operation level
In terms of unit cost of output
Evaluating Alternatives
Cost volume Analysis
Total cost VC
FC
TC 

Variable cost U
Q
VC *

Total revenue R
Q
TR *

Total Profit
FC
U
R
Q 

 )
(
*
TC
TR
P 

U
R
FC
P
Q



U
R
FC
Q


For breakeven
Financial Analysis
• Pay back period
• Net present value
• Internal rate of return
Capacity Planning

More Related Content

Similar to 03. 333333333333333333333Capacity Planning.ppt

Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and servicesgerlyn bonus
 
Standardization(work study & measurement)
Standardization(work study & measurement)Standardization(work study & measurement)
Standardization(work study & measurement)Nisarg Shah
 
Operations strategy
Operations strategy Operations strategy
Operations strategy Petre Vane
 
LECTURE 6 - PROCESS & CAPACITY DESIGN.ppt
LECTURE 6 - PROCESS & CAPACITY DESIGN.pptLECTURE 6 - PROCESS & CAPACITY DESIGN.ppt
LECTURE 6 - PROCESS & CAPACITY DESIGN.pptMehrNawaz1
 
Operation management
Operation managementOperation management
Operation managementMamta Karanji
 
Capacity planning chapter 8
Capacity planning chapter 8Capacity planning chapter 8
Capacity planning chapter 8Yonela Gaba
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
Capacity resource planning and production scheduling
Capacity resource planning and production schedulingCapacity resource planning and production scheduling
Capacity resource planning and production schedulingdutconsult
 
Case study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industryCase study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industryiasaglobal
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs SAJJAD KHUDHUR ABBAS
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningMOHD ARISH
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs SAJJAD KHUDHUR ABBAS
 
Oil-Refinery Planning & Scheduling Optimization
Oil-Refinery Planning & Scheduling OptimizationOil-Refinery Planning & Scheduling Optimization
Oil-Refinery Planning & Scheduling OptimizationAlkis Vazacopoulos
 
Production managment
Production managmentProduction managment
Production managmentAamir Shaikh
 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptxhafidhisaidi
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGVijit Gajbhiye
 

Similar to 03. 333333333333333333333Capacity Planning.ppt (20)

Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
Standardization(work study & measurement)
Standardization(work study & measurement)Standardization(work study & measurement)
Standardization(work study & measurement)
 
Operations strategy
Operations strategy Operations strategy
Operations strategy
 
LECTURE 6 - PROCESS & CAPACITY DESIGN.ppt
LECTURE 6 - PROCESS & CAPACITY DESIGN.pptLECTURE 6 - PROCESS & CAPACITY DESIGN.ppt
LECTURE 6 - PROCESS & CAPACITY DESIGN.ppt
 
Operation management
Operation managementOperation management
Operation management
 
Capacity planning chapter 8
Capacity planning chapter 8Capacity planning chapter 8
Capacity planning chapter 8
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
Capacity resource planning and production scheduling
Capacity resource planning and production schedulingCapacity resource planning and production scheduling
Capacity resource planning and production scheduling
 
Case study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industryCase study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industry
 
Chapter 9
Chapter 9Chapter 9
Chapter 9
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs
 
Oil-Refinery Planning & Scheduling Optimization
Oil-Refinery Planning & Scheduling OptimizationOil-Refinery Planning & Scheduling Optimization
Oil-Refinery Planning & Scheduling Optimization
 
Production managment
Production managmentProduction managment
Production managment
 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptx
 
Introduction
IntroductionIntroduction
Introduction
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNING
 

More from DarrajBrahim1

Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...DarrajBrahim1
 
13. 111111111111111111111Project Management (1).ppt
13. 111111111111111111111Project Management (1).ppt13. 111111111111111111111Project Management (1).ppt
13. 111111111111111111111Project Management (1).pptDarrajBrahim1
 
12. 55555555555555Supply Chain Management.ppt
12. 55555555555555Supply Chain Management.ppt12. 55555555555555Supply Chain Management.ppt
12. 55555555555555Supply Chain Management.pptDarrajBrahim1
 
08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.ppt08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.pptDarrajBrahim1
 
07. 666666666666666666666666666Inventory.ppt
07. 666666666666666666666666666Inventory.ppt07. 666666666666666666666666666Inventory.ppt
07. 666666666666666666666666666Inventory.pptDarrajBrahim1
 
06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.pptDarrajBrahim1
 
05. 888888888888888888Facility Layout.ppt
05. 888888888888888888Facility Layout.ppt05. 888888888888888888Facility Layout.ppt
05. 888888888888888888Facility Layout.pptDarrajBrahim1
 
04. 777777777777777777777Facility Location.ppt
04. 777777777777777777777Facility Location.ppt04. 777777777777777777777Facility Location.ppt
04. 777777777777777777777Facility Location.pptDarrajBrahim1
 
01. Forecas333333333333333333333333333333333333333333ting.ppt
01. Forecas333333333333333333333333333333333333333333ting.ppt01. Forecas333333333333333333333333333333333333333333ting.ppt
01. Forecas333333333333333333333333333333333333333333ting.pptDarrajBrahim1
 
Project Mahhhhhhhhhhhhhhhhnagement ppt1.ppt
Project Mahhhhhhhhhhhhhhhhnagement ppt1.pptProject Mahhhhhhhhhhhhhhhhnagement ppt1.ppt
Project Mahhhhhhhhhhhhhhhhnagement ppt1.pptDarrajBrahim1
 
495144444444444444448888855579986464583.ppt
495144444444444444448888855579986464583.ppt495144444444444444448888855579986464583.ppt
495144444444444444448888855579986464583.pptDarrajBrahim1
 
4965464548975554554554455587895468947.ppt
4965464548975554554554455587895468947.ppt4965464548975554554554455587895468947.ppt
4965464548975554554554455587895468947.pptDarrajBrahim1
 
Le_Management_d_entreprise_Integrahfl.ppt
Le_Management_d_entreprise_Integrahfl.pptLe_Management_d_entreprise_Integrahfl.ppt
Le_Management_d_entreprise_Integrahfl.pptDarrajBrahim1
 
alimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
alimentation dfddddddddddddddddddddddddddddddddddddddddd.pptalimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
alimentation dfddddddddddddddddddddddddddddddddddddddddd.pptDarrajBrahim1
 

More from DarrajBrahim1 (14)

Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
Body Part5555555555555555555555555555555s Vocabulary - Spanish - Foreign Lang...
 
13. 111111111111111111111Project Management (1).ppt
13. 111111111111111111111Project Management (1).ppt13. 111111111111111111111Project Management (1).ppt
13. 111111111111111111111Project Management (1).ppt
 
12. 55555555555555Supply Chain Management.ppt
12. 55555555555555Supply Chain Management.ppt12. 55555555555555Supply Chain Management.ppt
12. 55555555555555Supply Chain Management.ppt
 
08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.ppt08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.ppt
 
07. 666666666666666666666666666Inventory.ppt
07. 666666666666666666666666666Inventory.ppt07. 666666666666666666666666666Inventory.ppt
07. 666666666666666666666666666Inventory.ppt
 
06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt
 
05. 888888888888888888Facility Layout.ppt
05. 888888888888888888Facility Layout.ppt05. 888888888888888888Facility Layout.ppt
05. 888888888888888888Facility Layout.ppt
 
04. 777777777777777777777Facility Location.ppt
04. 777777777777777777777Facility Location.ppt04. 777777777777777777777Facility Location.ppt
04. 777777777777777777777Facility Location.ppt
 
01. Forecas333333333333333333333333333333333333333333ting.ppt
01. Forecas333333333333333333333333333333333333333333ting.ppt01. Forecas333333333333333333333333333333333333333333ting.ppt
01. Forecas333333333333333333333333333333333333333333ting.ppt
 
Project Mahhhhhhhhhhhhhhhhnagement ppt1.ppt
Project Mahhhhhhhhhhhhhhhhnagement ppt1.pptProject Mahhhhhhhhhhhhhhhhnagement ppt1.ppt
Project Mahhhhhhhhhhhhhhhhnagement ppt1.ppt
 
495144444444444444448888855579986464583.ppt
495144444444444444448888855579986464583.ppt495144444444444444448888855579986464583.ppt
495144444444444444448888855579986464583.ppt
 
4965464548975554554554455587895468947.ppt
4965464548975554554554455587895468947.ppt4965464548975554554554455587895468947.ppt
4965464548975554554554455587895468947.ppt
 
Le_Management_d_entreprise_Integrahfl.ppt
Le_Management_d_entreprise_Integrahfl.pptLe_Management_d_entreprise_Integrahfl.ppt
Le_Management_d_entreprise_Integrahfl.ppt
 
alimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
alimentation dfddddddddddddddddddddddddddddddddddddddddd.pptalimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
alimentation dfddddddddddddddddddddddddddddddddddddddddd.ppt
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

03. 333333333333333333333Capacity Planning.ppt

  • 1. Capacity Planning Capacity refers to an upper limit or ceiling on the load that an operating unit can handle The basic questions are: • What kind of capacity is needed? • How much is needed? • When it is needed?  Impact on the ability of the organization to meet future demands for products & services  Major determinant of initial cost – greater the capacity, larger the investment  Can affect competitiveness – excess capacity or flexible capacity  Affects the ease of management
  • 2. Design Capacity: maximum attainable output Effective Capacity: maximum possible output with scheduling difficulties, machine maintenance & so on Utilization is always less than efficiency capacity Effective output Actual Efficiency  capacity Design output Actual n Utilizatio  Capacity Planning
  • 3. Determinants of Effective Capacity Facilities • Design – including size & provision of expansion • Location – transportation cost, distance to market, labor supply • Layout – smoothness of flow, as will as lighting & ventilation Capacity Planning Product / services • Design – easier the design, easier to produce • Product Mix – varieties of product reduce capacity Process • Quantity – obvious determinant of capacity • Quality – low quality will require inspection & rework
  • 4. Determinants of Effective Capacity Human Factor • Job content • Training/Experience • Motivation • Compensation Capacity Planning Operational • Scheduling differences in equipment capabilities • Materials management – shortage of materials/ complaints • Quality assurance – in process & incoming materials External • Product standard – can restricts increasing capacity • Safety regulations • Unions
  • 5. Capacity Requirement Long term – relates to overall level of capacity e.g., facility size Short term – relates to probable variations e.g., seasonal, random Determined by forecasting demand over a time horizon, and then converting those forecasts into capacity requirement Trend - How long - Slope of trend Deviations are important as they can place severe strain to satisfy demand at sometimes & yet result in idle capacity at other times Capacity Planning
  • 6. Developing Capacity Alternatives Design flexibility into systems Provisions for future expansions in the original design Capacity Planning Differentiate between new and matured products/services Matured product/services tends to be more predictable Prepare to deal with capacity chunks Capacity increases are often acquired in fairly large chunks Attempt to smooth out capacity requirement Need to identify products which can offset each other Identify the optimal operation level In terms of unit cost of output
  • 7. Evaluating Alternatives Cost volume Analysis Total cost VC FC TC   Variable cost U Q VC *  Total revenue R Q TR *  Total Profit FC U R Q    ) ( * TC TR P   U R FC P Q    U R FC Q   For breakeven Financial Analysis • Pay back period • Net present value • Internal rate of return Capacity Planning