1. Renovation Complex Project on Gas Pipeline Asia-Europe All-round Automation, Electric systems, Fire Protection system control.
2. Gas Pipeline Asia-Europe Kassel München Saarbrücken Stuttgart Bayerngas Budget $52 million, Profit up to 30% Scope of work – 5 Compression Station, 20 Turbo Set+ centrifugal compression machine +package supported equipment +automatic, electric, fire protection systems, all-round automaton. Project Manager Konstantin Grigoryev
3.
4.
5.
6.
7.
8. Low Voltage Complete Plant (LVCP) LVCP provide full control switch on/off fan air cooling equipment air cooling , including soft start, vibration control cooling equipment . Provide commutation electro drives, current control of el. drives on start transient regime, regulation rotation speed , vibration protection, overload and insulation protection, thermo protection. LVCP designed on the basis of Simatic and element of Siemens's equipment . Communication on PROFIBUS .
9.
10.
11. SWITCHING SYSTEM (SS ) Serve for communication process of automatic system . Consist kit of communication network ( optical converter, network switch) Simplify assembling and service of automatic system.