• GAIL Limited is the largest state-owned natural gas processing
and distribution company in India declared by Govt. Of India.
• It is headquartered in New Delhi.
• It has six segments: Transmission services of natural gas &
liquefied petroleum gas(LPG)
• Natural gas trading, Petrochemicals, LPG
• Liquid hydrocarbon
• GAILTEL
• and others.
Gas authority of India Limited
• The gas sector infrastructure of gail is as follows:
•
• 1984 - The Birth of GAIL
• 1987 - HAZIRA VIJAIPUR JAGDISHPUR P/L
commissioned
• 1990 - Entry in LPG Processing
• 1997 - Achieved youngest Navratan Status
• 1997 - Entered in CNG Network
• 1999 - Entry Petrochemical Processing
• 2001 - Commissioned world largest LPG P/L
• 2004 - Import of LPG
• 2008 - Augmentation of Gas P/L Net work
• 2011 - Declared world No. 1 Co. in DS operation
• 2011 - MNC deal for Gas Contracts
• 2012 - New P/L dedication up to Bhatinda
• 2013 - P/L expansion in Uttrakhand
• 2013 - Declared Youngest MAHARATAN Co.
• (Top 5) by Govt. of India
•
Number of projects undertaken :-
• Study the CATHODIC PROTECTION OF
PIPELINE .
• Study the working of PIGGING SYSTEM, Types
of PIG And Pigging.
• List all the Mechanical Equipments with their
specification.
1. LPG is a liquid under pressure but a gas at ambient
conditions.
2. Vapour LPG is twice as heavy as air.
3. Liquid LPG is half as heavy as water.
4. LPG is colorless.
5. LPG has a low boiling point of - 6°C
6. LPG has a narrow flammability range between 1.8 to 9.5%
in air.
7. Flash point of LPG is -60°C.
8. The approximate minimum ignition temperature of LPG is
in the range 410°C to 580°C.
Properties of LPG
9) LPG is odourless.
10) Ethyl Mercaptan is added as an odourant to
detect LPG in case of leaks.
11) LPG is non-toxic.
12) It is lightly anaesthetic and can cause
suffocation, if present in sufficiently high
concentrations.
13) Liquid LPG can cause severe cold burns to the
skin owing to rapid vapourisation and the
consequent lowering of temperature.
Requirment of LPG pipeline
•Cost Benefit
•Continous flow
•Easy transportation
•Avoid delay in supply
•To reduce traffic on Road
•Prevent accident on Road
•In 2001, GAIL commissioned world’s longest and India’s first Cross
Country LPG
•Transmission Pipeline from Jamnagar to Loni .
•JAMNAGAR – LONI LPG PIPELINE, the world’s longest exclusive LPG
pipeline (1355 Km) & inaugurated for the commencement LPG
supply to oil companies on 24/12/2000.
•JLPL is the longest pipeline network in the world of 1335 km long,
where main line is 1244 km and spur line is 91 km.
•The pipeline is design to carry LPG and the capacity is 2.5 MMTPA.
•JLPL is used for LPG transportation.
JLPL pipeline
JLPL PIPELINE
State wise pipeline length :-
Gujarat- 578 KM
Rajasthan- 686 KM
Haryana- 98 KM
Delhi- 5 KM
UP- 48 KM
Total- 1414 KM
Size wise pipeline length :-
• 16” - 578.1 KM
• 14” - 166.7 KM
• 12” - 439.0 KM
• 10” - 58.67 KM
• 8” - 114.3 KM
• 6” - 43.3 KM
• 4” - 13.6 KM
Total - 1414 KM
This pipeline mainly comprises of:-
A. 4 Intermediate Pumping Station(IPS) - Which are
responsible for increasing the pressure to a limit so
that it can be on the next pumping station and
further-
1. SAMAKHALI
2. ABUROAD
3. NASIRABAD
4. MANSARAMPURA
B. Receiving Terminal(RT) - Places which we tap the LPG
so that it can be supplied to various oil companies-
•IOCL - 4
•BPCL - 4
•HPCL – 2
Most of the Terminals are having the arrangements for:-
1. Filtration Facilities
2. Temperature Control Facilities
3. Pressure Control Facilities
4. Measurement System
5. Pigging arrangement as per need
6. Fire fighting Network
7. Tap off arrangement
C. Sectionalizing Valves (SV) Stations-
1) Responsible for isolating the PL in case of emergency.
2) JLPL project has a total of 73 SV stations.
3) Responsible for isolating the p/ L case of emergency .
4) SV’s are installed at an average distance of 20 km all
along the pipeline
D. Crossing-
1) Rail -27
2) Road -198
3) Water bodies-149
4) HT-125
5) Foreign PL -113
E. 4 Intermediate Pigging Station:-
1) IP 1 ( Between Samakhali – Abu Road P/L Section)
2) IP 2 ( Between Abu Road – Nasirabad p/L Section)
3) IP 3 ( At Mansarampura)
4) IP 4 ( Between Mansarampura – Loni P/L Section)
Project cost : RS 1250 Crores
PIPELINE SECTION THROUGHPUT
MMPTA
FLOW RATE
TONS/HR
KANDLA TO SMK 0.5 63.33
SAMAKHIALI TO ABU ROAD 2.5 316.65
ABU ROAD TO NASIRABAD 2.5 316.65
NASIRABAD TO MANSARAMPURA 2.2 278.65
MANSARAMPURA TO LONI 2.0 253.32
FLOW RATE
Mechanical equipment used at IPS
MANSARAMPURA
• Booster pump/centrifugal pump
• Basket filter
• Mass flow meter
• Main jockey
• Main fire water pump
• Fire water tank
• Diesel storage tank
• Diesel transfer pump
• Scraper receiver
• Scraper launcher
Centrifugal Pump
• Centrifugal pump is basically a machine which is intended to
raise the pressure of an incompressible liquid from an
external source.
• Its purpose is to convert energy of a prime mover (a electric
motor or turbine) first into kinetic energy and then into
pressure energy of a fluid that is being pumped
• The energy changes occur by virtue of two main parts of the
pump, the impeller and the volute or diffuser.
• The impeller is the rotating part that converts driver energy
into the kinetic energy. Diffuser is the stationary part that
converts the kinetic energy into pressure energy..
Cenrifugal pump
Specification of Cenrifugal pump
• Pump manufacturer - DAVID BROWN
• Pump size - 6*8*10.5 B
• Model -DB 36 Multi stg. Centifugal Pump
• Number of stages – 10
• Suction pressure – 21 kg/cm2
• Discharge pressure – 70 to80kg/cm2
• Pumping temperature – 15 C normal 25 C max.
• Head – 1180m
• Capacity (normal/ rated) – 177/195 m3/hr
• Rated speed – 3420 rpm
• There are no drive seals, therefore the risk of leaks is
completely eradicated.
• Less heat transfer from the motor—
the pump chamber is separated from the motor by
an air gap; this provides a thermal barrier.
• Reduced friction
• Complete separation of the liquid means that liquid
cannot seep into the motor from the pump.
Advantages
Introduction to Pigging system
1) Pigging refers to the practice of using pipeline
inspection gauges or 'pigs' to perform various
maintenance operations on a pipeline.
2) This is done without stopping the flow of the product
in the pipeline.
3) These operations include cleaning and inspecting of
the pipeline.
Working of PIGGING System:-
1) This is accomplished by inserting the pig into a
'pig launcher' (or 'launching station')
2) The launcher / launching station is then closed
and the pressure-driven flow of the product in
the pipeline is used to push it along down the
pipe until it reaches the receiving trap – the 'pig
catcher' (or receiving station).
Thelauncher& Receivingarea:
TYPES OF PIG
Pigs can be broadly divided into four categories:
1) Foam pigs: which is used to remove moisture,
condensate etc.. this is a type of pig by which, it is
analysis that whether the pipe is thoroughly
cleaned or not.
2) Brush and Magnetic Pigs: which are used to clean
magnetic impurities from pipes. in case when form
pig fails to protect pipeline from unwanted dirt, dust
etc., then brush pigs are used.
3) Gauge pigs: which is used to check whether it
is applicable for intelligent pigging.
4 ) Magnetic Flux Leakage: which is used for
intelligent pigging .In the IPS use in determining the
thickness, anomalies, holes etc. in pipelines.
Types of PIGGING:-
1) Cleaning Pigging- In this pigging Foam pig
of respective pipe diameter is launched
directly into the pipes who serve normal
cleaning of pipes.
2) Intelligent Pigging- In this pigging process a
special types of pigs equipped with various
sensors to detect the various conditions of pipe
eg. Thickness of pipe range, ultrasonic sensing,
bend, and accumulation of sludge.
Some of the pigs after pigging :-
CATHODIC PROTECTION OF
PIPELINES
CORROSION
• WHAT IS CORROSION.
• DEGRADATION OF MATERIAL THRU
ENVIORMENTAL INTERACTION.
• FOCUS ON CORROSION OF CARBON STEEL
USED IN UNDERGROUND PIPELINES.
• WHEN IRON IS PLACED IN SOIL/WATER.
In order to prevent corrosion there are
coating used like iron is coated by zinc or
simply grease, paint, plastic is used. In
many cases there are cathode protection
used where a noble metal is connected to
a less noble and potential applied
FOUR COMPONENTS FOR CORROSION
CELL
• THERE MUST BE AN ANODE
• THERE MUST BE A CATHODE.
• THERE MUST BE A ELECTRICAL PATH
(PIPELINE ITSELF)
• THERE MUST BE A CONDUCTIVE
ELECTROLYTE (WATER/SOIL)
CATHODIC PROTECTION
• WE HAD SEEN THAT
• CORROSION TAKES PLACE AT ANODES.
• NO CORROSION AT CATHODES.
• DIFFERENT CORROSION CELLS ON PIPELINE.
WHAT WILL HAPPEN , IF WE MAKE
-THE WHOLE PIPELINE AS CATHODE.
NO CORROSION WILL TAKE PLACE..
HOW WE CAN MAKE
-BY MAKING IT CATHODE W.R.T. OTHER METAL
--BY MAKING IT TO COLLECT CURRENT FROM ANODE.
-WHEN WE MAKE ANY PIPELINE/STRUCTURE AS A
CATHODE W.R.T SOME METAL/ANODE
-IT IS CALLED CATHODIC PROTECTION.
CATHODIC PROTECTION- HOW IT WORKS
• PRINCIPLE
– DIRECT CURRENT IS MADE TO FLOW FROM EXTERNAL
SOURCE TO P/L
– THE PIPELINE IS MADE TO COLLECT CURRENT BY MAKING
IT CATHODE
– THE EXTERNAL CURRENT IS ADUSTED TO OVERPOWER THE
CORROSION CURRENT.
– RESULTING IN A NET FLOW OF CURRENT ONTO PIPELINE .
– ENTIRE P/L SURFACE BECOMES CATHODIC AND
PROTECTION COMPLETED.
GROUND BED
+IVE
-VE
TR UNIT/C.P
SOURCE
BURRIED PIPELINE
CURRENT
FLOW
ELECTROLYTE/
SOIL
FIG : BASIC CATHODIC PROTECTION INSTALLATION
TYPES OF CP SYSTEM
• SACRIFICIAL ANODE SYSTEM
• IMPRESSED CURRENT SYSTEM
Sacrificial CP System
Sacrificial Anode Pipeline
Current
Practical Galvanic Series for Metals in Neutral
Soil and WaterMETAL POTENTIAL V (CSE)
Mill Scale On Steel - 0.2
Mild Steel In Concrete - 0.2
Lead 0.5
Mild Steel (Rusted) - 0.5
Mild Steel (Clean and Shiny) - 0.5 to - 0.8
Aluminum Alloy (5% Zinc) - 1.05
Zinc - 1.1
Magnesium Alloy (6% Al, 3%
Zn, 0.15% Mn)
- 1.6
Commercially Pure
Magnesium
-1.75
Impressed Current CP System
Impressed current Anode Pipeline
Current
DC Power
Source+ -
ENVIRONMENT CURRENT DENSITY IN
mA/m2
WELL-AERATED NEUTRAL SOIL 21.5 – 32.3
DRY, WELL-AERATED SOIL 5.4 – 16.1
WET, SOIL, MODERATE/SEVERE
CONDITIONS
26.9 – 64.6
HIGHLY ACID SOIL 53.8 – 161.4
STATIONARY FRESH WATER 53.8
MOVING FRESH WATER 53.8 – 64.6
WELL COATED PIPELINE IN
SOILS
0.01
CURRENT REQUIREMENTS FOR STEEL
TYPES OF ANODE BEDS
• HORIZONTAL ANODE BED
• VERTICAL ANODE BED
• DEEP WELL ANODE BED
Horizontal Anode Bed
3m 6m 0.4m
Ground Level
Anode cable Coke
1.1m 0.75m Section
Vertical Anode Bed
6m 0.4m
1.1m 0.75m
Anode cable Coke Section
Deep well Anode
Bed
10 m
1.0 m
1.0m
Anode cable
Coke
Section
0.3 m
O&M Base Jurisdiction:
IPS, Mansarampura
Scheduled activities of LPG Pipeline
as per Maintenance policy
Guidelines.
 Normal PIGGING : Frequency – Yearly
 INTELLIGENT PIGGING: Frequency – 10 Years
 Helicopter / Aerial Surveillance- Monthly
Foot Patrolling:
 Foot Patrolling by Security Agency personnel: Daily
 Yearly foot patrolling by GAIL officials after
monsoon
 4) Coating Integrity Survey : Quaterly
 5) Thickness Measurement Survey : 2 times in a year
 6) IDENTIFICATION AND MONITORING OF
VULNERABLE LOCATIONS: Monthly
ANY QUERIES ??

More Related Content

What's hot

Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...
Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...
Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...Subodh Maithani
 
City gas distribution
City gas distributionCity gas distribution
City gas distributionSneha Santra
 
CNG NETWORK PPT.pdf
CNG NETWORK PPT.pdfCNG NETWORK PPT.pdf
CNG NETWORK PPT.pdfARHANMOHSIN
 
T4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety StandardsT4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety StandardsAbhishek Padiyar
 
project on enhancement of LPG recovery, GAIL
project on enhancement of LPG recovery, GAILproject on enhancement of LPG recovery, GAIL
project on enhancement of LPG recovery, GAILKumar Sanu Mahato
 
AGL Report
AGL ReportAGL Report
AGL ReportArpit Gour
 
Ongc report
Ongc reportOngc report
Ongc reportPATEL DEEP
 
Project report in gail(india) limited prakash
Project report in gail(india) limited prakashProject report in gail(india) limited prakash
Project report in gail(india) limited prakashPrakash Chand Baliwal
 
Industrial training at Indian Oil Corporation Limited (IOCL) Noonmati
Industrial training at Indian Oil Corporation Limited (IOCL) NoonmatiIndustrial training at Indian Oil Corporation Limited (IOCL) Noonmati
Industrial training at Indian Oil Corporation Limited (IOCL) NoonmatiPriyam Jyoti Borah
 
Summer Training Report
Summer Training ReportSummer Training Report
Summer Training Reportritu sharma
 
GAIL summer training report......
GAIL summer training report......GAIL summer training report......
GAIL summer training report......Navin Dixit
 
Steel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industrySteel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industryAkshay Toraskar
 
Project report ankur rawal june2011
Project report ankur rawal june2011Project report ankur rawal june2011
Project report ankur rawal june2011Qualisys
 
Summer Training Report,Oil India Limited
Summer Training Report,Oil India LimitedSummer Training Report,Oil India Limited
Summer Training Report,Oil India LimitedRijumoni Boro
 
Project Report in GAIL(India) Limited_Prakash
Project Report in GAIL(India) Limited_PrakashProject Report in GAIL(India) Limited_Prakash
Project Report in GAIL(India) Limited_PrakashPrakash Chand Baliwal
 
Project training report
Project training report Project training report
Project training report Nishant Kumar
 
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...Mohit Dhull
 
Akhilesh ongc report
Akhilesh ongc reportAkhilesh ongc report
Akhilesh ongc reportAKHILESH KUMAR
 
GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex neeraj prasad
 

What's hot (20)

Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...
Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...
Demand Analysis And Selection Of City For Cgd Network Establishment On Propos...
 
City gas distribution
City gas distributionCity gas distribution
City gas distribution
 
CNG NETWORK PPT.pdf
CNG NETWORK PPT.pdfCNG NETWORK PPT.pdf
CNG NETWORK PPT.pdf
 
T4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety StandardsT4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety Standards
 
project on enhancement of LPG recovery, GAIL
project on enhancement of LPG recovery, GAILproject on enhancement of LPG recovery, GAIL
project on enhancement of LPG recovery, GAIL
 
AGL Report
AGL ReportAGL Report
AGL Report
 
Ongc report
Ongc reportOngc report
Ongc report
 
Project report in gail(india) limited prakash
Project report in gail(india) limited prakashProject report in gail(india) limited prakash
Project report in gail(india) limited prakash
 
Industrial training at Indian Oil Corporation Limited (IOCL) Noonmati
Industrial training at Indian Oil Corporation Limited (IOCL) NoonmatiIndustrial training at Indian Oil Corporation Limited (IOCL) Noonmati
Industrial training at Indian Oil Corporation Limited (IOCL) Noonmati
 
Summer Training Report
Summer Training ReportSummer Training Report
Summer Training Report
 
GAIL summer training report......
GAIL summer training report......GAIL summer training report......
GAIL summer training report......
 
Steel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industrySteel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industry
 
Project report ankur rawal june2011
Project report ankur rawal june2011Project report ankur rawal june2011
Project report ankur rawal june2011
 
Summer Training Report,Oil India Limited
Summer Training Report,Oil India LimitedSummer Training Report,Oil India Limited
Summer Training Report,Oil India Limited
 
Project Report in GAIL(India) Limited_Prakash
Project Report in GAIL(India) Limited_PrakashProject Report in GAIL(India) Limited_Prakash
Project Report in GAIL(India) Limited_Prakash
 
Project training report
Project training report Project training report
Project training report
 
Draft vol. ii
Draft vol. iiDraft vol. ii
Draft vol. ii
 
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
 
Akhilesh ongc report
Akhilesh ongc reportAkhilesh ongc report
Akhilesh ongc report
 
GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex
 

Similar to Presentation1

Coal Handling Plants....
Coal Handling Plants....Coal Handling Plants....
Coal Handling Plants....Vipul Sinha
 
Deepak kohli rsmml traning report
Deepak kohli rsmml traning reportDeepak kohli rsmml traning report
Deepak kohli rsmml traning reportDeepak kohli
 
Training report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jbTraining report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jbUpal Jb
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resumeMayur Amin
 
Reformer Catalyst Report
Reformer Catalyst ReportReformer Catalyst Report
Reformer Catalyst ReportDharmaraj Daddikar
 
Industrial training at Numaligarh Refinery Limited ( Instrumentation Engineer...
Industrial training at Numaligarh Refinery Limited ( Instrumentation Engineer...Industrial training at Numaligarh Refinery Limited ( Instrumentation Engineer...
Industrial training at Numaligarh Refinery Limited ( Instrumentation Engineer...Alok Saikia
 
AJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAjith Kumar
 
OCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUROCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPURSudhanshu Shekhar
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATIONINDUSTRIAL ENGINEERING
 
Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Robert Singleton
 
Phoenix park gas processors ltd presentation
Phoenix park gas processors ltd presentationPhoenix park gas processors ltd presentation
Phoenix park gas processors ltd presentationVeno Seebaran
 
Summer Trg
Summer TrgSummer Trg
Summer TrgAmar Prem
 
Ammonia plant GSFC by Vishal Tapiawala
Ammonia plant GSFC by Vishal TapiawalaAmmonia plant GSFC by Vishal Tapiawala
Ammonia plant GSFC by Vishal TapiawalaVishal Tapiawala
 

Similar to Presentation1 (20)

Nitin
NitinNitin
Nitin
 
Coal Handling Plants....
Coal Handling Plants....Coal Handling Plants....
Coal Handling Plants....
 
Deepak kohli rsmml traning report
Deepak kohli rsmml traning reportDeepak kohli rsmml traning report
Deepak kohli rsmml traning report
 
Training report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jbTraining report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jb
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resume
 
Reformer Catalyst Report
Reformer Catalyst ReportReformer Catalyst Report
Reformer Catalyst Report
 
Industrial training at Numaligarh Refinery Limited ( Instrumentation Engineer...
Industrial training at Numaligarh Refinery Limited ( Instrumentation Engineer...Industrial training at Numaligarh Refinery Limited ( Instrumentation Engineer...
Industrial training at Numaligarh Refinery Limited ( Instrumentation Engineer...
 
nalco1122te
nalco1122tenalco1122te
nalco1122te
 
Emjac Pitch Deck
Emjac Pitch DeckEmjac Pitch Deck
Emjac Pitch Deck
 
Bhavdeep Resume
Bhavdeep ResumeBhavdeep Resume
Bhavdeep Resume
 
AJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production Operator
 
OCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUROCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUR
 
DIGBOI Rajan
DIGBOI RajanDIGBOI Rajan
DIGBOI Rajan
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 
Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
Sourish bhattacharyya
Sourish bhattacharyyaSourish bhattacharyya
Sourish bhattacharyya
 
Phoenix park gas processors ltd presentation
Phoenix park gas processors ltd presentationPhoenix park gas processors ltd presentation
Phoenix park gas processors ltd presentation
 
Summer Trg
Summer TrgSummer Trg
Summer Trg
 
Ammonia plant GSFC by Vishal Tapiawala
Ammonia plant GSFC by Vishal TapiawalaAmmonia plant GSFC by Vishal Tapiawala
Ammonia plant GSFC by Vishal Tapiawala
 

Recently uploaded

Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxachiever3003
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 

Recently uploaded (20)

Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptx
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 

Presentation1

  • 1. GAIL (INDIA) LIMITED GAIL TRAINING INSTITUTE- JAIPUR INDUSTRIAL TRAINING PRESENTATION ON OPERATION & MAINTENANCE of JAMNAGAR-LONI LPG PIPELINE SYSTEM At IPS Mansarampura Submitted By – Kapil Soni
  • 3. • GAIL Limited is the largest state-owned natural gas processing and distribution company in India declared by Govt. Of India. • It is headquartered in New Delhi. • It has six segments: Transmission services of natural gas & liquefied petroleum gas(LPG) • Natural gas trading, Petrochemicals, LPG • Liquid hydrocarbon • GAILTEL • and others. Gas authority of India Limited
  • 4. • The gas sector infrastructure of gail is as follows: • • 1984 - The Birth of GAIL • 1987 - HAZIRA VIJAIPUR JAGDISHPUR P/L commissioned • 1990 - Entry in LPG Processing • 1997 - Achieved youngest Navratan Status • 1997 - Entered in CNG Network • 1999 - Entry Petrochemical Processing • 2001 - Commissioned world largest LPG P/L • 2004 - Import of LPG • 2008 - Augmentation of Gas P/L Net work • 2011 - Declared world No. 1 Co. in DS operation • 2011 - MNC deal for Gas Contracts • 2012 - New P/L dedication up to Bhatinda • 2013 - P/L expansion in Uttrakhand • 2013 - Declared Youngest MAHARATAN Co. • (Top 5) by Govt. of India •
  • 5. Number of projects undertaken :- • Study the CATHODIC PROTECTION OF PIPELINE . • Study the working of PIGGING SYSTEM, Types of PIG And Pigging. • List all the Mechanical Equipments with their specification.
  • 6. 1. LPG is a liquid under pressure but a gas at ambient conditions. 2. Vapour LPG is twice as heavy as air. 3. Liquid LPG is half as heavy as water. 4. LPG is colorless. 5. LPG has a low boiling point of - 6°C 6. LPG has a narrow flammability range between 1.8 to 9.5% in air. 7. Flash point of LPG is -60°C. 8. The approximate minimum ignition temperature of LPG is in the range 410°C to 580°C. Properties of LPG
  • 7. 9) LPG is odourless. 10) Ethyl Mercaptan is added as an odourant to detect LPG in case of leaks. 11) LPG is non-toxic. 12) It is lightly anaesthetic and can cause suffocation, if present in sufficiently high concentrations. 13) Liquid LPG can cause severe cold burns to the skin owing to rapid vapourisation and the consequent lowering of temperature.
  • 8. Requirment of LPG pipeline •Cost Benefit •Continous flow •Easy transportation •Avoid delay in supply •To reduce traffic on Road •Prevent accident on Road
  • 9. •In 2001, GAIL commissioned world’s longest and India’s first Cross Country LPG •Transmission Pipeline from Jamnagar to Loni . •JAMNAGAR – LONI LPG PIPELINE, the world’s longest exclusive LPG pipeline (1355 Km) & inaugurated for the commencement LPG supply to oil companies on 24/12/2000. •JLPL is the longest pipeline network in the world of 1335 km long, where main line is 1244 km and spur line is 91 km. •The pipeline is design to carry LPG and the capacity is 2.5 MMTPA. •JLPL is used for LPG transportation. JLPL pipeline
  • 11. State wise pipeline length :- Gujarat- 578 KM Rajasthan- 686 KM Haryana- 98 KM Delhi- 5 KM UP- 48 KM Total- 1414 KM
  • 12. Size wise pipeline length :- • 16” - 578.1 KM • 14” - 166.7 KM • 12” - 439.0 KM • 10” - 58.67 KM • 8” - 114.3 KM • 6” - 43.3 KM • 4” - 13.6 KM Total - 1414 KM
  • 13. This pipeline mainly comprises of:- A. 4 Intermediate Pumping Station(IPS) - Which are responsible for increasing the pressure to a limit so that it can be on the next pumping station and further- 1. SAMAKHALI 2. ABUROAD 3. NASIRABAD 4. MANSARAMPURA
  • 14. B. Receiving Terminal(RT) - Places which we tap the LPG so that it can be supplied to various oil companies- •IOCL - 4 •BPCL - 4 •HPCL – 2 Most of the Terminals are having the arrangements for:- 1. Filtration Facilities 2. Temperature Control Facilities 3. Pressure Control Facilities 4. Measurement System 5. Pigging arrangement as per need 6. Fire fighting Network 7. Tap off arrangement
  • 15. C. Sectionalizing Valves (SV) Stations- 1) Responsible for isolating the PL in case of emergency. 2) JLPL project has a total of 73 SV stations. 3) Responsible for isolating the p/ L case of emergency . 4) SV’s are installed at an average distance of 20 km all along the pipeline D. Crossing- 1) Rail -27 2) Road -198 3) Water bodies-149 4) HT-125 5) Foreign PL -113
  • 16. E. 4 Intermediate Pigging Station:- 1) IP 1 ( Between Samakhali – Abu Road P/L Section) 2) IP 2 ( Between Abu Road – Nasirabad p/L Section) 3) IP 3 ( At Mansarampura) 4) IP 4 ( Between Mansarampura – Loni P/L Section) Project cost : RS 1250 Crores
  • 17. PIPELINE SECTION THROUGHPUT MMPTA FLOW RATE TONS/HR KANDLA TO SMK 0.5 63.33 SAMAKHIALI TO ABU ROAD 2.5 316.65 ABU ROAD TO NASIRABAD 2.5 316.65 NASIRABAD TO MANSARAMPURA 2.2 278.65 MANSARAMPURA TO LONI 2.0 253.32 FLOW RATE
  • 18. Mechanical equipment used at IPS MANSARAMPURA • Booster pump/centrifugal pump • Basket filter • Mass flow meter • Main jockey • Main fire water pump • Fire water tank • Diesel storage tank • Diesel transfer pump • Scraper receiver • Scraper launcher
  • 19. Centrifugal Pump • Centrifugal pump is basically a machine which is intended to raise the pressure of an incompressible liquid from an external source. • Its purpose is to convert energy of a prime mover (a electric motor or turbine) first into kinetic energy and then into pressure energy of a fluid that is being pumped • The energy changes occur by virtue of two main parts of the pump, the impeller and the volute or diffuser. • The impeller is the rotating part that converts driver energy into the kinetic energy. Diffuser is the stationary part that converts the kinetic energy into pressure energy..
  • 21. Specification of Cenrifugal pump • Pump manufacturer - DAVID BROWN • Pump size - 6*8*10.5 B • Model -DB 36 Multi stg. Centifugal Pump • Number of stages – 10 • Suction pressure – 21 kg/cm2 • Discharge pressure – 70 to80kg/cm2 • Pumping temperature – 15 C normal 25 C max. • Head – 1180m • Capacity (normal/ rated) – 177/195 m3/hr • Rated speed – 3420 rpm
  • 22. • There are no drive seals, therefore the risk of leaks is completely eradicated. • Less heat transfer from the motor— the pump chamber is separated from the motor by an air gap; this provides a thermal barrier. • Reduced friction • Complete separation of the liquid means that liquid cannot seep into the motor from the pump. Advantages
  • 23. Introduction to Pigging system 1) Pigging refers to the practice of using pipeline inspection gauges or 'pigs' to perform various maintenance operations on a pipeline. 2) This is done without stopping the flow of the product in the pipeline. 3) These operations include cleaning and inspecting of the pipeline.
  • 24. Working of PIGGING System:- 1) This is accomplished by inserting the pig into a 'pig launcher' (or 'launching station') 2) The launcher / launching station is then closed and the pressure-driven flow of the product in the pipeline is used to push it along down the pipe until it reaches the receiving trap – the 'pig catcher' (or receiving station).
  • 26.
  • 27.
  • 28. TYPES OF PIG Pigs can be broadly divided into four categories: 1) Foam pigs: which is used to remove moisture, condensate etc.. this is a type of pig by which, it is analysis that whether the pipe is thoroughly cleaned or not.
  • 29. 2) Brush and Magnetic Pigs: which are used to clean magnetic impurities from pipes. in case when form pig fails to protect pipeline from unwanted dirt, dust etc., then brush pigs are used.
  • 30. 3) Gauge pigs: which is used to check whether it is applicable for intelligent pigging. 4 ) Magnetic Flux Leakage: which is used for intelligent pigging .In the IPS use in determining the thickness, anomalies, holes etc. in pipelines.
  • 31. Types of PIGGING:- 1) Cleaning Pigging- In this pigging Foam pig of respective pipe diameter is launched directly into the pipes who serve normal cleaning of pipes. 2) Intelligent Pigging- In this pigging process a special types of pigs equipped with various sensors to detect the various conditions of pipe eg. Thickness of pipe range, ultrasonic sensing, bend, and accumulation of sludge.
  • 32. Some of the pigs after pigging :-
  • 34. CORROSION • WHAT IS CORROSION. • DEGRADATION OF MATERIAL THRU ENVIORMENTAL INTERACTION. • FOCUS ON CORROSION OF CARBON STEEL USED IN UNDERGROUND PIPELINES. • WHEN IRON IS PLACED IN SOIL/WATER.
  • 35. In order to prevent corrosion there are coating used like iron is coated by zinc or simply grease, paint, plastic is used. In many cases there are cathode protection used where a noble metal is connected to a less noble and potential applied
  • 36. FOUR COMPONENTS FOR CORROSION CELL • THERE MUST BE AN ANODE • THERE MUST BE A CATHODE. • THERE MUST BE A ELECTRICAL PATH (PIPELINE ITSELF) • THERE MUST BE A CONDUCTIVE ELECTROLYTE (WATER/SOIL)
  • 37. CATHODIC PROTECTION • WE HAD SEEN THAT • CORROSION TAKES PLACE AT ANODES. • NO CORROSION AT CATHODES. • DIFFERENT CORROSION CELLS ON PIPELINE.
  • 38. WHAT WILL HAPPEN , IF WE MAKE -THE WHOLE PIPELINE AS CATHODE. NO CORROSION WILL TAKE PLACE.. HOW WE CAN MAKE -BY MAKING IT CATHODE W.R.T. OTHER METAL --BY MAKING IT TO COLLECT CURRENT FROM ANODE. -WHEN WE MAKE ANY PIPELINE/STRUCTURE AS A CATHODE W.R.T SOME METAL/ANODE -IT IS CALLED CATHODIC PROTECTION.
  • 39. CATHODIC PROTECTION- HOW IT WORKS • PRINCIPLE – DIRECT CURRENT IS MADE TO FLOW FROM EXTERNAL SOURCE TO P/L – THE PIPELINE IS MADE TO COLLECT CURRENT BY MAKING IT CATHODE – THE EXTERNAL CURRENT IS ADUSTED TO OVERPOWER THE CORROSION CURRENT. – RESULTING IN A NET FLOW OF CURRENT ONTO PIPELINE . – ENTIRE P/L SURFACE BECOMES CATHODIC AND PROTECTION COMPLETED.
  • 40. GROUND BED +IVE -VE TR UNIT/C.P SOURCE BURRIED PIPELINE CURRENT FLOW ELECTROLYTE/ SOIL FIG : BASIC CATHODIC PROTECTION INSTALLATION
  • 41. TYPES OF CP SYSTEM • SACRIFICIAL ANODE SYSTEM • IMPRESSED CURRENT SYSTEM
  • 42. Sacrificial CP System Sacrificial Anode Pipeline Current
  • 43. Practical Galvanic Series for Metals in Neutral Soil and WaterMETAL POTENTIAL V (CSE) Mill Scale On Steel - 0.2 Mild Steel In Concrete - 0.2 Lead 0.5 Mild Steel (Rusted) - 0.5 Mild Steel (Clean and Shiny) - 0.5 to - 0.8 Aluminum Alloy (5% Zinc) - 1.05 Zinc - 1.1 Magnesium Alloy (6% Al, 3% Zn, 0.15% Mn) - 1.6 Commercially Pure Magnesium -1.75
  • 44. Impressed Current CP System Impressed current Anode Pipeline Current DC Power Source+ -
  • 45. ENVIRONMENT CURRENT DENSITY IN mA/m2 WELL-AERATED NEUTRAL SOIL 21.5 – 32.3 DRY, WELL-AERATED SOIL 5.4 – 16.1 WET, SOIL, MODERATE/SEVERE CONDITIONS 26.9 – 64.6 HIGHLY ACID SOIL 53.8 – 161.4 STATIONARY FRESH WATER 53.8 MOVING FRESH WATER 53.8 – 64.6 WELL COATED PIPELINE IN SOILS 0.01 CURRENT REQUIREMENTS FOR STEEL
  • 46. TYPES OF ANODE BEDS • HORIZONTAL ANODE BED • VERTICAL ANODE BED • DEEP WELL ANODE BED
  • 47. Horizontal Anode Bed 3m 6m 0.4m Ground Level Anode cable Coke 1.1m 0.75m Section
  • 48. Vertical Anode Bed 6m 0.4m 1.1m 0.75m Anode cable Coke Section
  • 49. Deep well Anode Bed 10 m 1.0 m 1.0m Anode cable Coke Section 0.3 m
  • 50. O&M Base Jurisdiction: IPS, Mansarampura Scheduled activities of LPG Pipeline as per Maintenance policy Guidelines.
  • 51.  Normal PIGGING : Frequency – Yearly  INTELLIGENT PIGGING: Frequency – 10 Years  Helicopter / Aerial Surveillance- Monthly Foot Patrolling:  Foot Patrolling by Security Agency personnel: Daily  Yearly foot patrolling by GAIL officials after monsoon  4) Coating Integrity Survey : Quaterly  5) Thickness Measurement Survey : 2 times in a year  6) IDENTIFICATION AND MONITORING OF VULNERABLE LOCATIONS: Monthly