Project Estimation
Where to Start ?
What is Project Cost Estimation?
Project Cost Estimation is defined as the process of approximating the total expenditure of the project.
The accuracy of the cost estimation and budgeting in project management depends on the accuracy and
details of the project scope, which is the scope baseline.
The scope will also define any constraints like date, resources or budget. The risk register will help to
calculate estimate types of costs, the expenses made behind the contingent action and the expenses
made to cope with risks.
● Labor cost
● Equipment cost
● Cost of supplies
● Travel cost
● Training cost
● Overhead cost, etc.
Estimating Costs
Costs are comprised of direct costs (largely humans, machines, and materials) and indirect
costs (mostly support functions, utilities, management, taxes, etc).
Direct costs in many industries have become a relatively small percentage of overall
product cost, while indirect costs have become much larger.
Because cost estimation is a complex activity, the following questions form a structure for
our discussion.
● What cost components must be estimated?
● What approach to cost estimation will be applied?
● How accurate should the estimates be?
● What estimation techniques will be utilized?
Understanding
Cost Estimation
Analogous Estimating
This estimating technique is based on expert judgments and information based on similar previous projects. Where previously
done similar project cost is considered with plus or minus of 20% for existing project.
Parametric Estimation
Parametric estimation is used when historical data is available from previous projects related to the current project. In this case,
you can use statistical techniques such as regression or correlation analysis to determine an equation that accurately predicts
costs for similar tasks on future projects.
Three-point Estimation
Three-point estimation is another technique used for cost estimation in projects. In this method, we divide our project into three
phases: low-end, most likely, and high-end estimates for each phase separately. This approach allows us to avoid over- or under-
estimating the budget by providing us with more realistic results due to its flexibility.
Expert Judgement
This is the most common technique used by project managers. They use their knowledge and experience to arrive at an
estimate. Experts may be required to estimate elements like cost, time, and resources or other variables that can influence the
estimate.
Estimation by Analogy
This technique is based on comparing similar projects and applying the same cost factors or estimating relationships to the new
project.
Bottom-up Estimation
In this technique, each task is estimated separately and added up to get a total cost for the project. Still, it has limitations because
it doesn't consider risks associated with each task, which may negatively impact the overall project cost.
Top-down Estimation
This is a method where you first need to estimate the total costs for all phases of your project and then break down each phase
into smaller units.
Vendor Bid Analysis
This involves analyzing the bids received from vendors for particular goods and services required to complete a specific task or
phase of the project. It helps in determining whether these bids are in line with what was expected or not.
Reserve Analysis
Reserve Analysis is a complex method that uses historical data to forecast costs and duration for similar projects.
Cost of Quality Analysis
Cost of quality is an analysis technique used to determine if any changes should be made to achieve higher quality standards. Cost
of quality looks at two factors:
Quality costs - these are costs associated with developing high-quality products and services.
Avoidable costs - are costs associated with mistakes made by people working on projects (errors) or employees not following
procedures correctly (waste).
Cost Estimation
Approach
The bottom-up approach treats the required price as
an output variable and the cost estimates as input
variables.
This approach works well when competition is not
the dominant factor in pricing the product or
service.
The design-to-cost, or top-down, approach treats
the competitive price as an input variable and the
cost estimates as output variables.
This approach places greater emphasis on the
accuracy of the price estimation activity. The target
cost must be realistic, or it becomes very difficult to
make sensible, realizable cost estimates for the
various components.
Accuracy of
the Estimates
Thank you.

More Related Content

Similar to Project Estimation Project Estimation Project Estimation

Project_cost_managment definition and tools
Project_cost_managment definition and toolsProject_cost_managment definition and tools
Project_cost_managment definition and tools
MaryMa75
 
Estimation guidelines and templates
Estimation guidelines and templatesEstimation guidelines and templates
Estimation guidelines and templates
Hoa PN Thaycacac
 
Cost estimation
Cost estimationCost estimation
Cost estimation
Nabeel Ahmad
 
Constructiion cost estimating 2017
Constructiion cost estimating 2017Constructiion cost estimating 2017
Constructiion cost estimating 2017
Peter Cholakis
 
Strategic cost management
Strategic cost managementStrategic cost management
Strategic cost managementVaibhav Banjan
 
Project cost management
Project cost management Project cost management
Project cost management
PALLA NARASIMHUDU
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
sheryl90
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
sheryl90
 
Cost Estimating And Developing The Budget
Cost Estimating And Developing The BudgetCost Estimating And Developing The Budget
Cost Estimating And Developing The Budget
Reema
 
46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf
ssuserad21d8
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
Baker Khader Abdallah, PMP
 
Introduction of civil engineering.pdf
Introduction of civil engineering.pdfIntroduction of civil engineering.pdf
Introduction of civil engineering.pdf
bkbk37
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimation
ssuser9d62d6
 
PM Estimation techniques
PM Estimation techniquesPM Estimation techniques
PM Estimation techniques
Chander Parkash
 
Cost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxCost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptx
SudipBalLama
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
Sunayana Miglani
 
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
pankajsh10
 
1052 1 rf
1052 1 rf1052 1 rf
1052 1 rf
sumitvatse6647
 
Web Engineering - Web Effort Estimation
Web Engineering - Web Effort EstimationWeb Engineering - Web Effort Estimation
Web Engineering - Web Effort Estimation
Nosheen Qamar
 

Similar to Project Estimation Project Estimation Project Estimation (20)

Project_cost_managment definition and tools
Project_cost_managment definition and toolsProject_cost_managment definition and tools
Project_cost_managment definition and tools
 
Estimation guidelines and templates
Estimation guidelines and templatesEstimation guidelines and templates
Estimation guidelines and templates
 
Cost estimation
Cost estimationCost estimation
Cost estimation
 
Constructiion cost estimating 2017
Constructiion cost estimating 2017Constructiion cost estimating 2017
Constructiion cost estimating 2017
 
Strategic cost management
Strategic cost managementStrategic cost management
Strategic cost management
 
Project cost management
Project cost management Project cost management
Project cost management
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
Cost Estimating And Developing The Budget
Cost Estimating And Developing The BudgetCost Estimating And Developing The Budget
Cost Estimating And Developing The Budget
 
46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Introduction of civil engineering.pdf
Introduction of civil engineering.pdfIntroduction of civil engineering.pdf
Introduction of civil engineering.pdf
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimation
 
PM Estimation techniques
PM Estimation techniquesPM Estimation techniques
PM Estimation techniques
 
Cost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxCost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptx
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
 
Chap005
Chap005Chap005
Chap005
 
1052 1 rf
1052 1 rf1052 1 rf
1052 1 rf
 
Web Engineering - Web Effort Estimation
Web Engineering - Web Effort EstimationWeb Engineering - Web Effort Estimation
Web Engineering - Web Effort Estimation
 

Recently uploaded

Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 

Recently uploaded (20)

Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 

Project Estimation Project Estimation Project Estimation

  • 3.
  • 4. What is Project Cost Estimation? Project Cost Estimation is defined as the process of approximating the total expenditure of the project. The accuracy of the cost estimation and budgeting in project management depends on the accuracy and details of the project scope, which is the scope baseline. The scope will also define any constraints like date, resources or budget. The risk register will help to calculate estimate types of costs, the expenses made behind the contingent action and the expenses made to cope with risks. ● Labor cost ● Equipment cost ● Cost of supplies ● Travel cost ● Training cost ● Overhead cost, etc.
  • 5. Estimating Costs Costs are comprised of direct costs (largely humans, machines, and materials) and indirect costs (mostly support functions, utilities, management, taxes, etc). Direct costs in many industries have become a relatively small percentage of overall product cost, while indirect costs have become much larger. Because cost estimation is a complex activity, the following questions form a structure for our discussion.
  • 6. ● What cost components must be estimated? ● What approach to cost estimation will be applied? ● How accurate should the estimates be? ● What estimation techniques will be utilized?
  • 8. Analogous Estimating This estimating technique is based on expert judgments and information based on similar previous projects. Where previously done similar project cost is considered with plus or minus of 20% for existing project. Parametric Estimation Parametric estimation is used when historical data is available from previous projects related to the current project. In this case, you can use statistical techniques such as regression or correlation analysis to determine an equation that accurately predicts costs for similar tasks on future projects. Three-point Estimation Three-point estimation is another technique used for cost estimation in projects. In this method, we divide our project into three phases: low-end, most likely, and high-end estimates for each phase separately. This approach allows us to avoid over- or under- estimating the budget by providing us with more realistic results due to its flexibility. Expert Judgement This is the most common technique used by project managers. They use their knowledge and experience to arrive at an estimate. Experts may be required to estimate elements like cost, time, and resources or other variables that can influence the estimate. Estimation by Analogy This technique is based on comparing similar projects and applying the same cost factors or estimating relationships to the new project.
  • 9. Bottom-up Estimation In this technique, each task is estimated separately and added up to get a total cost for the project. Still, it has limitations because it doesn't consider risks associated with each task, which may negatively impact the overall project cost. Top-down Estimation This is a method where you first need to estimate the total costs for all phases of your project and then break down each phase into smaller units. Vendor Bid Analysis This involves analyzing the bids received from vendors for particular goods and services required to complete a specific task or phase of the project. It helps in determining whether these bids are in line with what was expected or not. Reserve Analysis Reserve Analysis is a complex method that uses historical data to forecast costs and duration for similar projects. Cost of Quality Analysis Cost of quality is an analysis technique used to determine if any changes should be made to achieve higher quality standards. Cost of quality looks at two factors: Quality costs - these are costs associated with developing high-quality products and services. Avoidable costs - are costs associated with mistakes made by people working on projects (errors) or employees not following procedures correctly (waste).
  • 10. Cost Estimation Approach The bottom-up approach treats the required price as an output variable and the cost estimates as input variables. This approach works well when competition is not the dominant factor in pricing the product or service. The design-to-cost, or top-down, approach treats the competitive price as an input variable and the cost estimates as output variables. This approach places greater emphasis on the accuracy of the price estimation activity. The target cost must be realistic, or it becomes very difficult to make sensible, realizable cost estimates for the various components.