SlideShare a Scribd company logo
1
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural Build Environment (FNBE)
CONSTRUCTED LANDSCAPE [ARC30203]
Prerequisite: None
Lecturer: Shazreene Nurjanna Samsudin, Noorul Iffa Mohd Nayan
Project 3 (Final)
Residential Landscape Project
40% Individual
Submission: 31st July 2015, Friday (Week 16)
Introduction
Projects in landscape architecture progress through stages, from the very first contact with the client
and awareness of the site, through to the realization, construction and maturation of the finished design.
It is important to remember that the design process, unlike a timeline, is often completely non-linear.
The phrase “back to the drawing board” refers to the continual process of testing and retesting that is
characteristic of the architectures.
In the planning of a residence, there are not only the space is matters but also to integrate the natural
site component with its landscape environs. Since the area to be developed is small scale, the design
will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and
all other natural or architectural features – and bring them into harmony.
“The earth is our home and the ways of nature our paths to understanding”.
[Simonds, J. O.]
Objectives of Project
The objectives of this project:
 To acquire knowledge about design process, planning and development of project.
 To proffer exposure of small scale landscape project to the students.
 To familiarize students about the design stages and how to visualize their ideas onto
presentation boards.
Learning Outcomes of this Project
On successful completion of this subject, students will be able to demonstrate the following:
1. A design process involved in landscape project development and the representation of ideas
for every stage taken.
2. Understanding on landscape design components and how it works and have been applied into
the field.
2
Tasks - Methodology
This is a continuous assignment of Project 2 and an individual project. From the same site that you
were doing for previous Project 2, you are required to design the landscape for the residence/house.
You have to imagine that you are going to present the landscape proposal to the client (who is the
house owner) by preparing ALL drawings needed for every development stages. The development
stages shall include as following;
A. PROJECT DESCRIPTION
A short paragraph of your design statement which explaining about the ideas, rationale of the
design and the concept of the design. The narration should briefly describe, constructive and
informative.
*note: It is advisable to complete at the end of the process
B. CONCEPTUAL DIAGRAM
From the site synthesis (refer to previous individual component of project 2), develop a bubble
diagram. Bubble diagram is used as a means to show what spaces and activities that you want
to propose at the site. Subsequently, you need to come out with a conceptual diagram.
Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and
bubble diagram which related to the site.
C. SCHEMATIC PLAN
From the conceptual plan, you need to develop a schematic plan. It is also known as
preliminary master plan. In schematic plan, you are to compose all of elements that you intend
to put into the design. It should have form composition, shape and pattern of the design
elements. You may provide sketches/illustrations (sections/elevations) to better represent your
ideas.
D. MASTER PLAN
After the schematic plan has been approved by your tutor, you should produce a master plan
set of drawings. The set of drawings include;
- Master Plan
- Elevation & Section
- Hardscape Palette
- Softscape Palette
E. COST ESTIMATION & MAINTENANCE PLAN
A brief cost estimation or budget allocation of the landscape project that you proposed.. The
cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are
also to include a brief maintenance plan of the project.
(These two topics will be taught by guest lecturer (QS Lecturer) in Week 14).
**Note:
A self-independent study is required on graphic communication particularly on architectural lettering,
sketching,colouring & presentation layout. Do save images from internet or scan from books for ideas
collection and inspirations.
3
Submission Requirement
Each student is required to submit ALL of the following:
1. A3 presentation boards. You can use any type of paper and colour materials as long as it is
pasted on the board. You are advisable to use spray mount to stick your paper onto the board.
2. You need to provide ALL of the following;
- Project Description
- Location Plan & Key Plan
- Bubble Diagram
- Conceptual Plan
- Schematic Plan
- Master Plan
- 1 Section & 1 Elevation Drawings
- Hardscape & Softscape Palette
- Cost Estimation & Maintenance Plan
3. All presentation board must be in landscape/potrait layout (FRONT AND BACK) with title
block in every page. The title block will be provided by the lecturer a week before submission.
The overall layout template will be prepared by the lecturer.
4. You are to show your progress of drawing every week during tutorial sessions to your
respective tutors. The progress drawing must be on butter paper, signed by the tutor with
date, to be compiled in A4 plastic cover and to submit together with presentation
boards.
5. All drawings need to be completed manually (hand drawn & hand written) by using
architectural graphic communication. Images can be printed out.
6. All drawings must be coloured. You may choose any medium of colouring technique that
you are master in. It is not compulsory to colour all, it can be a portion or part of the overall
drawings only.
7. Your A3 boards must be binded.
8. You need to submit the complete binded presentation boards with a set of progression drawing
on 31st July 2015 (Friday). Time and venue of submission will be informed.
9. Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days,
no assessment will be done.
10. You are encouraged to take photo or scan your work for e-portfolio purposes.
4
Assessment Criteria
The assessment criteria for this assignment will be based on:
 Demonstrated understanding of brief
 Relevance, appropriateness and depth of research exhibited in the assignment
 Creative application of graphic communication skills, originality and quality of the work
 Design ideas and constructive representation the ideas.
Marking Criteria
Marks shall be distributed as follows:
Work will be assessed based on:
1. CONTENT:
i. Project Description 2 %
ii. Conceptual Plan 4%
iii. Schematic Plan 4%
iv. Master Plan 10%
v. Cost & Maintenance Plan 5%
TOTAL: 25%
2. Originality, creativity & quality of workmanship 10%
3. Progress Drawings 5%
GRAND TOTAL: 40%

More Related Content

Viewers also liked

Architecture design studio 1 project 3 brief march2016
Architecture design studio 1 project 3 brief march2016Architecture design studio 1 project 3 brief march2016
Architecture design studio 1 project 3 brief march2016
Joeylau97
 
Eng
EngEng
Design communication. assignment 2c 2016
Design communication. assignment 2c 2016Design communication. assignment 2c 2016
Design communication. assignment 2c 2016
Joeylau97
 
Australian 6 Assessment Sample
Australian 6 Assessment SampleAustralian 6 Assessment Sample
Australian 6 Assessment Sample
Teejay Maths
 
Resume-Sherry Holly
Resume-Sherry HollyResume-Sherry Holly
Resume-Sherry Holly
Sherry Holly
 
Project 1 brief cts mac 2015
Project 1 brief cts mac 2015Project 1 brief cts mac 2015
Project 1 brief cts mac 2015
Joeylau97
 
Polaroid History
Polaroid HistoryPolaroid History
Polaroid History
Vadim Zhiltsov
 

Viewers also liked (7)

Architecture design studio 1 project 3 brief march2016
Architecture design studio 1 project 3 brief march2016Architecture design studio 1 project 3 brief march2016
Architecture design studio 1 project 3 brief march2016
 
Eng
EngEng
Eng
 
Design communication. assignment 2c 2016
Design communication. assignment 2c 2016Design communication. assignment 2c 2016
Design communication. assignment 2c 2016
 
Australian 6 Assessment Sample
Australian 6 Assessment SampleAustralian 6 Assessment Sample
Australian 6 Assessment Sample
 
Resume-Sherry Holly
Resume-Sherry HollyResume-Sherry Holly
Resume-Sherry Holly
 
Project 1 brief cts mac 2015
Project 1 brief cts mac 2015Project 1 brief cts mac 2015
Project 1 brief cts mac 2015
 
Polaroid History
Polaroid HistoryPolaroid History
Polaroid History
 

Similar to Project 3 residential landscape project march 2015

CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
christinelee1996
 
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
KY Quah
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
stactixzz97
 
Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891
yongzsoh
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
chuenmin
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Quo Ming
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
Lin Hui
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Louise Foong
 
FNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEFFNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEF
barbaraxchang
 
Cl project2B residential landscape project
Cl project2B residential landscape projectCl project2B residential landscape project
Cl project2B residential landscape project
SongKit96
 
CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
ashleyyeap
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Amelisa Collins
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Dameerster
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Alexis Wei
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
Leon Lim
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
Gynie
 
Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892
KY Quah
 

Similar to Project 3 residential landscape project march 2015 (17)

CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
 
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
FNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEFFNBE 0115 - CL PROJECT 3 BRIEF
FNBE 0115 - CL PROJECT 3 BRIEF
 
Cl project2B residential landscape project
Cl project2B residential landscape projectCl project2B residential landscape project
Cl project2B residential landscape project
 
CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
 
Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892
 

Recently uploaded

Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
Bisnar Chase Personal Injury Attorneys
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
Assessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptxAssessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptx
Kavitha Krishnan
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 

Recently uploaded (20)

Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
Assessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptxAssessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptx
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 

Project 3 residential landscape project march 2015

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural Build Environment (FNBE) CONSTRUCTED LANDSCAPE [ARC30203] Prerequisite: None Lecturer: Shazreene Nurjanna Samsudin, Noorul Iffa Mohd Nayan Project 3 (Final) Residential Landscape Project 40% Individual Submission: 31st July 2015, Friday (Week 16) Introduction Projects in landscape architecture progress through stages, from the very first contact with the client and awareness of the site, through to the realization, construction and maturation of the finished design. It is important to remember that the design process, unlike a timeline, is often completely non-linear. The phrase “back to the drawing board” refers to the continual process of testing and retesting that is characteristic of the architectures. In the planning of a residence, there are not only the space is matters but also to integrate the natural site component with its landscape environs. Since the area to be developed is small scale, the design will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and all other natural or architectural features – and bring them into harmony. “The earth is our home and the ways of nature our paths to understanding”. [Simonds, J. O.] Objectives of Project The objectives of this project:  To acquire knowledge about design process, planning and development of project.  To proffer exposure of small scale landscape project to the students.  To familiarize students about the design stages and how to visualize their ideas onto presentation boards. Learning Outcomes of this Project On successful completion of this subject, students will be able to demonstrate the following: 1. A design process involved in landscape project development and the representation of ideas for every stage taken. 2. Understanding on landscape design components and how it works and have been applied into the field.
  • 2. 2 Tasks - Methodology This is a continuous assignment of Project 2 and an individual project. From the same site that you were doing for previous Project 2, you are required to design the landscape for the residence/house. You have to imagine that you are going to present the landscape proposal to the client (who is the house owner) by preparing ALL drawings needed for every development stages. The development stages shall include as following; A. PROJECT DESCRIPTION A short paragraph of your design statement which explaining about the ideas, rationale of the design and the concept of the design. The narration should briefly describe, constructive and informative. *note: It is advisable to complete at the end of the process B. CONCEPTUAL DIAGRAM From the site synthesis (refer to previous individual component of project 2), develop a bubble diagram. Bubble diagram is used as a means to show what spaces and activities that you want to propose at the site. Subsequently, you need to come out with a conceptual diagram. Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and bubble diagram which related to the site. C. SCHEMATIC PLAN From the conceptual plan, you need to develop a schematic plan. It is also known as preliminary master plan. In schematic plan, you are to compose all of elements that you intend to put into the design. It should have form composition, shape and pattern of the design elements. You may provide sketches/illustrations (sections/elevations) to better represent your ideas. D. MASTER PLAN After the schematic plan has been approved by your tutor, you should produce a master plan set of drawings. The set of drawings include; - Master Plan - Elevation & Section - Hardscape Palette - Softscape Palette E. COST ESTIMATION & MAINTENANCE PLAN A brief cost estimation or budget allocation of the landscape project that you proposed.. The cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are also to include a brief maintenance plan of the project. (These two topics will be taught by guest lecturer (QS Lecturer) in Week 14). **Note: A self-independent study is required on graphic communication particularly on architectural lettering, sketching,colouring & presentation layout. Do save images from internet or scan from books for ideas collection and inspirations.
  • 3. 3 Submission Requirement Each student is required to submit ALL of the following: 1. A3 presentation boards. You can use any type of paper and colour materials as long as it is pasted on the board. You are advisable to use spray mount to stick your paper onto the board. 2. You need to provide ALL of the following; - Project Description - Location Plan & Key Plan - Bubble Diagram - Conceptual Plan - Schematic Plan - Master Plan - 1 Section & 1 Elevation Drawings - Hardscape & Softscape Palette - Cost Estimation & Maintenance Plan 3. All presentation board must be in landscape/potrait layout (FRONT AND BACK) with title block in every page. The title block will be provided by the lecturer a week before submission. The overall layout template will be prepared by the lecturer. 4. You are to show your progress of drawing every week during tutorial sessions to your respective tutors. The progress drawing must be on butter paper, signed by the tutor with date, to be compiled in A4 plastic cover and to submit together with presentation boards. 5. All drawings need to be completed manually (hand drawn & hand written) by using architectural graphic communication. Images can be printed out. 6. All drawings must be coloured. You may choose any medium of colouring technique that you are master in. It is not compulsory to colour all, it can be a portion or part of the overall drawings only. 7. Your A3 boards must be binded. 8. You need to submit the complete binded presentation boards with a set of progression drawing on 31st July 2015 (Friday). Time and venue of submission will be informed. 9. Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no assessment will be done. 10. You are encouraged to take photo or scan your work for e-portfolio purposes.
  • 4. 4 Assessment Criteria The assessment criteria for this assignment will be based on:  Demonstrated understanding of brief  Relevance, appropriateness and depth of research exhibited in the assignment  Creative application of graphic communication skills, originality and quality of the work  Design ideas and constructive representation the ideas. Marking Criteria Marks shall be distributed as follows: Work will be assessed based on: 1. CONTENT: i. Project Description 2 % ii. Conceptual Plan 4% iii. Schematic Plan 4% iv. Master Plan 10% v. Cost & Maintenance Plan 5% TOTAL: 25% 2. Originality, creativity & quality of workmanship 10% 3. Progress Drawings 5% GRAND TOTAL: 40%