The Impact of Temperature and Relative Humidity Elevation on Mental Health of...ijtsrd
The paper examined the impact of temperature and relative humidity escalation on mental health of in patient admitted into Jos Teaching Hospital JUTH Jos, Plateau State, Nigeria. The main independent variables of interest were temperature and relative humidity we also employed two derived parameters heat index and overlapping effect in our analysis in which we used four years 2011 2014 data of psychiatric cases and in patient that were admitted in the hospital, ex post facto research design was adopted for the study. The population of the study comprised 2073 in patient that was admitted in the hospital from the year 2011 2014 was sample used for the study. Data collected were analyzed with used of single regression and multiple regression analysis with complex heat index formula. The study found climate parameters temperature and relative humidity and their counterpart derived parameters heat index and overlapping effect make population vulnerable to the risk of psychiatric cases and do increase the numbers of patient admitted in the JUTH. There were positive association between the numbers of in patient in the JUTH and those parameters with 41 and 38 critical acute psychiatric cases due to overlapping and heat index effect respectively. In other word 79 10.2 of the total 778 numbers of patient traceable to those parameters were in critical acute psychiatric condition. Increase in the relative humidity and overlapping made population more vulnerable to the risk of psychiatric cases with approximately equal strength than the heat index and temperature. But the heat index makes more risk than temperature. The vulnerability of population to psychiatric cases was not equally distributed throughout the year 2011 2014. Population response differently to the impact of each parameter throughout those years considered. The effective strength of relative humidity determines the effective strength of the overlapping effect and the effective strength of temperature determine that of the heat index. Jaiyeola O. Paul | Abdullahi Ayegba | Abimaje Okolo Suleiman ""The Impact of Temperature and Relative Humidity Elevation on Mental Health of In-Patient Admitted Into Jos Teaching Hospital Jos, Plateau State, Nigeria"" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-2 , February 2020, URL: https://www.ijtsrd.com/papers/ijtsrd29944.pdf
Paper Url : https://www.ijtsrd.com/engineering/aeronautical-engineering/29944/the-impact-of-temperature-and-relative-humidity-elevation-on-mental-health-of-in-patient-admitted-into-jos-teaching-hospital-jos-plateau-state-nigeria/jaiyeola-o-paul
135 impact of climate change on epilepsy patients with age stratifications ijtsrd
"The paper examined the impact of climate change on epilepsy patients in and out patient that visited Neuropsychiatric Hospital Akure, Ondo State, Nigeria. The main independent variables of interest are temperature and relative humidity as climate the two parameters covering a period of eight years 2010 2017. Data of in and out patients diagnosed with epilepsy and other related cases were sourced from the hospital records. The population of the study is 2873 epilepsy patients that visited the hospital within the period of study, comprising of 143 4.98 age 0 4 years, 447 15.56 age 5 9 years, 963 33.52 age 10 19 years, 983 34.22 age 20 44 years, 273 9.50 age 45 64 years, 36 1.25 age 65 69 years and 28 0.97 age 70 years. And for the purpose of analysis and discussion the population of study was further stratified into Children aged 0 19 years 1553 54.05 , adult aged 20 64 years 1256 43.72 , older adult aged 65 69 years 36 1.25 and elderly aged 70 28 0.97 . Jaiyeola O. Paul | Abdullahi Ayegba | Esu S. Ulaetor ""Impact of Climate Change on Epilepsy Patients with Age Stratifications: Variability of Temperature and Relative Humidity Effects"" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-2 , February 2020,
URL: https://www.ijtsrd.com/papers/ijtsrd30153.pdf
Paper Url : https://www.ijtsrd.com/engineering/other/30153/impact-of-climate-change-on-epilepsy-patients-with-age-stratifications-variability-of-temperature-and-relative-humidity-effects/jaiyeola-o-paul
The Impact of Temperature and Relative Humidity Elevation on Mental Health of...ijtsrd
The paper examined the impact of temperature and relative humidity escalation on mental health of in patient admitted into Jos Teaching Hospital JUTH Jos, Plateau State, Nigeria. The main independent variables of interest were temperature and relative humidity we also employed two derived parameters heat index and overlapping effect in our analysis in which we used four years 2011 2014 data of psychiatric cases and in patient that were admitted in the hospital, ex post facto research design was adopted for the study. The population of the study comprised 2073 in patient that was admitted in the hospital from the year 2011 2014 was sample used for the study. Data collected were analyzed with used of single regression and multiple regression analysis with complex heat index formula. The study found climate parameters temperature and relative humidity and their counterpart derived parameters heat index and overlapping effect make population vulnerable to the risk of psychiatric cases and do increase the numbers of patient admitted in the JUTH. There were positive association between the numbers of in patient in the JUTH and those parameters with 41 and 38 critical acute psychiatric cases due to overlapping and heat index effect respectively. In other word 79 10.2 of the total 778 numbers of patient traceable to those parameters were in critical acute psychiatric condition. Increase in the relative humidity and overlapping made population more vulnerable to the risk of psychiatric cases with approximately equal strength than the heat index and temperature. But the heat index makes more risk than temperature. The vulnerability of population to psychiatric cases was not equally distributed throughout the year 2011 2014. Population response differently to the impact of each parameter throughout those years considered. The effective strength of relative humidity determines the effective strength of the overlapping effect and the effective strength of temperature determine that of the heat index. Jaiyeola O. Paul | Abdullahi Ayegba | Abimaje Okolo Suleiman ""The Impact of Temperature and Relative Humidity Elevation on Mental Health of In-Patient Admitted Into Jos Teaching Hospital Jos, Plateau State, Nigeria"" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-2 , February 2020, URL: https://www.ijtsrd.com/papers/ijtsrd29944.pdf
Paper Url : https://www.ijtsrd.com/engineering/aeronautical-engineering/29944/the-impact-of-temperature-and-relative-humidity-elevation-on-mental-health-of-in-patient-admitted-into-jos-teaching-hospital-jos-plateau-state-nigeria/jaiyeola-o-paul
135 impact of climate change on epilepsy patients with age stratifications ijtsrd
"The paper examined the impact of climate change on epilepsy patients in and out patient that visited Neuropsychiatric Hospital Akure, Ondo State, Nigeria. The main independent variables of interest are temperature and relative humidity as climate the two parameters covering a period of eight years 2010 2017. Data of in and out patients diagnosed with epilepsy and other related cases were sourced from the hospital records. The population of the study is 2873 epilepsy patients that visited the hospital within the period of study, comprising of 143 4.98 age 0 4 years, 447 15.56 age 5 9 years, 963 33.52 age 10 19 years, 983 34.22 age 20 44 years, 273 9.50 age 45 64 years, 36 1.25 age 65 69 years and 28 0.97 age 70 years. And for the purpose of analysis and discussion the population of study was further stratified into Children aged 0 19 years 1553 54.05 , adult aged 20 64 years 1256 43.72 , older adult aged 65 69 years 36 1.25 and elderly aged 70 28 0.97 . Jaiyeola O. Paul | Abdullahi Ayegba | Esu S. Ulaetor ""Impact of Climate Change on Epilepsy Patients with Age Stratifications: Variability of Temperature and Relative Humidity Effects"" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-2 , February 2020,
URL: https://www.ijtsrd.com/papers/ijtsrd30153.pdf
Paper Url : https://www.ijtsrd.com/engineering/other/30153/impact-of-climate-change-on-epilepsy-patients-with-age-stratifications-variability-of-temperature-and-relative-humidity-effects/jaiyeola-o-paul
Radiofrequency Radiation and Children’s Health – Sustainability Challenges fo...Mikko Ahonen
Presented in the 14 Scandinavian Workshop on E-Goverment. By post-doc researcher, PhD Mikko Ahonen and researcher, PhD student Tarmo Koppel.
Includes discussion about outdated RF Guidelines and risk-management from schools' perspective.
Mobile phones and cancers: What is the evidence? - Prof Mike RepacholiThe Radiation Doctor
This is the ultimate research study which will demystify all the myths related to cellphones & cell-tower radiation! This piece presented by Prof Mike Repacholi, Former Co-ordinator, Radiation and Environmental Health
World Health Organization, Geneva, Switzerland. He has presented all the relevant facts about relation of cancer & other health hazards with radiation.
Why Do People Get Sick in Damp Buildings? The joint conference of the Wisconsin Environmental Health Association and the Bureau of Environmental and Occupational Health (Wisconsin Department of Health Services).
Radiofrequency Radiation and Children’s Health – Sustainability Challenges fo...Mikko Ahonen
Presented in the 14 Scandinavian Workshop on E-Goverment. By post-doc researcher, PhD Mikko Ahonen and researcher, PhD student Tarmo Koppel.
Includes discussion about outdated RF Guidelines and risk-management from schools' perspective.
Mobile phones and cancers: What is the evidence? - Prof Mike RepacholiThe Radiation Doctor
This is the ultimate research study which will demystify all the myths related to cellphones & cell-tower radiation! This piece presented by Prof Mike Repacholi, Former Co-ordinator, Radiation and Environmental Health
World Health Organization, Geneva, Switzerland. He has presented all the relevant facts about relation of cancer & other health hazards with radiation.
Why Do People Get Sick in Damp Buildings? The joint conference of the Wisconsin Environmental Health Association and the Bureau of Environmental and Occupational Health (Wisconsin Department of Health Services).
OM: Advanced Bio-Well Practical Hands on Training - Feb.5-6-7/2016Krishna Madappa
OM: As our global and concentrated Bio-Well community grows, so should our dedicated training.
Dr.K.Korotkov & Krishna see this as an essential educational module for creating a next generation of Bio-Well professional users.
As the software platforms continue to amplify the non-linearity and our understanding of our multi dimensional presence, we are here to ennoble a seamless interface to this evolutionary level of Human Development.
Ultimately our singular purpose is to assist all our Bio-Well users globally to be the stewards of the advanced science of Bio-Electrography and inspire a generation towards the "Sciences of Optimal Human Excellence".
The current pandemic shows us what happens if pathogens become easily transmissible from human to human, even if the mortality rate of a virus is relatively low. In view of this fact, it is almost unbelievable that since more than ten years, highly risky “gain-of-function” experiments are being conducted in various research labs where dangerous pathogens, such as avian influenza viruses and SARS-type viruses, are being adapted to human cells so that they ultimately become dangerous, i.e. potentially pandemic pathogens. Such experiments are ongoing – even with much more dangerous types of viruses – and, at least partially funded by taxpayers’ money. It is the responsibility of scientists worldwide to raise awareness about these huge risks among politicians and among the general public. A group of 50 scientists from different scientific disciplines and from various countries in Europa, America, Asia, Australia and New Zealand have drafted and signed the „Hamburg Declaration 2022“ with the goal of a worldwide ban of „gain-of-function” research with potentially pandemic pathogens as well as its supervision and continuous monitoring by an independent international regulatory agency. This Declaration follows the spirit of the “Göttinger Declaration of 1957” devoted to the threat by nuclear weapons
Title: Sense of Taste
Presenter: Dr. Faiza, Assistant Professor of Physiology
Qualifications:
MBBS (Best Graduate, AIMC Lahore)
FCPS Physiology
ICMT, CHPE, DHPE (STMU)
MPH (GC University, Faisalabad)
MBA (Virtual University of Pakistan)
Learning Objectives:
Describe the structure and function of taste buds.
Describe the relationship between the taste threshold and taste index of common substances.
Explain the chemical basis and signal transduction of taste perception for each type of primary taste sensation.
Recognize different abnormalities of taste perception and their causes.
Key Topics:
Significance of Taste Sensation:
Differentiation between pleasant and harmful food
Influence on behavior
Selection of food based on metabolic needs
Receptors of Taste:
Taste buds on the tongue
Influence of sense of smell, texture of food, and pain stimulation (e.g., by pepper)
Primary and Secondary Taste Sensations:
Primary taste sensations: Sweet, Sour, Salty, Bitter, Umami
Chemical basis and signal transduction mechanisms for each taste
Taste Threshold and Index:
Taste threshold values for Sweet (sucrose), Salty (NaCl), Sour (HCl), and Bitter (Quinine)
Taste index relationship: Inversely proportional to taste threshold
Taste Blindness:
Inability to taste certain substances, particularly thiourea compounds
Example: Phenylthiocarbamide
Structure and Function of Taste Buds:
Composition: Epithelial cells, Sustentacular/Supporting cells, Taste cells, Basal cells
Features: Taste pores, Taste hairs/microvilli, and Taste nerve fibers
Location of Taste Buds:
Found in papillae of the tongue (Fungiform, Circumvallate, Foliate)
Also present on the palate, tonsillar pillars, epiglottis, and proximal esophagus
Mechanism of Taste Stimulation:
Interaction of taste substances with receptors on microvilli
Signal transduction pathways for Umami, Sweet, Bitter, Sour, and Salty tastes
Taste Sensitivity and Adaptation:
Decrease in sensitivity with age
Rapid adaptation of taste sensation
Role of Saliva in Taste:
Dissolution of tastants to reach receptors
Washing away the stimulus
Taste Preferences and Aversions:
Mechanisms behind taste preference and aversion
Influence of receptors and neural pathways
Impact of Sensory Nerve Damage:
Degeneration of taste buds if the sensory nerve fiber is cut
Abnormalities of Taste Detection:
Conditions: Ageusia, Hypogeusia, Dysgeusia (parageusia)
Causes: Nerve damage, neurological disorders, infections, poor oral hygiene, adverse drug effects, deficiencies, aging, tobacco use, altered neurotransmitter levels
Neurotransmitters and Taste Threshold:
Effects of serotonin (5-HT) and norepinephrine (NE) on taste sensitivity
Supertasters:
25% of the population with heightened sensitivity to taste, especially bitterness
Increased number of fungiform papillae
Report Back from SGO 2024: What’s the Latest in Cervical Cancer?bkling
Are you curious about what’s new in cervical cancer research or unsure what the findings mean? Join Dr. Emily Ko, a gynecologic oncologist at Penn Medicine, to learn about the latest updates from the Society of Gynecologic Oncology (SGO) 2024 Annual Meeting on Women’s Cancer. Dr. Ko will discuss what the research presented at the conference means for you and answer your questions about the new developments.
These lecture slides, by Dr Sidra Arshad, offer a quick overview of physiological basis of a normal electrocardiogram.
Learning objectives:
1. Define an electrocardiogram (ECG) and electrocardiography
2. Describe how dipoles generated by the heart produce the waveforms of the ECG
3. Describe the components of a normal electrocardiogram of a typical bipolar leads (limb II)
4. Differentiate between intervals and segments
5. Enlist some common indications for obtaining an ECG
Study Resources:
1. Chapter 11, Guyton and Hall Textbook of Medical Physiology, 14th edition
2. Chapter 9, Human Physiology - From Cells to Systems, Lauralee Sherwood, 9th edition
3. Chapter 29, Ganong’s Review of Medical Physiology, 26th edition
4. Electrocardiogram, StatPearls - https://www.ncbi.nlm.nih.gov/books/NBK549803/
5. ECG in Medical Practice by ABM Abdullah, 4th edition
6. ECG Basics, http://www.nataliescasebook.com/tag/e-c-g-basics
These simplified slides by Dr. Sidra Arshad present an overview of the non-respiratory functions of the respiratory tract.
Learning objectives:
1. Enlist the non-respiratory functions of the respiratory tract
2. Briefly explain how these functions are carried out
3. Discuss the significance of dead space
4. Differentiate between minute ventilation and alveolar ventilation
5. Describe the cough and sneeze reflexes
Study Resources:
1. Chapter 39, Guyton and Hall Textbook of Medical Physiology, 14th edition
2. Chapter 34, Ganong’s Review of Medical Physiology, 26th edition
3. Chapter 17, Human Physiology by Lauralee Sherwood, 9th edition
4. Non-respiratory functions of the lungs https://academic.oup.com/bjaed/article/13/3/98/278874
Prix Galien International 2024 Forum ProgramLevi Shapiro
June 20, 2024, Prix Galien International and Jerusalem Ethics Forum in ROME. Detailed agenda including panels:
- ADVANCES IN CARDIOLOGY: A NEW PARADIGM IS COMING
- WOMEN’S HEALTH: FERTILITY PRESERVATION
- WHAT’S NEW IN THE TREATMENT OF INFECTIOUS,
ONCOLOGICAL AND INFLAMMATORY SKIN DISEASES?
- ARTIFICIAL INTELLIGENCE AND ETHICS
- GENE THERAPY
- BEYOND BORDERS: GLOBAL INITIATIVES FOR DEMOCRATIZING LIFE SCIENCE TECHNOLOGIES AND PROMOTING ACCESS TO HEALTHCARE
- ETHICAL CHALLENGES IN LIFE SCIENCES
- Prix Galien International Awards Ceremony
New Directions in Targeted Therapeutic Approaches for Older Adults With Mantl...i3 Health
i3 Health is pleased to make the speaker slides from this activity available for use as a non-accredited self-study or teaching resource.
This slide deck presented by Dr. Kami Maddocks, Professor-Clinical in the Division of Hematology and
Associate Division Director for Ambulatory Operations
The Ohio State University Comprehensive Cancer Center, will provide insight into new directions in targeted therapeutic approaches for older adults with mantle cell lymphoma.
STATEMENT OF NEED
Mantle cell lymphoma (MCL) is a rare, aggressive B-cell non-Hodgkin lymphoma (NHL) accounting for 5% to 7% of all lymphomas. Its prognosis ranges from indolent disease that does not require treatment for years to very aggressive disease, which is associated with poor survival (Silkenstedt et al, 2021). Typically, MCL is diagnosed at advanced stage and in older patients who cannot tolerate intensive therapy (NCCN, 2022). Although recent advances have slightly increased remission rates, recurrence and relapse remain very common, leading to a median overall survival between 3 and 6 years (LLS, 2021). Though there are several effective options, progress is still needed towards establishing an accepted frontline approach for MCL (Castellino et al, 2022). Treatment selection and management of MCL are complicated by the heterogeneity of prognosis, advanced age and comorbidities of patients, and lack of an established standard approach for treatment, making it vital that clinicians be familiar with the latest research and advances in this area. In this activity chaired by Michael Wang, MD, Professor in the Department of Lymphoma & Myeloma at MD Anderson Cancer Center, expert faculty will discuss prognostic factors informing treatment, the promising results of recent trials in new therapeutic approaches, and the implications of treatment resistance in therapeutic selection for MCL.
Target Audience
Hematology/oncology fellows, attending faculty, and other health care professionals involved in the treatment of patients with mantle cell lymphoma (MCL).
Learning Objectives
1.) Identify clinical and biological prognostic factors that can guide treatment decision making for older adults with MCL
2.) Evaluate emerging data on targeted therapeutic approaches for treatment-naive and relapsed/refractory MCL and their applicability to older adults
3.) Assess mechanisms of resistance to targeted therapies for MCL and their implications for treatment selection
Flu Vaccine Alert in Bangalore Karnatakaaddon Scans
As flu season approaches, health officials in Bangalore, Karnataka, are urging residents to get their flu vaccinations. The seasonal flu, while common, can lead to severe health complications, particularly for vulnerable populations such as young children, the elderly, and those with underlying health conditions.
Dr. Vidisha Kumari, a leading epidemiologist in Bangalore, emphasizes the importance of getting vaccinated. "The flu vaccine is our best defense against the influenza virus. It not only protects individuals but also helps prevent the spread of the virus in our communities," he says.
This year, the flu season is expected to coincide with a potential increase in other respiratory illnesses. The Karnataka Health Department has launched an awareness campaign highlighting the significance of flu vaccinations. They have set up multiple vaccination centers across Bangalore, making it convenient for residents to receive their shots.
To encourage widespread vaccination, the government is also collaborating with local schools, workplaces, and community centers to facilitate vaccination drives. Special attention is being given to ensuring that the vaccine is accessible to all, including marginalized communities who may have limited access to healthcare.
Residents are reminded that the flu vaccine is safe and effective. Common side effects are mild and may include soreness at the injection site, mild fever, or muscle aches. These side effects are generally short-lived and far less severe than the flu itself.
Healthcare providers are also stressing the importance of continuing COVID-19 precautions. Wearing masks, practicing good hand hygiene, and maintaining social distancing are still crucial, especially in crowded places.
Protect yourself and your loved ones by getting vaccinated. Together, we can help keep Bangalore healthy and safe this flu season. For more information on vaccination centers and schedules, residents can visit the Karnataka Health Department’s official website or follow their social media pages.
Stay informed, stay safe, and get your flu shot today!
Knee anatomy and clinical tests 2024.pdfvimalpl1234
This includes all relevant anatomy and clinical tests compiled from standard textbooks, Campbell,netter etc..It is comprehensive and best suited for orthopaedicians and orthopaedic residents.
Explore natural remedies for syphilis treatment in Singapore. Discover alternative therapies, herbal remedies, and lifestyle changes that may complement conventional treatments. Learn about holistic approaches to managing syphilis symptoms and supporting overall health.
Tom Selleck Health: A Comprehensive Look at the Iconic Actor’s Wellness Journeygreendigital
Tom Selleck, an enduring figure in Hollywood. has captivated audiences for decades with his rugged charm, iconic moustache. and memorable roles in television and film. From his breakout role as Thomas Magnum in Magnum P.I. to his current portrayal of Frank Reagan in Blue Bloods. Selleck's career has spanned over 50 years. But beyond his professional achievements. fans have often been curious about Tom Selleck Health. especially as he has aged in the public eye.
Follow us on: Pinterest
Introduction
Many have been interested in Tom Selleck health. not only because of his enduring presence on screen but also because of the challenges. and lifestyle choices he has faced and made over the years. This article delves into the various aspects of Tom Selleck health. exploring his fitness regimen, diet, mental health. and the challenges he has encountered as he ages. We'll look at how he maintains his well-being. the health issues he has faced, and his approach to ageing .
Early Life and Career
Childhood and Athletic Beginnings
Tom Selleck was born on January 29, 1945, in Detroit, Michigan, and grew up in Sherman Oaks, California. From an early age, he was involved in sports, particularly basketball. which played a significant role in his physical development. His athletic pursuits continued into college. where he attended the University of Southern California (USC) on a basketball scholarship. This early involvement in sports laid a strong foundation for his physical health and disciplined lifestyle.
Transition to Acting
Selleck's transition from an athlete to an actor came with its physical demands. His first significant role in "Magnum P.I." required him to perform various stunts and maintain a fit appearance. This role, which he played from 1980 to 1988. necessitated a rigorous fitness routine to meet the show's demands. setting the stage for his long-term commitment to health and wellness.
Fitness Regimen
Workout Routine
Tom Selleck health and fitness regimen has evolved. adapting to his changing roles and age. During his "Magnum, P.I." days. Selleck's workouts were intense and focused on building and maintaining muscle mass. His routine included weightlifting, cardiovascular exercises. and specific training for the stunts he performed on the show.
Selleck adjusted his fitness routine as he aged to suit his body's needs. Today, his workouts focus on maintaining flexibility, strength, and cardiovascular health. He incorporates low-impact exercises such as swimming, walking, and light weightlifting. This balanced approach helps him stay fit without putting undue strain on his joints and muscles.
Importance of Flexibility and Mobility
In recent years, Selleck has emphasized the importance of flexibility and mobility in his fitness regimen. Understanding the natural decline in muscle mass and joint flexibility with age. he includes stretching and yoga in his routine. These practices help prevent injuries, improve posture, and maintain mobilit
Ozempic: Preoperative Management of Patients on GLP-1 Receptor Agonists Saeid Safari
Preoperative Management of Patients on GLP-1 Receptor Agonists like Ozempic and Semiglutide
ASA GUIDELINE
NYSORA Guideline
2 Case Reports of Gastric Ultrasound
HOT NEW PRODUCT! BIG SALES FAST SHIPPING NOW FROM CHINA!! EU KU DB BK substit...GL Anaacs
Contact us if you are interested:
Email / Skype : kefaya1771@gmail.com
Threema: PXHY5PDH
New BATCH Ku !!! MUCH IN DEMAND FAST SALE EVERY BATCH HAPPY GOOD EFFECT BIG BATCH !
Contact me on Threema or skype to start big business!!
Hot-sale products:
NEW HOT EUTYLONE WHITE CRYSTAL!!
5cl-adba precursor (semi finished )
5cl-adba raw materials
ADBB precursor (semi finished )
ADBB raw materials
APVP powder
5fadb/4f-adb
Jwh018 / Jwh210
Eutylone crystal
Protonitazene (hydrochloride) CAS: 119276-01-6
Flubrotizolam CAS: 57801-95-3
Metonitazene CAS: 14680-51-4
Payment terms: Western Union,MoneyGram,Bitcoin or USDT.
Deliver Time: Usually 7-15days
Shipping method: FedEx, TNT, DHL,UPS etc.Our deliveries are 100% safe, fast, reliable and discreet.
Samples will be sent for your evaluation!If you are interested in, please contact me, let's talk details.
We specializes in exporting high quality Research chemical, medical intermediate, Pharmaceutical chemicals and so on. Products are exported to USA, Canada, France, Korea, Japan,Russia, Southeast Asia and other countries.
HOT NEW PRODUCT! BIG SALES FAST SHIPPING NOW FROM CHINA!! EU KU DB BK substit...
Progress Report2002 2003
1. THE INTERNATIONAL EMF
PROJECT
PROGRESS REPORT 2002-2003
SUMMARY
This eighth progress report for the International EMF Project covers activities and outputs for the period
May 2002 to May 2003. The report has been formatted according to scheduled EMF Project
activities: scientific reviews; research co-ordination; health risk assessments; harmonization of EMF
standards; risk perception and communication. Current details of the EMF Project, its activities and
outputs can be found on our newly re-vamped home page at: http://www.who.int/emf/
A workshop on the effects of heating on the human body was held at WHO/HQ in March 2002. The
results have been published as a special volume of the International Journal of Hyperthermia, Vol. 19,
No. 3, pp. 215-384 / May-June 2003.
We have embarked on the health risk assessments for exposure to static and ELF fields. Based on the
large literature on static fields which has never been thoroughly reviewed we have decided to develop
to separate monographs, one for static fields and another one for ELF fields.
The Handbook on "Establishing a dialogue on risks from electromagnetic fields" has been published.
It has been very well received and has been translated into Spanish, German and Italian, electronic
versions of which are available on the Project WebSite. Additionally, it is currently being translated into:
French (in house at WHO). Dutch and Japanese translations are being discussed. If you are interested
in translating it into other languages please let us know.
The standards harmonization activity has reached the stage where all 6 regions of WHO have had
meetings allowing input from scientists and government officials in each region. A framework has been
re-drafted based on numerous inputs and has been mailed to IAC for final review. Depending on
comments received we will further refine it and submit to an international meeting for approval in 2004.
SCIENTIFIC REVIEWS
Since the main effect of exposure of humans to RF radiation is heating, it is of particular importance to
critically evaluate information relating elevated temperature effects on the human body, from the cellular
and tissue level to the whole body level. This would include heating of the embryo and fetus as well as
thermally sensitive organs in the body. In order to provide this information, WHO's EMF Project
convened a Workshop on Adverse Temperature Levels in the Human Body from 21-22 March 2002
at WHO headquarters in Geneva.
The purpose of the Workshop was to:
• present state-of-the-science information on the effects of elevated temperature and times of exposure
on mammalian cells and tissues, the fetus, sensitive organs (e.g. eye, skin, brain, and testes) and the
1
2. whole body.
• define the combined elevated temperature and exposure times causing adverse effects in biological
systems.
• prepare a written report on the persuasiveness of the data for recommendations for maximal
permissible temperature elevations in tissues and organs in human beings and make such
recommendations if appropriate.
• provide information useful for development of RF exposure standards.
The results have been published as a special volume of the International Journal of Hyperthermia, Vol.
19, No. 3, pp. 215-384 / May-June 2003. (Publisher: Taylor & Francis Health Sciences, part of the
Taylor & Francis Group):
Thermal stress and radiation protection principles
L. Kheifets, M. Repacholi, R. Saunders
Cardiovascular responses to heat stress and their adverse consequences in healthy and
vulnerable human populations
G. C. Donaldson, W. R. Keatinge, R. D. Saunders
Carcinogenic effects of hyperthermia
M. W. Dewhirst, M. Lora-Michiels, B. L. Viglianti, et al.
Cellular effects of hyperthermia: relevance to the minimum dose for thermal damage
James R. Lepock
Basic principles of thermal dosimetry and thermal thresholds for tissue damage from
hyperthermia
M. W. Dewhirst, B. L. Viglianti, M. Lora-Michiels, et al.
Effects of heat on embryos and foetuses
M. J. Edwards, R. D. Saunders, K. Shiota
Hyperthermia induced pathophysiology of the central nervous system
H. S. Sharma, P. J. Hoopes
Effects of heat stress on cognitive performance: the current state of knowledge
P. A. Hancock, I. Vasmatzidis
Summary, conclusions and recommendations: adverse temperature levels in the human
body
L. S. Goldstein, M. W. Dewhirst, M. Repacholi, et al.
2
3. Glossary
As you can see several papers in this volume are by leading hyperthermia scientists and WHO staff
representing state-of the art knowledge and will provide key input to the development of standards
world-wide.
Scientific reviews of the literature are conducted for two main purposes: to provide a status report on
current knowledge related to possible health effects of EMF; and to identify gaps in knowledge that
need further research leading to better health risk assessments. Special meetings have been conducted
in countries having large research programmes, but where most of the results are published in their own
language (other than English) and so are not widely available for the scientific review process. These
meetings also provide the opportunity to allow key scientists to summarize their results so that they can
become part of WHO's world wide review process for determining possible EMF health risks.
Of particular importance this year was the meeting on Electromagnetic Fields and Human Health.
Fundamental and Applied Research. Moscow / St. Petersburg, Russia - 17-25 September 2002. This
workshop reviewed Russian publications that have provided the basis for standards in Russia and other
parts of the world. Additionally, important discussion focused on the differences in the scientific
evidence and review standards in the different parts of the world. While providing important insight
most of these differences remain unresolved. Previous attempts to replicate Russian studies have not
been successful. Further progress will require organization and funding of parallel studies addressing
key hypothesis.
Previously held scientific review meetings include:
• Biological effects from exposure to EMF in the RF range (10 MHz to 300 GHz) were reviewed
at meetings in Munich, Germany (1996) and RF pulse-modulated fields in Erice, Sicily (1999); Low
frequencies (0 to 300 Hz) were reviewed in Bologna, Italy (1997);
• Psychosocial impacts of EMF exposure in Graz, Austria (1998);
• Intermediate frequencies (300 Hz to 10 MHz) were reviewed in Maastricht, The Netherlands
(1999); and
• Environmental impacts of EMF were reviewed in Ismaning, Germany (1999).
Updates of the science are now given on a regional basis at meetings for the Standards Harmonisation
activity.
RESEARCH CO-ORDINATION
A research update meeting will take place in Geneva June 11-13, 2003. At this meeting we will focus
on RF research only. Research needs for static fields and ELF are being developed as part of the
review for EHC. At this meeting on RF we will assess ongoing studies, planned research and research
priorities by government and industry funding agencies.
Assessment of outstanding EMF research needs will be determined by independent research scientists
3
4. invited by WHO on 11 June 2003. Assessment of ongoing studies and research priorities by
government and industry funding agencies will take place on June 12-13. At this meeting we will review
ongoing and planned national and collaborative research programs as well as identify of research needs.
We will discuss both short term priorities for research which can be completed to in time to contribute
to EHC, as well as the long term research agenda. Finally, we will discuss the WHO Research
Database and the best way to update and maintain it.
HEALTH RISK ASSESSMENTS
The primary goal of the International EMF Project is to review the scientific literature on health effects
of electromagnetic fields with frequencies 0 to 300 GHz, to assess the health risks of exposures based
on this review, and to develop policy options in light of this understanding. The results will be published
as Environmental Health Criteria (EHC) monograph or another similar document. We have embarked
on the health risk assessments for exposure to static and ELF fields. Based on the large literature on
static fields which has never been thoroughly reviewed we have decided to develop to separate
monographs one for static fields and another one for ELF fields.
The EHCs are the result of in-depth weight-of-evidence critical reviews conducted through independent,
scientific peer-review groups on various topics related to exposure of people to static and time varying
electric and magnetic fields. The reviews will build on excellent reviews already completed and update
them with the more recent literature. Reviews will be primarily focus on the peer review literature,
however reports and other publications of well-conducted research not in the peer review literature will
also be considered.
Once the first drafts of the chapters are complete they will be peer-reviewed. Comments will be
incorporated and a combined report will be subjected to a formally constituted WHO Task Group
meeting. Membership of WHO Task Groups are approved by the Executive Director (Sustainable
Development and Healthy Environments) of WHO and will comprise representatives of the drafting
committees and experts appointed by speciality, range of views, gender and geographical distribution.
Following WHO technical reviewing and editing, the final document will be published by WHO.
Schedule of assessments and progress
The schedule for formal reviews of the EMF literature have been scheduled as shown below:
2001 IARC carcinogen identification and evaluation of static and ELF fields
2003-4 WHO/ICNIRP health risk assessment of static and ELF fields
2005 IARC carcinogen identification and evaluation of RF fields
2006-7 WHO/ICNIRP health risk assessment of RF fields
Several working group meetings which are developing chapters for EHC have been held, including
Static Fields held in Vlaardingen, The Netherlands (18-19 November 2002); Neurodegenerative
workshop held at WHO HQ, Geneva (12-13 December 2002); Cardiovascular disease held at
Karolinska Institut, Sweden (27 May 2003). And the important policy workshop held in Luxembourg
(Feb 2003) which is described in the next section.
4
5. The next workshop, to be held in Japan and scheduled for September 2003 and will:
1. Review a chapter on World-wide exposure distribution and other aspect of human exposure
2. Update epidemiological studies on cancer (especially childhood leukaemia) which came out after
IARC evaluation (Germany, Japan and possibly Italy)
3. Critically review Epidemiological studies (what do they tell us, exposure misclassification,
uncertainties)
4. Decide how to move beyond hazard identification to the estimate of the disease burden.
EMF RISK MANAGEMENT
Possible health effects arising from exposure to extremely low frequency (ELF) electromagnetic fields
(EMF) have been the subject of research for many years, but without definitive scientific resolution. At
radio frequencies (RF), the rapid growth of new technologies such as mobile wireless
telecommunications has raised concerns that exposure to fields from mobile phones and base stations
could have long-term health consequences.
Conducting Human Health and Environmental Risk Assessment and Risk Management under the
precepts of Precautionary Principle represents challenges and opportunities for scientists, policy makers
and the public. Responding to the need to provide a framework and test it in a case study, the World
Health Organization, The European Commission and the National Institute of Environmental Health
Science conducted a 3 day meeting on "Application of the Precautionary Principle to EMF". This
meeting, held in Luxembourg on February 24-26, 2003, brought together international experts whose
individual perspectives led to the synthesis of an approach that recognizes and accommodates the
diverse disciplines necessary for successful implementation of Precautionary Principle.
The first day was an open meeting featuring point-counterpoint presentations to highlight strengths and
weaknesses of the Precautionary Principle, and arguments for and against its use for policy decisions
regarding possible health implications from exposure to electromagnetic fields (EMF). Attendees had
the opportunity to provide input and perspective and participate in an open discussion with a panel of
experts. The workshop was well attend and 16 individuals and organizations had an opportunity to
provide a diverse input. For a masterful summary by Tom McManus go to:
http://www.who.int/peh-emf/meetings/Lux_final_rapp_report.pdf
During the second and third days, invited experts worked on a draft document. The workshop brought
together scientists, engineers, lawyers, health professionals and concerned citizens with knowledge of
the Precautionary Principle to contribute perspectives from health, government, academia, environmental
advocacy groups and industry. As a starting point the group used the criteria for the application of
Precautionary Principle developed in the European Commission communication published in February
2002: decisions must be proportional to the chosen level of protection, non-discriminatory in their
5
6. application, consistent with measures already taken, based on potential costs and benefits, subject to
review and capable of assigning responsibility for producing the scientific evidence necessary for more
comprehensive risk assessment. EMF was a test case for an environmental agent already classified as
possibly carcinogenic for the low frequency magnetic fields, and for mobile phone technologies where
key studies for the conventional risk assessment will not be completed for several years.
As the result of the input received at the workshop, WHO re-drafted it’s document focusing on the
development of an overarching framework for use of precautionary measures at each stage of the risk
management cycle. This document is currently undergoing a review within WHO. Simultaneously, the
document is broadly circulated for a comprehensive review by all stakeholders.
Based on this framework, and once it has been finalized, we will develop several case studies which will
include ELF and RF. Results of this important meeting will contribute to the WHO International EMF
Project's development of policy options for EMF, and to general WHO policy on the use of
Precautionary Framework on health issues.
EMF RISK PERCEPTION AND COMMUNICATION
A large amount of useful information on EMF risk perception, communication and management has now
been gathered following the international reviews in Vienna in 1997 and Ottawa in 1998. A summary
report of the Ottawa meeting, entitled “EMF Risk Perception and Communication” by LM Brodsky,
W Leiss, D Krewski and MH Repacholi has been completed and has been submitted for publication.
A user-friendly handbook for governmental and non-governmental organizations, and individuals
interested in this topic has been completed and published. It is entitled "Establishing a dialogue on risks
from electromagnetic fields" (ISBN 92 4 154571 2). All IAC members have had the opportunity to
review this book that has taken some time to complete. This handbook was published in an attractive
format in October 2002, and formatted for use and downloading on the EMF web site:
http://www.who.int/peh-emf/publications/risk_hand/en/
Due to the extreme popularity and large demand of this publication, and at the advice of WHO’s
Marketing and Dissemination Unit, we decided to sell it. The Handbook has been very well received
and has been kindly translated into Spanish by Victor Cruz’s institute, Peruvian National Institute for
Research and Training in Telecommunications (INICTEL), German, Axel Böttger’s institute (Federal
Ministry of Environment, Nature Conservation and Nuclear Safety) and also into Italian by Paolo
Vecchia, Istituto Superiore di Sanità. It is expected that about 50,000 copies of the Italian version will
be printed. Electronic versions of the Spanish, Italian and German are now available to downloadable
from the EMF web site at:
http://www.who.int/peh-emf/publications/risk_hand/en/
Additionally, it is currently being translated into French (in house at WHO), and Dutch and Japanese
translations are also being discussed. If you are interested in translating it into other languages please
let us know.
6
7. HARMONIZATION OF EMF STANDARDS
In response to the many countries that are considering new EMF standards WHO launched an initiative
to harmonize EMF standards. Globalization of trade and the rapid introduction of mobile
telecommunications worldwide have focused attention on the large differences existing in standards.
Differences in the EMF limit values in standards in some Eastern European and Western countries are,
in some cases, over 100 times. This has raised concerns about their safety and has led to public anxiety
about increasing EMF exposures from the introduction of new technologies.
The purpose of this activity is to work towards, and hopefully achieve, international agreement on a
framework for developing guidelines on protection of the public and workers from exposure to EMF.
Development of the framework has been carried out by working groups formed to address the key
components. Working group meetings have been held, generally in conjunction with scientific meetings
in key geographical regions that will allow the input of scientists and government officials in those
regions. One goal of setting up the working groups is to enhance the quality of communication among
scientists and government officials, in examining the scientific basis for the standards and the assumptions
that underlie them.
Scientific conferences organized to include working group meetings in key regions.
1. 2nd International EMF Seminar in China: Electromagnetic Fields and Biological Effects:
Xi'an, China 23-26 October 2000.
2. WHO EMF Standards Harmonization Meeting: Brooks Airforce Base, San Antonio, Texas
13-14 November 2000
3. WHO/Peru Government regional seminar: Bioeffects and EMF Standards Harmonization,
Lima, Peru 7-9 March 2001
4. WHO EMF Standards Harmonization regional meeting, Bulgaria 28April - 3 May 2001
5. WHO EMF Biological Effects and Standards Harmonization regional meeting, South Korea
22-25 October 2001
6. WHO EMF Biological Effects and Standards Harmonization regional meeting, Cape Town,
South Africa 5-7 December 2001
7. WHO EMF Biological Effects and Standards Harmonization, Moscow and St Petersburg
17-25 September 2002
8. WHO EMF Biological Effects and Standards Harmonization regional meeting, Guilin,
Guangxi, China 18-22 April 2003 (Incorporates a working group meeting to finalize the
framework prior to submitting to the international congress) Meeting to be rescheduled
because of SARS outbreak.
9. WHO EMF Standards Harmonization International Congress, Geneva, Switzerland in 2004
The overall plan is to comply with the World Trade Organization (WTO) recommendation that any
standards that affect trade should be developed in conjunction with both developed and developing
countries. Meetings have been established to cover all geographical regions to allow scientists to have
input to a process that is envisaged to lead to a common international standard.
The standards harmonization activity has reached the stage where all 6 regions of WHO have had
7
8. meetings allowing input from scientists and government officials in each region. However, the last
working group meeting scheduled to take place in China had to be postponed due to SARS.
A framework has been re-drafted based on numerous inputs and has been mailed to IAC for final
review. Depending on the comments received we will further refine it and submit to a final International
Conference on Harmonization of EMF Standards which is envisaged for 2004 in Geneva to reach
agreement on the framework. Alternatively, we might have to postpone this activity until the China
meeting takes place. Final framework would be used as a basis for national standards and for
international standards by ICNIRP. In addition we are proceeding with the development of model
legislation for NIR protection. This could be used as a basis for national legislation in those countries
not having a process for setting mandatory health standards or health protection measures for NIR. This
activity should be completed over the next year.
ADMINISTRATION
Role of WHO
In 1996 WHO established the International EMF Project and defined its activities and workplans.
WHO acts as the Secretariat to coordinate, facilitate and implement the Project. EMF Project Working
Groups are comprised of internationally-recognized experts representing a wide range of diverse
opinions on the subject under deliberation. WHO staff cannot be members of any EMF Project
Working Group but are present at meetings to facilitate reaching consensus agreement on conclusions
or recommendations
The International EMF Project scientific reviews meetings are generally conducted in conjunction with
ICNIRP (WHO's formally recognized NGO for NIR protection). These review meetings are open to
any scientist, but working group membership is restricted to independent (non-industry) scientists. WG
conclusions and recommendations are published in scientific peer-review journals to ensure that the
information is made available to as wide an audience as possible. WHO staff members may be listed
authors as appropriate.
All publications of the EMF Project are reviewed by the International Advisory Committee. This
oversight Committee is composed of representatives of many national authorities, 8 international
agencies and WHO collaborating centres. Formal approval by WHO management is required of all
publications. Once a scientific review is completed WHO uses the conclusions and recommendations
in its information for national authorities and the public.
This year has been a very busy for us with requests for presentations on the state of science and the
EMF project well in excess of what we can handle. We attempt to fulfill requests as much as possible,
especially when it comes from national authorities. For the list of the meetings with presentations by
WHO staff see below.
Funding
Over the past year there have been questions raised as to the funding sources of the EMF Project. A
summary of funding sources and conditions are given below. There are very strict requirements for
8
9. WHO to receive funds for extrabudgetary projects, such as the EMF Project.
WHO can receive funds from industry (preferably from industry associations) only after review and
approval by WHO's Legal office. A special WHO committee provides further review of funding from
industry.
All contributions and accounting are strictly audited by WHO and RAH. The EMF Project has adhered
to all the requirements placed on it by WHO and will continue to do so until the Project concludes.
Personnel and Structure
In view of the new importance in radiation within WHO, a new Unit was created called Radiation and
Environmental Health, effective January 2002. This Unit has the responsibility for all WHO activities
related to ionizing and non-ionizing radiations (including the International EMF Project) and is directed
by Dr. Michael Repacholi.
Dr Leeka Kheifets joined WHO in June 2001 to head the radiation studies program. After fulfilment
of her commitment of two years Leeka has resigned and will be moving back to the US. We have
greatly benefited from Leeka’s scientific and management expertise and will continue working with her
on the project. We are currently recruiting for her replacement. Dr Larry Goldstein, a biologist, joined
WHO in February 2002 and is continuing the health risk assessment process. In addition, Dr Emilie van
Deventer works 80% for the EMF Project. Emilie is a professor in electrical engineering and, as part
of her duties, she responds to the large number of enquiries that the Project receives each week.
EMF PROJECT RESOURCES
PUBLICATIONS
Home page
Visit our new EMF Project home page at http://www.who.int/emf/ for much useful and up to date
information.
Brochures
Establishing a dialogue on risks from electromagnetic fields (ISBN 92 4 154571 2) (see previous
paragraph on EMF Risk Perception and Communication).
An extensive booklet on Electromagnetic Fields was drafted for the WHO European Regional Office.
It is written for the lay public and local authorities, and was published in early 1999. This booklet gives
details on the physical characteristics and biological effects of EMF, standards and protective measures,
and is presented in a glossy format with many colour pictures and diagrams for ease of comprehension.
Copies can be ordered directly on the web site at: www.who.dk/environment/pamphlets or from the
Chartered Institute of Environmental Health, Chadwick Court, 15 Hatfields, London SE1 8DJ, UK.
9
10. Fact Sheets
The following WHO Fact Sheets concerning EMF have been published:
• Electromagnetic Fields and Public Health: The International EMF Project. WHO Fact Sheet
#181 Oct. 1997, revised May 1998.
• Electromagnetic Fields and Public Health: Physical Properties and Effects on Biological Systems.
WHO Fact Sheet #182 Oct. 1997, revised May 1998.
• Electromagnetic Fields and Public Health: Health Effects of Radiofrequency Fields. WHO Fact
Sheet #183 Oct. 1997, revised May 1998.
• Electromagnetic Fields and Public Health: Public Perception of EMF Risks. WHO Fact Sheet
#184 Oct. 1997, revised May 1998.
• Electromagnetic Fields and Public Health: Mobile Telephones and their Base Stations. WHO
Fact Sheet #193, revised June 2000.
• Video Display Units (VDUs) and Human Health. WHO Fact Sheet #201 July 1998
• Electromagnetic Fields and Public Health: Extremely Low Frequency (ELF). WHO Fact Sheet
#205 November 1998.
• Electromagnetic Fields and Public Health: Radars and Human Health. WHO Fact Sheet #226
June 1999.
• Electromagnetic Fields and Public Health: WHO Backgrounder on Cautionary Policies. March
2000
• Electromagnetic Fields and Public Health: Extremely low frequency fields and cancer. WHO Fact
Sheet #263 October 2001
Many published Fact Sheets are now available multiple languages.
Press Releases
The following have been published by WHO on the Project:
• WHO Launches New International Project to Assess Health Effects of Electric and Magnetic
Fields. Press release WHO/42, 4 June 1996.
• Electromagnetic fields: Experts Met in Vienna to Assess Public Perceptions of Risks. Press
release WHO/75, 23 October, 1997.
• Health Effects of Electromagnetic Fields: WHO Recommends Research Priorities. Press release
WHO/95, 19 December 1997.
• Scientists Meet in Moscow to Discuss Adverse Effects of Electromagnetic Fields. Press release
WHO/38, 20 May, 1998.
• WHO Launches an Initiative to Harmonize Electromagnetic Field Standards Worldwide. Press
release WHO/88, 17 November 1998
• More information necessary to establish health effects of mobile phones. Press release WHO/45,
28 June 2000.
• WHO clarifies its position on health effects of mobile phone use. Note for the press No 14 10
October 2001
• Clarification of mooted relationship between mobile telephone base stations and cancer.
Statement WHO/1 23 January 2002.
10
11. EMF Project Scientific Journal Publications
• M H Repacholi, E Cardis (1997): Criteria for EMF Health Risk Assessment. Radiation
Protection Dosimetry 72: 305-312.
• M H Repacholi (ed) (1998): Low-Level Exposure to Radiofrequency Electromagnetic Fields:
Health Effects and Research Needs. Bioelectromagnetics 19: 1-19 (1998)
• M H Repacholi and B Greenebaum (eds) (1999): Interaction of Static and Extremely Low
Frequency Electric and Magnetic Fields with Living Systems: Health Effects and Research
Needs. Bioelectromagnetics 20: 133-160.
• A F McKinlay and M H Repacholi (eds) (1999): Exposure metrics and dosimetry for EMF
epidemiology. Radiation Protection Dosimetry 83(1-2): 194.
• K H Foster, P Vecchia, M H Repacholi (2000): Science and the Precautionary Policy. Science
288: 979-981.
• G Mezei, L Kheifets (2001): "Is There any Evidence for Differential Misclassification or for Bias
Away from the Nullmin the Swedish Childhood Cancer Study?" Letter to the Editor,
Epidemiology 12(6):750.
• L Kheifets, R Greenberg, R Neutra, G Hester, C Poole, D Rall D, G Banerjee (2001): From
epidemiology to policy: An EMF case study. American Journal of Epidemiology 154(12):
S50-59.
• L Kheifets, G Hester, G Banerjee (2001): The Precautionary Principle and EMF: Implementation
and Evaluation. Journal of Risk Research 4(2): 113-125.
• L Kheifets (2001): Electric and Magnetic Fields and Occupational Health. Patty's Industrial
Hygiene and Toxicology, Fifth Edition 100: 141-198.
• L Kheifets (2001): Electric and magnetic field exposure and brain cancer. Bioelectromagnetics
5: S120-S131.
• M H Repacholi (2001): Health risks from the use of mobile phones. Toxicology Letters 120:
323-331.
• E Litvak, K R Foster and M H Repacholi (2002): Health and safety implications of exposure to
electromagnetic fields in the frequency range 300 Hz to 10 MHz. Bioelectromagnetics 23(1):
68-82.
• M H Repacholi (2002). Assessment of the Health Effects of EMF Exposure. The Radio
Science Bulletin 301: 14-24.
• L Goldstein, L Kheifets, E van Deventer, M H Repacholi (2002): Comments of the paper "Long-
term exposure of Em -Pim1 transgenic mice to 898.4 MHz microwaves does not increase
lymphoma incidence" Radiation Research. Radiation Research 158: 357-364.
• LS Goldstein, L Kheifets, E van Deventer, M H Repacholi (2002): Further comments on "Long-
term Exposure of E&mgr;-Pim1 Transgenic Mice to 898.4 MHz Microwaves Does Not Increase
Lymphoma Incidence" by Utteridge et al., Radiat. Res. 158, 357-364 (2002).
• J Sahl, G Mezei, R Kavet, A McMillan, A Silvers, A Sastre, L Kheifets (2002): Occupational
magnetic field exposures and cardiovascular mortality in a cohort of electric utility workers.
American Journal of Epidemiology 156:913-918.
• G Mezei, L Kheifets (2002): Clues to the possible viral etiology of childhood leukemia.
Technology 9: 3-14.
• L Kheifets, N Thrall (2002): Electromagnetic Fields and Health. Macmillians Guide to
Pollution, in press.
11
12. • L Kheifets, M H Repacholi, and R Saunders (2003): Thermal stress and radiation protection
principles. International Journal of Hyperthermia 19(3) May-June 2003: 215-224.
• M W Dewhirst, M Lora-Michiels, B L Viglianti and M H Repacholi (2003): Carcinogenic effects
of hyperthermia. International Journal of Hyperthermia 19(3) May-June 2003: 236-251.
• L S Goldstein, M W Dewhirst, M H Repacholi and L Kheifets (2003): Summary, conclusions
and recommendations: adverse temperature levels in the human body. International Journal
of Hyperthermia 19(3) May-June 2003: 373-384.
WHO/IARC publications
Non-ionizing radiation, Part 1: Static and extremely low-frequency (ELF) electric and magnetic fields,
IARC Monographs 80, IARC Press: Lyon, (2002), pp 429.
All press materials, WHO’s Agenda for EMF Research, project progress reports, Minutes of Research
Co-ordination meetings, Standards Harmonization meetings and International Advisory Committee
meetings can be obtained on WHO EMF Project web site at: www.who.int/emf
MEETINGS
The following 3 scientific conferences were organized for 2003, to include working group meetings
in key regions, however, both meetings had to be postponed due to the SARS epidemic:
- 3rd International Conference, Electromagnetic Fields and Human Health. Fundamental and
Applied Researches, Moscow and St Petersburg, Russia. 17-25 September 2002
- EMF Biological Effects and Standards Harmonization regional meeting, Guilin, Guangxi,
(Incorporates a working group meeting to finalize the framework prior to submitting to the
international congress). Postponed until end of March 2004.
- WHO / US Air Force Asian Pacific EMF Conference – Postponed until possibly April 2004.
EMF PROJECT Staff presented and participated in the following meetings
from June 2002 –May 2003
Meeting details Place Date
• Royal Swedish International Union of Radio Science. Stockholm June 2002
Keynote Speech “Epidemiologic Studies of Sweden
Electromagnetic Fields and their Contribution to Risk
Assessment”
• 24th Annual Meeting of the Bioelectromagnetics Quebec June 2002
Society Meeting. Keynote Address Canada
• Malaga University Summer Course on Mobile Ronda – Malaga July 2002
Telephony and its Health Effects. Presentation on Spain
“NIR Protection against short-term thermal effect:
The ICNIRP/WHO approach”
12
13. • General Assembly of the International Union of Radio Maastricht August 2002
Science Commission K on Electromagnetics in The Netherlands
Biology and Medicine
• Keynote Address
• Talks with French Senators regarding EMF, mobile Paris September
phones and health. France 2002
• The National Board of Health and Welfare: Lund September
Environmental Medicine Symposium. Presentation on Sweden 2002
the WHO EMF Project
• The Tunisian Society of Occupational Medicine 5th Tunisia September
ICOH International Conference on Occupational 2002
Health of Health Workers. Presentation on
Electromagnetic Capability
• 3rd International Conference: EMF and Human Moscow & St September
Health, Fundamental and Applied Researches. Petersburg 2002
Russia
• EMC EUROPE 2002: Electromagnetic Fields and Sorrento September
Sustainable Development. Presentation on WHO Italy 2002
Risk Assessment Process
• 2nd International Workshop on Rhodes October 2002
Biological Effects of Electromagnetic Fields Greece
• To participate in a workshop on “Genetic and Lowestein November
Cytogenetic aspects of RF Field Interaction” and Germany 2002
present on the WHO EMF Project.
• Mobile Telecommunications and Health Research London November
Programme Meeting UK 2002
• COST 281 meeting London November
UK 2002
• Representing the WHO EMF Project at a local Gourdon November
public debate on Power lines and health France 2002
• Royal Society. 1- day Workshop London January 2003
UK
• Precautionary Principle – WHO EHC meeting Luxembourg February
2003
• To speak at public debate on the subject of 400,000 Chambéry February
volt power line between Lyon and Chambéry – France 2003
organised by RTE (Gestionnaire du Réseau de
Transport d’Electricité)
• ICNIRP / WHO International Workshop “Weak Oxford March 2003
13
14. ELF Electric Field Effects in the Body” UK
• IBC Conference: Mobile Health and the London March 2003
Environment. Presentation on: “Meeting the ongoing UK
challenge of Risk Communication”
• To participate in “The Rise of the Precautionary Maastricht May 2003
Principle in EU Risk Regulation” organized by the The Netherlands
University of Maastricht International and European
Law.
• European Parliament - Seminar on Mobile Brussels May 2003
Communication Health and Environment in the Belgium
Mobile Community
• Official presentation on Italian translation of Rome May 2003
“Establishing a dialogue on risks from Italy
Electromagnetic Fields”
Scientific Meeting Proceedings
• Non-Thermal Effects of RF Electromagnetic Fields. R Matthes, JH Bernhardt and MH Repacholi
(eds) Proceedings of Munich meeting, November 1996. ICNIRP Pub. 3/97. From: ICNIRP C/-
Bundesamt für Strahlenschutz, Institut für Strahlenhygiene, Ingolstädter Landstraße 1, D-85764
Oberschleißheim, Germany. Tel:+49 89 31603288, Fax:+49 89 316 03289, E-mail:
RMatthes@bfs.de
• Biological Effects of Static and ELF Fields. R Matthes, JH Bernhardt and MH Repacholi (eds),
Proceedings of Bologna meeting, June 1997. ICNIRP Pub. 4/97. From: ICNIRP C/-
Bundesamt für Strahlenschutz, Institut für Strahlenhygiene, Ingolstädter Landstraße 1, D-85764
Oberschleißheim, Germany. Tel:+49 89 31603288, Fax:+49 89 316 03289, E-mail
RMatthes@bfs.de
• Risk Perception, Risk Communication and its Application to EMF Exposure. R Matthes, JH
Bernhardt and MH Repacholi (eds) Proceedings of Vienna meeting, October 1997. ICNIRP
Pub 5/98. From: ICNIRP C/- Bundesamt für Strahlenschutz, Institut für Strahlenhygiene,
Ingolstädter Landstraße 1, D-85764 Oberschleißheim, Germany. Tel:+49 89 31603288,
Fax:+49 89 316 03289, E-mail RMatthes@bfs.de
• Electromagnetic fields: Biological effects and hygienic standardisation. MH Repacholi, NB
Rubtsova and AM Muc (eds) Proceedings of International Meeting. Moscow 18-22 May 1998.
WHO publication WHO/SDE/OEH/99.5, WHO Geneva 1999.
• EMF Risk Perception and Communication. MH Repacholi and AM Muc (eds) Proceedings of
International Seminar on EMF Risk Perception and Communication. Ottawa, Canada 31
August-1 September 1998. WHO publication # WHO/SDE/OEH/99.01, WHO Geneva 1999.
• Health Effects of Electromagnetic Fields in the Frequency Range 300 Hz to 10 MHz. R Matthes,
E van Rongen and MH Repacholi (eds) Proceedings of International Meeting, Maastricht, The
Netherlands 7-8 June 1999. ICNIRP Pub 8/99. From: ICNIRP C/- Bundesamt für
Strahlenschutz, Institut für Strahlenhygiene, Ingolstädter Landstraße 1, D-85764
14
15. Oberschleißheim, Germany. Tel:+49 89 31603288, Fax:+49 89 316 03289, E-mail
RMatthes@bfs.de
• Effects of Electromagnetic Fields on the Living Environment. R Matthes, JH Bernhardt and MH
Repacholi (eds). Proceedings of International Seminar, Ismaning, Germany 4-5 October 1999.
ICNIRP Pub 10/2000. From: ICNIRP C/- Bundesamt für Strahlenschutz, Institut für
Strahlenhygiene, Ingolstädter Landstraße 1, D-85764 Oberschleißheim, Germany. Tel:+49 89
31603288, Fax:+49 89 316 03289, E-mail RMatthes@bfs.de
• Biological effects, health consequences and standards for pulsed radiofrequency fields. R
Matthes, JH Bernhardt and MH Repacholi (eds). Proceedings of International seminar on
biological effects, health consequences and standards for pulsed radiofrequency fields. Erice,
Sicily, Italy, 21-25 November 1999. ICNIRP publication 11/2001. From: ICNIRP C/-
Bundesamt für Strahlenschutz, Institut für Strahlenhygiene, Ingolstädter Landstraße 1, D-85764
Oberschleißheim, Germany. Tel:+49 89 31603288, Fax:+49 89 316 03289, E-mail
RMatthes@bfs.de
• Eastern European Regional EMF Meeting and Workshop “Measurements and Criteria for
Standard Harmonization in the Field of EMF Exposure” and WHO EMF Standards
Harmonization Meeting. Varna, Bulgaria, 28 April – 3 May 2001. M Israel & M Repacholi
(eds). Published by Foundation “Faraday” – Non-ionising Radiation and Electricity.
• Adverse Temperature Levels in the Human Body Workshop. WHO, Geneva, March 21-22
2002. The proceedings of this workshop are published in the International Journal of
Hyperthermia, Vol. 19, No. 3, pp. 215-384 / May-June 2003.
Electronic Proceedings on EMF Project Website
There are several proceedings from meetings available electronically on the EMF Project WebSite at:
http://www.who.int/peh-emf/meetings/archive/en/
• Application of the Precautionary Principle to EMF. 24-26 February 2003, European Commission,
Luxembourg.
• 2nd International Workshop on Biological Effects of Electromagnetic Fields. 7-11 October 2002,
Rhodes – Greece
• WHO/ICNIRP Conference on EMF Biological effects, WHO Standards Harmonization for the
African region, WHO RF Research coordination meeting. 4-7 December 2001, Cape Town, South
Africa.
• WHO Meeting on EMF Biological Effects, Standards Harmonization in Asia & Oceania.
22-24 October 2001, Seoul, South Korea.
• WHO Workshop: Selection Bias in EMF - Childhood Leukemia Epidemiologic Studies
27-28 July 2001, Whistler, British Columbia.
• WHO EMF Standards Harmonization - Eastern European.
28 April-3 May 2001,Varna, Bulgaria.
• Americas Regional Seminar on Bioeffects, and WHO EMF Standards Harmonization.
7-9 March 2001, Lima, Peru
15
16. FOR FURTHER INFORMATION ON THE INTERNATIONAL EMF PROJECT
Visit the web site at: http://www.who.int/emf/
Or contact:
Radiation and Environmental Health
World Health Organization
20 Avenue Appia
CH-1211 Geneva 27
Switzerland
Tel +41 22 791 40 76
Fax +41 22 791 41 23
16