PROFESSIONAL EXPERIENCE
COST MANAGEMENT SERVICES (PVT) LTD.
Project QS / Assistant QS / Trainee QS
I am currently employed in one leading Quantity Surveying Consultancy
firm in the country as a Project Quantity Surveyor and currently handling
few projects in a diverse nature. I’ve executed, coordinated, and taken part
in both pre-contract and post-contract work in a few major hospitality
renovation projects in Sri Lanka. The projects are (but not limited to) as
follows:
Renovation of Taj Samudra, Colombo, Sri Lanka - USD 29M
Project QS
Preliminary Estimating, Budget Checking & Finalising
Value Engineering
Preparation of Bills of Quantities and Engineer’s Estimates
Tendering, Evaluation, Negotiation and Award
Interim Valuations, Variations and Final Bills
Budget Tracking and Bank Confirmations on Commitments and
Payments
Proposed Maternity Hospital at Galle, Sri Lanka – 41,000m2
Client’s Consultant’s Quantity Surveying Partner
Design and built basis lump sum project
BOQ scope and specification checking and comments on the
completeness of the documents
Engineer’s Estimate
Participated representing the Client’s Cost Consultant for the Price
Negotiations
Prepared the payment schedule incorporating the total scope of work
and interim/final valuations
Prepared cash flow forecast for the total project
Refurbishment of Vivanta - By Taj, Bentota, Sri Lanka - USD 12.5 M
Project QS
Prepared and adjusted the tender document to suit the Sri Lankan
context
Coordinated, prepared and finalized BOQs
Produced Engineer’s Estimates and Final Cost Plans
Attended pre-tender meetings and negotiations as Consultant QS
Documented Minutes of Meetings
2. 2 of 2
Familiarized with Taj tendering procedure
Prepared and issued Addendums during the tendering process
Formation of evaluation reports, detailed comparisons and letter of
award
Valuation of variations and certification of Final Payments
Proposed Common Wealth Games 2018 Hambanthota, Sri Lanka
Team Coordinator
Coordinated, prepared and finalized the preliminary estimate
Gathered information of previous similar events to finalize the pricing
Consulted sports specialists to collect data for suitable sports flooring,
equipment, seating, etc. for an international sports event
The proposed games village was consisted of 11 main venues including
main stadium, velodrome, swimming pool complex, main arena,
shooting range, public areas (pods), accommodation facilities for over
people 5000, landscaping and related infrastructure etc.
Have done an estimate for 20,000m2 warehouse including pallet
storage
Sheraton Airport Hotel, Katunayake, Sri Lanka
Team Coordinator
Coordinated, prepared and finalized the BOQ
The proposed hotel was a 4 star hotel with over 200 rooms and other
related facilities
Measured and prepared BOQ for electrical installation
Proposed Factory Extension for Royal Ceramic (Pvt) Ltd
Project QS
Measured and certified interim valuations
Valued and certified variations
The project was over LKR 75 million worth factory space
Checked and certified final accounts
Proposed office complex for Epic Technologies (Pvt) Ltd.
Trainee QS
Measured and prepared interim bills
Worked as the site QS for over 4 months in the absence of the site QS
Have done material forecasting, material reconciliation and ordering
Supervised the labour in major concreting works, masonry works etc.
The project was over LKR 100 million office complex with all related
services
Jan 2010 –
July 2010