five week job,drafted in at short notice to provide temporary cover whilst they could find a manager who had worked on swimming pools before.Moved the job on as fast as we could and broke its back even though first week was mainly draining the new concrete slab and footings ,internally most of the work was complete barring cubicle installations, decoration and flooring. External structural steel up [after having to redo most of the fixing bolts due to wrong resin most pulled out under low pressure] and handed over and was awaiting roofing to start for the site manager that took over