Definition of A Turbo Machine
Turbines are energy developing machines. Turbines convert fluid energy into
mechanical energy. The mechanical energy developed by the turbines is used
in running an electric generator, which is directly connected, to the shaft of the
electrical generator.
Earlier days method – wooden wheel
Overshot Wheel
 Had very good efficiency
 Could not handle large quantity of water
Undershot Wheel
 Low Efficiency
General layout of Hydro-Power Plant
a) Reservoir
Reservoirs ensure supply of water through out the year, by storing water
during rainy season and supplying the same during dry season.
b) Dam
The function of the dam is to increase the reservoir capacity and to increase the
working head of the turbine.
c) Penstock
A pipe between dam and turbine is known as penstock. It will carry the water
from dam to turbine. Penstock is commonly made of steel pipes covered with
RCC.

d) Surge tank/Forebay
When the rate of water flow through the penstock is suddenly decreased, the
pressure inside the penstock will increase suddenly due to water hammer
and thereby damage the penstock.
Surge tank/Forebay is constructed between the dam and turbine. It will act
as a pressure regulator during variable loads.
e) Turbine
Turbines convert the kinetic and potential energy of water into mechanical
energy to produce electric power.
f) Generator and Transformer
Electric generator converts mechanical energy into electrical energy. A step
up transformer will increase the voltage for loss free transmission.
General layout of Hydro-Power Plant

Advantages of hydraulic power plants
 Operating cost is very low
 Less Maintenance cost and less manpower required
 Pollution free
 Quick to start and easy to synchronize
 Can be used for irrigation and flood control
 Long plant life.
Disadvantages of Hydraulic Power Plants
 Initial cost of total plant is comparatively high
 Power generation depends on availability of water
 Cost of transmission is high since most of the plants are in remote areas
 Project duration is long.
Advantages and Disadvantages of HPP

1) Gross Head
 Difference Between the Head race level and Tail race level
 Static (No water flow) / Total Head – H1
2) Net or Effective Head
Head available at the entrance of the turbine: H = H1 - hf
a) Net Head for a Reaction Turbine
H = {(P1/w) + (V1
2/2g) + Z1} – {Z2 + V2
2/2g)}
b) Net Head for Impulse Turbine
H = {(P1/w) + (V1
2/2g) + Z1} – Z2
Head of Hydraulic Turbines

1) Hydraulic Efficiency – due to hydraulic losses
Power developed by the runner
Net power supplied at the turbine entrance
SI Unit: kW
Metric Unit : Horse Power/Water Horse Power (W.H.P)
2) Mechanical Efficiency – Due to mechanical losses ( bearing friction)
Power available at the turbine shaft (P)
Power developed by the runner
Efficiencies of Hydraulic Turbines

3) Volumetric Efficiency – due to amt of water slips directly to the tail race
Amount of water striking the runner
Amount of water supplied to the turbine
4) Overall Efficiency
Power available at the turbine shaft (P)
Net power supplied at the turbine entrance
Cont…

Classification of Turbines
Turbines are classified according to several considerations as indicated below.
i) Based on working principle
a) Impulse turbine
b) Reaction turbine

Impulse Turbine:
The pressure of liquid does not change while flowing through the rotor of the
machine. In Impulse Turbines pressure change occur only in the nozzles of
the machine.
One such example of impulse turbine is Pelton Wheel.
Reaction Turbine:
The pressure of liquid changes while it flows through the rotor of the
machine. The change in fluid velocity and reduction in its pressure causes
a reaction on the turbine blades; this is where from the name Reaction
Turbine may have been derived.
Francis and Kaplan Turbines fall in the category of Reaction Turbines.
Cont…

Cont…
ii) Based on working media
a) Hydraulic turbine
b) Steam turbine
c) Gas turbine
d) Wind Turbine
iii) Based on head
Head is the elevation difference of reservoir water level and D/S water level.
a) High head turbine (Above 250 m) Pelton Turbine
b) Medium head turbine (60 – 250 m) Francis Turbine
c) Low head turbine (Below 60 m) Kaplan Turbine

iv) Based on specific speed
Turbines can be classified based on Specific Speed. Specific speed is defined
as the speed in rpm of a geometrically similar turbine, which is identical in
shape, dimensions, blade angles and gate openings with the actual turbine
working under unit head and developing unit power. Specific speed is used to
compare the turbines and is denoted by Ns.
Specific speed Ns = N √P / H5/4
a) Low specific speed (8.5 – 30) - Pelton Turbine
b) Medium specific speed (50 – 340) - Francis Turbine
c) High specific speed (255 – 860) - Kaplan Turbine
Cont…

v) Based on disposition of turbine main shaft
a) Horizontal shaft
b) Vertical shaft
vi) Based on flow through the runner
a) Radial flow
1. Inward
2. Outward
b) Axial flow - Kaplan Turbine
c) Mixed flow - Francis Turbine
d) Tangential flow - Pelton Turbine
Cont…

Design of Pelton Wheel Turbine
 It has a circular disk with cup shaped blades/buckets,
 Water jet emerging from a nozzle is tangential to the circumference of
the wheel.
Pelton Wheel Turbine

Working Principle of Pelton Turbine
 Water jets emerging strike the buckets at splitter.
 Stream flow along the inner curve of the bucket and leave it in the direction
opposite to that of incoming jet.
 The high pressure water can be obtained from any water body situated at
some height or streams of water flowing down the hills.
 The change in momentum (direction as well as speed) of water stream
produces an impulse on the blades of the wheel of Pelton Turbine. This
impulse generates the torque and rotation in the shaft of Pelton Turbine.
 Horizontal shaft - Not more than 2 jets are used and
Vertical shaft - Larger no. of jets (upto 6) are used.
 Iron/Steel casing to prevent splashing of water and to lead water to the tail
race.

More Related Content

Similar to presentation_turbines_.ppt

Similar to presentation_turbines_.ppt (20)

Report on Hydraulic Turbine
Report on Hydraulic TurbineReport on Hydraulic Turbine
Report on Hydraulic Turbine
 
Hydraulic turbines
Hydraulic turbinesHydraulic turbines
Hydraulic turbines
 
turbine in plant
turbine in plantturbine in plant
turbine in plant
 
Hydraulic turbines1
Hydraulic turbines1Hydraulic turbines1
Hydraulic turbines1
 
Hydraulic Turbine & its Types
Hydraulic Turbine & its TypesHydraulic Turbine & its Types
Hydraulic Turbine & its Types
 
Classification of Turbines
Classification of TurbinesClassification of Turbines
Classification of Turbines
 
Francis reaction turbine
Francis reaction turbineFrancis reaction turbine
Francis reaction turbine
 
hydraulicmachines-200422173920.pdf
hydraulicmachines-200422173920.pdfhydraulicmachines-200422173920.pdf
hydraulicmachines-200422173920.pdf
 
Hydraulic machines
Hydraulic machinesHydraulic machines
Hydraulic machines
 
fluid_mechanics_and_hydraulics.pptx
fluid_mechanics_and_hydraulics.pptxfluid_mechanics_and_hydraulics.pptx
fluid_mechanics_and_hydraulics.pptx
 
Pratap
PratapPratap
Pratap
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydraulic Turbine
Hydraulic TurbineHydraulic Turbine
Hydraulic Turbine
 
Small hydro
Small hydroSmall hydro
Small hydro
 
Hydel Generation and Types Of Turbines
Hydel Generation and Types Of TurbinesHydel Generation and Types Of Turbines
Hydel Generation and Types Of Turbines
 
HYDRAULIC TURBINES - KTU Module 5 notes Pumps and Turbines
HYDRAULIC TURBINES - KTU Module 5 notes Pumps and TurbinesHYDRAULIC TURBINES - KTU Module 5 notes Pumps and Turbines
HYDRAULIC TURBINES - KTU Module 5 notes Pumps and Turbines
 
Francis Turbine
Francis Turbine Francis Turbine
Francis Turbine
 
200118 chapter 8 hydromechanical
200118 chapter 8 hydromechanical200118 chapter 8 hydromechanical
200118 chapter 8 hydromechanical
 
hydraulic machinery turbines
hydraulic machinery turbineshydraulic machinery turbines
hydraulic machinery turbines
 
Ppt unit 3 4 thm
Ppt unit 3 4 thmPpt unit 3 4 thm
Ppt unit 3 4 thm
 

More from reenarana28

UNIT 4 Unsteady Flow.pptx
UNIT 4 Unsteady Flow.pptxUNIT 4 Unsteady Flow.pptx
UNIT 4 Unsteady Flow.pptxreenarana28
 
UNIFORM FLOW OCF.pptx
UNIFORM FLOW OCF.pptxUNIFORM FLOW OCF.pptx
UNIFORM FLOW OCF.pptxreenarana28
 
boundarylayertheory.pptx
boundarylayertheory.pptxboundarylayertheory.pptx
boundarylayertheory.pptxreenarana28
 
boundary_layers_History.ppt
boundary_layers_History.pptboundary_layers_History.ppt
boundary_layers_History.pptreenarana28
 
UNIT 1 UNIFORM FLOW.pptx
UNIT 1 UNIFORM FLOW.pptxUNIT 1 UNIFORM FLOW.pptx
UNIT 1 UNIFORM FLOW.pptxreenarana28
 
Unit 2 - PART.pptx
Unit 2 - PART.pptxUnit 2 - PART.pptx
Unit 2 - PART.pptxreenarana28
 
Unit 1 - PART 1.pptx
Unit 1 - PART 1.pptxUnit 1 - PART 1.pptx
Unit 1 - PART 1.pptxreenarana28
 

More from reenarana28 (10)

UNIT 4 Unsteady Flow.pptx
UNIT 4 Unsteady Flow.pptxUNIT 4 Unsteady Flow.pptx
UNIT 4 Unsteady Flow.pptx
 
UNIFORM FLOW OCF.pptx
UNIFORM FLOW OCF.pptxUNIFORM FLOW OCF.pptx
UNIFORM FLOW OCF.pptx
 
boundarylayertheory.pptx
boundarylayertheory.pptxboundarylayertheory.pptx
boundarylayertheory.pptx
 
boundary_layers_History.ppt
boundary_layers_History.pptboundary_layers_History.ppt
boundary_layers_History.ppt
 
DT UNIT 3..pptx
DT UNIT 3..pptxDT UNIT 3..pptx
DT UNIT 3..pptx
 
UNIT 1 UNIFORM FLOW.pptx
UNIT 1 UNIFORM FLOW.pptxUNIT 1 UNIFORM FLOW.pptx
UNIT 1 UNIFORM FLOW.pptx
 
Unit 2 - PART.pptx
Unit 2 - PART.pptxUnit 2 - PART.pptx
Unit 2 - PART.pptx
 
Unit 1 - PART 1.pptx
Unit 1 - PART 1.pptxUnit 1 - PART 1.pptx
Unit 1 - PART 1.pptx
 
DT UNIT 1.pptx
DT UNIT 1.pptxDT UNIT 1.pptx
DT UNIT 1.pptx
 
DM Unit 4.pptx
DM Unit 4.pptxDM Unit 4.pptx
DM Unit 4.pptx
 

Recently uploaded

Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 

Recently uploaded (20)

Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 

presentation_turbines_.ppt

  • 1. Definition of A Turbo Machine Turbines are energy developing machines. Turbines convert fluid energy into mechanical energy. The mechanical energy developed by the turbines is used in running an electric generator, which is directly connected, to the shaft of the electrical generator. Earlier days method – wooden wheel Overshot Wheel  Had very good efficiency  Could not handle large quantity of water Undershot Wheel  Low Efficiency
  • 2. General layout of Hydro-Power Plant a) Reservoir Reservoirs ensure supply of water through out the year, by storing water during rainy season and supplying the same during dry season. b) Dam The function of the dam is to increase the reservoir capacity and to increase the working head of the turbine. c) Penstock A pipe between dam and turbine is known as penstock. It will carry the water from dam to turbine. Penstock is commonly made of steel pipes covered with RCC.
  • 3.  d) Surge tank/Forebay When the rate of water flow through the penstock is suddenly decreased, the pressure inside the penstock will increase suddenly due to water hammer and thereby damage the penstock. Surge tank/Forebay is constructed between the dam and turbine. It will act as a pressure regulator during variable loads. e) Turbine Turbines convert the kinetic and potential energy of water into mechanical energy to produce electric power. f) Generator and Transformer Electric generator converts mechanical energy into electrical energy. A step up transformer will increase the voltage for loss free transmission.
  • 4. General layout of Hydro-Power Plant
  • 5.  Advantages of hydraulic power plants  Operating cost is very low  Less Maintenance cost and less manpower required  Pollution free  Quick to start and easy to synchronize  Can be used for irrigation and flood control  Long plant life. Disadvantages of Hydraulic Power Plants  Initial cost of total plant is comparatively high  Power generation depends on availability of water  Cost of transmission is high since most of the plants are in remote areas  Project duration is long. Advantages and Disadvantages of HPP
  • 6.  1) Gross Head  Difference Between the Head race level and Tail race level  Static (No water flow) / Total Head – H1 2) Net or Effective Head Head available at the entrance of the turbine: H = H1 - hf a) Net Head for a Reaction Turbine H = {(P1/w) + (V1 2/2g) + Z1} – {Z2 + V2 2/2g)} b) Net Head for Impulse Turbine H = {(P1/w) + (V1 2/2g) + Z1} – Z2 Head of Hydraulic Turbines
  • 7.  1) Hydraulic Efficiency – due to hydraulic losses Power developed by the runner Net power supplied at the turbine entrance SI Unit: kW Metric Unit : Horse Power/Water Horse Power (W.H.P) 2) Mechanical Efficiency – Due to mechanical losses ( bearing friction) Power available at the turbine shaft (P) Power developed by the runner Efficiencies of Hydraulic Turbines
  • 8.  3) Volumetric Efficiency – due to amt of water slips directly to the tail race Amount of water striking the runner Amount of water supplied to the turbine 4) Overall Efficiency Power available at the turbine shaft (P) Net power supplied at the turbine entrance Cont…
  • 9.  Classification of Turbines Turbines are classified according to several considerations as indicated below. i) Based on working principle a) Impulse turbine b) Reaction turbine
  • 10.  Impulse Turbine: The pressure of liquid does not change while flowing through the rotor of the machine. In Impulse Turbines pressure change occur only in the nozzles of the machine. One such example of impulse turbine is Pelton Wheel. Reaction Turbine: The pressure of liquid changes while it flows through the rotor of the machine. The change in fluid velocity and reduction in its pressure causes a reaction on the turbine blades; this is where from the name Reaction Turbine may have been derived. Francis and Kaplan Turbines fall in the category of Reaction Turbines. Cont…
  • 11.  Cont… ii) Based on working media a) Hydraulic turbine b) Steam turbine c) Gas turbine d) Wind Turbine iii) Based on head Head is the elevation difference of reservoir water level and D/S water level. a) High head turbine (Above 250 m) Pelton Turbine b) Medium head turbine (60 – 250 m) Francis Turbine c) Low head turbine (Below 60 m) Kaplan Turbine
  • 12.  iv) Based on specific speed Turbines can be classified based on Specific Speed. Specific speed is defined as the speed in rpm of a geometrically similar turbine, which is identical in shape, dimensions, blade angles and gate openings with the actual turbine working under unit head and developing unit power. Specific speed is used to compare the turbines and is denoted by Ns. Specific speed Ns = N √P / H5/4 a) Low specific speed (8.5 – 30) - Pelton Turbine b) Medium specific speed (50 – 340) - Francis Turbine c) High specific speed (255 – 860) - Kaplan Turbine Cont…
  • 13.  v) Based on disposition of turbine main shaft a) Horizontal shaft b) Vertical shaft vi) Based on flow through the runner a) Radial flow 1. Inward 2. Outward b) Axial flow - Kaplan Turbine c) Mixed flow - Francis Turbine d) Tangential flow - Pelton Turbine Cont…
  • 14.  Design of Pelton Wheel Turbine  It has a circular disk with cup shaped blades/buckets,  Water jet emerging from a nozzle is tangential to the circumference of the wheel. Pelton Wheel Turbine
  • 15.  Working Principle of Pelton Turbine  Water jets emerging strike the buckets at splitter.  Stream flow along the inner curve of the bucket and leave it in the direction opposite to that of incoming jet.  The high pressure water can be obtained from any water body situated at some height or streams of water flowing down the hills.  The change in momentum (direction as well as speed) of water stream produces an impulse on the blades of the wheel of Pelton Turbine. This impulse generates the torque and rotation in the shaft of Pelton Turbine.  Horizontal shaft - Not more than 2 jets are used and Vertical shaft - Larger no. of jets (upto 6) are used.  Iron/Steel casing to prevent splashing of water and to lead water to the tail race.

Editor's Notes

  1. (Pressure head at the turbine entrance + Velocity head in the penstock+ Elevation above the datum) – (Elevation of the tail water + Velocity head in the draft Tube)
  2. Power developed by the runner W((Q+^Q)H
  3. Power developed by the runner W((Q+^Q)H