INTERNAL AUDIT
BY: MASUD ALAM
Key Task|| Major Activities of INTERNAL AUDIT
The scope of Internal Audit encompasses the examination and evaluation of the adequacy and effectiveness of the organization’s
governance, risk management process, system of internal control structure, and the quality of performance in carrying out
assigned responsibilities to achieve the organization's stated goals and objectives. It includes:
1. Review the reliability and integrity of financial and operating information and the means used to identify, measure, classify, and report such information;
2. Review financial, accounting, administrative, and information systems established to ensure compliance with policies, plans, procedures, laws, and regulations
which could have a significant impact on the Institute;
3. Review the means of safeguarding assets and verify the existence of such assets;
4. Review the effectiveness and efficiency with which resources are employed;
5. Review operations or programs to ascertain whether results are consistent with established objectives and goals and whether the operations or programs are
being carried out as planned;
6. Review governance and business risk management processes;
7. Perform consulting and advisory services related to business risk management and control;
8. Report significant risk exposures and internal control issues, including fraud risks, and other matters;
9. Evaluate specific operations at the request of the Audit Visiting Committee or management, as appropriate;
10. Administer the Institute’s Ethics Point Compliance Hotline System and investigate hotline reports of accounting and financial matters;
Key Task|| Major Activities of IA (CONT.)
11. Develop detailed yearly audit plan and program; ICMAB Job Distribution 2023
12. Review and check the processes & and internal control system in various departments like purchase, requisition, bill payment, and many
other departmental functions to develop standard operating procedures;
13. Pre-audit the daily transactions;
14. Post-audit the Financial Statements (quarterly, half-yearly, and annually);
15. Prepare internal audit report and submit it to the Council;
16. Conduct internal audit of various departments/sections as directed;
17. Submit Management Report including follow-up report to the Audit Committee;
18. Submit External Audit Report to the Audit Committee for their next course of action;
19. Co-ordinate the activities of the External Audit team; and
20. Any other job as assigned by the Authority from time to time. Reporting to: Executive Director
Audit Activities in 2023
Sl. No. Work(s)/ activity(ies) of 2023
Present Status of work(s)
(Implemented/ Ongoing)
Expected time of
completion
(if ongoing)
1 Review the recruitment & promotion process of employees of the Institute since
2014 with the ICMAB Rules and Regulations.
Implemented
2 Preparation of department-wise valid list of policies and procedures including the latest revision
date.
Implemented
3 Internal audit charter shall be distributed among the committee members immediately for their
review and perusal.
Implemented
4 Preparation of yearly audit plan of the internal audit department and their work progress report
including audit findings and present status of their recommendations and finding.
Implemented
5 Preparation of Fixed asset management, Inventory management and Advances management
policy and procedures/guidelines (process flow, process definition).
E-mail sent to the Head of
Administration in this regard to
prepare such policies.
29th Feb 2024
6 Latest physical fixed assets verification report, physical inventory verification report, and
advances list (name, designation, date of advance and amount of advance, purpose of advance,
comments of relevant department about the recovery measures, disciplinary measures taken
within the service rules or code of conduct etc.).
Communicated with the Head of
Finance and Accounts department
and a format also given to the
department for preparing Advance list.
29th Feb 2024
Sl. No. Work(s)/ activity(ies) of 2023
Present Status of work(s)
(Implemented/ Ongoing)
Expected time of
completion
(if ongoing)
7 Statement of income tax and VAT deducted or collected at source and deposited by the Institute in
the financial year 2022-23.
Communicated with the Head of
Finance and Accounts department
and a format also given to the
department for preparing statement of
VAT & TAX.
It will be completed by
29th February 2024
8
Draft annual accounts report of the institute for the financial year 2022-23. Yet to be implemented
As a separate agenda
may be given in the next
audit committee meeting
for discussion.
9 IT Department head will give a presentation about the ERP system. E-mail sent to the Head of ICT
department in this regard.
As a separate agenda
will be taken in the next
audit committee meeting
for presentation.
10 Management Comment on the Management Report of the Institute of Cost and Management
Accountants of Bangladesh for the year ended June 30, 2023.
Management Report including
Management Comments has been
prepared for finalization.
11 Review of the procurement process of goods & services of the Institute over Tk. 5.00 (Five) lac
since 2016.
A draft report has been prepared. It will be completed
within 02 days.
Audit Plans for 2024
Audit Activities Execution
period
Nature of
activity (ies)
Audit duration &
month
Submission
deadline of
draft audit
report
Audit Report
Finalization
Review of procurement process of goods ,
services & works
January-
December
quarterly
1st -20th day in
April, August &
December
By 25th in
each month
Draft audit
report will be
submitted to
the Audit
Review of the recruitment & promotion
process of Employees
yearly
1st -20th day in
January
By 25th in
each month
Committee
meeting for
finalization.
Review of draft accounts of the Institute
half yearly
1st -20th day in
March & September
By 25th in
each month
Review of physical fixed assets verification
report
yearly 1st -20th day in July
By 25th in
each month
Audit Plans for 2024
Audit Activities Execution
Period
Nature of
activity
(ies)
Audit Duration &
month
Submission
deadline of draft
Audit report
Audit Report
Finalization
Statement of Advance list & Income TAX & VAT
deducted or collected at source and deposited by
the Institute in the financial year 2023-24
January-
December
quarterly
1st -20th day in
February, June &
October
By 25th in each
month
Draft audit
report will be
submitted to
the Audit
Review of latest physical Inventory verification
report
yearly 1st -20th day in
July
By 25th in each
month
Committee
meeting for
finalization.
Submit Management Report including follow up
report to the Audit Committee meeting. yearly
1st -20th day in
November
By 25th in each
month
Verification of Exemption process of Students
yearly
1st -20th day in
May
By 25th in each
month
Audit Plans for 2024 (cont.)
Major Challenges of the Section
 ADD/DD : 01
 AD/O/AO: 01
 OS : 01
1.No supporting employees have been posted in this
department. The head of the Department is doing all types of
work alone.
Organogram:
2. Inventory management software may be developed by the
ICT department of ICMAB.
3. Preparation
Major Challenges of the Section
3. WO should be provided by ERP. We need a report on
the Work Order for the verification of bills.
4. Need a policy on Fixed asset management, Inventory
management, and advanced management policy and
procedures/guidelines (process flow, process definition).
Thank You

More Related Content

Similar to Presentation of Internal Audit_Masud.pptx

Similar to Presentation of Internal Audit_Masud.pptx (20)

Cv mohan vydianathan
Cv mohan vydianathanCv mohan vydianathan
Cv mohan vydianathan
 
AUDIT ENGAGEMENT TUTORIAL BY ANTHONY SHITANDI
AUDIT ENGAGEMENT TUTORIAL BY ANTHONY SHITANDIAUDIT ENGAGEMENT TUTORIAL BY ANTHONY SHITANDI
AUDIT ENGAGEMENT TUTORIAL BY ANTHONY SHITANDI
 
Antoine Daher CV
Antoine Daher CVAntoine Daher CV
Antoine Daher CV
 
mohan vydianathan
mohan vydianathanmohan vydianathan
mohan vydianathan
 
Ahmed abdelkariem C.V
Ahmed abdelkariem C.V Ahmed abdelkariem C.V
Ahmed abdelkariem C.V
 
Swapan sau cv_for_cost_manager
Swapan sau cv_for_cost_managerSwapan sau cv_for_cost_manager
Swapan sau cv_for_cost_manager
 
Shehata george - cv . 2017
Shehata  george  - cv . 2017Shehata  george  - cv . 2017
Shehata george - cv . 2017
 
Saleem Younus CV
Saleem Younus CVSaleem Younus CV
Saleem Younus CV
 
NEVILLE SALDANHA
NEVILLE SALDANHANEVILLE SALDANHA
NEVILLE SALDANHA
 
ROWE Ross_resume
ROWE Ross_resumeROWE Ross_resume
ROWE Ross_resume
 
My Resume
My ResumeMy Resume
My Resume
 
Resume
ResumeResume
Resume
 
SFC Plan of engagement
SFC Plan of engagementSFC Plan of engagement
SFC Plan of engagement
 
IFC Presentation
IFC PresentationIFC Presentation
IFC Presentation
 
DIXON-MARIGNA
DIXON-MARIGNADIXON-MARIGNA
DIXON-MARIGNA
 
Ah Zakaria CV 15-01-2016 (1)
Ah Zakaria CV 15-01-2016 (1)Ah Zakaria CV 15-01-2016 (1)
Ah Zakaria CV 15-01-2016 (1)
 
Audit assignment m.com part ii – semester iv
Audit assignment  m.com part ii – semester ivAudit assignment  m.com part ii – semester iv
Audit assignment m.com part ii – semester iv
 
totchum cv
totchum cvtotchum cv
totchum cv
 
Presentation on Audit Findings
Presentation on Audit FindingsPresentation on Audit Findings
Presentation on Audit Findings
 
Finance Department COSO Implementation Memo
Finance Department COSO Implementation MemoFinance Department COSO Implementation Memo
Finance Department COSO Implementation Memo
 

Recently uploaded

Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 

Recently uploaded (20)

Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 

Presentation of Internal Audit_Masud.pptx

  • 2. Key Task|| Major Activities of INTERNAL AUDIT The scope of Internal Audit encompasses the examination and evaluation of the adequacy and effectiveness of the organization’s governance, risk management process, system of internal control structure, and the quality of performance in carrying out assigned responsibilities to achieve the organization's stated goals and objectives. It includes: 1. Review the reliability and integrity of financial and operating information and the means used to identify, measure, classify, and report such information; 2. Review financial, accounting, administrative, and information systems established to ensure compliance with policies, plans, procedures, laws, and regulations which could have a significant impact on the Institute; 3. Review the means of safeguarding assets and verify the existence of such assets; 4. Review the effectiveness and efficiency with which resources are employed; 5. Review operations or programs to ascertain whether results are consistent with established objectives and goals and whether the operations or programs are being carried out as planned; 6. Review governance and business risk management processes; 7. Perform consulting and advisory services related to business risk management and control; 8. Report significant risk exposures and internal control issues, including fraud risks, and other matters; 9. Evaluate specific operations at the request of the Audit Visiting Committee or management, as appropriate; 10. Administer the Institute’s Ethics Point Compliance Hotline System and investigate hotline reports of accounting and financial matters;
  • 3. Key Task|| Major Activities of IA (CONT.) 11. Develop detailed yearly audit plan and program; ICMAB Job Distribution 2023 12. Review and check the processes & and internal control system in various departments like purchase, requisition, bill payment, and many other departmental functions to develop standard operating procedures; 13. Pre-audit the daily transactions; 14. Post-audit the Financial Statements (quarterly, half-yearly, and annually); 15. Prepare internal audit report and submit it to the Council; 16. Conduct internal audit of various departments/sections as directed; 17. Submit Management Report including follow-up report to the Audit Committee; 18. Submit External Audit Report to the Audit Committee for their next course of action; 19. Co-ordinate the activities of the External Audit team; and 20. Any other job as assigned by the Authority from time to time. Reporting to: Executive Director
  • 5. Sl. No. Work(s)/ activity(ies) of 2023 Present Status of work(s) (Implemented/ Ongoing) Expected time of completion (if ongoing) 1 Review the recruitment & promotion process of employees of the Institute since 2014 with the ICMAB Rules and Regulations. Implemented 2 Preparation of department-wise valid list of policies and procedures including the latest revision date. Implemented 3 Internal audit charter shall be distributed among the committee members immediately for their review and perusal. Implemented 4 Preparation of yearly audit plan of the internal audit department and their work progress report including audit findings and present status of their recommendations and finding. Implemented 5 Preparation of Fixed asset management, Inventory management and Advances management policy and procedures/guidelines (process flow, process definition). E-mail sent to the Head of Administration in this regard to prepare such policies. 29th Feb 2024 6 Latest physical fixed assets verification report, physical inventory verification report, and advances list (name, designation, date of advance and amount of advance, purpose of advance, comments of relevant department about the recovery measures, disciplinary measures taken within the service rules or code of conduct etc.). Communicated with the Head of Finance and Accounts department and a format also given to the department for preparing Advance list. 29th Feb 2024
  • 6. Sl. No. Work(s)/ activity(ies) of 2023 Present Status of work(s) (Implemented/ Ongoing) Expected time of completion (if ongoing) 7 Statement of income tax and VAT deducted or collected at source and deposited by the Institute in the financial year 2022-23. Communicated with the Head of Finance and Accounts department and a format also given to the department for preparing statement of VAT & TAX. It will be completed by 29th February 2024 8 Draft annual accounts report of the institute for the financial year 2022-23. Yet to be implemented As a separate agenda may be given in the next audit committee meeting for discussion. 9 IT Department head will give a presentation about the ERP system. E-mail sent to the Head of ICT department in this regard. As a separate agenda will be taken in the next audit committee meeting for presentation. 10 Management Comment on the Management Report of the Institute of Cost and Management Accountants of Bangladesh for the year ended June 30, 2023. Management Report including Management Comments has been prepared for finalization. 11 Review of the procurement process of goods & services of the Institute over Tk. 5.00 (Five) lac since 2016. A draft report has been prepared. It will be completed within 02 days.
  • 8. Audit Activities Execution period Nature of activity (ies) Audit duration & month Submission deadline of draft audit report Audit Report Finalization Review of procurement process of goods , services & works January- December quarterly 1st -20th day in April, August & December By 25th in each month Draft audit report will be submitted to the Audit Review of the recruitment & promotion process of Employees yearly 1st -20th day in January By 25th in each month Committee meeting for finalization. Review of draft accounts of the Institute half yearly 1st -20th day in March & September By 25th in each month Review of physical fixed assets verification report yearly 1st -20th day in July By 25th in each month Audit Plans for 2024
  • 9. Audit Activities Execution Period Nature of activity (ies) Audit Duration & month Submission deadline of draft Audit report Audit Report Finalization Statement of Advance list & Income TAX & VAT deducted or collected at source and deposited by the Institute in the financial year 2023-24 January- December quarterly 1st -20th day in February, June & October By 25th in each month Draft audit report will be submitted to the Audit Review of latest physical Inventory verification report yearly 1st -20th day in July By 25th in each month Committee meeting for finalization. Submit Management Report including follow up report to the Audit Committee meeting. yearly 1st -20th day in November By 25th in each month Verification of Exemption process of Students yearly 1st -20th day in May By 25th in each month Audit Plans for 2024 (cont.)
  • 10. Major Challenges of the Section  ADD/DD : 01  AD/O/AO: 01  OS : 01 1.No supporting employees have been posted in this department. The head of the Department is doing all types of work alone. Organogram: 2. Inventory management software may be developed by the ICT department of ICMAB. 3. Preparation
  • 11. Major Challenges of the Section 3. WO should be provided by ERP. We need a report on the Work Order for the verification of bills. 4. Need a policy on Fixed asset management, Inventory management, and advanced management policy and procedures/guidelines (process flow, process definition).