SlideShare a Scribd company logo
Kathmandu University
Department of Civil and Geomatics Engineering
PREPARATION OF 3D MODEL OF INTERNATIONAL SPACE
STATION
Proposal Defense
Presenters : Supervisors :
Shrestha Rabi [25] Mr. Uma shankar Pandey
Subedi Anil[26] Mr. Nawaraj Shrestha
Tamang Bipul [27]
Thapa Mukesh [28]
Kathmandu University
Department of Civil and Geomatics Engineering
INTRODUCTION
International Space Station
Artificial satellite in low earth orbit
Spacecraft capable of supporting crewmembers
Collects datas and images of earth
2
2
International
Space Station
Source: Google Photos
Kathmandu University
Department of Civil and Geomatics Engineering
•Features of ISS
•It is large spacecraft in orbit around earth.
•It orbits earth at an average altitude of approximately
250 miles.
•It travels at 17,500 mph(i.e every 90 minute)
•The space station covers the area of football field
including the end zones.
•The 75 to 90 kilowatts of power for the ISS is supplied
by an acre of solar panels.
•Fifty-two computers control the systems on the ISS.
3
Kathmandu University
Department of Civil and Geomatics Engineering
International Space Station
4
Source: Google Photos
Kathmandu University
Department of Civil and Geomatics Engineering
Objectives
Primary Objectives:-
To develop the 3D model of international space station
Secondary Objectives:-
To learn preparation of 3D modelling.
To apply the basic engineering skills learned so far in practical life.
5
Kathmandu University
Department of Civil and Geomatics Engineering
Methodology
Preliminary Research
Consultation
Data collection
Cost estimation
Materials collection
Rough designing of Model
Working on the Model
Painting and finishing the model
Submission of the model
6
Kathmandu University
Department of Civil and Geomatics Engineering
Methedological Flow Chart
Kathmandu University
Department of Civil and Geomatics Engineering
Materials Required and cost estimation
S.
N
Materials Required Rate Quantity Cost
1 Globe 1000 1 1000
2 Measuring tape 150 1 150
3 Ball Bearing 100 1 100
4 Wire 50 4m 200
5 Paint & brush 500 1 500
6 Bowl 100 1 100
7 Fevicol 300 1 300
8 Iron Rod 100 1 100
9 Card Board 500 1 500
10 Glass 150 1 150
TOTAL 3100
7
Kathmandu University
Department of Civil and Geomatics Engineering
LOGICAL FRAME ANALYSIS
Objective 1:To study the working mechanism of space station Objective 2:To prepare 3D Model of ISS
Methodology:
Literature Review
1:Data and materials collection
2.Construction of 3D Model
Activities:
1.Searching through the internet about working mechanism of space station
2:watching Youtube videos
Activities:
1.Collection of data and information from study
2.Consulting with supervisor
3.listing and collection of materials required
4.Working on model
5.Painting and finishing up
6Submission to supervisors, preparation of report and final
presentation
Who:
Literature review : All
Who:
Data collection: Rabi Shrestha
Bipul Tamang
Material collection: Mukesh Thapa
Anil Subedi
Construction of 3D model: All
When: from 1st day to till the submission of project. When: After the approval of proposal to till the submission of
project and final report.
Risk: The data gained may not be accurate. Risk: Materials required may be costly.
Solution: Data can be gained from reliable sources and authentic websites. Solution: Alternatives, easily available and low costly material
can be used.
Kathmandu University
Department of Civil and Geomatics Engineering
Expected outcome
• The 3D model of international space station is expected outcome. We
will give our best about international space station. Our project will
be enough to make people clear how the ISS work.
Kathmandu University
Department of Civil and Geomatics Engineering
Conclusion
•Construction of 3D model of the space station helps
us to gain idea about 3D modeling and also will help
us to enhance knowledge and working mechanism
of ISS and Application of ISS in our day to day lives
navigation, astronomy,weather forecasting and
various research.
9
Kathmandu University
Department of Civil and Geomatics Engineering
Limitations
• Ground stations are not in scale.
• Satellite and earth do not rotate separately.
• Secondary source of data collection may always not be reliable as
primary source of data collection is not possible.
10
Kathmandu University
Department of Civil and Geomatics Engineering
References
• Gerson, S. G.(2014) Technical Communication: Research. New York:
Pearson Education., Print
• Faculty members, Seniors
• Internet
• https://en.wikipedia.org/wiki/International_Space_Station
• https://www.space.com/16748-international-space-station.html
12

More Related Content

Similar to Preparation of 3 d model of international space station

3D Model preparation of a landscape
3D Model preparation of a landscape3D Model preparation of a landscape
3D Model preparation of a landscape
Srijit Sharma
 
Final year project proposal on feasibility study of small hydro power
Final year project proposal on feasibility study of small hydro powerFinal year project proposal on feasibility study of small hydro power
Final year project proposal on feasibility study of small hydro power
surya paudel
 
Cv avishek
Cv avishekCv avishek
Cv avishek
Avishek Ghosh
 
Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...
Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...
Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...
Polytechnic of Namibia
 
Mercury CubeSat Presentation for ASAT2016
Mercury CubeSat Presentation for ASAT2016Mercury CubeSat Presentation for ASAT2016
Mercury CubeSat Presentation for ASAT2016
Karen Grothe
 
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
Natasha Grant
 
B.tech. 2nd year civil engg aicte model curriculum 2019 20
B.tech. 2nd year civil engg aicte model curriculum 2019 20B.tech. 2nd year civil engg aicte model curriculum 2019 20
B.tech. 2nd year civil engg aicte model curriculum 2019 20
Rohit Singh
 
Terrestrial laser scanning
Terrestrial laser scanningTerrestrial laser scanning
Terrestrial laser scanning
Iris Kramer
 
Miklovicz thesis defence 2017
Miklovicz thesis defence 2017Miklovicz thesis defence 2017
Miklovicz thesis defence 2017
Tamás Miklovicz
 
ISM2014
ISM2014ISM2014
ISM2014
nlab_utokyo
 
Muhammad Shamsul Kamal-Resume
Muhammad Shamsul Kamal-ResumeMuhammad Shamsul Kamal-Resume
Muhammad Shamsul Kamal-ResumeShamsul Kamal
 
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat MissionApplying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Karen Grothe
 
CIVIL_NAAC_06-9-2016_V2 (2) (1).pptx
CIVIL_NAAC_06-9-2016_V2 (2) (1).pptxCIVIL_NAAC_06-9-2016_V2 (2) (1).pptx
CIVIL_NAAC_06-9-2016_V2 (2) (1).pptx
arfath khan mohammed
 
Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...
Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...
Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...
nitrrfie
 
Electronic Atlas and its Types
Electronic Atlas and its TypesElectronic Atlas and its Types
Electronic Atlas and its Types
Ashim Sharma
 
CV Aritra 08-2020
CV Aritra 08-2020CV Aritra 08-2020
CV Aritra 08-2020
Aritra Sarkar
 
Galaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
Galaxy Forum SEA Indonesia - Boonrucksar SoonthornthumGalaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
Galaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
ILOAHawaii
 
2015-07-08 Paper 38 - ICVS Talk
2015-07-08 Paper 38 - ICVS Talk2015-07-08 Paper 38 - ICVS Talk
2015-07-08 Paper 38 - ICVS TalkThomas Sølund
 
Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...
Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...
Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...
aadaarsh2004
 
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...Biplov Bhandari
 

Similar to Preparation of 3 d model of international space station (20)

3D Model preparation of a landscape
3D Model preparation of a landscape3D Model preparation of a landscape
3D Model preparation of a landscape
 
Final year project proposal on feasibility study of small hydro power
Final year project proposal on feasibility study of small hydro powerFinal year project proposal on feasibility study of small hydro power
Final year project proposal on feasibility study of small hydro power
 
Cv avishek
Cv avishekCv avishek
Cv avishek
 
Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...
Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...
Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...
 
Mercury CubeSat Presentation for ASAT2016
Mercury CubeSat Presentation for ASAT2016Mercury CubeSat Presentation for ASAT2016
Mercury CubeSat Presentation for ASAT2016
 
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
 
B.tech. 2nd year civil engg aicte model curriculum 2019 20
B.tech. 2nd year civil engg aicte model curriculum 2019 20B.tech. 2nd year civil engg aicte model curriculum 2019 20
B.tech. 2nd year civil engg aicte model curriculum 2019 20
 
Terrestrial laser scanning
Terrestrial laser scanningTerrestrial laser scanning
Terrestrial laser scanning
 
Miklovicz thesis defence 2017
Miklovicz thesis defence 2017Miklovicz thesis defence 2017
Miklovicz thesis defence 2017
 
ISM2014
ISM2014ISM2014
ISM2014
 
Muhammad Shamsul Kamal-Resume
Muhammad Shamsul Kamal-ResumeMuhammad Shamsul Kamal-Resume
Muhammad Shamsul Kamal-Resume
 
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat MissionApplying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
 
CIVIL_NAAC_06-9-2016_V2 (2) (1).pptx
CIVIL_NAAC_06-9-2016_V2 (2) (1).pptxCIVIL_NAAC_06-9-2016_V2 (2) (1).pptx
CIVIL_NAAC_06-9-2016_V2 (2) (1).pptx
 
Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...
Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...
Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...
 
Electronic Atlas and its Types
Electronic Atlas and its TypesElectronic Atlas and its Types
Electronic Atlas and its Types
 
CV Aritra 08-2020
CV Aritra 08-2020CV Aritra 08-2020
CV Aritra 08-2020
 
Galaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
Galaxy Forum SEA Indonesia - Boonrucksar SoonthornthumGalaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
Galaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
 
2015-07-08 Paper 38 - ICVS Talk
2015-07-08 Paper 38 - ICVS Talk2015-07-08 Paper 38 - ICVS Talk
2015-07-08 Paper 38 - ICVS Talk
 
Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...
Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...
Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...
 
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
 

Recently uploaded

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
AkolbilaEmmanuel1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 

Recently uploaded (20)

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 

Preparation of 3 d model of international space station

  • 1. Kathmandu University Department of Civil and Geomatics Engineering PREPARATION OF 3D MODEL OF INTERNATIONAL SPACE STATION Proposal Defense Presenters : Supervisors : Shrestha Rabi [25] Mr. Uma shankar Pandey Subedi Anil[26] Mr. Nawaraj Shrestha Tamang Bipul [27] Thapa Mukesh [28]
  • 2. Kathmandu University Department of Civil and Geomatics Engineering INTRODUCTION International Space Station Artificial satellite in low earth orbit Spacecraft capable of supporting crewmembers Collects datas and images of earth 2 2 International Space Station Source: Google Photos
  • 3. Kathmandu University Department of Civil and Geomatics Engineering •Features of ISS •It is large spacecraft in orbit around earth. •It orbits earth at an average altitude of approximately 250 miles. •It travels at 17,500 mph(i.e every 90 minute) •The space station covers the area of football field including the end zones. •The 75 to 90 kilowatts of power for the ISS is supplied by an acre of solar panels. •Fifty-two computers control the systems on the ISS. 3
  • 4. Kathmandu University Department of Civil and Geomatics Engineering International Space Station 4 Source: Google Photos
  • 5. Kathmandu University Department of Civil and Geomatics Engineering Objectives Primary Objectives:- To develop the 3D model of international space station Secondary Objectives:- To learn preparation of 3D modelling. To apply the basic engineering skills learned so far in practical life. 5
  • 6. Kathmandu University Department of Civil and Geomatics Engineering Methodology Preliminary Research Consultation Data collection Cost estimation Materials collection Rough designing of Model Working on the Model Painting and finishing the model Submission of the model 6
  • 7. Kathmandu University Department of Civil and Geomatics Engineering Methedological Flow Chart
  • 8. Kathmandu University Department of Civil and Geomatics Engineering Materials Required and cost estimation S. N Materials Required Rate Quantity Cost 1 Globe 1000 1 1000 2 Measuring tape 150 1 150 3 Ball Bearing 100 1 100 4 Wire 50 4m 200 5 Paint & brush 500 1 500 6 Bowl 100 1 100 7 Fevicol 300 1 300 8 Iron Rod 100 1 100 9 Card Board 500 1 500 10 Glass 150 1 150 TOTAL 3100 7
  • 9. Kathmandu University Department of Civil and Geomatics Engineering LOGICAL FRAME ANALYSIS Objective 1:To study the working mechanism of space station Objective 2:To prepare 3D Model of ISS Methodology: Literature Review 1:Data and materials collection 2.Construction of 3D Model Activities: 1.Searching through the internet about working mechanism of space station 2:watching Youtube videos Activities: 1.Collection of data and information from study 2.Consulting with supervisor 3.listing and collection of materials required 4.Working on model 5.Painting and finishing up 6Submission to supervisors, preparation of report and final presentation Who: Literature review : All Who: Data collection: Rabi Shrestha Bipul Tamang Material collection: Mukesh Thapa Anil Subedi Construction of 3D model: All When: from 1st day to till the submission of project. When: After the approval of proposal to till the submission of project and final report. Risk: The data gained may not be accurate. Risk: Materials required may be costly. Solution: Data can be gained from reliable sources and authentic websites. Solution: Alternatives, easily available and low costly material can be used.
  • 10. Kathmandu University Department of Civil and Geomatics Engineering Expected outcome • The 3D model of international space station is expected outcome. We will give our best about international space station. Our project will be enough to make people clear how the ISS work.
  • 11. Kathmandu University Department of Civil and Geomatics Engineering Conclusion •Construction of 3D model of the space station helps us to gain idea about 3D modeling and also will help us to enhance knowledge and working mechanism of ISS and Application of ISS in our day to day lives navigation, astronomy,weather forecasting and various research. 9
  • 12. Kathmandu University Department of Civil and Geomatics Engineering Limitations • Ground stations are not in scale. • Satellite and earth do not rotate separately. • Secondary source of data collection may always not be reliable as primary source of data collection is not possible. 10
  • 13. Kathmandu University Department of Civil and Geomatics Engineering References • Gerson, S. G.(2014) Technical Communication: Research. New York: Pearson Education., Print • Faculty members, Seniors • Internet • https://en.wikipedia.org/wiki/International_Space_Station • https://www.space.com/16748-international-space-station.html 12