Investor Presentation
November 2015
Forward looking statements
This presentation may contain forward-looking statements and information that
both represents management's current expectations or beliefs concerning future
events and are subject to known and unknown risks and uncertainties.
A number of factors could cause actual results, performance or events to differ
materially from those expressed or implied by these forward-looking statements.
November2015 | P1
Executive summary
Delivering our short term targets
Above budget and guidance year-to-date driven by 90%
operating efficiency
Strong operating cash
flow
Production of
57.5 kboepd
Opex per barrel
reduction
Net debt stable
Covenant flexibility
Solan and Catcher
milestones achieved
Resource additions
Increased cash flows: strong production, lower costs and
hedging benefits (which continue for rest of 2015 and 2016)
Further cost savings identified; $16/boe opex expected for
FY2015
Net debt of $2.3 billion, despite ongoing investments in Solan
and Catcher
Renegotiated terms; covenant headroom >$700m for FY2015
On track for first oil before the year end from Solan and 2017
from Catcher
Discoveries atZebedee and Isobel Deep; resource additions at
Anoa
Refocusing the
portfolio
Asset disposals (Norway subsidiary andAceh in Indonesia); Low
cost acreage additions in Brazil and Mexico
November 2015 | P3
Cash generation in a low oil price environment
November 2015 | P4
• Growing production profile
– Intense focus on execution
– Reducing level of spend
2.
• Robust, low cost production
generates good cash flow
1.
• Free cash flow will be
directed at debt reduction
3.
20
19
17
14
16
0
5
10
15
20
2013 2014 2015
budget
2015 1H 2015
forecast
Opex ($/boe)
Committed capex $m
0
200
400
600
800
1000
1200
2015F 2016 2017 2018
Exploration
P&D Capex
Favourable financing structure
November 2015 | P5
• Liquidity
– $1.2bn cash & undrawn facilities (end
October 2015)
– No significant debt maturities until 2019
2.
• Corporate unsecured structure
– No reserve base redeterminations
– Average debt cost 2015 ytd: 3.5%
1.
• Increased financial flexibility
– Covenants amended
– Strong support from banks &
bondholders
3.
Net debt/ EBITDAX
Old covenants
Amended covenants
0
1
2
3
4
5
2015
1H
2015
FY
2016
1H
2016
FY
2017
1H
2017
FY
307 362
1,238
558
0
200
400
600
800
1000
1200
1400
2015 2016 2017 2018 2019 2020-
2024
Drawn debt maturities ($m)
Production
Pakistan (10.3 kboepd)
• Well-established gas
producing fields
• Generates positive, stable
cash flows
• Formal sales process
ongoing
0
5
10
15
20
2014 2015 ytd
2015 ytd – strong production
November 2015 | P7
Indonesia (13.8 kboepd)
• Singapore demand above
take or pay
• GSA1 share 42.8%; above
contractual share of 39.9%
• Pelikan on-stream
0
5
10
15
20
2014 2015 ytd
Vietnam (17.0 kboepd)
• High operating efficiency
following summer
shutdown
• Better than predicted
reservoir performance
0
5
10
15
20
2014 2015 ytd
Group
• High operating
efficiency
• Higher liquids
production
0
10
20
30
40
50
60
70
2014 2015 ytd
FY guidance
2015 ytd
average:
57.5 kboepd
North Sea (16.4 kboepd)
• Unrestricted production
from Huntington since April
• Steady production from rest
of UK portfolio
0
5
10
15
20
25
2014 2015 ytd
OE
84%
OE
90%
OE
72%
Production (kboepd)Production (kboepd)
Production (kboepd)Production (kboepd)
OE
87%
OE
84%
OE
86%
OE
94%
OE
92%
OE
96%
OE
95%
UK – underlying growth
2015 ytd
• Averaged 16.4 kboepd
• Improved operating efficiency
• Opex $30.2/bbl, down 20% (FY 2014:
$37.75/bbl)
– Sale of high cost Scott area
– Active cost management and
G&A cuts
• Sanctioned projects will see Premier’s
UK production rise to c. 50 kboepd
• $3.3 bn of UK tax losses and allowances
Catcher
Balmoral AreaSolan
Wytch Farm
Kyle Huntington
87%
operating
efficiency
Key projects Equity
interest
First
oil/gas
Operator Reserves
YE14 (gross)
Balmoral Area c. 80% Various Premier 7 mmboe
Catcher 50% 2017 Premier 96 mmboe
Huntington 40% 2013 E.On 16 mmboe
Kyle 40% 2001 CNR 5 mmboe
Solan 100% 2015 Premier 44 mmboe
Wytch Farm 30% 1979 Perenco 47 mmboe
November 2015 | P8
Indonesia – strategically positioned
2015 ytd highlights
•Singapore demand
aboveToP
•42.8% of GSA1 vs
39.9% contractual
share
•Pelikan on-stream
•Block A Aceh sale
completed
Outlook
•Steady Singapore gas
demand but
increasing market
share for GSA1
•Portfolio of growth
opportunities
GSA2
Domestic Gas Swap
GSA1
November 2015 | P9
42.8%
share of
GSA1
Growing
domestic
market
Vietnam – high performing cash generator
November 2015 | P10
2015 ytd highlights
• 17 kboepd, reflecting continued
outperformance
• Better than predicted reservoir
performance
• Significantly reduced opex at
c.$12/boe
• 5% premium to Brent for crude
Outlook
• No committed capex
• Incremental growth opportunities
0
5
10
15
2017 2018 2019 2020 2021 2022 2023
Incremental production
86%
operating
efficiency
Development
Development – sustained growth
Catcher (50% op.)
• 96 mmboe
• ~50 kbopd at peak
• $1.6bn capex pre-first oil
• Reservoir upside
Solan (100% op.)
• >40 mmbbls
• First oil stillQ4 2015
• $1.76bn capex spent to
endOct 2015
BIGP
(28.7% op.)
• Backfill our existing
contracts
• Q4 2016 investment
decision
Sea Lion Phase 1a
(60% op.)
• c. 160 mmbbls
• ~60 kbopd
• $1.8bn capex pre-first oil
• 2016 FEED decision
Increasing
deliverability
November 2015 | P12
Monetising
high value
UK tax pool
Progressing
phased,
lower capex
solution
Monetising
high value
UK tax pool
Solan – first oil Q4 2015
Long term vision
• Reserves upside potential
• Infill drilling opportunities; near field
exploration
• Nearby accumulations; potential 3rd party
business over Solan hub facility
• Consider farm down of equity post first oil
Cash
generative
$26/bbl opex
(LOF)
No tax
25,000
20,000
15,000
10,000
5,000
0
2020
Solan oil production rate (stb/d)
November 2015 | P13
Potential ullage?
2015 ytd highlights
• P1/W2 tied in; P2 suspended,
W2 underway
• Improved offshore
productivity
• Removed partner funding
concerns
• Reduced balance sheet
exposure (Flowstream)
• Cash spend at as 31 Oct
$1.76m
Peak
production
25,000
bopd
Solan – facilities update
2015 1H Sep - Oct Nov - Dec
Siem Spearfish
60 men; 180-280 hrs/day
Regalia flotel
135-150 men; 600-800 hrs/day
Superior flotel
200-240 men; 1,000 hrs/day
Habitation
20 men; 100-120 hrs/day
Complete construction
works; commissioning of
accommodation
Commissioning of
safety, accommodation,
& production systems,
power generation &
utilities
Tanker
Offloading trials
Jul - Aug
Bibby DSV
SOST &
P1/W1 tied in
Ocean Valiant
P2 suspended; sidetrack Q2 2016
Victory
250 men; 800-1,000 hrs/day
Completion of over-side
work & commissioning of
emergency power systems
Bibby DSV
Complete commissioning
of subsea infrastructure
o
Ocean Valiant
W2 spudded
Commissioning of
production systems
Commissioning of
production systems
First oil
November 2015 | P14
November 2015| P15
Catcher area
Reservoir
upside
Near field tie-backs
Exploration
upside
No tax
Catcher
5P, 2I
Varadero
4P, 3I
Burgman
5P, 3I
Catcher – subsea
• 2 templates installed
(Catcher 1 & Burgman 1)
• PLEM installed
• 60 km gas export
pipeline lay completed
• Fabrication of remaining
templates completed
• Fabrication of towheads
well-advanced
• First steel cut on mid-
water arches
• Fabrication of bundles
underway
• Fabrication of risers and
jumpers to commence in
2016
November 2015 | P16
Catcher - execution phase progressing
November 2015 | P17
Formal
concept select
FPSO HUC
DECC
approval
2013 201620152014 2017
Exploration
FPSO and SURF
fabrication
commenced
SURF
installation
Development
drilling
FPSO
• Turret and mooring system
progressing
• Hull fabrication on-going in
Japan and Korea
• Topsides fabrication
underway in ProFab,
Dynamac and Asia
Offshore yards
Drilling
• Ensco 100 rig on hire since July
• Batch drilling of first 4 wells
completed
• CTI1 water injection well
complete; good reservoir
results
• CCI2 water injection well being
completed
• Operations on schedule and
within budget
96mmboe
$1.6bn (gross
budget to first oil)
Peak production
c.50 kbopd First
oil
CTI1
Buoy and
moorings
installation
De-risking the Sea Lion development
November 2015 | P18
• Phase 1a reservoir is fully appraised, subsurface
plan is robust
• FPSO and SURF is well understood, conceptual
design is now mature
• Key project execution contractors selected
ahead of FEED
• Financing plans progressing well
• Upside in the area has increased and become
better defined
• Stakeholder discussions continuing
Phase 1a facilities
Subsea drill centre
FPSOShuttle tanker
8 well
production
manifold
5 well
water injection
manifold
Flowline to
gas well
Nov 2014 capex
Pre-sanction capex $0.1bn
Surf & installation $0.7bn
Project management $0.4bn
Pre-first oil drillex $0.6bn
$1.8bn
Potential
for cost
reductions
November 2015 | P19
3Km
Phase 1a
(160 mmbbls)
Phase 1b
Phase 2
Exploration
Exploration – re-shaping the portfolio
Balance of wells targeting Mature verses Emerging plays
2012 2015
North Sea and SE Asia
Falklands, Brazil and Mexico 110
Growth in
emerging basins
with material
opportunities
Rationalisation
in
mature areas
• Focusing on under-explored, emerging
plays in proven hydrocarbon provinces
– Entry into Brazil and follow-on
farm in to Block 661, Ceará Basin
– Successful entry into Mexico
with award of Blocks 2 & 7
• Minimising up-front capex
commitments
• Current industry conditions favour low
cost acreage acquisition
• Exiting acreage in traditional, more
mature areas (save for near-field
exploration)
– Significant disposal proceeds
and reduced well commitments
– Improved materiality of
discoveries
• Net unrisked prospective resource of
>1 bn boe
100%
Emerging
100%
Mature
2015 well
campaign
2012 well
campaign
1751
November 2015 | P21
2015 North Falklands Basin campaign
2015 ytd highlights
• Zebedee oil & gas discovery (36% op interest)
– adds c. 50 mmbbls to Phase 2
• Isobel Deep oil discovery (36% op interest)
– de-risks the Isobel/Elaine fan complex (un-
risked Pmean resource of 400 mmbbls)
– opens up potential Phase 3 development
Two
discoveries
from two
wells
2015 /2016 look ahead
• Isobel Deep (36% op interest), well to spudQ4 2015
– Partners agreed to performing more drilling at
Isobel Deep, ahead of Jayne East
• Chatham (40% op interest), well to spudQ1 2016
– would add resource to Phase 1b
Chatham
Pmean
47 mmbbls
50
mmbls
Zebedee
Southern
exploration
leads
Phase 2
prospects
PL032
prospects
Jayne
East
Pmean
39mmbbls
Isobel /
Elaine
Pmean
400 mmbbls
November 2015 | P22
Beyond 2016
• Additional exploration/appraisal prospects
identified for drilling in 2017/2018
Falklands: Isobel Deep Re-Drill
Full stack amplitude at F3G horizon • Further drilling at Isobel / Elaine complex to confirm
significant resource potential of southern F3 fan system
(unrisked Pmean 400 mmbbls)
• Chatham exploration well follows, also appraises the
expected gas cap in the west of the Sea Lion field
•
North
Falkland
Graben
Isobel / Elaine
Re-drill Isobel Deep
Jayne East
Zebedee
Jayne East
Isobel Deep
Isobel / Elaine
November 2015 | P23
10Km
Brazil Ceará Basin – expanding acreage footprint
Pecem discovery
• Flowed light oil
to surface when
tested in 2014
• De-risks key
play elements
Outline of new
3D survey being
acquired 2H15
Cretaceous sand
channel systems
Brazil Focus Basin
• Strong analogies with West
African Tano basin
discoveries
• Proven light oil petroleum
system
• Multiple play types
• Attracted supermajors to
make significant operational
commitments
Opportunity
• Position in 3 Licences
provides dominant position
in basin
• 3 wells drilling late 2017/18
• Premier coordinating rig-
share
• 3D seismic survey 50%
complete
Mean gross
unrisked
resource
> 2 bn bbls
November 2015 | P24
Mexico – low cost entry
Strong
partnership
Proven but
under-explored
hydrocarbon basin
Low cost
entry
November 2015 | P25
Block 2
• Primary target – 100 mmbbls
• 3 follow on prospects of c. 80-100 mmbbls each
Block 7
• Primary target – 130 mmbbls
• 4 follow on prospects of
c. 40-150 mmbbls each
Block 2
Salt stock
Closure
Miocene Depth Structure Map – Poblano Prospect
Low cost entry to high quality
acreage
• Awarded 10% in Blocks 2 & 7,
shallow water Sureste Basin
• Option to increase interest to
25% prior to drilling
• Numerous leads in established
and emerging plays
• Fully carried to first well on each
block
2015/2016 exploration drilling schedule
November 2015 | P26
All well timings are subject to revision for operational reasons
Finance
Strong cash flows in 2015 1H
6 months
to 30 June
2015
6 months
to 30 June
2014
Working Interest production (kboepd) 60.4 64.9
Entitlement production (kboepd) 55.7 59.7
Realised oil price (US$/bbl) - post hedge 83.7 107.9
Realised gas price (US$/mcf) - post hedge 7.2 9.1
$m $m
Cash flow from operations 570 609
Taxation (57) (110)
Operating cash flow 513 499
Capital expenditure (518) (506)
Disposals 83 -
Finance and other charges, net (49) (49)
Dividends - (44)
Share buy back - (33)
Net cash in (out) flow 29 (236)
Capital expenditure ($m)
Comprises $49m from the BlockAAceh sale
and ~$34m positive adjustment from Scott
area disposal
Liquids hedging
1H 2015 2H 2015 2016
Barrels
hedged
2.7 m 2.85 m 3.65 m
Average price
($/bbl)
$103 $92 $68
2015 1H FY 2015 E
Exploration $115 $240
Development $403 $900
Total $518 $1,140
November2015 | P28
0
500
1000
1500
2014 2015F 2016 2017 2018
Committed capex ($m)
Exploration
P&D Capex
Significantly reduced costs
November 2015 | P29
30% reduction in opex
• Sale of Scott area
• Renegotiation of contracts
• Operating efficiencies
• Lower insurance & fuel costs
• Reduced headcount
• Contractor rate cuts
0
100
200
300
400
500
FY 2014 (actual) 2015 initial
budget (Oct 14)
2015 final
budget (Feb 15)
2015 forecast
(Aug 15)
Opex ($m)
0
50
100
150
200
250
300
350
FY 2014
(actual)
2015 initial
budget
(Oct 14)
2015 final
budget
(Feb 15)
2015
forecast
(Aug 15)
Gross G&A ($m)
2015 1H:
$14/bbl opex
Significantly
reduced
capex
commitments
from 2016
Forecast
Actual
Forecast
Actual
6 months to
30 June 2015
$m
6 months to
30 June 2014
$m
Sales and other operating revenues 577 885
Cost of sales (684) (646)
Gross profit/(loss) (107) 239
Exploration/New Business (52) (50)
General and administration costs (8) (13)
Disposals - (84)
Operating profit/(loss) (167) 92
Financial items (48) (41)
Profit/(loss) before taxation (215) 51
Tax credit/(charge) (160) 122
Profit/(loss) after taxation (375) 173
Income statement
Operating costs ($/boe)
* excludes insurance receipts of $4.7m
Cost of sales breakdown
2015 1H 2014 1H
UK $28.8 $34.9
Indonesia $8.9 $10.1
Pakistan $3.2 $2.7
Vietnam $10.1* $15.5
Group $13.7 $18.5
Profit before tax and impairments 171 195
November 2015 | P30
0
250
500
750
Operating
costs
Stock
underlift
Royalties DD&A Impair-
ment
Cost of
sales
Non-cash
items
$3.3 bn of UK tax losses and allowances
Liquidity and balance sheet position
At
30 June 2015
$m
At
31 Dec 2014
$m
Cash 372 292
Bank debt (1,482) (1,230)
Bonds (753) (955)
Convertibles1 (230) (229)
Net debt position (2,093) (2,122)
Covenant headroom $417 $700
Gearing2 59% 53%
Cash and undrawn facilities 1,446 1,940
1 Maturity value of US$245 million
2 Net debt/net debt plus equity
Average debt costs of 4.7% (fixed) and 2.2%
(floating)
Net debt/ EBITDAX
Old covenants
Amended covenants
November 2015 | P31
307 362
1238
558
0
200
400
600
800
1000
1200
1400
2015 2016 2017 2018 2019 2020-
2024
Drawn debt maturities ($m)
0
1
2
3
4
5
2015
1H
2015
FY
2016
1H
2016
FY
2017
1H
2017
FY
End 2014 2P reserves and resources
November 2015 | P32
Falklands Indonesia Mauritania Norway Pakistan UK Vietnam Total
2P
On Production – 33.7 0.4 – 16.3 26.5 26.0 102.8
Approved for
Development
– 10.5 – – – 74.2 1.4 86.1
Justified for
Development
– 29.1 – 23.2 – 2.2 – 54.4
Total Reserves – 73.3 0.4 23.2 16.3 102.8 27.3 243.3
2C
Development
Pending
98.0 – 3.1 37.5 0.6 0.1 – 139.3
Development
Unclarified / on hold
142.0 170.8 3.6 5.1 3.0 16.9 7.4 348.7
Development not
viable
33.8 4.5 1.3 2.4 – 18.2 2.2 62.4
TotalContingent
Resources
273.7 175.4 8.0 45.0 3.6 35.1 9.6 550.5
Total Reserves +
Contingent Resources
273.7 248.7 8.4 68.2 19.9 137.9 36.9 793.8
Premier Oil Plc
23 Lower Belgrave Street
London
SW1W 0NR
Tel: +44 (0)20 7730 1111
Fax: +44 (0)20 7730 4696
Email: premier@premier-oil.com
www.premier-oil.com
November 2015

More Related Content

What's hot

PA Resources Q4 Interim report
PA Resources Q4 Interim report PA Resources Q4 Interim report
PA Resources Q4 Interim report
PA Resources AB
 
Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013PA Resources AB
 
PA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentationPA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentation
PA Resources AB
 
Pa resources farm out and review-presentation 29 may_final
Pa resources farm out and review-presentation 29 may_finalPa resources farm out and review-presentation 29 may_final
Pa resources farm out and review-presentation 29 may_finalPA Resources AB
 
Premier oil 2014_hy_presentation
Premier oil 2014_hy_presentationPremier oil 2014_hy_presentation
Premier oil 2014_hy_presentation
Company Spotlight
 
PA Resources Q3 Interim report
PA Resources Q3 Interim reportPA Resources Q3 Interim report
PA Resources Q3 Interim report
PA Resources AB
 
Q2 Presentation
Q2 PresentationQ2 Presentation
Q2 Presentation
PA Resources AB
 
Pa resources agm 2013 presentation 14 may 2013
Pa resources agm 2013 presentation 14 may 2013Pa resources agm 2013 presentation 14 may 2013
Pa resources agm 2013 presentation 14 may 2013PA Resources AB
 
Pareto E&P conference PA Resources
Pareto E&P conference PA ResourcesPareto E&P conference PA Resources
Pareto E&P conference PA Resources
PA Resources AB
 
Pa Resources Rights issue and bond undertakings 5 june 2013
Pa Resources Rights issue and bond undertakings 5 june 2013Pa Resources Rights issue and bond undertakings 5 june 2013
Pa Resources Rights issue and bond undertakings 5 june 2013PA Resources AB
 
Premier Oil Investor Presentation 2017-February
Premier Oil Investor Presentation 2017-FebruaryPremier Oil Investor Presentation 2017-February
Premier Oil Investor Presentation 2017-February
OILWIRE
 
Q4 2013 presentation
Q4 2013 presentationQ4 2013 presentation
Q4 2013 presentation
PA Resources AB
 
Pa resources q4 2012 presentation_6 february 2013
Pa resources q4 2012 presentation_6 february 2013Pa resources q4 2012 presentation_6 february 2013
Pa resources q4 2012 presentation_6 february 2013PA Resources AB
 
Premier oil results 2014
Premier oil results 2014Premier oil results 2014
Premier oil results 2014
Company Spotlight
 
Annual results presentation14
Annual results presentation14Annual results presentation14
Annual results presentation14Company Spotlight
 
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITEDApril Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
Symposium
 
2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing
Enbridge Inc.
 
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
Innovation Norway
 
Exile Resources June 2010 Investor Presentation
Exile Resources June 2010 Investor PresentationExile Resources June 2010 Investor Presentation
Exile Resources June 2010 Investor Presentation
PENTA
 

What's hot (20)

PA Resources Q4 Interim report
PA Resources Q4 Interim report PA Resources Q4 Interim report
PA Resources Q4 Interim report
 
Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013Pa resources q1 2013 results 24 april 2013
Pa resources q1 2013 results 24 april 2013
 
PA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentationPA Resources - AGM and Q1 presentation
PA Resources - AGM and Q1 presentation
 
Pa resources farm out and review-presentation 29 may_final
Pa resources farm out and review-presentation 29 may_finalPa resources farm out and review-presentation 29 may_final
Pa resources farm out and review-presentation 29 may_final
 
Premier oil 2014_hy_presentation
Premier oil 2014_hy_presentationPremier oil 2014_hy_presentation
Premier oil 2014_hy_presentation
 
PA Resources Q3 Interim report
PA Resources Q3 Interim reportPA Resources Q3 Interim report
PA Resources Q3 Interim report
 
Q2 Presentation
Q2 PresentationQ2 Presentation
Q2 Presentation
 
Pa resources agm 2013 presentation 14 may 2013
Pa resources agm 2013 presentation 14 may 2013Pa resources agm 2013 presentation 14 may 2013
Pa resources agm 2013 presentation 14 may 2013
 
Pareto E&P conference PA Resources
Pareto E&P conference PA ResourcesPareto E&P conference PA Resources
Pareto E&P conference PA Resources
 
Pa Resources Rights issue and bond undertakings 5 june 2013
Pa Resources Rights issue and bond undertakings 5 june 2013Pa Resources Rights issue and bond undertakings 5 june 2013
Pa Resources Rights issue and bond undertakings 5 june 2013
 
Premier Oil Investor Presentation 2017-February
Premier Oil Investor Presentation 2017-FebruaryPremier Oil Investor Presentation 2017-February
Premier Oil Investor Presentation 2017-February
 
Q4 2013 presentation
Q4 2013 presentationQ4 2013 presentation
Q4 2013 presentation
 
Pa resources q4 2012 presentation_6 february 2013
Pa resources q4 2012 presentation_6 february 2013Pa resources q4 2012 presentation_6 february 2013
Pa resources q4 2012 presentation_6 february 2013
 
Premier oil results 2014
Premier oil results 2014Premier oil results 2014
Premier oil results 2014
 
Annual results presentation14
Annual results presentation14Annual results presentation14
Annual results presentation14
 
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITEDApril Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
April Investor RoadShow *Special Oil and Gas* GALILEE ENERGY LIMITED
 
2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing
 
Fogl agm2014 presentation
Fogl agm2014 presentationFogl agm2014 presentation
Fogl agm2014 presentation
 
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
Gassco - Future Gas Export from the Norwegian Continental Shelf - Thor Otto L...
 
Exile Resources June 2010 Investor Presentation
Exile Resources June 2010 Investor PresentationExile Resources June 2010 Investor Presentation
Exile Resources June 2010 Investor Presentation
 

Similar to Premier oil inv_pres_nov_2015

2014 interim results presentation no script
2014 interim results presentation   no script2014 interim results presentation   no script
2014 interim results presentation no script
Company Spotlight
 
Saipem stake disposal & Eni's 2015 Q3 Results
Saipem stake disposal & Eni's 2015 Q3 ResultsSaipem stake disposal & Eni's 2015 Q3 Results
Saipem stake disposal & Eni's 2015 Q3 Results
Eni
 
Noble Energy 2016 credit suisse Presentation
Noble Energy 2016 credit suisse PresentationNoble Energy 2016 credit suisse Presentation
Noble Energy 2016 credit suisse Presentation
Andy Varoshiotis
 
Premier Oil Annual Result 2016 Press Release
Premier Oil Annual Result 2016 Press ReleasePremier Oil Annual Result 2016 Press Release
Premier Oil Annual Result 2016 Press Release
OILWIRE
 
Eni: second quarter and first half of 2016 results
Eni: second quarter and first half of 2016 resultsEni: second quarter and first half of 2016 results
Eni: second quarter and first half of 2016 results
Eni
 
Presentation april - final
Presentation   april - finalPresentation   april - final
Presentation april - final
FirstQuantum
 
150825 2015 half year results 2 pp-1a82e52f-ff49-4a17-9cc5-e5f333a6d5a5-0
150825 2015 half year results 2 pp-1a82e52f-ff49-4a17-9cc5-e5f333a6d5a5-0150825 2015 half year results 2 pp-1a82e52f-ff49-4a17-9cc5-e5f333a6d5a5-0
150825 2015 half year results 2 pp-1a82e52f-ff49-4a17-9cc5-e5f333a6d5a5-0
absmartkarma
 
Aker BP Fourth Quarter Financial Results Q4 2016 - Presentation
Aker BP Fourth Quarter Financial Results Q4 2016 - PresentationAker BP Fourth Quarter Financial Results Q4 2016 - Presentation
Aker BP Fourth Quarter Financial Results Q4 2016 - Presentation
OILWIRE
 
State of the Canadian Oilfield Services Industry and 2015 Outlook Webinar
State of the Canadian Oilfield Services Industry and 2015 Outlook WebinarState of the Canadian Oilfield Services Industry and 2015 Outlook Webinar
State of the Canadian Oilfield Services Industry and 2015 Outlook Webinar
MNP LLP
 
Nemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINALNemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINALVictor Cantore
 
PA Resources EGM 7 December 2012
PA Resources EGM 7 December 2012PA Resources EGM 7 December 2012
PA Resources EGM 7 December 2012PA Resources AB
 
Dangote sugar H1 2015 presentation
Dangote sugar H1 2015 presentationDangote sugar H1 2015 presentation
Dangote sugar H1 2015 presentation
CSL Stockbroking Ltd.
 
Total's 2018 Results and Outlook
Total's 2018 Results and OutlookTotal's 2018 Results and Outlook
Total's 2018 Results and Outlook
Total
 
Candax Energy Corporate Presentation
Candax Energy Corporate PresentationCandax Energy Corporate Presentation
Candax Energy Corporate PresentationCompany Spotlight
 
2016-2020 Strategy & Targets
2016-2020 Strategy & Targets2016-2020 Strategy & Targets
2016-2020 Strategy & Targets
Snam
 
Capital Power April Investor Presentation
Capital Power April Investor PresentationCapital Power April Investor Presentation
Capital Power April Investor Presentation
Capital Power
 
Capital Power 2015 Annual Meeting Presentation
Capital Power 2015 Annual Meeting PresentationCapital Power 2015 Annual Meeting Presentation
Capital Power 2015 Annual Meeting Presentation
Capital Power
 
Presentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongPresentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong Kong
Santos Ltd
 
Tullow Oil Plc - 2016 Annual Report and Accounts
Tullow Oil Plc - 2016 Annual Report and AccountsTullow Oil Plc - 2016 Annual Report and Accounts
Tullow Oil Plc - 2016 Annual Report and Accounts
OILWIRE
 
Investorupdate sep14
Investorupdate sep14Investorupdate sep14
Investorupdate sep14
Company Spotlight
 

Similar to Premier oil inv_pres_nov_2015 (20)

2014 interim results presentation no script
2014 interim results presentation   no script2014 interim results presentation   no script
2014 interim results presentation no script
 
Saipem stake disposal & Eni's 2015 Q3 Results
Saipem stake disposal & Eni's 2015 Q3 ResultsSaipem stake disposal & Eni's 2015 Q3 Results
Saipem stake disposal & Eni's 2015 Q3 Results
 
Noble Energy 2016 credit suisse Presentation
Noble Energy 2016 credit suisse PresentationNoble Energy 2016 credit suisse Presentation
Noble Energy 2016 credit suisse Presentation
 
Premier Oil Annual Result 2016 Press Release
Premier Oil Annual Result 2016 Press ReleasePremier Oil Annual Result 2016 Press Release
Premier Oil Annual Result 2016 Press Release
 
Eni: second quarter and first half of 2016 results
Eni: second quarter and first half of 2016 resultsEni: second quarter and first half of 2016 results
Eni: second quarter and first half of 2016 results
 
Presentation april - final
Presentation   april - finalPresentation   april - final
Presentation april - final
 
150825 2015 half year results 2 pp-1a82e52f-ff49-4a17-9cc5-e5f333a6d5a5-0
150825 2015 half year results 2 pp-1a82e52f-ff49-4a17-9cc5-e5f333a6d5a5-0150825 2015 half year results 2 pp-1a82e52f-ff49-4a17-9cc5-e5f333a6d5a5-0
150825 2015 half year results 2 pp-1a82e52f-ff49-4a17-9cc5-e5f333a6d5a5-0
 
Aker BP Fourth Quarter Financial Results Q4 2016 - Presentation
Aker BP Fourth Quarter Financial Results Q4 2016 - PresentationAker BP Fourth Quarter Financial Results Q4 2016 - Presentation
Aker BP Fourth Quarter Financial Results Q4 2016 - Presentation
 
State of the Canadian Oilfield Services Industry and 2015 Outlook Webinar
State of the Canadian Oilfield Services Industry and 2015 Outlook WebinarState of the Canadian Oilfield Services Industry and 2015 Outlook Webinar
State of the Canadian Oilfield Services Industry and 2015 Outlook Webinar
 
Nemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINALNemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINAL
 
PA Resources EGM 7 December 2012
PA Resources EGM 7 December 2012PA Resources EGM 7 December 2012
PA Resources EGM 7 December 2012
 
Dangote sugar H1 2015 presentation
Dangote sugar H1 2015 presentationDangote sugar H1 2015 presentation
Dangote sugar H1 2015 presentation
 
Total's 2018 Results and Outlook
Total's 2018 Results and OutlookTotal's 2018 Results and Outlook
Total's 2018 Results and Outlook
 
Candax Energy Corporate Presentation
Candax Energy Corporate PresentationCandax Energy Corporate Presentation
Candax Energy Corporate Presentation
 
2016-2020 Strategy & Targets
2016-2020 Strategy & Targets2016-2020 Strategy & Targets
2016-2020 Strategy & Targets
 
Capital Power April Investor Presentation
Capital Power April Investor PresentationCapital Power April Investor Presentation
Capital Power April Investor Presentation
 
Capital Power 2015 Annual Meeting Presentation
Capital Power 2015 Annual Meeting PresentationCapital Power 2015 Annual Meeting Presentation
Capital Power 2015 Annual Meeting Presentation
 
Presentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongPresentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong Kong
 
Tullow Oil Plc - 2016 Annual Report and Accounts
Tullow Oil Plc - 2016 Annual Report and AccountsTullow Oil Plc - 2016 Annual Report and Accounts
Tullow Oil Plc - 2016 Annual Report and Accounts
 
Investorupdate sep14
Investorupdate sep14Investorupdate sep14
Investorupdate sep14
 

More from Company Spotlight

Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsPresentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Company Spotlight
 
Aben resources presentation
Aben resources presentationAben resources presentation
Aben resources presentation
Company Spotlight
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
Company Spotlight
 
Cypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCypress Development Corp. Investor Presentation
Cypress Development Corp. Investor Presentation
Company Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
Company Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
Company Spotlight
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
Company Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
Company Spotlight
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
Company Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
Company Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
Company Spotlight
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
Company Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
Company Spotlight
 
TerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationTerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate Presentation
Company Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
Company Spotlight
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
Company Spotlight
 
TerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationTerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate Presentation
Company Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
Company Spotlight
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
Company Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
Company Spotlight
 

More from Company Spotlight (20)

Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsPresentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
 
Aben resources presentation
Aben resources presentationAben resources presentation
Aben resources presentation
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
 
Cypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCypress Development Corp. Investor Presentation
Cypress Development Corp. Investor Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 
TerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationTerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
 
TerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationTerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate Presentation
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 

Recently uploaded

一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
ybout
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
Sysco_Investors
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
Valentina Ottini
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
Philip Rabenok
 
Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024
Sysco_Investors
 
cyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdfcyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
CollectiveMining1
 

Recently uploaded (8)

一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
 
Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024
 
cyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdfcyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdf
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 

Premier oil inv_pres_nov_2015

  • 2. Forward looking statements This presentation may contain forward-looking statements and information that both represents management's current expectations or beliefs concerning future events and are subject to known and unknown risks and uncertainties. A number of factors could cause actual results, performance or events to differ materially from those expressed or implied by these forward-looking statements. November2015 | P1
  • 4. Delivering our short term targets Above budget and guidance year-to-date driven by 90% operating efficiency Strong operating cash flow Production of 57.5 kboepd Opex per barrel reduction Net debt stable Covenant flexibility Solan and Catcher milestones achieved Resource additions Increased cash flows: strong production, lower costs and hedging benefits (which continue for rest of 2015 and 2016) Further cost savings identified; $16/boe opex expected for FY2015 Net debt of $2.3 billion, despite ongoing investments in Solan and Catcher Renegotiated terms; covenant headroom >$700m for FY2015 On track for first oil before the year end from Solan and 2017 from Catcher Discoveries atZebedee and Isobel Deep; resource additions at Anoa Refocusing the portfolio Asset disposals (Norway subsidiary andAceh in Indonesia); Low cost acreage additions in Brazil and Mexico November 2015 | P3
  • 5. Cash generation in a low oil price environment November 2015 | P4 • Growing production profile – Intense focus on execution – Reducing level of spend 2. • Robust, low cost production generates good cash flow 1. • Free cash flow will be directed at debt reduction 3. 20 19 17 14 16 0 5 10 15 20 2013 2014 2015 budget 2015 1H 2015 forecast Opex ($/boe) Committed capex $m 0 200 400 600 800 1000 1200 2015F 2016 2017 2018 Exploration P&D Capex
  • 6. Favourable financing structure November 2015 | P5 • Liquidity – $1.2bn cash & undrawn facilities (end October 2015) – No significant debt maturities until 2019 2. • Corporate unsecured structure – No reserve base redeterminations – Average debt cost 2015 ytd: 3.5% 1. • Increased financial flexibility – Covenants amended – Strong support from banks & bondholders 3. Net debt/ EBITDAX Old covenants Amended covenants 0 1 2 3 4 5 2015 1H 2015 FY 2016 1H 2016 FY 2017 1H 2017 FY 307 362 1,238 558 0 200 400 600 800 1000 1200 1400 2015 2016 2017 2018 2019 2020- 2024 Drawn debt maturities ($m)
  • 8. Pakistan (10.3 kboepd) • Well-established gas producing fields • Generates positive, stable cash flows • Formal sales process ongoing 0 5 10 15 20 2014 2015 ytd 2015 ytd – strong production November 2015 | P7 Indonesia (13.8 kboepd) • Singapore demand above take or pay • GSA1 share 42.8%; above contractual share of 39.9% • Pelikan on-stream 0 5 10 15 20 2014 2015 ytd Vietnam (17.0 kboepd) • High operating efficiency following summer shutdown • Better than predicted reservoir performance 0 5 10 15 20 2014 2015 ytd Group • High operating efficiency • Higher liquids production 0 10 20 30 40 50 60 70 2014 2015 ytd FY guidance 2015 ytd average: 57.5 kboepd North Sea (16.4 kboepd) • Unrestricted production from Huntington since April • Steady production from rest of UK portfolio 0 5 10 15 20 25 2014 2015 ytd OE 84% OE 90% OE 72% Production (kboepd)Production (kboepd) Production (kboepd)Production (kboepd) OE 87% OE 84% OE 86% OE 94% OE 92% OE 96% OE 95%
  • 9. UK – underlying growth 2015 ytd • Averaged 16.4 kboepd • Improved operating efficiency • Opex $30.2/bbl, down 20% (FY 2014: $37.75/bbl) – Sale of high cost Scott area – Active cost management and G&A cuts • Sanctioned projects will see Premier’s UK production rise to c. 50 kboepd • $3.3 bn of UK tax losses and allowances Catcher Balmoral AreaSolan Wytch Farm Kyle Huntington 87% operating efficiency Key projects Equity interest First oil/gas Operator Reserves YE14 (gross) Balmoral Area c. 80% Various Premier 7 mmboe Catcher 50% 2017 Premier 96 mmboe Huntington 40% 2013 E.On 16 mmboe Kyle 40% 2001 CNR 5 mmboe Solan 100% 2015 Premier 44 mmboe Wytch Farm 30% 1979 Perenco 47 mmboe November 2015 | P8
  • 10. Indonesia – strategically positioned 2015 ytd highlights •Singapore demand aboveToP •42.8% of GSA1 vs 39.9% contractual share •Pelikan on-stream •Block A Aceh sale completed Outlook •Steady Singapore gas demand but increasing market share for GSA1 •Portfolio of growth opportunities GSA2 Domestic Gas Swap GSA1 November 2015 | P9 42.8% share of GSA1 Growing domestic market
  • 11. Vietnam – high performing cash generator November 2015 | P10 2015 ytd highlights • 17 kboepd, reflecting continued outperformance • Better than predicted reservoir performance • Significantly reduced opex at c.$12/boe • 5% premium to Brent for crude Outlook • No committed capex • Incremental growth opportunities 0 5 10 15 2017 2018 2019 2020 2021 2022 2023 Incremental production 86% operating efficiency
  • 13. Development – sustained growth Catcher (50% op.) • 96 mmboe • ~50 kbopd at peak • $1.6bn capex pre-first oil • Reservoir upside Solan (100% op.) • >40 mmbbls • First oil stillQ4 2015 • $1.76bn capex spent to endOct 2015 BIGP (28.7% op.) • Backfill our existing contracts • Q4 2016 investment decision Sea Lion Phase 1a (60% op.) • c. 160 mmbbls • ~60 kbopd • $1.8bn capex pre-first oil • 2016 FEED decision Increasing deliverability November 2015 | P12 Monetising high value UK tax pool Progressing phased, lower capex solution Monetising high value UK tax pool
  • 14. Solan – first oil Q4 2015 Long term vision • Reserves upside potential • Infill drilling opportunities; near field exploration • Nearby accumulations; potential 3rd party business over Solan hub facility • Consider farm down of equity post first oil Cash generative $26/bbl opex (LOF) No tax 25,000 20,000 15,000 10,000 5,000 0 2020 Solan oil production rate (stb/d) November 2015 | P13 Potential ullage? 2015 ytd highlights • P1/W2 tied in; P2 suspended, W2 underway • Improved offshore productivity • Removed partner funding concerns • Reduced balance sheet exposure (Flowstream) • Cash spend at as 31 Oct $1.76m Peak production 25,000 bopd
  • 15. Solan – facilities update 2015 1H Sep - Oct Nov - Dec Siem Spearfish 60 men; 180-280 hrs/day Regalia flotel 135-150 men; 600-800 hrs/day Superior flotel 200-240 men; 1,000 hrs/day Habitation 20 men; 100-120 hrs/day Complete construction works; commissioning of accommodation Commissioning of safety, accommodation, & production systems, power generation & utilities Tanker Offloading trials Jul - Aug Bibby DSV SOST & P1/W1 tied in Ocean Valiant P2 suspended; sidetrack Q2 2016 Victory 250 men; 800-1,000 hrs/day Completion of over-side work & commissioning of emergency power systems Bibby DSV Complete commissioning of subsea infrastructure o Ocean Valiant W2 spudded Commissioning of production systems Commissioning of production systems First oil November 2015 | P14
  • 16. November 2015| P15 Catcher area Reservoir upside Near field tie-backs Exploration upside No tax Catcher 5P, 2I Varadero 4P, 3I Burgman 5P, 3I
  • 17. Catcher – subsea • 2 templates installed (Catcher 1 & Burgman 1) • PLEM installed • 60 km gas export pipeline lay completed • Fabrication of remaining templates completed • Fabrication of towheads well-advanced • First steel cut on mid- water arches • Fabrication of bundles underway • Fabrication of risers and jumpers to commence in 2016 November 2015 | P16
  • 18. Catcher - execution phase progressing November 2015 | P17 Formal concept select FPSO HUC DECC approval 2013 201620152014 2017 Exploration FPSO and SURF fabrication commenced SURF installation Development drilling FPSO • Turret and mooring system progressing • Hull fabrication on-going in Japan and Korea • Topsides fabrication underway in ProFab, Dynamac and Asia Offshore yards Drilling • Ensco 100 rig on hire since July • Batch drilling of first 4 wells completed • CTI1 water injection well complete; good reservoir results • CCI2 water injection well being completed • Operations on schedule and within budget 96mmboe $1.6bn (gross budget to first oil) Peak production c.50 kbopd First oil CTI1 Buoy and moorings installation
  • 19. De-risking the Sea Lion development November 2015 | P18 • Phase 1a reservoir is fully appraised, subsurface plan is robust • FPSO and SURF is well understood, conceptual design is now mature • Key project execution contractors selected ahead of FEED • Financing plans progressing well • Upside in the area has increased and become better defined • Stakeholder discussions continuing
  • 20. Phase 1a facilities Subsea drill centre FPSOShuttle tanker 8 well production manifold 5 well water injection manifold Flowline to gas well Nov 2014 capex Pre-sanction capex $0.1bn Surf & installation $0.7bn Project management $0.4bn Pre-first oil drillex $0.6bn $1.8bn Potential for cost reductions November 2015 | P19 3Km Phase 1a (160 mmbbls) Phase 1b Phase 2
  • 22. Exploration – re-shaping the portfolio Balance of wells targeting Mature verses Emerging plays 2012 2015 North Sea and SE Asia Falklands, Brazil and Mexico 110 Growth in emerging basins with material opportunities Rationalisation in mature areas • Focusing on under-explored, emerging plays in proven hydrocarbon provinces – Entry into Brazil and follow-on farm in to Block 661, Ceará Basin – Successful entry into Mexico with award of Blocks 2 & 7 • Minimising up-front capex commitments • Current industry conditions favour low cost acreage acquisition • Exiting acreage in traditional, more mature areas (save for near-field exploration) – Significant disposal proceeds and reduced well commitments – Improved materiality of discoveries • Net unrisked prospective resource of >1 bn boe 100% Emerging 100% Mature 2015 well campaign 2012 well campaign 1751 November 2015 | P21
  • 23. 2015 North Falklands Basin campaign 2015 ytd highlights • Zebedee oil & gas discovery (36% op interest) – adds c. 50 mmbbls to Phase 2 • Isobel Deep oil discovery (36% op interest) – de-risks the Isobel/Elaine fan complex (un- risked Pmean resource of 400 mmbbls) – opens up potential Phase 3 development Two discoveries from two wells 2015 /2016 look ahead • Isobel Deep (36% op interest), well to spudQ4 2015 – Partners agreed to performing more drilling at Isobel Deep, ahead of Jayne East • Chatham (40% op interest), well to spudQ1 2016 – would add resource to Phase 1b Chatham Pmean 47 mmbbls 50 mmbls Zebedee Southern exploration leads Phase 2 prospects PL032 prospects Jayne East Pmean 39mmbbls Isobel / Elaine Pmean 400 mmbbls November 2015 | P22 Beyond 2016 • Additional exploration/appraisal prospects identified for drilling in 2017/2018
  • 24. Falklands: Isobel Deep Re-Drill Full stack amplitude at F3G horizon • Further drilling at Isobel / Elaine complex to confirm significant resource potential of southern F3 fan system (unrisked Pmean 400 mmbbls) • Chatham exploration well follows, also appraises the expected gas cap in the west of the Sea Lion field • North Falkland Graben Isobel / Elaine Re-drill Isobel Deep Jayne East Zebedee Jayne East Isobel Deep Isobel / Elaine November 2015 | P23 10Km
  • 25. Brazil Ceará Basin – expanding acreage footprint Pecem discovery • Flowed light oil to surface when tested in 2014 • De-risks key play elements Outline of new 3D survey being acquired 2H15 Cretaceous sand channel systems Brazil Focus Basin • Strong analogies with West African Tano basin discoveries • Proven light oil petroleum system • Multiple play types • Attracted supermajors to make significant operational commitments Opportunity • Position in 3 Licences provides dominant position in basin • 3 wells drilling late 2017/18 • Premier coordinating rig- share • 3D seismic survey 50% complete Mean gross unrisked resource > 2 bn bbls November 2015 | P24
  • 26. Mexico – low cost entry Strong partnership Proven but under-explored hydrocarbon basin Low cost entry November 2015 | P25 Block 2 • Primary target – 100 mmbbls • 3 follow on prospects of c. 80-100 mmbbls each Block 7 • Primary target – 130 mmbbls • 4 follow on prospects of c. 40-150 mmbbls each Block 2 Salt stock Closure Miocene Depth Structure Map – Poblano Prospect Low cost entry to high quality acreage • Awarded 10% in Blocks 2 & 7, shallow water Sureste Basin • Option to increase interest to 25% prior to drilling • Numerous leads in established and emerging plays • Fully carried to first well on each block
  • 27. 2015/2016 exploration drilling schedule November 2015 | P26 All well timings are subject to revision for operational reasons
  • 29. Strong cash flows in 2015 1H 6 months to 30 June 2015 6 months to 30 June 2014 Working Interest production (kboepd) 60.4 64.9 Entitlement production (kboepd) 55.7 59.7 Realised oil price (US$/bbl) - post hedge 83.7 107.9 Realised gas price (US$/mcf) - post hedge 7.2 9.1 $m $m Cash flow from operations 570 609 Taxation (57) (110) Operating cash flow 513 499 Capital expenditure (518) (506) Disposals 83 - Finance and other charges, net (49) (49) Dividends - (44) Share buy back - (33) Net cash in (out) flow 29 (236) Capital expenditure ($m) Comprises $49m from the BlockAAceh sale and ~$34m positive adjustment from Scott area disposal Liquids hedging 1H 2015 2H 2015 2016 Barrels hedged 2.7 m 2.85 m 3.65 m Average price ($/bbl) $103 $92 $68 2015 1H FY 2015 E Exploration $115 $240 Development $403 $900 Total $518 $1,140 November2015 | P28
  • 30. 0 500 1000 1500 2014 2015F 2016 2017 2018 Committed capex ($m) Exploration P&D Capex Significantly reduced costs November 2015 | P29 30% reduction in opex • Sale of Scott area • Renegotiation of contracts • Operating efficiencies • Lower insurance & fuel costs • Reduced headcount • Contractor rate cuts 0 100 200 300 400 500 FY 2014 (actual) 2015 initial budget (Oct 14) 2015 final budget (Feb 15) 2015 forecast (Aug 15) Opex ($m) 0 50 100 150 200 250 300 350 FY 2014 (actual) 2015 initial budget (Oct 14) 2015 final budget (Feb 15) 2015 forecast (Aug 15) Gross G&A ($m) 2015 1H: $14/bbl opex Significantly reduced capex commitments from 2016 Forecast Actual Forecast Actual
  • 31. 6 months to 30 June 2015 $m 6 months to 30 June 2014 $m Sales and other operating revenues 577 885 Cost of sales (684) (646) Gross profit/(loss) (107) 239 Exploration/New Business (52) (50) General and administration costs (8) (13) Disposals - (84) Operating profit/(loss) (167) 92 Financial items (48) (41) Profit/(loss) before taxation (215) 51 Tax credit/(charge) (160) 122 Profit/(loss) after taxation (375) 173 Income statement Operating costs ($/boe) * excludes insurance receipts of $4.7m Cost of sales breakdown 2015 1H 2014 1H UK $28.8 $34.9 Indonesia $8.9 $10.1 Pakistan $3.2 $2.7 Vietnam $10.1* $15.5 Group $13.7 $18.5 Profit before tax and impairments 171 195 November 2015 | P30 0 250 500 750 Operating costs Stock underlift Royalties DD&A Impair- ment Cost of sales Non-cash items $3.3 bn of UK tax losses and allowances
  • 32. Liquidity and balance sheet position At 30 June 2015 $m At 31 Dec 2014 $m Cash 372 292 Bank debt (1,482) (1,230) Bonds (753) (955) Convertibles1 (230) (229) Net debt position (2,093) (2,122) Covenant headroom $417 $700 Gearing2 59% 53% Cash and undrawn facilities 1,446 1,940 1 Maturity value of US$245 million 2 Net debt/net debt plus equity Average debt costs of 4.7% (fixed) and 2.2% (floating) Net debt/ EBITDAX Old covenants Amended covenants November 2015 | P31 307 362 1238 558 0 200 400 600 800 1000 1200 1400 2015 2016 2017 2018 2019 2020- 2024 Drawn debt maturities ($m) 0 1 2 3 4 5 2015 1H 2015 FY 2016 1H 2016 FY 2017 1H 2017 FY
  • 33. End 2014 2P reserves and resources November 2015 | P32 Falklands Indonesia Mauritania Norway Pakistan UK Vietnam Total 2P On Production – 33.7 0.4 – 16.3 26.5 26.0 102.8 Approved for Development – 10.5 – – – 74.2 1.4 86.1 Justified for Development – 29.1 – 23.2 – 2.2 – 54.4 Total Reserves – 73.3 0.4 23.2 16.3 102.8 27.3 243.3 2C Development Pending 98.0 – 3.1 37.5 0.6 0.1 – 139.3 Development Unclarified / on hold 142.0 170.8 3.6 5.1 3.0 16.9 7.4 348.7 Development not viable 33.8 4.5 1.3 2.4 – 18.2 2.2 62.4 TotalContingent Resources 273.7 175.4 8.0 45.0 3.6 35.1 9.6 550.5 Total Reserves + Contingent Resources 273.7 248.7 8.4 68.2 19.9 137.9 36.9 793.8
  • 34. Premier Oil Plc 23 Lower Belgrave Street London SW1W 0NR Tel: +44 (0)20 7730 1111 Fax: +44 (0)20 7730 4696 Email: premier@premier-oil.com www.premier-oil.com November 2015