SlideShare a Scribd company logo
1 of 15
Outline for Lithium ion and
Lithium Metal Cell/Battery
Performance-Based Standard
George A. Kerchner
PRBA – The Rechargeable Battery Association
1776 K Street, NW
Washington, DC 20006
202.719.4978
1
“Problem Statement” and “Goal” of
ICAO Working Group
Problem Statement: A fire involving significant
quantities of lithium batteries (UN 3090 and UN
3480) may exceed the fire suppression capability
of the aircraft and could lead to a catastrophic
failure of the airframe.
Goal: Develop performance-based standards
based on the principle that hazardous effects
will be contained within the package.
2
Thermal Runaway Definition
[A chain of exothermic internal chemical
reactions within a cell resulting in a sudden
increase in temperature and drop in voltage.]
3
Inducement of Thermal Runaway
One cell is heated until the cell enters thermal
runaway. Various methods of inducing thermal
runaway may be used (e.g., heating, overcharge).
After thermal runaway in cell is initiated, the
heater is turned off. The method used to create
a thermal runaway is to be described and
documented in the test report.
4
Package Testing
• The cell or battery pack is placed in packaging
that will be presented for transportation
• For Li ion cells/batteries, the specified
shipping SOC is set per manufacturer’s
specifications
• The testing is identical to that run at the cell
or battery pack level
• Pass/Fail Criteria (see following page)
5
Package Pass/Fail Criteria
• Pass
– Package integrity maintained
– Package has not ruptured or released any debris or fragmentation outside
of packaging
– No external flames observed
– Smoke venting is permitted
– Exterior sidewall temperatures of package cannot exceed 100° C in any
location
• Fail
– Package has not maintained structural integrity
– Package has ruptured or released debris or fragmentation outside of
packaging
– External flames observed
– Ignition of vented gases
– Exterior sidewall temperatures exceed 100° C
6
Battery Pack Testing
Li ion Battery Packs Shipped at > 30% SOC
and Li Metal Battery Packs
• For Li ion battery, the battery is prepared at the specified shipping
SOC per the manufacturer
• Cell temperature and cell voltage are monitored
• If heater is used to induce thermal runaway on the cell, a pre-test is
run to determine what size heater is required to achieve a ramp rate
of 5±2°C/min. Alternatively, a closed-loop temperature controller
may be used to achieve the ramp.
• If heater is used, cell heater is activated until either thermal runaway
is achieved or the cell reaches 200°C, which is held for 20 minutes
• The battery pack is considered to pass if there is no disassembly or
fire outside the battery pack
7
UL 1973
Safety for Batteries for Use in Light Electric Rail
Applications and Stationary Applications
Internal Fire Exposure Test
• Energy storage system shall be designed to prevent a
single cell failure within the system from cascading into
a fire and disassembly of DUT
• Cell within energy storage system subjected thermal
runaway or otherwise forcing the failure of a cell
through any means necessary and determining whether
or not failure remains safely controlled
• Once thermal runaway is initiated, heating mechanism
is shut off
• 1 hour observation period
DUT = Device under test
8
UL 1973
Safety for Batteries for Use in Light Electric Rail
Applications and Stationary Applications
Internal Fire Exposure Test
• Testing may be conducted on a representative
subassembly consisting of one or more modules and
surrounding representative environment, if it can be
demonstrated that there is no propagation beyond the
subassembly
• There shall be no fire propagating from the DUT or
explosion of the DUT
• If thermal runaway condition cannot be initiated, as
demonstrated through testing, the DUT complies with
test
DUT = Device under test
9
Cell Testing
Li ion Cells Shipped at > 30% SOC and Li Metal Cells
• For Li ion cell, the cell is prepared at the specified shipping
SOC per the manufacturer
• Cell temperature and cell voltage are monitored
• If heater is used to induce thermal runaway on the cell, a
pre-test is run to determine what size heater is required to
achieve a ramp rate of 5±2°C/min. Alternatively, a closed-
loop temperature controller may be used to achieve the
ramp.
• If heater is used, cell heater is activated until either thermal
runaway is achieved or the cell reaches 200°C, which is held
for 20 minutes
• The cell is considered to pass if there is no fire or
disassembly
10
Shipping Li ion Cells and Batteries
≤ 30% SOC
• Li ion cells and batteries are excepted from
testing provided that are shipped at ≤ 30%
SOC
11
12
FAA Test Data – Gas Generation
13
FAA Test Data - Gas Generation
14
Cells, Batteries and Packaging of
Similar Design
Cells, batteries or packaging which differ from a tested type by:
• For primary cells and batteries, a change of more than [0.1 g or 20%
by mass], whichever is greater, to the cathode, to the anode, or to
the electrolyte;
• For rechargeable cells and batteries, an increase in nominal energy
in Watt-hours of more than [20%], an increase in nominal voltage of
more than [20%], or an increase in state of charge of more than
[__%]; or
• A change in packaging configuration that may lead to failure of the
test,
shall be considered a new cell, battery or packaging type and subjected
to the required tests.
15

More Related Content

Similar to PRBA_presentation.pptx

Solar thermal testing
Solar thermal testingSolar thermal testing
Solar thermal testing
Intertek CE
 
Belt heater-2009-catalog
Belt heater-2009-catalogBelt heater-2009-catalog
Belt heater-2009-catalog
George Hebb
 

Similar to PRBA_presentation.pptx (20)

97 rajesh
97 rajesh97 rajesh
97 rajesh
 
Solar thermal testing
Solar thermal testingSolar thermal testing
Solar thermal testing
 
Belt heater-2009-catalog
Belt heater-2009-catalogBelt heater-2009-catalog
Belt heater-2009-catalog
 
BCM.pptx
BCM.pptxBCM.pptx
BCM.pptx
 
D2015
D2015D2015
D2015
 
LG INR18650M29
LG INR18650M29LG INR18650M29
LG INR18650M29
 
Battery Presentation.ppt
Battery Presentation.pptBattery Presentation.ppt
Battery Presentation.ppt
 
Sajid rashid Presentation homework.pptx
Sajid rashid Presentation homework.pptxSajid rashid Presentation homework.pptx
Sajid rashid Presentation homework.pptx
 
Nuclear power plants
Nuclear power plantsNuclear power plants
Nuclear power plants
 
moc0828011.pdf
moc0828011.pdfmoc0828011.pdf
moc0828011.pdf
 
OTEC (Ocean Thermal Energy Conversion)
OTEC (Ocean Thermal Energy Conversion)OTEC (Ocean Thermal Energy Conversion)
OTEC (Ocean Thermal Energy Conversion)
 
Unit-3_PPE.pdf
Unit-3_PPE.pdfUnit-3_PPE.pdf
Unit-3_PPE.pdf
 
Fukushima Daiichi Nuclear Power Station Accident April19 2011
Fukushima Daiichi Nuclear Power Station  Accident April19 2011Fukushima Daiichi Nuclear Power Station  Accident April19 2011
Fukushima Daiichi Nuclear Power Station Accident April19 2011
 
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdfOn Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
 
Nuclear reconsidered
Nuclear reconsideredNuclear reconsidered
Nuclear reconsidered
 
The COST of Battery Maintenance_3.ppt
The COST of Battery Maintenance_3.pptThe COST of Battery Maintenance_3.ppt
The COST of Battery Maintenance_3.ppt
 
THE SECOND LAW OF THERMODYNAMICS For Mechanical and Industrial Engineerig
THE SECOND LAW OF THERMODYNAMICS For Mechanical and Industrial EngineerigTHE SECOND LAW OF THERMODYNAMICS For Mechanical and Industrial Engineerig
THE SECOND LAW OF THERMODYNAMICS For Mechanical and Industrial Engineerig
 
Projectppt 190513183453
Projectppt 190513183453Projectppt 190513183453
Projectppt 190513183453
 
thermometric refrigeration system
thermometric refrigeration systemthermometric refrigeration system
thermometric refrigeration system
 
Nuclear Power plants
Nuclear Power plantsNuclear Power plants
Nuclear Power plants
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Recently uploaded (20)

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 

PRBA_presentation.pptx

  • 1. Outline for Lithium ion and Lithium Metal Cell/Battery Performance-Based Standard George A. Kerchner PRBA – The Rechargeable Battery Association 1776 K Street, NW Washington, DC 20006 202.719.4978 1
  • 2. “Problem Statement” and “Goal” of ICAO Working Group Problem Statement: A fire involving significant quantities of lithium batteries (UN 3090 and UN 3480) may exceed the fire suppression capability of the aircraft and could lead to a catastrophic failure of the airframe. Goal: Develop performance-based standards based on the principle that hazardous effects will be contained within the package. 2
  • 3. Thermal Runaway Definition [A chain of exothermic internal chemical reactions within a cell resulting in a sudden increase in temperature and drop in voltage.] 3
  • 4. Inducement of Thermal Runaway One cell is heated until the cell enters thermal runaway. Various methods of inducing thermal runaway may be used (e.g., heating, overcharge). After thermal runaway in cell is initiated, the heater is turned off. The method used to create a thermal runaway is to be described and documented in the test report. 4
  • 5. Package Testing • The cell or battery pack is placed in packaging that will be presented for transportation • For Li ion cells/batteries, the specified shipping SOC is set per manufacturer’s specifications • The testing is identical to that run at the cell or battery pack level • Pass/Fail Criteria (see following page) 5
  • 6. Package Pass/Fail Criteria • Pass – Package integrity maintained – Package has not ruptured or released any debris or fragmentation outside of packaging – No external flames observed – Smoke venting is permitted – Exterior sidewall temperatures of package cannot exceed 100° C in any location • Fail – Package has not maintained structural integrity – Package has ruptured or released debris or fragmentation outside of packaging – External flames observed – Ignition of vented gases – Exterior sidewall temperatures exceed 100° C 6
  • 7. Battery Pack Testing Li ion Battery Packs Shipped at > 30% SOC and Li Metal Battery Packs • For Li ion battery, the battery is prepared at the specified shipping SOC per the manufacturer • Cell temperature and cell voltage are monitored • If heater is used to induce thermal runaway on the cell, a pre-test is run to determine what size heater is required to achieve a ramp rate of 5±2°C/min. Alternatively, a closed-loop temperature controller may be used to achieve the ramp. • If heater is used, cell heater is activated until either thermal runaway is achieved or the cell reaches 200°C, which is held for 20 minutes • The battery pack is considered to pass if there is no disassembly or fire outside the battery pack 7
  • 8. UL 1973 Safety for Batteries for Use in Light Electric Rail Applications and Stationary Applications Internal Fire Exposure Test • Energy storage system shall be designed to prevent a single cell failure within the system from cascading into a fire and disassembly of DUT • Cell within energy storage system subjected thermal runaway or otherwise forcing the failure of a cell through any means necessary and determining whether or not failure remains safely controlled • Once thermal runaway is initiated, heating mechanism is shut off • 1 hour observation period DUT = Device under test 8
  • 9. UL 1973 Safety for Batteries for Use in Light Electric Rail Applications and Stationary Applications Internal Fire Exposure Test • Testing may be conducted on a representative subassembly consisting of one or more modules and surrounding representative environment, if it can be demonstrated that there is no propagation beyond the subassembly • There shall be no fire propagating from the DUT or explosion of the DUT • If thermal runaway condition cannot be initiated, as demonstrated through testing, the DUT complies with test DUT = Device under test 9
  • 10. Cell Testing Li ion Cells Shipped at > 30% SOC and Li Metal Cells • For Li ion cell, the cell is prepared at the specified shipping SOC per the manufacturer • Cell temperature and cell voltage are monitored • If heater is used to induce thermal runaway on the cell, a pre-test is run to determine what size heater is required to achieve a ramp rate of 5±2°C/min. Alternatively, a closed- loop temperature controller may be used to achieve the ramp. • If heater is used, cell heater is activated until either thermal runaway is achieved or the cell reaches 200°C, which is held for 20 minutes • The cell is considered to pass if there is no fire or disassembly 10
  • 11. Shipping Li ion Cells and Batteries ≤ 30% SOC • Li ion cells and batteries are excepted from testing provided that are shipped at ≤ 30% SOC 11
  • 12. 12
  • 13. FAA Test Data – Gas Generation 13
  • 14. FAA Test Data - Gas Generation 14
  • 15. Cells, Batteries and Packaging of Similar Design Cells, batteries or packaging which differ from a tested type by: • For primary cells and batteries, a change of more than [0.1 g or 20% by mass], whichever is greater, to the cathode, to the anode, or to the electrolyte; • For rechargeable cells and batteries, an increase in nominal energy in Watt-hours of more than [20%], an increase in nominal voltage of more than [20%], or an increase in state of charge of more than [__%]; or • A change in packaging configuration that may lead to failure of the test, shall be considered a new cell, battery or packaging type and subjected to the required tests. 15