SlideShare a Scribd company logo
1 of 3
Download to read offline
Stanley M. White, P.E., D.PE [RET], D.CE [RET], P.Eng [RET]
Positions Held
Page | 1
From:
To:
Organization:
Title:
Summary:
2013
Present
Stanley White Engineering, LLC
Principal
Mr. White is a consulting engineer providing project management
and engineering expertise to offshore wind projects in the US
including LEEDCo (Lake Erie) and Fishermen’s Energy (Atlantic
City, NJ). Expert witness services relating to port and coastal
engineering insurance and legal claims.
From:
To:
Organization:
Title:
Summary:
2014
2016
Fishermen’s Energy, LLC
Program Director
Mr. White served on the Fishermen’s Energy team starting in 2013
as a technical consultant. In mid-2014 Mr. White joined
Fishermen’s Energy as the the Program Director. Mr. White was
responsible for the management of the US Department of Energy
$50m grant, supervises all technical aspects of the project
including construction planning and supervises the regulatory
review process (Federal and State).
From:
To:
Organization:
Title:
Summary:
2013
2013
Ocean and Coastal Consultants, Inc.
Principal (Part Time)
Mr. White was a consulting engineer providing project
management and engineering expertise to offshore wind projects
in the US.
From:
To:
Organization:
Title:
Summary:
1983
2012
Ocean and Coastal Consultants, Inc.
President and Founder
Mr. White was in responsible charge of all engineering and
financial operations of the nationally recognized port and coastal
engineering consulting firm. The Firm was sold in 2007 to the US
subsidiary of COWI A/S, a leading Danish consultancy. Mr. White
was appointed President of COWI USA, Inc. (now COWI North
America, Inc.) after the acquisition and held that position until the
end of 2011.
Stanley M. White, P.E., D.PE [RET], D.CE [RET], P.Eng [RET]
Positions Held
Page | 2
From: 1986
To: 1992
Organization: Fairfield Dock Company
Title: Vice President
Summary: Mr. White was in responsible charge of a marine construction
company that operated in Long Island Sound and the Hudson
River. Projects ranged from residential piers and seawalls to
major waterfront developments which included bulkheads and
marinas. Mr. White was responsible for labor and equipment
utilization, business development and QA/QC.
From: 1980
To: 1983
Organization: Han Padron Associates
Title: Project Manager
Summary: Mr. White performed preliminary studies, final designs, cost
estimating, preparation of technical specifications and construction
supervision for various new and rehabilitated marine structures
including petroleum terminals, coal transshipment terminals,
floating breakwaters and single point moorings.
From: 1979
To: 1980
Organization: Dravo-Van Houton
Title: Project Engineer
Summary: Mr. White participated in the design of a new Tanker Berth at the
Exxon Terminal in Bayonne, NJ. The design for which Mr. White
was responsible included new mooring and breasting dolphins. Mr.
White was responsible for the failure investigation and redesign of
the Azzawia Refinery breakwater in Libya.
From: 1976
To: 1979
Organization: J. Ray McDermott
Title: Engineer
Summary: Mr. White was a member of an in-house consulting group for this
worldwide leader in the offshore industry. Mr. White was involved
with a range of engineering assignments for this offshore
contractor. Mr. White was a primary designer for the installation
equipment used to install an offshore oil rig in 1,025 feet of water.
Mr. White oversaw the design and fabrication of a unique 1,200
metric tonne crane in Germany.
Stanley M. White, P.E., D.PE [RET], D.CE [RET], P.Eng [RET]
Positions Held
Page | 3
From: 1973
To: 1976
Organization: Massachusetts Institute of Technology
Title: Research Assistant
Summary: Mr. White was responsible for the design and model testing of a hot
water diffuser discharge system for the Maine Power Plant in Casco
Bay, Maine. This work involved creation of a physical model of
Casco Bay that included a full range of tidal current variations. As
part of his thesis, Mr. White performed research on the
transmission coefficient of rubble mound breakwaters. Mr. White
was under contract to the U.S. Army Corps of Engineers and his
work became part of the USACOE Shore Protection Manual.

More Related Content

Viewers also liked

[20160504] VNese Culture in doing business
[20160504] VNese Culture in doing business[20160504] VNese Culture in doing business
[20160504] VNese Culture in doing businessNgoc Pham
 
Elektrik Piyasası Kanun Teklifi 25042016
Elektrik Piyasası Kanun Teklifi 25042016Elektrik Piyasası Kanun Teklifi 25042016
Elektrik Piyasası Kanun Teklifi 25042016Faik Sönmez
 
N'Report 5 - Mobil Video
N'Report 5 - Mobil VideoN'Report 5 - Mobil Video
N'Report 5 - Mobil VideoNmobs
 
Make Way for Women
Make Way for WomenMake Way for Women
Make Way for WomenKaren Chand
 
Open door mission post ave presentation
Open door mission post ave presentationOpen door mission post ave presentation
Open door mission post ave presentationChris Scribani
 
Proefschrift Daphne Hijzen
Proefschrift Daphne HijzenProefschrift Daphne Hijzen
Proefschrift Daphne HijzenDaphne Hijzen
 
Camh substantive consultant presentation for cambridgeshire post september 2014
Camh substantive consultant presentation for cambridgeshire post september 2014Camh substantive consultant presentation for cambridgeshire post september 2014
Camh substantive consultant presentation for cambridgeshire post september 2014Jennifer Spencer
 

Viewers also liked (8)

[20160504] VNese Culture in doing business
[20160504] VNese Culture in doing business[20160504] VNese Culture in doing business
[20160504] VNese Culture in doing business
 
Elektrik Piyasası Kanun Teklifi 25042016
Elektrik Piyasası Kanun Teklifi 25042016Elektrik Piyasası Kanun Teklifi 25042016
Elektrik Piyasası Kanun Teklifi 25042016
 
N'Report 5 - Mobil Video
N'Report 5 - Mobil VideoN'Report 5 - Mobil Video
N'Report 5 - Mobil Video
 
Make Way for Women
Make Way for WomenMake Way for Women
Make Way for Women
 
Open door mission post ave presentation
Open door mission post ave presentationOpen door mission post ave presentation
Open door mission post ave presentation
 
Proefschrift Daphne Hijzen
Proefschrift Daphne HijzenProefschrift Daphne Hijzen
Proefschrift Daphne Hijzen
 
Camh substantive consultant presentation for cambridgeshire post september 2014
Camh substantive consultant presentation for cambridgeshire post september 2014Camh substantive consultant presentation for cambridgeshire post september 2014
Camh substantive consultant presentation for cambridgeshire post september 2014
 
Jackie (2)
Jackie (2)Jackie (2)
Jackie (2)
 

Similar to Positions Held

Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile Walls
Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile WallsRoen Salvage Company In situ Repair of Submerged Steel Sheet Pile Walls
Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile WallsDocks & Marinas, Inc.
 
Jerry Wilhite Resume
Jerry Wilhite ResumeJerry Wilhite Resume
Jerry Wilhite ResumeJerry Wilhite
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Mastersimon smith
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin
 
What can we learn from the hoover dam
What can we learn from the hoover damWhat can we learn from the hoover dam
What can we learn from the hoover damJasmine Tung
 
Cca clean energypanel_agenda+bios
Cca clean energypanel_agenda+biosCca clean energypanel_agenda+bios
Cca clean energypanel_agenda+biosAngelique
 
Borvin Kracman_Advisory_Feb 2017
Borvin Kracman_Advisory_Feb 2017Borvin Kracman_Advisory_Feb 2017
Borvin Kracman_Advisory_Feb 2017Borvin Kracman
 
Resume of gary wiseman 9 may 2016
Resume of gary wiseman 9 may 2016Resume of gary wiseman 9 may 2016
Resume of gary wiseman 9 may 2016Gary Wiseman
 
R Baldwin - 2015 pdf
R Baldwin - 2015 pdfR Baldwin - 2015 pdf
R Baldwin - 2015 pdfRusty Baldwin
 
Davis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRDavis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRGary Davis
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAdnet Communications
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAdnet Communications
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAdnet Communications
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAdnet Communications
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAdnet Communications
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAdnet Communications
 
Bmartin_Resume_Feb_2015.GRNO
Bmartin_Resume_Feb_2015.GRNOBmartin_Resume_Feb_2015.GRNO
Bmartin_Resume_Feb_2015.GRNOBrent Martin
 
Architects and Building Designers
Architects and Building DesignersArchitects and Building Designers
Architects and Building DesignersEF Associates
 
Anthony Dunn's C.V
Anthony Dunn's C.VAnthony Dunn's C.V
Anthony Dunn's C.Vanthony dunn
 

Similar to Positions Held (20)

Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile Walls
Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile WallsRoen Salvage Company In situ Repair of Submerged Steel Sheet Pile Walls
Roen Salvage Company In situ Repair of Submerged Steel Sheet Pile Walls
 
Jerry Wilhite Resume
Jerry Wilhite ResumeJerry Wilhite Resume
Jerry Wilhite Resume
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LP
 
What can we learn from the hoover dam
What can we learn from the hoover damWhat can we learn from the hoover dam
What can we learn from the hoover dam
 
Cca clean energypanel_agenda+bios
Cca clean energypanel_agenda+biosCca clean energypanel_agenda+bios
Cca clean energypanel_agenda+bios
 
Borvin Kracman_Advisory_Feb 2017
Borvin Kracman_Advisory_Feb 2017Borvin Kracman_Advisory_Feb 2017
Borvin Kracman_Advisory_Feb 2017
 
Resume of gary wiseman 9 may 2016
Resume of gary wiseman 9 may 2016Resume of gary wiseman 9 may 2016
Resume of gary wiseman 9 may 2016
 
R Baldwin - 2015 pdf
R Baldwin - 2015 pdfR Baldwin - 2015 pdf
R Baldwin - 2015 pdf
 
Davis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRDavis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIR
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
August 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate PresentationAugust 31, 2012 - Corporate Presentation
August 31, 2012 - Corporate Presentation
 
Bmartin_Resume_Feb_2015.GRNO
Bmartin_Resume_Feb_2015.GRNOBmartin_Resume_Feb_2015.GRNO
Bmartin_Resume_Feb_2015.GRNO
 
Architects and Building Designers
Architects and Building DesignersArchitects and Building Designers
Architects and Building Designers
 
Anthony Dunn's C.V
Anthony Dunn's C.VAnthony Dunn's C.V
Anthony Dunn's C.V
 

Positions Held

  • 1. Stanley M. White, P.E., D.PE [RET], D.CE [RET], P.Eng [RET] Positions Held Page | 1 From: To: Organization: Title: Summary: 2013 Present Stanley White Engineering, LLC Principal Mr. White is a consulting engineer providing project management and engineering expertise to offshore wind projects in the US including LEEDCo (Lake Erie) and Fishermen’s Energy (Atlantic City, NJ). Expert witness services relating to port and coastal engineering insurance and legal claims. From: To: Organization: Title: Summary: 2014 2016 Fishermen’s Energy, LLC Program Director Mr. White served on the Fishermen’s Energy team starting in 2013 as a technical consultant. In mid-2014 Mr. White joined Fishermen’s Energy as the the Program Director. Mr. White was responsible for the management of the US Department of Energy $50m grant, supervises all technical aspects of the project including construction planning and supervises the regulatory review process (Federal and State). From: To: Organization: Title: Summary: 2013 2013 Ocean and Coastal Consultants, Inc. Principal (Part Time) Mr. White was a consulting engineer providing project management and engineering expertise to offshore wind projects in the US. From: To: Organization: Title: Summary: 1983 2012 Ocean and Coastal Consultants, Inc. President and Founder Mr. White was in responsible charge of all engineering and financial operations of the nationally recognized port and coastal engineering consulting firm. The Firm was sold in 2007 to the US subsidiary of COWI A/S, a leading Danish consultancy. Mr. White was appointed President of COWI USA, Inc. (now COWI North America, Inc.) after the acquisition and held that position until the end of 2011.
  • 2. Stanley M. White, P.E., D.PE [RET], D.CE [RET], P.Eng [RET] Positions Held Page | 2 From: 1986 To: 1992 Organization: Fairfield Dock Company Title: Vice President Summary: Mr. White was in responsible charge of a marine construction company that operated in Long Island Sound and the Hudson River. Projects ranged from residential piers and seawalls to major waterfront developments which included bulkheads and marinas. Mr. White was responsible for labor and equipment utilization, business development and QA/QC. From: 1980 To: 1983 Organization: Han Padron Associates Title: Project Manager Summary: Mr. White performed preliminary studies, final designs, cost estimating, preparation of technical specifications and construction supervision for various new and rehabilitated marine structures including petroleum terminals, coal transshipment terminals, floating breakwaters and single point moorings. From: 1979 To: 1980 Organization: Dravo-Van Houton Title: Project Engineer Summary: Mr. White participated in the design of a new Tanker Berth at the Exxon Terminal in Bayonne, NJ. The design for which Mr. White was responsible included new mooring and breasting dolphins. Mr. White was responsible for the failure investigation and redesign of the Azzawia Refinery breakwater in Libya. From: 1976 To: 1979 Organization: J. Ray McDermott Title: Engineer Summary: Mr. White was a member of an in-house consulting group for this worldwide leader in the offshore industry. Mr. White was involved with a range of engineering assignments for this offshore contractor. Mr. White was a primary designer for the installation equipment used to install an offshore oil rig in 1,025 feet of water. Mr. White oversaw the design and fabrication of a unique 1,200 metric tonne crane in Germany.
  • 3. Stanley M. White, P.E., D.PE [RET], D.CE [RET], P.Eng [RET] Positions Held Page | 3 From: 1973 To: 1976 Organization: Massachusetts Institute of Technology Title: Research Assistant Summary: Mr. White was responsible for the design and model testing of a hot water diffuser discharge system for the Maine Power Plant in Casco Bay, Maine. This work involved creation of a physical model of Casco Bay that included a full range of tidal current variations. As part of his thesis, Mr. White performed research on the transmission coefficient of rubble mound breakwaters. Mr. White was under contract to the U.S. Army Corps of Engineers and his work became part of the USACOE Shore Protection Manual.