SlideShare a Scribd company logo
Universidad Politécnica de Valencia
Escuela Técnica Superior de Ingenieros de Caminos
Canales y Puertos
Santiago Garnes Simón
Civil Engineer
Tutors: José Sergio Palencia Jiménez - María Carmen Castro Bugallo
January 2011 - January 2013
Development, design and urban planning project of residential area in Segorbe (Spain)
LIDAR Technology
Natural-Scale ProfilePoints Cloud Surface
 Getting the
topographic
information from
LIDAR Technology
and modelling the
surface with Civil 3D
 Big problem with the heavy grade, 40 meters of elevation’s difference
Necessary a Study of Solutions to find the best option
Main features:
 11.298 m2 of green space
 Preserve existing forest
 Good from urban area
 Difficult development
 High volume of dirt moving
 Big occupancy rate
 Stability slope problems
Development, design and urban planning project of residential area in Segorbe (Spain)
Design 1 Roads System
Plots
Service Areas
Development, design and urban planning project of residential area in Segorbe (Spain)
Design 2
Main features:
 57.935 m2 of green space
 Don’t preserve part of existing forest
 Bad access from urban area
 Easy development
 Minimum dirt moving
 Small occupancy rate
 No stability slope problems
Roads System
Plots
Service Areas
Main features:
 17.887 m2 of green space
 Don’t preserve existing forest
 Good access from urban area
 Difficult development
 Maximum dirt moving
 High occupancy rate
 Stability slope problems
Development, design and urban planning project of residential area in Segorbe (Spain)
Design 3 Roads System
Plots
Service Areas
Main features:
 20.050 m2 of green space
 Don’t preserve existing forest
 Good access from urban area
 Difficult development
 Maximum dirt moving
 High occupancy rate
 Stability slope problems
Development, design and urban planning project of residential area in Segorbe (Spain)
Design 4 Roads System
Plots
Service Areas
Main features:
 6.601 m2 of green space
 Don’t preserve part of existing forest
 Good access from urban area
 Difficult development
 Minimum dirt moving
 Medium occupancy rate
 No stability slope problems
Development, design and urban planning project of residential area in Segorbe (Spain)
Design 5 Roads System
Plots
Service Areas
Development, design and urban planning project of residential area in Segorbe (Spain)
 Due to the high elevation difference between the North and South side of the
area, the development is concentrated in the South flat part.
 To reduce the dirt moving, roads have been designed based on the contour lines,
being a complex system of parks and roads.
Design 5
Development, design and urban planning project of residential area in Segorbe (Spain)
Pedestrian Road Northern Perimeter RoadInternal Roads
 Northern Perimeter Road: Double direction's road with double sidewalk and ditch
in the external side to collect the mountain runoff water
 Internal Road: Single direction’s roads with a car park line and double sidewalk
 Pedestrian Road: Four pedestrian roads to give pedestrian access to the houses
Development, design and urban planning project of residential area in Segorbe (Spain)
 The grade line has been designed 1 meter
under the surface line considering the
aggregate material of the platform
 Longitudinal section: The cut and fill of the
road and the dirt moving
 Cross Sections: Let analyse how the road
evolves every 20 meters
Longitudinal Section
Northern Perimeter Road
Cross Sections
Road Axis
Development, design and urban planning project of residential area in Segorbe (Spain)
Collector 4
Collector 1
Collector 2
General Collector
Collector 3
Concrete Stormtank
Drainage net Runoff areas
Drain SectionCYPE computation net
Collector 1
 The drainage system has
been calculated with CYPE
software
 The manholes have been
designed from the ground
slope, keeping in mind the
water speeds and the
minimum tube diameters
Development, design and urban planning project of residential area in Segorbe (Spain)
Sewer net Drain Section
Civil 3D computation net
Collector 3
 Sewer system has been
calculated with Civil 3D
software
 Sewer and drainage system
are a separate system
Network 2
Network 1
General Water System
Network 1
General Water System
It is the highest point in the Sewer System
General Water System
Network 1
 The clean water system has been
calculated with CYPE software.
 This system guarantees a 30 mca
pressure in the highest point of
the sewer system
 There are designed the irrigation
connexions for green areas
Development, design and urban planning project of residential area in Segorbe (Spain)
Development, design and urban planning project of residential area in Segorbe (Spain)
Medium and Low Voltage
Power Substation
Roads Lighting System
Lighting System in Central Park
 Underground medium and low
voltage lines
 Separate lighting system to
guarantee lighting supply in
case of breakdown
 Special lighting design for parks
and gardens using different
luminaries depending on the
situation
Medium voltage
Low voltage
Parks Lighting System
Development, design and urban planning project of residential area in Segorbe (Spain)
Central Park
Central Park Eastern Park
Small Landscaped Areas
Green Spaces
 There are two big parks, Central and Eastern
Park, and ten small landscaped areas to connect
the roads
Central Park
 This park has 4 platforms in a different level to solve the roads connection problem
 Platform 1: Connection zone between zone 2 and 4 with a ramp and stairs
 Platform 2: The biggest area with playground and sport zone
 Platform 3: A promenade with benches, trees and special lighting
 Platform 4: A landscape area with a characteristic garden design
1 2
43
Development, design and urban planning project of residential area in Segorbe (Spain)
Eastern Park Small Landscaped Areas
Eastern Park
 This park has 4 platforms in a different level to give access from the road with high slope
 Platform 1: Leisure zone with barbecues and tables
 Platform 2: Area with playground and benches without direct access to the road
 Platform 3: Area with playground and benches with direct access to the road
 Platform 4: Closed landscape area with the power substation building
1
2
4
3
 Ten small landscaped areas which connect
different levels roads
 There are two zones, the highest one is a
extension of the sidewalks with a fountain and
benches
 The medium zone is an landscaped area. Both
are connected with ramps and stairs substation
building
Development, design and urban planning project of residential area in Segorbe (Spain)
Resume Euros %
Dirt Moving 208,606.15 5.37
Roads System 672,133.06 17.29
Sewer System 367,976.34 9.46
Drainage System 667,140.45 17.16
Stormtanks 8,026.87 0.21
Water System 175,345.33 4.51
Power System 295,912.71 7.61
Lighting System 216,166.27 5.56
Telecom System 49,035.24 1.26
Green Spaces 1,086,433.24 27.94
System of signs 25,225.53 0.65
Quality Control 25,262.22 0.65
Waste Management 58,636.24 1.51
Health and Safety 31,966.21 0.82
Estimated Cost 3,887,865.86
Percentage of costs
Economic Ratios
40 €/ m2 gross
255 €/ m2 parcel
167 €/ m2 roof
 It is needed a work outline of 14 months, calculated
with Microsoft Project
 The budget has been estimated with Presto
Software, being a total amount of 3,887,865.86 €
 There is an important cost for green spaces due to
urban furniture and special luminaries
 The economics ratios give us an idea how much we
will spend to buy a parcel in this urban area
Universidad Politécnica de Valencia
Escuela Técnica Superior de Ingenieros de Caminos
Canales y Puertos
Santiago Garnes Simón
Civil Engineer
Tutors: José Sergio Palencia Jiménez - María Carmen Castro Bugallo
January 2011 - January 2013

More Related Content

What's hot

Group housing case study
Group housing case studyGroup housing case study
Group housing case studyVishwas Sahni
 
Titan township by charles corea
Titan township by charles coreaTitan township by charles corea
Titan township by charles coreaShril Soni
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Amir Azhar
 
Mr delhi 99 and jasmine grove live case study
Mr delhi 99 and jasmine grove live case studyMr delhi 99 and jasmine grove live case study
Mr delhi 99 and jasmine grove live case studyRUSHALI SRIVASTAVA
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)Mansi Pushpakar
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case studyAr. Prerna Chouhan
 
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar GurgaonAArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaonnisarahmad036
 
Affordable Housing Design at Hathazari
Affordable Housing Design at HathazariAffordable Housing Design at Hathazari
Affordable Housing Design at HathazariAnik Gouala
 
Urban Sustainability in Cascadia Region
 Urban Sustainability in Cascadia Region Urban Sustainability in Cascadia Region
Urban Sustainability in Cascadia RegionAkanksha Chopra
 
Cyberwalk campus,gurgaon
Cyberwalk campus,gurgaonCyberwalk campus,gurgaon
Cyberwalk campus,gurgaonBISHAL KHANAL
 
Infopack udaan
Infopack udaanInfopack udaan
Infopack udaanDakssh
 
Commercial complex at parel south mumbai
Commercial complex   at parel south mumbaiCommercial complex   at parel south mumbai
Commercial complex at parel south mumbaiRAAJESH SHETH
 
Item 7.4 public use facility design ordinance
Item 7.4 public use facility design ordinanceItem 7.4 public use facility design ordinance
Item 7.4 public use facility design ordinanceepdevelopment
 
31611381234318 lotus greensggnppt
31611381234318 lotus greensggnppt31611381234318 lotus greensggnppt
31611381234318 lotus greensggnpptPankaj Sipl
 
Ad live case stdy (JANAADHAR SHUBHA) BY ARSHIYA & SIDDIQ
Ad live case stdy (JANAADHAR SHUBHA) BY ARSHIYA & SIDDIQAd live case stdy (JANAADHAR SHUBHA) BY ARSHIYA & SIDDIQ
Ad live case stdy (JANAADHAR SHUBHA) BY ARSHIYA & SIDDIQsiddiqpasha
 
GDCR Planning Regulations
GDCR Planning Regulations GDCR Planning Regulations
GDCR Planning Regulations GeetShah8
 

What's hot (18)

Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
Titan township by charles corea
Titan township by charles coreaTitan township by charles corea
Titan township by charles corea
 
Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)Case study Housing (Sem-VIth)
Case study Housing (Sem-VIth)
 
Kessaku Phoenix
Kessaku PhoenixKessaku Phoenix
Kessaku Phoenix
 
Mr delhi 99 and jasmine grove live case study
Mr delhi 99 and jasmine grove live case studyMr delhi 99 and jasmine grove live case study
Mr delhi 99 and jasmine grove live case study
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case study
 
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar GurgaonAArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
AArone Group - Cyberwalk | Sector 8, IMT Manesar Gurgaon
 
Affordable Housing Design at Hathazari
Affordable Housing Design at HathazariAffordable Housing Design at Hathazari
Affordable Housing Design at Hathazari
 
Urban Sustainability in Cascadia Region
 Urban Sustainability in Cascadia Region Urban Sustainability in Cascadia Region
Urban Sustainability in Cascadia Region
 
Cyberwalk campus,gurgaon
Cyberwalk campus,gurgaonCyberwalk campus,gurgaon
Cyberwalk campus,gurgaon
 
Pardih
PardihPardih
Pardih
 
Infopack udaan
Infopack udaanInfopack udaan
Infopack udaan
 
Commercial complex at parel south mumbai
Commercial complex   at parel south mumbaiCommercial complex   at parel south mumbai
Commercial complex at parel south mumbai
 
Item 7.4 public use facility design ordinance
Item 7.4 public use facility design ordinanceItem 7.4 public use facility design ordinance
Item 7.4 public use facility design ordinance
 
31611381234318 lotus greensggnppt
31611381234318 lotus greensggnppt31611381234318 lotus greensggnppt
31611381234318 lotus greensggnppt
 
Ad live case stdy (JANAADHAR SHUBHA) BY ARSHIYA & SIDDIQ
Ad live case stdy (JANAADHAR SHUBHA) BY ARSHIYA & SIDDIQAd live case stdy (JANAADHAR SHUBHA) BY ARSHIYA & SIDDIQ
Ad live case stdy (JANAADHAR SHUBHA) BY ARSHIYA & SIDDIQ
 
GDCR Planning Regulations
GDCR Planning Regulations GDCR Planning Regulations
GDCR Planning Regulations
 

Similar to Portfolio. Project 1

Case study on Majid Sarani & various streets
Case study on Majid Sarani & various streetsCase study on Majid Sarani & various streets
Case study on Majid Sarani & various streets17052MahmudurHossain
 
Informal notes from Urban Planning 3_13-14 (1).pdf
Informal notes from Urban Planning 3_13-14 (1).pdfInformal notes from Urban Planning 3_13-14 (1).pdf
Informal notes from Urban Planning 3_13-14 (1).pdfkayfiakrmmawlan
 
Seppe Cassettari: New directions in Mapping Place
Seppe Cassettari: New directions in Mapping PlaceSeppe Cassettari: New directions in Mapping Place
Seppe Cassettari: New directions in Mapping PlaceAGI Geocommunity
 
Energy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesEnergy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesTiE Bangalore
 
The solar city
The solar cityThe solar city
The solar citysaharsnd
 
The solar city
The solar cityThe solar city
The solar citysaharsnd
 
The solar city
The solar cityThe solar city
The solar citysaharsnd
 
The solar city
The solar cityThe solar city
The solar citysaharsnd
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshikusha Ahmed
 
My Architectural Portfilio
My Architectural PortfilioMy Architectural Portfilio
My Architectural Portfilioahmed nagy
 
EIA Project - Presentation
EIA Project - PresentationEIA Project - Presentation
EIA Project - PresentationEmma Syrat
 
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptx
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptxAAHDP_BOLE-SUMMIT Presentation Nove 5.pptx
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptxBossGold
 
A presentation on Area Condition of a part of Khulna district
A presentation on Area Condition of a part of Khulna districtA presentation on Area Condition of a part of Khulna district
A presentation on Area Condition of a part of Khulna districtMahdi Mansur
 
Hosam Abdeltawab portfolio 2021
Hosam Abdeltawab portfolio 2021Hosam Abdeltawab portfolio 2021
Hosam Abdeltawab portfolio 2021Hosam Ashal
 
Aranya Community housing- Case Study
Aranya Community housing- Case StudyAranya Community housing- Case Study
Aranya Community housing- Case StudyRajat Rana
 
The Solar City "Linz, Austria"
The Solar City "Linz, Austria"The Solar City "Linz, Austria"
The Solar City "Linz, Austria"Yousef Abujubba
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Crosstown TO
 

Similar to Portfolio. Project 1 (20)

Case study on Majid Sarani & various streets
Case study on Majid Sarani & various streetsCase study on Majid Sarani & various streets
Case study on Majid Sarani & various streets
 
GW-Codman-all
GW-Codman-allGW-Codman-all
GW-Codman-all
 
Informal notes from Urban Planning 3_13-14 (1).pdf
Informal notes from Urban Planning 3_13-14 (1).pdfInformal notes from Urban Planning 3_13-14 (1).pdf
Informal notes from Urban Planning 3_13-14 (1).pdf
 
Seppe Cassettari: New directions in Mapping Place
Seppe Cassettari: New directions in Mapping PlaceSeppe Cassettari: New directions in Mapping Place
Seppe Cassettari: New directions in Mapping Place
 
Energy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesEnergy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building Envelopes
 
The solar city
The solar cityThe solar city
The solar city
 
The solar city
The solar cityThe solar city
The solar city
 
The solar city
The solar cityThe solar city
The solar city
 
The solar city
The solar cityThe solar city
The solar city
 
The solar city
The solar cityThe solar city
The solar city
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshi
 
My Architectural Portfilio
My Architectural PortfilioMy Architectural Portfilio
My Architectural Portfilio
 
EIA Project - Presentation
EIA Project - PresentationEIA Project - Presentation
EIA Project - Presentation
 
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptx
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptxAAHDP_BOLE-SUMMIT Presentation Nove 5.pptx
AAHDP_BOLE-SUMMIT Presentation Nove 5.pptx
 
A presentation on Area Condition of a part of Khulna district
A presentation on Area Condition of a part of Khulna districtA presentation on Area Condition of a part of Khulna district
A presentation on Area Condition of a part of Khulna district
 
Hosam Abdeltawab portfolio 2021
Hosam Abdeltawab portfolio 2021Hosam Abdeltawab portfolio 2021
Hosam Abdeltawab portfolio 2021
 
Sustainable Seville
Sustainable SevilleSustainable Seville
Sustainable Seville
 
Aranya Community housing- Case Study
Aranya Community housing- Case StudyAranya Community housing- Case Study
Aranya Community housing- Case Study
 
The Solar City "Linz, Austria"
The Solar City "Linz, Austria"The Solar City "Linz, Austria"
The Solar City "Linz, Austria"
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 

Portfolio. Project 1

  • 1. Universidad Politécnica de Valencia Escuela Técnica Superior de Ingenieros de Caminos Canales y Puertos Santiago Garnes Simón Civil Engineer Tutors: José Sergio Palencia Jiménez - María Carmen Castro Bugallo January 2011 - January 2013
  • 2. Development, design and urban planning project of residential area in Segorbe (Spain) LIDAR Technology Natural-Scale ProfilePoints Cloud Surface  Getting the topographic information from LIDAR Technology and modelling the surface with Civil 3D  Big problem with the heavy grade, 40 meters of elevation’s difference Necessary a Study of Solutions to find the best option
  • 3. Main features:  11.298 m2 of green space  Preserve existing forest  Good from urban area  Difficult development  High volume of dirt moving  Big occupancy rate  Stability slope problems Development, design and urban planning project of residential area in Segorbe (Spain) Design 1 Roads System Plots Service Areas
  • 4. Development, design and urban planning project of residential area in Segorbe (Spain) Design 2 Main features:  57.935 m2 of green space  Don’t preserve part of existing forest  Bad access from urban area  Easy development  Minimum dirt moving  Small occupancy rate  No stability slope problems Roads System Plots Service Areas
  • 5. Main features:  17.887 m2 of green space  Don’t preserve existing forest  Good access from urban area  Difficult development  Maximum dirt moving  High occupancy rate  Stability slope problems Development, design and urban planning project of residential area in Segorbe (Spain) Design 3 Roads System Plots Service Areas
  • 6. Main features:  20.050 m2 of green space  Don’t preserve existing forest  Good access from urban area  Difficult development  Maximum dirt moving  High occupancy rate  Stability slope problems Development, design and urban planning project of residential area in Segorbe (Spain) Design 4 Roads System Plots Service Areas
  • 7. Main features:  6.601 m2 of green space  Don’t preserve part of existing forest  Good access from urban area  Difficult development  Minimum dirt moving  Medium occupancy rate  No stability slope problems Development, design and urban planning project of residential area in Segorbe (Spain) Design 5 Roads System Plots Service Areas
  • 8. Development, design and urban planning project of residential area in Segorbe (Spain)  Due to the high elevation difference between the North and South side of the area, the development is concentrated in the South flat part.  To reduce the dirt moving, roads have been designed based on the contour lines, being a complex system of parks and roads. Design 5
  • 9. Development, design and urban planning project of residential area in Segorbe (Spain) Pedestrian Road Northern Perimeter RoadInternal Roads  Northern Perimeter Road: Double direction's road with double sidewalk and ditch in the external side to collect the mountain runoff water  Internal Road: Single direction’s roads with a car park line and double sidewalk  Pedestrian Road: Four pedestrian roads to give pedestrian access to the houses
  • 10. Development, design and urban planning project of residential area in Segorbe (Spain)  The grade line has been designed 1 meter under the surface line considering the aggregate material of the platform  Longitudinal section: The cut and fill of the road and the dirt moving  Cross Sections: Let analyse how the road evolves every 20 meters Longitudinal Section Northern Perimeter Road Cross Sections Road Axis
  • 11. Development, design and urban planning project of residential area in Segorbe (Spain) Collector 4 Collector 1 Collector 2 General Collector Collector 3 Concrete Stormtank Drainage net Runoff areas Drain SectionCYPE computation net Collector 1  The drainage system has been calculated with CYPE software  The manholes have been designed from the ground slope, keeping in mind the water speeds and the minimum tube diameters
  • 12. Development, design and urban planning project of residential area in Segorbe (Spain) Sewer net Drain Section Civil 3D computation net Collector 3  Sewer system has been calculated with Civil 3D software  Sewer and drainage system are a separate system
  • 13. Network 2 Network 1 General Water System Network 1 General Water System It is the highest point in the Sewer System General Water System Network 1  The clean water system has been calculated with CYPE software.  This system guarantees a 30 mca pressure in the highest point of the sewer system  There are designed the irrigation connexions for green areas Development, design and urban planning project of residential area in Segorbe (Spain)
  • 14. Development, design and urban planning project of residential area in Segorbe (Spain) Medium and Low Voltage Power Substation Roads Lighting System Lighting System in Central Park  Underground medium and low voltage lines  Separate lighting system to guarantee lighting supply in case of breakdown  Special lighting design for parks and gardens using different luminaries depending on the situation Medium voltage Low voltage Parks Lighting System
  • 15. Development, design and urban planning project of residential area in Segorbe (Spain) Central Park Central Park Eastern Park Small Landscaped Areas Green Spaces  There are two big parks, Central and Eastern Park, and ten small landscaped areas to connect the roads Central Park  This park has 4 platforms in a different level to solve the roads connection problem  Platform 1: Connection zone between zone 2 and 4 with a ramp and stairs  Platform 2: The biggest area with playground and sport zone  Platform 3: A promenade with benches, trees and special lighting  Platform 4: A landscape area with a characteristic garden design 1 2 43
  • 16. Development, design and urban planning project of residential area in Segorbe (Spain) Eastern Park Small Landscaped Areas Eastern Park  This park has 4 platforms in a different level to give access from the road with high slope  Platform 1: Leisure zone with barbecues and tables  Platform 2: Area with playground and benches without direct access to the road  Platform 3: Area with playground and benches with direct access to the road  Platform 4: Closed landscape area with the power substation building 1 2 4 3  Ten small landscaped areas which connect different levels roads  There are two zones, the highest one is a extension of the sidewalks with a fountain and benches  The medium zone is an landscaped area. Both are connected with ramps and stairs substation building
  • 17. Development, design and urban planning project of residential area in Segorbe (Spain) Resume Euros % Dirt Moving 208,606.15 5.37 Roads System 672,133.06 17.29 Sewer System 367,976.34 9.46 Drainage System 667,140.45 17.16 Stormtanks 8,026.87 0.21 Water System 175,345.33 4.51 Power System 295,912.71 7.61 Lighting System 216,166.27 5.56 Telecom System 49,035.24 1.26 Green Spaces 1,086,433.24 27.94 System of signs 25,225.53 0.65 Quality Control 25,262.22 0.65 Waste Management 58,636.24 1.51 Health and Safety 31,966.21 0.82 Estimated Cost 3,887,865.86 Percentage of costs Economic Ratios 40 €/ m2 gross 255 €/ m2 parcel 167 €/ m2 roof  It is needed a work outline of 14 months, calculated with Microsoft Project  The budget has been estimated with Presto Software, being a total amount of 3,887,865.86 €  There is an important cost for green spaces due to urban furniture and special luminaries  The economics ratios give us an idea how much we will spend to buy a parcel in this urban area
  • 18. Universidad Politécnica de Valencia Escuela Técnica Superior de Ingenieros de Caminos Canales y Puertos Santiago Garnes Simón Civil Engineer Tutors: José Sergio Palencia Jiménez - María Carmen Castro Bugallo January 2011 - January 2013