This document provides instructions for presiding officers and polling officials on conducting elections in Kerala, India. It covers procedures before, during, and after polling day. Key points include:
1. Outlining the duties of presiding officers and polling staff, and assigning roles for verifying voters, maintaining paperwork, and operating the electronic voting machine.
2. Describing the process for setting up the polling station, including arranging materials and displaying notices. Mock polls must be conducted before voting begins.
3. Detailing procedures during voting hours such as regulating voter entry, enforcing election laws, assisting certain voters, handling challenged ballots, and addressing other issues.
4. Instructions for closing the poll at the end
Do you want to be a good presiding officer......INDIA ELECTION 2014- DUTY OF POLLING OFFICERS.- ppt uploaded by T J Joseph Additional Tahsildar Pala, Kottayam.Mob 944464502-
How to be an expert polling officer-Election to the Legislative Assembly 2016-Guide to polling officers..ppt prepared by T J Joseph Tahsildar Kottayam Mob 9447484502-Kerala legislative assembly election trainers ppt
Do you want to be a good presiding officer......INDIA ELECTION 2014- DUTY OF POLLING OFFICERS.- ppt uploaded by T J Joseph Additional Tahsildar Pala, Kottayam.Mob 944464502-
How to be an expert polling officer-Election to the Legislative Assembly 2016-Guide to polling officers..ppt prepared by T J Joseph Tahsildar Kottayam Mob 9447484502-Kerala legislative assembly election trainers ppt
IN THE SUPREME COURT OF INDIA
CIVIL ORIGINAL JURISDICTION
WRIT PETITION (CIVIL) NO. 161 OF 2004
People’s Union for Civil
Liberties & Anr. .... Petitioner (s)
Versus
Union of India & Anr. .... Respondent(s)
IN THE SUPREME COURT OF INDIA
CIVIL ORIGINAL JURISDICTION
WRIT PETITION (CIVIL) NO. 161 OF 2004
People’s Union for Civil
Liberties & Anr. .... Petitioner (s)
Versus
Union of India & Anr. .... Respondent(s)
IN THE SUPREME COURT OF INDIA
CIVIL ORIGINAL JURISDICTION
WRIT PETITION (CIVIL) NO. 161 OF 2004
People’s Union for Civil
Liberties & Anr. .... Petitioner (s)
Versus
Union of India & Anr. .... Respondent(s)
IN THE SUPREME COURT OF INDIA
CIVIL ORIGINAL JURISDICTION
WRIT PETITION (CIVIL) NO. 161 OF 2004
People’s Union for Civil
Liberties & Anr. .... Petitioner (s)
Versus
Union of India & Anr. .... Respondent(s)
This is a presentation from the COMELEC General Guidelines for May 13, 2013 Elections. Attributions and references are found in the last part of the presentation.
This was the act made in 1951 that legislated for both houses of India's Parliament and for State Legislatures, the qualifications of members, disqualifications, Disqualifications for voting, notification of general elections, Administrative machinery for the conduct of elections, Registration of political parties, Conduct of Elections, Free supply of certain material to candidates of recognised political parties, Dispute Regarding Elections, Corrupt practices and electoral offenses, Disqualifications, Bye-elections, etc.
Welcome to the new Mizzima Weekly !
Mizzima Media Group is pleased to announce the relaunch of Mizzima Weekly. Mizzima is dedicated to helping our readers and viewers keep up to date on the latest developments in Myanmar and related to Myanmar by offering analysis and insight into the subjects that matter. Our websites and our social media channels provide readers and viewers with up-to-the-minute and up-to-date news, which we don’t necessarily need to replicate in our Mizzima Weekly magazine. But where we see a gap is in providing more analysis, insight and in-depth coverage of Myanmar, that is of particular interest to a range of readers.
हम आग्रह करते हैं कि जो भी सत्ता में आए, वह संविधान का पालन करे, उसकी रक्षा करे और उसे बनाए रखे।" प्रस्ताव में कुल तीन प्रमुख हस्तक्षेप और उनके तंत्र भी प्रस्तुत किए गए। पहला हस्तक्षेप स्वतंत्र मीडिया को प्रोत्साहित करके, वास्तविकता पर आधारित काउंटर नैरेटिव का निर्माण करके और सत्तारूढ़ सरकार द्वारा नियोजित मनोवैज्ञानिक हेरफेर की रणनीति का मुकाबला करके लोगों द्वारा निर्धारित कथा को बनाए रखना और उस पर कार्यकरना था।
‘वोटर्स विल मस्ट प्रीवेल’ (मतदाताओं को जीतना होगा) अभियान द्वारा जारी हेल्पलाइन नंबर, 4 जून को सुबह 7 बजे से दोपहर 12 बजे तक मतगणना प्रक्रिया में कहीं भी किसी भी तरह के उल्लंघन की रिपोर्ट करने के लिए खुला रहेगा।
31052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
27052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
ys jagan mohan reddy political career, Biography.pdfVoterMood
Yeduguri Sandinti Jagan Mohan Reddy, often referred to as Y.S. Jagan Mohan Reddy, is an Indian politician who currently serves as the Chief Minister of the state of Andhra Pradesh. He was born on December 21, 1972, in Pulivendula, Andhra Pradesh, to Yeduguri Sandinti Rajasekhara Reddy (popularly known as YSR), a former Chief Minister of Andhra Pradesh, and Y.S. Vijayamma.
In a May 9, 2024 paper, Juri Opitz from the University of Zurich, along with Shira Wein and Nathan Schneider form Georgetown University, discussed the importance of linguistic expertise in natural language processing (NLP) in an era dominated by large language models (LLMs).
The authors explained that while machine translation (MT) previously relied heavily on linguists, the landscape has shifted. “Linguistics is no longer front and center in the way we build NLP systems,” they said. With the emergence of LLMs, which can generate fluent text without the need for specialized modules to handle grammar or semantic coherence, the need for linguistic expertise in NLP is being questioned.
03062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
role of women and girls in various terror groupssadiakorobi2
Women have three distinct types of involvement: direct involvement in terrorist acts; enabling of others to commit such acts; and facilitating the disengagement of others from violent or extremist groups.
01062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
Future Of Fintech In India | Evolution Of Fintech In IndiaTheUnitedIndian
Navigating the Future of Fintech in India: Insights into how AI, blockchain, and digital payments are driving unprecedented growth in India's fintech industry, redefining financial services and accessibility.
4. I. ACQUAINT ELECTION PROCEDURE
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL.
CONDUCT OF POLL
5. I. ACQUAINT ELECTION PROCEDURE
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL
CONDUCT OF POLL
6. CONDUCT OF POLL
1. ACQUAINT RULES AND PROCEDURES
Attend all
Rehearsal
and
Training
Classes
Modus
operandi
of
EVM
Clarification
of
doubts
7. I. ACQUAINT ELECTION PROCEDURE
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL
CONDUCT OF POLL
8. 1. Arrival at the Distribution Centre
2. Identification of polling station
3. Familiarizing the Polling Team
4. Itinerary to and from the PS
5. Collection of Polling Materials.
II. ON THE DAY PREVIOUS TO POLL
CONDUCT OF POLL
10. MOST IMPORTANT POLLING MATERIALS
Marked copy of Electoral roll
Register of Voters (17 A)
Voters Slip
Indelible ink
Tendered Ballot paper
Arrow cross mark
Self inking pad
Metal seal
Copy of specimen signature of candidate /
Election agent
11. MOST IMPORTANT POLLING MATERIALS
Detailed list available in
Presiding Officers Check list
Paper seal
Strip Seal
Presiding Officer’s Diary, Declaration etc
Sample of EVM Balloting Unit
16 Point Report as per Annexure XV
Address tag
Special tag
12. 6. Arrangement of Polling Station
a. Set up of PS (Slogans / Photo etc
should be covered or removed)
b. Set up of Voting Compartment
c. Display of Notices.
II. ON THE DAY PREVIOUS TO POLL
CONDUCT OF POLL
13.
14.
15.
16. I. ACQUAINT ELECTION PROCEDURES
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL
CONDUCT OF POLL
17. 1. Assignment of Duties to Polling Officers
III. BEFORE COMMENCEMENT OF POLL
1ST
POLLING OFFICER
2nd
POLLING OFFICER
3rd
POLLING OFFICER
CONDUCT OF POLL
18. 1ST
POLLING OFFICER
In charge
of
marked copy
Verification
of identity
of Electors
Read out
serial No
and entry of the
elector in the
electoral roll
1. Assignment of Duties to Polling Officers
III. BEFORE COMMENCEMENT OF POLL
CONDUCT OF POLL
20. Minor errors in
the EPIC and
Electoral roll may
be
ignored and over
looked.
1ST
POLLING OFFICER
1. Assignment of Duties to Polling Officers
III. BEFORE COMMENCEMENT OF POLL
DUTIES AND FUNCTIONS OF PRESIDING OFFICER
21. 2nd
POLLING OFFICER
1. Assignment of Duties to Polling Officers
III. BEFORE COMMENCEMENT OF POLL
DUTIES AND FUNCTIONS OF PRESIDING OFFICER
In charge of
Register of
Voters
17 A
22.
23. 2nd
POLLING OFFICER
From the upper tip of the nail
to the bottom of the 1st
joint
1. Assignment of Duties to Polling Officers
III. BEFORE COMMENCEMENT OF POLL
In charge
of
Indelible
ink
CONDUCT OF POLL
24. 2nd
POLLING OFFICER
1. Assignment of Duties to Polling Officers
III. BEFORE COMMENCEMENT OF POLL
Issuance of
Voters Slip
CONDUCT OF POLL
26. 3rd
POLLING OFFICER
1. Assignment of Duties to Polling Officers
III. BEFORE COMMENCEMENT OF POLL
In charge
of Control
Unit Ensuring
Indelible
ink mark
CONDUCT OF POLL
27. These duties can be performed by the presiding Office
where the number of Electors is small.
3rd
POLLING OFFICER
1. Assignment of Duties to Polling Officers
III. BEFORE COMMENCEMENT OF POLL
DUTIES AND FUNCTIONS OF PRESIDING OFFICER
Activatin
g
the
Balloting
Unit
137
958
Collecti
ng
Voters
Slip
28. 28
2.Appointment of Polling Agents
III. BEFORE COMMENCEMENT OF POLL
1.Assignment of Duties to Polling Officers
29. 29
Appointment letter in Form No.10
Appointment by candidate or his election agent
Revocation by candidate or his election agent
Compare specimen signature in case of any doubt
Pass for polling agents
2.Appointment of Polling Agents
III. BEFORE COMMENCEMENT OF POLL
30. 30
Seating of polling agents
i. Candidates recognized by the National Parties
ii. Candidates recognized by the State Parties
iii. Candidates recognized by State Parties of other
States who have been permitted to use their
reserved symbols in the constituency.
iv. Candidates of registered unrecognized parties
v. Independent candidates
2.Appointment of Election Agents
III. BEFORE COMMENCEMENT OF POLL
33. I. ACQUAINT THROUGH KNOWLEDGE
ABOUT ELECTION PROCEDURE
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL
CONDUCT OF POLL
34. 1.Commencement of poll
IV. DURING THE POLL
4. Other important functions
2. Admission into the Polling Station
3. Enforcement of Election Law
CONDUCT OF POLL
35. a. Warning about secrecy of voting
1.Commencement of poll
IV. DURING THE POLL
Violation of maintenance of secrecy is
punishable with imprisonment which may
extend to three months or fine or with both
as per section128 of the
Representation of People Act , 1951.
CONDUCT OF POLL
36. 36
c. Declaration by the Presiding Officer
b. At the stroke of the hour fixed
a. Warning about secrecy of voting
d. Precautions about indelible ink
e. Maintenance of register of voters in form No.17 A
f. Maintenance of PO’s Diary
g. Maintenance of visit sheet
1.Commencement of poll
IV. DURING THE POLL
CONDUCT OF POLL
39. 1.Commencement of poll
4. Other important functions
2. Admission into the Polling Station
3. Enforcement of Election Law
IV. DURING THE POLL
CONDUCT OF POLL
40. The electors
The Polling Officials
Each candidate, his election agent and one polling
agent of each candidate at a time
Persons authorized by the Election Commission
Public Servants on duty
Child in arms accompanying an elector
A person accompanying a blind or an infirm voter
Identifying officers
2. Admission into the Polling Station
CONDUCT OF POLL
41. 1.Commencement of poll
4. Other important functions
2. Admission into the Polling Station
3. Enforcement of Election Law
IV. DURING THE POLL
CONDUCT OF POLL
42. Declaration of Elector about his age
Obtain
declaration
as in
Annexure X
Inform the
penal provision in
section 31 of the
R.P.Act
Imprisonment for one year or fine or both
3. Enforcement of Election Law
CONDUCT OF POLL
43. Prohibition of canvassing in or near PS
Canvassing of Votes
Soliciting the vote of any elector
Persuading any elector not to vote for
any particular candidate
3. Enforcement of Election Law
CONDUCT OF POLL
44. Persuading any elector not to vote at
the election
Exhibiting any notice or sign relating to
the election
--are punishable under section
130 of the RP Act.
Prohibition of canvassing in or near PS
3. Enforcement of Election Law
CONDUCT OF POLL
45. Other offences
Disorderly conduct in or near PS (section 131)
Misconduct at the PS (section 132)
Failure to observe procedure for voting (section 132 A)
Illegal hiring or procuring of conveyance (section 133)
Breaches of Election duty (section 134)
Going armed to or near PS (section 134 B)
3. Enforcement of Election Law
CONDUCT OF POLL
46. Smoking prohibited inside the PS
Polling agents are not permitted to bring mobile
phones inside the PS
Photography prohibited inside the PS
Wearing of badges/emblem etc bearing the names of
candidate Political leaders or Symbols etc are prohibited.
Impersonation is punishable under Indian Penal Code
Other offences
3. Enforcement of Election Law
CONDUCT OF POLL
47. 1.Commencement of poll
4. Other important functions
2. Admission into the Polling Station
3. Enforcement of Election Law
IV. DURING THE POLL
CONDUCT OF POLL
48. PO’s entry in Voting Compartment
Voting of blind and infirm voters
Adjournment or stoppage of Poll
Tendered Vote
4. Other important functions
CONDUCT OF POLL
51. Refusal to observe voting procedure
Withdraw
and cancel
voters slip
Inscribe the fact
in Register
of Voters
Put signature
below the
entry in the
remarks column
Never change the Sl.No in 17 A
4. Other important functions
CONDUCT OF POLL
52. Electors deciding not to vote
Never change the Sl.No in 17 A
Shall not
Compel to cast
his vote
Inscribe
“Refused to Vote”
in remarks
column of register
of voters (17 A)
Signature
Or thumb
impression
of the elector
against the
entry
4. Other important functions
CONDUCT OF POLL
53. USE OF NEW VOTING MACHINE
Read out
a further
Declaration
in part II of Annexure VII
4. Other important functions
CONDUCT OF POLL
55. VOTING
BY
PROXY
(CSV)
Must be a resident of the constituency concerned
Should have at least 18 years of age
Shall not be disqualified for regn. as an elector
Indelible ink – on the middle finger
The letters “PV” should be suffixed in 17 A
4. Other important functions
CONDUCT OF POLL
56. I. ACQUAINT THROUGH KNOWLEDGE
ABOUT ELECTION PROCEDURE
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL
CONDUCT OF POLL
57. Announce
the fact a
few minutes
before the
hour
appointed
CLOSING HOUR
Permit
Electors
present
at the
PS at the
hour
appointed
Distribute
slip
with
signature
in full.
V. END OF THE POLL
CONDUCT OF POLL
58. Press “close”
button of CU
Show the
“total”
in the CU and
record in 17 C
CLOSING OF EVM
V. END OF THE POLL
CONDUCT OF POLL
64. 958
959
960
961
534
857
861
638
0891
6859
7421
2357
The last serial No. is 961 (Nine Six One)
2nd
PO PrO
Sl. No Sl. No. of
elector in the
electoral roll
Details of the
document produced by
the elector in proof of
his/her identification
Signature /
Thumb
impression
of elector
Remarks
Date: Time:
68. V. END OF THE POLL
16 POINT REPORT
CONDUCT OF POLL
69.
70. SEALING OF ELECTION PAPERS
(The above covers should be sent separately
along with the EVM to the receiving centre)
V. END OF THE POLL
Cover containing 17 C
Cover containing Declaration of PO
Cover containing PO’s Diary
16 Point ReportVisit Sheet
CONDUCT OF POLL
71. Packet No. I
Statutory Covers
Packet No.II
Non-Statutory Covers
Packet No.III
Packet No.IV.
SEALING OF ELECTION PAPERS
V. END OF THE POLL
CONDUCT OF POLL
72. PACKET No. I
(Should be super scribed as “Statutory Covers”)
1. Sealed Cover containing marked copy of
electoral roll and List of CSVs
2. Sealed cover containing the Register of Voters (17 A)
3. Sealed Cover containing voters slips
4. Sealed Cover containing unused tendered ballot papers
5. Sealed Cover containing used tendered ballot papers
and the list in Form No.17 B
If any cover mentioned above is nil, a NIL cover should be placed.
SEALING OF ELECTION PAPERS
V. END OF THE POLL
CONDUCT OF POLL
73. PACKET No.II
(Should be superscribed as “Non-Statutory Covers”)
1. Copies of Electoral Roll other than marked copy
2. Appointment letters of Polling Agents in Form 10.
3. List of blind and infirm electors in Form 14 A and the
declaration of the companion.
4. Declaration obtained from electors as to their age
and list of such electors (Annexure XI)
5. Receipt book and cash, if any, in respect of
Challenged votes
SEALING OF ELECTION PAPERS
V. END OF THE POLL
CONDUCT OF POLL
74. 6. Unused and damaged paper seals
7. Unused voters slips
8. Unused and damaged strip seal
10. Election Duty Certificates
9. Unused and damaged special tags
PACKET No.II
(Should be super scribed as “Non-Statutory Covers”)
SEALING OF ELECTION PAPERS
V. END OF THE POLL
11. List of challenged votes in Form 14 (Sealed Cover)
CONDUCT OF POLL
75. 1. Hand book for PO
2. Manual of EVM
3. Indelible ink set without leakage
5. Metal seal of the PO
4. Self inking pad
6. Arrow cross mark
7. Cup for setting indelible ink.
PACKET No.III
SEALING OF ELECTION PAPERS
V. END OF THE POLL
CONDUCT OF POLL
76. All other items such as
Voting compartment,
Waste paper basket,
Polythene bag, etc…..
PACKET No.IV
SEALING OF ELECTION PAPERS
V. END OF THE POLL
CONDUCT OF POLL
77. POINTS TO BE REMEMBERED
Maintain close relation with the members
of your polling team
Maintain good relation with the polling agents
Commence the poll at the appointed hour
Start mock poll at least one hour before the
hour fixed for the commencement of poll
Formally announce the close of poll after
the last elector has voted
Take personal responsibility to hand over
the EVM and election papers.