WELCOME TO
The Festival of
Democracy
GENERAL ELECTION 2019
ARTICLE 324 OF THE CONSTITUTION
SUPERINTENDENCE, DIRECTION & CONTROL
REPRESENTATION OF PEOPLE ACT 1951
S.28A– On deputation to Election Commission
ELECTION COMMISSION OF INDIA
I. ACQUAINT THOROUGH KNOWLEDGE
ABOUT ELECTION PROCEDURE
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Attend
all rehearsal
and
Training
Classes
Modus
operandi
of
EVMClarification
of
doubts
I. ACQUAINT THOROUGH KNOWLEDGE
ABOUT ELECTION PROCEDURE
DUTIES AND FUNCTIONS OF POLLING OFFICERS
I. ACQUAINT THOROUGH KNOWLEDGE
ABOUT ELECTION PROCEDURE
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
1. Arrival at the Distribution Centre
2. Identification of polling station
3. Familiarizing the Polling Team
4. Itinerary to and from the PS
5. Collection of Polling Materials.
II. ON THE DAY PREVIOUS TO POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Electronic Voting Machine(EVM) & Voter
Verifiable Paper Audit Trail (VVPAT)
Marked copy of Electoral roll
Register of Voters (17 A)
Voters Slip
Tendered Ballot paper
MOST IMPORTANT POLLING MATERIALS
To be returned in Packet No. 1
Copies of Elector Rolls
Paper Seals
Special Tags
Strip Seals
MOST IMPORTANT POLLING MATERIALS
To be returned in Packet No. 2
Address Tag
Indelible Ink
Cup Holder for Indelible Ink
Metal Seal of PRO
Self inking pad
Arrow Cross Mark
MOST IMPORTANT POLLING MATERIALS
To be returned in Packet No. 3
Copy of the List of Contesting Candidates
Specimen
Signatures of
Candidates /
Election Agent
Sample of EVM Balloting Unit
Book containing Forms – 23 items
MOST IMPORTANT POLLING MATERIALS
Braille Ballot Label
Envelop made of Thick Black Paper
Plastic Box for
Sealing
Black Paper
Envelope
Forms for declaration u/r 49 MA
Pink Paper for Sealing Plastic Box
Additional Items of Polling Materials
Rubber stamp with ‘Mock Poll Slip’
A detailed list of
polling materials
incorporated in
Annexure 19
of Presiding Officers
Hand Book.
MOST IMPORTANT POLLING MATERIALS
6. ARRANGEMENT OF POLLING STATION
a. Set up of PS (Slogans / Photo etc
should be covered or removed)
b. Set up of Voting Compartment
c. Display of Notices.
II. ON THE DAY PREVIOUS TO POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
I. ACQUAINT THROUGH KNOWLEDGE
ABOUT ELECTION PROCEDURES
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
1. Assignment of Duties to Polling Officers
2. Appointment of Election Agents
3. Preparation of EVM
4. Mock Poll
5. Sealing of EVM
III. BEFORE COMMENCEMENT OF POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
1. Assignment of Duties to Polling Officers
1st POLLING OFFICER
2nd POLLING OFFICER
3rd POLLING OFFICER
DUTIES AND FUNCTIONS OF POLLING OFFICERS
1ST POLLING OFFICER
In charge
of
marked copy
Verification
of identity
of Electors
Read out
serial No
and entry of the
elector in the
electoral roll
1. Assignment of Duties to Polling Officers
DUTIES AND FUNCTIONS OF POLLING OFFICERS
2nd POLLING OFFICER
Issuance
of
Voters
slip
In charge of
Register
of
Voters
In charge
of
indelible ink
Obtain
Signature or
Thumb
Impression
of each
elector
1. Assignment of Duties to Polling Officers
DUTIES AND FUNCTIONS OF POLLING OFFICERS
In charge
of
Control
Unit
Ensuring
indelible
ink mark
These duties can be performed by the presiding Officer,
where the number of Electors is small.
3rd POLLING OFFICER
Activating
the
Balloting
Unit
1. Assignment of Duties to Polling Officers
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Appointment letter in Form No.10
Appointment by candidate or his election agent
Revocation by candidate or his election agent
Compare specimen signature in case of any doubt
Pass for polling agents
2.Appointment of Election Agents
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Seating of polling agents
1. Candidates recognized by the National Parties
2. Candidates recognized by the State Parties
3. Candidates recognized by State Parties of other
States who have been permitted to use their
reserved symbols in the constituency.
4. Candidates of registered unrecognized parties
5. Independent candidates
2.Appointment of Election Agents
DUTIES AND FUNCTIONS OF POLLING OFFICERS
3. Preparation of EVM
Press the latch Pull out the cover
26
Mock Poll Important points
Set the printer switch of VVPAT to
Working mode before power on CU
(Vertical position)
27
Switch on CU only after the cables connected
properly as per color code and set the
VVPAT switch to Working mode …
The VVPAT unit has no separate on/off switch
Do not plug or unplug any cable while VVPAT is ON
Mock Poll Important points
4. MOCK POLL
Set to
zero (0)
by clearing
the machine
Press “Ballot” button.
Busy lamp in the
display section will glow
RED Simultaneously,
the ready lamp in the
balloting unit will also
start glowing GREEN
Red lamp
Ready lamp
Candidate’s Name
Number
5
Voter sees printed ballot slip with number,
name & symbol of the candidate chosen
Ask
any polling agent
to press any of the
candidate’s button
on the balloting
unit
Repeat
the process with
the remaining
agents
Press
“Total” button
for tallying the
total votes
polled
At the end of
mock poll,
press “CLOSE”
button
MOCK POLL
“Minimum 50 Votes”
Next press
“Result”
button
Then
the display
panel
will show
the result
Cross Check with
“VVPAT Slips”
and show
the agents
MOCK POLL
Next press
“Clear” button
and show
the count zero (0)
to the agents
Certificate
of
Mock poll
MOCK POLL
Mock Poll Certificate
This is certified that I, ……………… Presiding Officer at the Polling Station No……….of ………………..
Assembly Constituency (or the ………………… Assembly segment under …………………… Parliamentary
Constituency) conducted the mock poll at ……….. AM today, the poll day i.e. ……………… (date),
following scrupulously all the instructions issued by the Election Commission of India, using –CU
of Serial No. (as printed on back-side of the CU)…………………… BU of Serial No. (as printed on
back-side of the BU)……………… VVPAT Unit of Serial Number (if used) …………………………
1. A total of ……… votes were cast for each candidate and also for NOTA.
2. It was verified that the LED light was getting lit up against the correct candidate/NOTA
button, when the button was pressed and beep sound was properly heard.
3. The candidate-wise detail of votes polled during mock-poll and result displayed, is as under:
S
L.
No.
Name of
the Candidate
Number
of votes cast
during mock
poll
Number
of votes
displayed in
CU on
checking the
result
Number of
Printed Paper
Slips, as per
counting on
checking mock
poll result (if
VVPAT used)
Votes Cast
and Result
displayed &
Printed Paper Slip
count (if VVPAT
used) Tallied with
each other
(YES/NO)
NOTA
4.I have cleared the memory of the EVM and also removed the printed paper slips of VVPAT
after the mock poll and verified that the memory has been cleared, by pressing the Total
button and seeing the Total is shown as ‘0’.
5. At the time of mock poll the following polling agents representing the candidates whose names
mentioned against the names of such agents were present and I have obtained their signatures.
6. Poll Start Date and Time seen on the display of CU at the time of start of actual
poll……………………………………………….. (To be filled in case of Post-2006 EVMs).
S.No. Name of Polling Agent Name of Party Name of candidate Sign of Polling Agent
1.
2.
3.
4.
5.
or
At the time scheduled for mock poll no polling agent was present/the agent of only one
contesting candidate was present. After waiting for fifteen more minutes, I conducted the
mock poll along with other polling staff at …….….AM.
Signature of Micro-Observer (if posted at the polling station)
Date:
Time: Name & Signature of the Presiding Officer
Polling Station No ………………..
Polling Station Name…………..….
Stamp on the
reverse side
“Mock Poll Slip”
Black Paper
Envelope
SEALING
Pink Paper
Seal on
Plastic Box
Signatures of
Presiding Officer
and Polling Agents
on the paper seal
Verification of
signatures
of agents.
5. SEALING OF EVM
Fixing of
Green
Paper Seal
SEALING OF EVM
Frontside Backside
Signature
of PO and
Candidate
or Agent
Special Tag
Should be
sealed
using
Twine thread
SEALING OF EVM
Election To: (Lok Sabha or Legislative
Assembly)
From: (No. and Name of)
Constituency
Control Unit/ Balloting Unit No.: (ID number)
Serial No. & Name of
Polling Station Where Used ……..…….… …
Date of Poll:………………………………………
Closing and
Sealing of
outer cover of
result section
Attach
address tag
SEALING OF EVM
Strip seal
A B D
Frontside
C
Backside
SEALING OF EVM
BALLOT SLIPS COMPARTMENT
Then Ballot slips compartment has to be sealed as shown below by
Presiding Officer at polling station after mock poll.
Slide to Lock
43
Push the cover
up and close the
compartment
6
4 5
Lock the
compartment
I. ACQUAINT THROUGH KNOWLEDGE
ABOUT ELECTION PROCEDURE
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
1.Commencement of poll
IV. DURING THE POLL
4. Other important functions
2. Admission into the Polling Station
3. Enforcement of Election Law
DUTIES AND FUNCTIONS OF POLLING OFFICERS
c. Declaration by the Presiding Officer
b. At the stroke of the hour fixed
a. Warning about secrecy of voting
d. Precautions about indelible ink
e. Maintenance of register of voters in form No.17 A
f. Maintenance of PO’s Diary
g. Maintenance of visitors sheet
h. Entry of voters to PS to be regulated
IV. DURING THE POLL 1.Commencement of poll
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Separate
Queues
for
men and
women
Infirm/
Women voters
with babies
in arms
may be given
precedence
h. Entry of voters to PS to be regulated
IV. DURING THE POLL 1.Commencement of poll
DUTIES AND FUNCTIONS OF POLLING OFFICERS
1.Commencement of poll
4. Other important functions
2. Admission into the Polling Station
3. Enforcement of Election Law
IV. DURING THE POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
The electors
The Polling Officials
Each candidate, his election agent and one polling
agent of each candidate at a time
Persons authorized by the Election Commission
Public Servants on duty
Child in arms accompanying an elector
A person accompanying a blind or an infirm voter
Identifying officers
2. Admission into the Polling Station
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Cover of Marked Copy
Register of Voters – Form 17 A
3. Opening of
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Writing Voters Slip
DUTIES AND FUNCTIONS OF POLLING OFFICERS
137
958
1.Commencement of poll
4. Other important functions
2. Admission into the Polling Station
3. Enforcement of Election Law
IV. DURING THE POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
b. Maintenance of secrecy
Violation of maintenance of secrecy is
punishable with imprisonment which may
extend to three months or fine or with both
as per section128 of the
Representation of People Act , 1951.
3. Enforcement of Election Law
DUTIES AND FUNCTIONS OF POLLING OFFICERS
c. Prohibition of canvassing in or near PS
Canvassing of Votes
Soliciting the vote of any elector
Persuading any elector not to vote for
any particular candidate
3. Enforcement of Election Law
DUTIES AND FUNCTIONS OF POLLING OFFICERS
c. Prohibition of canvassing in or near PS
Persuading any elector not to vote at
the election
Exhibiting any notice or sign relating to
the election
--are punishable under section
130 of the RP Act.
3. Enforcement of Election Law
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Smoking to be prohibited inside the PS
Polling agents are not permitted to bring mobile phones
inside the PS
Photography prohibited inside the PS
Wearing of badges/emblem etc bearing the names of
candidate Political leaders or Symbols etc are prohibited.
Impersonation is punishable under the Indian Penal Code
d. Other offences
3. Enforcement of Election Law
DUTIES AND FUNCTIONS OF POLLING OFFICERS
1.Commencement of poll
IV. DURING THE POLL
4. Other important functions
2. Admission into the Polling Station
3. Enforcement of Election Law
DUTIES AND FUNCTIONS OF POLLING OFFICERS
PO’s entry in Voting Compartment during Poll
Voting of blind and infirm voters
Adjournment or stoppage of Poll
Tendered Vote
4. Other important functions
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Challenged Votes
Challenge
fee
Summary
enquiry
Burden of
proof
Return/forfeiture
of
challenge fee.
4. Other important functions
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Refusal to observe voting procedure
Withdraw
and cancel
voters slip
Inscribe the fact
in Register
of Voters
Put signature
below the
entry in the
remarks column
Never change the Sl.No in 17 A
4. Other important functions
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Electors deciding not to vote
Never change the Sl.No in 17 A
Shall not
Compell to cast
his vote
Inscribe
“Refused to Vote”
in remarks
column of register
of voters (17 A)
Signature
Or thumb
impression
of the elector
against the
entry
4. Other important functions
DUTIES AND FUNCTIONS OF POLLING OFFICERS
USE OF NEW EVM / VVPAT
Read out
a further
Declaration
in part II of Annexure VII
4. Other important functions
DUTIES AND FUNCTIONS OF POLLING OFFICERS
I. ACQUAINT THROUGH KNOWLEDGE
ABOUT ELECTION PROCEDURE
II. ON THE DAY PREVIOUS TO POLL
III. BEFORE COMMENCEMENT OF POLL
IV. DURING THE POLL
V. END OF THE POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Announce
the fact a
few minutes
before the
hour
appointed
CLOSING HOUR
Permit
Electors
present
at the
PS at the
hour
appointed
Distribute
slip
with
signature
in full.
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Press “close”
button of CU
Show the
“total”
in the CU and
record in 17 C
CLOSING OF EVM
DUTIES AND FUNCTIONS OF POLLING OFFICERS
Supply
attested
copies
of 17 C to
Polling
Agents
Closing of
Voters
Register
(17 A)
CLOSING OF EVM
DUTIES AND FUNCTIONS OF POLLING OFFICERS
DECLARATION
AT THE END
OF THE POLL
V. END OF THE POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
V. END OF THE POLL
Place the
Control Unit
and Balloting
Unit in their
carrying
cases, close
and
seal with the
Address tag
DUTIES AND FUNCTIONS OF POLLING OFFICERS
DECLARATION
AFTER SEALING
THE EVM
V. END OF THE POLL
DUTIES AND FUNCTIONS OF POLLING OFFICERS
1. Cover containing Form 17 C
2. Cover containing Declaration of PRO
3. Cover containing PRO’s Diary
4. Visit Sheet
Covers with EVM & VVPAT
DUTIES AND FUNCTIONS OF POLLING OFFICERS
5. 16 Point Observer’s Report
Packet No. I
Statutory Covers
Packet No.II
Non-Statutory Covers
Packet No.III
Packet No.IV.
SEALING OF ELECTION PAPERS
DUTIES AND FUNCTIONS OF POLLING OFFICERS
PACKET No. I
(Should be super scribed as “Statutory Covers”)
1. Sealed Cover containing marked copy of
electoral roll and List of CSVs
2. Sealed cover containing the Register of Voters (17 A)
3. Sealed Cover containing voters slips
4. Sealed Cover containing unused tendered ballot papers
5. Sealed Cover containing used tendered ballot papers
and the list in Form No.17 B
If any cover mentioned above is nil, a NIL cover should be placed.
SEALING OF ELECTION PAPERS
DUTIES AND FUNCTIONS OF POLLING OFFICERS
PACKET No.II
(Should be superscribed as “Non-Statutory Covers”)
1. Copies of Electoral Roll other than marked copy
2. Appointment letters of Polling Agents in Form 10.
3. List of blind and infirm electors in Form 14 A and the
declaration of the companion.
4. Declaration obtained from electors as to their age
and list of such electors (Annexure XI)
5. Receipt book and cash, if any, in respect of
Challenged votes
SEALING OF ELECTION PAPERS
DUTIES AND FUNCTIONS OF POLLING OFFICERS
6. Unused and damaged paper seals
7. Unused voters slips
8. Unused and damaged strip seal
10. List of challenged votes in Form 14 (Sealed Cover)
9. Unused and damaged special tags
PACKET No.II
SEALING OF ELECTION PAPERS
(Should be super scribed as “Non-Statutory Covers”)
DUTIES AND FUNCTIONS OF POLLING OFFICERS
1. Hand book for PO
2. Manual of EVM
3. Indelible ink set without leakage
5. Metal seal of the PO
4. Self inking pad
6. Arrow cross mark
7. Cup of setting indelible ink.
PACKET No.III
SEALING OF ELECTION PAPERS
DUTIES AND FUNCTIONS OF POLLING OFFICERS
All other items such as
Voting compartment,
Waste paper basket,
Polythene bag, etc…..
PACKET No.IV
SEALING OF ELECTION PAPERS
DUTIES AND FUNCTIONS OF POLLING OFFICERS
POINTS TO BE REMEMBERED
Read Hand Book, Manual and instructions
Percentage of polling shall be informed
Ensure free and fair Election
Maintain close relation with the members
of your polling team
Maintain good relation with the polling agents
POINTS TO BE REMEMBERED
Commence the poll at the appointed hour
Formally announce the close of poll after
the last elector has voted
Take personal responsibility to hand over
the EVM and election papers.
Start mock poll at least one hour before the
hour fixed for the commencement of poll
Thank You
P.A.Shanavas Khan
State Level Master Trainer
What’s up : 99 47 95 7654

Election 1st rehearsal class 2019

  • 1.
    WELCOME TO The Festivalof Democracy GENERAL ELECTION 2019
  • 2.
    ARTICLE 324 OFTHE CONSTITUTION SUPERINTENDENCE, DIRECTION & CONTROL REPRESENTATION OF PEOPLE ACT 1951 S.28A– On deputation to Election Commission ELECTION COMMISSION OF INDIA
  • 3.
    I. ACQUAINT THOROUGHKNOWLEDGE ABOUT ELECTION PROCEDURE II. ON THE DAY PREVIOUS TO POLL III. BEFORE COMMENCEMENT OF POLL IV. DURING THE POLL V. END OF THE POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 4.
    Attend all rehearsal and Training Classes Modus operandi of EVMClarification of doubts I. ACQUAINTTHOROUGH KNOWLEDGE ABOUT ELECTION PROCEDURE DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 5.
    I. ACQUAINT THOROUGHKNOWLEDGE ABOUT ELECTION PROCEDURE II. ON THE DAY PREVIOUS TO POLL III. BEFORE COMMENCEMENT OF POLL IV. DURING THE POLL V. END OF THE POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 6.
    1. Arrival atthe Distribution Centre 2. Identification of polling station 3. Familiarizing the Polling Team 4. Itinerary to and from the PS 5. Collection of Polling Materials. II. ON THE DAY PREVIOUS TO POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 7.
    Electronic Voting Machine(EVM)& Voter Verifiable Paper Audit Trail (VVPAT)
  • 8.
    Marked copy ofElectoral roll Register of Voters (17 A) Voters Slip Tendered Ballot paper MOST IMPORTANT POLLING MATERIALS To be returned in Packet No. 1
  • 9.
    Copies of ElectorRolls Paper Seals Special Tags Strip Seals MOST IMPORTANT POLLING MATERIALS To be returned in Packet No. 2 Address Tag
  • 10.
    Indelible Ink Cup Holderfor Indelible Ink Metal Seal of PRO Self inking pad Arrow Cross Mark MOST IMPORTANT POLLING MATERIALS To be returned in Packet No. 3
  • 11.
    Copy of theList of Contesting Candidates Specimen Signatures of Candidates / Election Agent Sample of EVM Balloting Unit Book containing Forms – 23 items MOST IMPORTANT POLLING MATERIALS Braille Ballot Label
  • 12.
    Envelop made ofThick Black Paper Plastic Box for Sealing Black Paper Envelope Forms for declaration u/r 49 MA Pink Paper for Sealing Plastic Box Additional Items of Polling Materials Rubber stamp with ‘Mock Poll Slip’
  • 13.
    A detailed listof polling materials incorporated in Annexure 19 of Presiding Officers Hand Book. MOST IMPORTANT POLLING MATERIALS
  • 14.
    6. ARRANGEMENT OFPOLLING STATION a. Set up of PS (Slogans / Photo etc should be covered or removed) b. Set up of Voting Compartment c. Display of Notices. II. ON THE DAY PREVIOUS TO POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 16.
    I. ACQUAINT THROUGHKNOWLEDGE ABOUT ELECTION PROCEDURES II. ON THE DAY PREVIOUS TO POLL III. BEFORE COMMENCEMENT OF POLL IV. DURING THE POLL V. END OF THE POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 17.
    1. Assignment ofDuties to Polling Officers 2. Appointment of Election Agents 3. Preparation of EVM 4. Mock Poll 5. Sealing of EVM III. BEFORE COMMENCEMENT OF POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 18.
    1. Assignment ofDuties to Polling Officers 1st POLLING OFFICER 2nd POLLING OFFICER 3rd POLLING OFFICER DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 19.
    1ST POLLING OFFICER Incharge of marked copy Verification of identity of Electors Read out serial No and entry of the elector in the electoral roll 1. Assignment of Duties to Polling Officers DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 20.
    2nd POLLING OFFICER Issuance of Voters slip Incharge of Register of Voters In charge of indelible ink Obtain Signature or Thumb Impression of each elector 1. Assignment of Duties to Polling Officers DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 21.
    In charge of Control Unit Ensuring indelible ink mark Theseduties can be performed by the presiding Officer, where the number of Electors is small. 3rd POLLING OFFICER Activating the Balloting Unit 1. Assignment of Duties to Polling Officers DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 22.
    Appointment letter inForm No.10 Appointment by candidate or his election agent Revocation by candidate or his election agent Compare specimen signature in case of any doubt Pass for polling agents 2.Appointment of Election Agents DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 23.
    Seating of pollingagents 1. Candidates recognized by the National Parties 2. Candidates recognized by the State Parties 3. Candidates recognized by State Parties of other States who have been permitted to use their reserved symbols in the constituency. 4. Candidates of registered unrecognized parties 5. Independent candidates 2.Appointment of Election Agents DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 24.
    3. Preparation ofEVM Press the latch Pull out the cover
  • 26.
    26 Mock Poll Importantpoints Set the printer switch of VVPAT to Working mode before power on CU (Vertical position)
  • 27.
    27 Switch on CUonly after the cables connected properly as per color code and set the VVPAT switch to Working mode … The VVPAT unit has no separate on/off switch Do not plug or unplug any cable while VVPAT is ON Mock Poll Important points
  • 30.
    4. MOCK POLL Setto zero (0) by clearing the machine Press “Ballot” button. Busy lamp in the display section will glow RED Simultaneously, the ready lamp in the balloting unit will also start glowing GREEN
  • 31.
    Red lamp Ready lamp Candidate’sName Number 5 Voter sees printed ballot slip with number, name & symbol of the candidate chosen Ask any polling agent to press any of the candidate’s button on the balloting unit
  • 32.
    Repeat the process with theremaining agents Press “Total” button for tallying the total votes polled At the end of mock poll, press “CLOSE” button MOCK POLL “Minimum 50 Votes”
  • 33.
    Next press “Result” button Then the display panel willshow the result Cross Check with “VVPAT Slips” and show the agents MOCK POLL
  • 34.
    Next press “Clear” button andshow the count zero (0) to the agents Certificate of Mock poll MOCK POLL
  • 35.
    Mock Poll Certificate Thisis certified that I, ……………… Presiding Officer at the Polling Station No……….of ……………….. Assembly Constituency (or the ………………… Assembly segment under …………………… Parliamentary Constituency) conducted the mock poll at ……….. AM today, the poll day i.e. ……………… (date), following scrupulously all the instructions issued by the Election Commission of India, using –CU of Serial No. (as printed on back-side of the CU)…………………… BU of Serial No. (as printed on back-side of the BU)……………… VVPAT Unit of Serial Number (if used) ………………………… 1. A total of ……… votes were cast for each candidate and also for NOTA. 2. It was verified that the LED light was getting lit up against the correct candidate/NOTA button, when the button was pressed and beep sound was properly heard. 3. The candidate-wise detail of votes polled during mock-poll and result displayed, is as under: S L. No. Name of the Candidate Number of votes cast during mock poll Number of votes displayed in CU on checking the result Number of Printed Paper Slips, as per counting on checking mock poll result (if VVPAT used) Votes Cast and Result displayed & Printed Paper Slip count (if VVPAT used) Tallied with each other (YES/NO) NOTA
  • 36.
    4.I have clearedthe memory of the EVM and also removed the printed paper slips of VVPAT after the mock poll and verified that the memory has been cleared, by pressing the Total button and seeing the Total is shown as ‘0’. 5. At the time of mock poll the following polling agents representing the candidates whose names mentioned against the names of such agents were present and I have obtained their signatures. 6. Poll Start Date and Time seen on the display of CU at the time of start of actual poll……………………………………………….. (To be filled in case of Post-2006 EVMs). S.No. Name of Polling Agent Name of Party Name of candidate Sign of Polling Agent 1. 2. 3. 4. 5. or At the time scheduled for mock poll no polling agent was present/the agent of only one contesting candidate was present. After waiting for fifteen more minutes, I conducted the mock poll along with other polling staff at …….….AM. Signature of Micro-Observer (if posted at the polling station) Date: Time: Name & Signature of the Presiding Officer Polling Station No ……………….. Polling Station Name…………..….
  • 37.
    Stamp on the reverseside “Mock Poll Slip” Black Paper Envelope SEALING Pink Paper Seal on Plastic Box
  • 38.
    Signatures of Presiding Officer andPolling Agents on the paper seal Verification of signatures of agents. 5. SEALING OF EVM
  • 39.
  • 40.
    Frontside Backside Signature of POand Candidate or Agent Special Tag Should be sealed using Twine thread SEALING OF EVM
  • 41.
    Election To: (LokSabha or Legislative Assembly) From: (No. and Name of) Constituency Control Unit/ Balloting Unit No.: (ID number) Serial No. & Name of Polling Station Where Used ……..…….… … Date of Poll:……………………………………… Closing and Sealing of outer cover of result section Attach address tag SEALING OF EVM
  • 42.
    Strip seal A BD Frontside C Backside SEALING OF EVM
  • 43.
    BALLOT SLIPS COMPARTMENT ThenBallot slips compartment has to be sealed as shown below by Presiding Officer at polling station after mock poll. Slide to Lock 43 Push the cover up and close the compartment 6 4 5 Lock the compartment
  • 44.
    I. ACQUAINT THROUGHKNOWLEDGE ABOUT ELECTION PROCEDURE II. ON THE DAY PREVIOUS TO POLL III. BEFORE COMMENCEMENT OF POLL IV. DURING THE POLL V. END OF THE POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 45.
    1.Commencement of poll IV.DURING THE POLL 4. Other important functions 2. Admission into the Polling Station 3. Enforcement of Election Law DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 46.
    c. Declaration bythe Presiding Officer b. At the stroke of the hour fixed a. Warning about secrecy of voting d. Precautions about indelible ink e. Maintenance of register of voters in form No.17 A f. Maintenance of PO’s Diary g. Maintenance of visitors sheet h. Entry of voters to PS to be regulated IV. DURING THE POLL 1.Commencement of poll DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 47.
    Separate Queues for men and women Infirm/ Women voters withbabies in arms may be given precedence h. Entry of voters to PS to be regulated IV. DURING THE POLL 1.Commencement of poll DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 48.
    1.Commencement of poll 4.Other important functions 2. Admission into the Polling Station 3. Enforcement of Election Law IV. DURING THE POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 49.
    The electors The PollingOfficials Each candidate, his election agent and one polling agent of each candidate at a time Persons authorized by the Election Commission Public Servants on duty Child in arms accompanying an elector A person accompanying a blind or an infirm voter Identifying officers 2. Admission into the Polling Station DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 50.
    Cover of MarkedCopy Register of Voters – Form 17 A 3. Opening of DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 51.
    Writing Voters Slip DUTIESAND FUNCTIONS OF POLLING OFFICERS 137 958
  • 52.
    1.Commencement of poll 4.Other important functions 2. Admission into the Polling Station 3. Enforcement of Election Law IV. DURING THE POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 53.
    b. Maintenance ofsecrecy Violation of maintenance of secrecy is punishable with imprisonment which may extend to three months or fine or with both as per section128 of the Representation of People Act , 1951. 3. Enforcement of Election Law DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 54.
    c. Prohibition ofcanvassing in or near PS Canvassing of Votes Soliciting the vote of any elector Persuading any elector not to vote for any particular candidate 3. Enforcement of Election Law DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 55.
    c. Prohibition ofcanvassing in or near PS Persuading any elector not to vote at the election Exhibiting any notice or sign relating to the election --are punishable under section 130 of the RP Act. 3. Enforcement of Election Law DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 56.
    Smoking to beprohibited inside the PS Polling agents are not permitted to bring mobile phones inside the PS Photography prohibited inside the PS Wearing of badges/emblem etc bearing the names of candidate Political leaders or Symbols etc are prohibited. Impersonation is punishable under the Indian Penal Code d. Other offences 3. Enforcement of Election Law DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 57.
    1.Commencement of poll IV.DURING THE POLL 4. Other important functions 2. Admission into the Polling Station 3. Enforcement of Election Law DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 58.
    PO’s entry inVoting Compartment during Poll Voting of blind and infirm voters Adjournment or stoppage of Poll Tendered Vote 4. Other important functions DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 59.
    Challenged Votes Challenge fee Summary enquiry Burden of proof Return/forfeiture of challengefee. 4. Other important functions DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 60.
    Refusal to observevoting procedure Withdraw and cancel voters slip Inscribe the fact in Register of Voters Put signature below the entry in the remarks column Never change the Sl.No in 17 A 4. Other important functions DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 61.
    Electors deciding notto vote Never change the Sl.No in 17 A Shall not Compell to cast his vote Inscribe “Refused to Vote” in remarks column of register of voters (17 A) Signature Or thumb impression of the elector against the entry 4. Other important functions DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 62.
    USE OF NEWEVM / VVPAT Read out a further Declaration in part II of Annexure VII 4. Other important functions DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 63.
    I. ACQUAINT THROUGHKNOWLEDGE ABOUT ELECTION PROCEDURE II. ON THE DAY PREVIOUS TO POLL III. BEFORE COMMENCEMENT OF POLL IV. DURING THE POLL V. END OF THE POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 64.
    Announce the fact a fewminutes before the hour appointed CLOSING HOUR Permit Electors present at the PS at the hour appointed Distribute slip with signature in full. DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 65.
    Press “close” button ofCU Show the “total” in the CU and record in 17 C CLOSING OF EVM DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 66.
    Supply attested copies of 17 Cto Polling Agents Closing of Voters Register (17 A) CLOSING OF EVM DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 67.
    DECLARATION AT THE END OFTHE POLL V. END OF THE POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 68.
    V. END OFTHE POLL Place the Control Unit and Balloting Unit in their carrying cases, close and seal with the Address tag DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 69.
    DECLARATION AFTER SEALING THE EVM V.END OF THE POLL DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 70.
    1. Cover containingForm 17 C 2. Cover containing Declaration of PRO 3. Cover containing PRO’s Diary 4. Visit Sheet Covers with EVM & VVPAT DUTIES AND FUNCTIONS OF POLLING OFFICERS 5. 16 Point Observer’s Report
  • 71.
    Packet No. I StatutoryCovers Packet No.II Non-Statutory Covers Packet No.III Packet No.IV. SEALING OF ELECTION PAPERS DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 72.
    PACKET No. I (Shouldbe super scribed as “Statutory Covers”) 1. Sealed Cover containing marked copy of electoral roll and List of CSVs 2. Sealed cover containing the Register of Voters (17 A) 3. Sealed Cover containing voters slips 4. Sealed Cover containing unused tendered ballot papers 5. Sealed Cover containing used tendered ballot papers and the list in Form No.17 B If any cover mentioned above is nil, a NIL cover should be placed. SEALING OF ELECTION PAPERS DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 73.
    PACKET No.II (Should besuperscribed as “Non-Statutory Covers”) 1. Copies of Electoral Roll other than marked copy 2. Appointment letters of Polling Agents in Form 10. 3. List of blind and infirm electors in Form 14 A and the declaration of the companion. 4. Declaration obtained from electors as to their age and list of such electors (Annexure XI) 5. Receipt book and cash, if any, in respect of Challenged votes SEALING OF ELECTION PAPERS DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 74.
    6. Unused anddamaged paper seals 7. Unused voters slips 8. Unused and damaged strip seal 10. List of challenged votes in Form 14 (Sealed Cover) 9. Unused and damaged special tags PACKET No.II SEALING OF ELECTION PAPERS (Should be super scribed as “Non-Statutory Covers”) DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 75.
    1. Hand bookfor PO 2. Manual of EVM 3. Indelible ink set without leakage 5. Metal seal of the PO 4. Self inking pad 6. Arrow cross mark 7. Cup of setting indelible ink. PACKET No.III SEALING OF ELECTION PAPERS DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 76.
    All other itemssuch as Voting compartment, Waste paper basket, Polythene bag, etc….. PACKET No.IV SEALING OF ELECTION PAPERS DUTIES AND FUNCTIONS OF POLLING OFFICERS
  • 80.
    POINTS TO BEREMEMBERED Read Hand Book, Manual and instructions Percentage of polling shall be informed Ensure free and fair Election Maintain close relation with the members of your polling team Maintain good relation with the polling agents
  • 81.
    POINTS TO BEREMEMBERED Commence the poll at the appointed hour Formally announce the close of poll after the last elector has voted Take personal responsibility to hand over the EVM and election papers. Start mock poll at least one hour before the hour fixed for the commencement of poll
  • 82.
    Thank You P.A.Shanavas Khan StateLevel Master Trainer What’s up : 99 47 95 7654