This document summarizes the dry dock period of the patrol vessel P-207 "28 de Noviembre" of the Panamanian Coast Guard from December 4th 2013 to July 18th 2014. The dry dock work was performed by MEC Panamá and included overhauling engines and generators, replacing the main deck and shell plating, painting interior spaces, and installing new navigation and communication equipment. After 7 months of repairs, the vessel was undocked and returned to service.