SlideShare a Scribd company logo
1 of 3
Fall-2016
Get solved assignments at nominal price of Rs.130 each.
Mail us at: subjects4u@gmail.com or contact at
09882243490
Master of Business Administration- MBA Semester 4
PM0015-Quantitaive Methods in Project Management
(Book ID: B2011)
Assignment (60 Marks)
Note: Answer all questions must be written within 300 to 400 words each. Each Question carries 10
marks 6 X 10=60.
Q1. Explain Business Value Models in detail.
 Balanced scorecard model
 The Treacy-Wiersema model
 The Kano model
Answer. The following business models in detail in the following section:
Balanced scorecard model:
The balanced scorecard model defines four scoring areas for business value and was first published by
Robert S. Kaplan and David P. Norton in an article, “The Balanced Scorecard – Measures that Drive
Performance.”
The model was developed as a replacement for earlier systems; those only included the financial
perspective to measure performance. The business scorecard model is an educational, informational, and
Q2. What is parametric estimating? Explain the steps involved in the development of a parametric
model.
Answer. Parametric estimating:
Parametric estimating is an estimating technique that uses a statistical relationship between historical data
and other variables, such as square footage in construction and lines of code in software development for
calculating an estimate for activity parameters, such as scope, cost, budget, and duration. Parametric
estimating can produce higher levels of accuracy depending upon the accuracy and sophistication of the
Q3. What is Capital Budgeting. What aspects of capital budgeting must be considered while selecting a
project?
Answer. Capital Budgeting: -
Capital budgeting is a process used by companies for evaluating and ranking potential expenditures or
investments that are significant in amount. The large expenditures could include the purchase of new
equipment, rebuilding existing equipment, purchasing delivery vehicles, constructing additions to
buildings, etc. The large amounts spent for these types of projects are known as capital expenditures.
Q4. Explain the various expense items in a project.
(List the various expense items in a project
Describe each expense with suitable examples 9 (3 marks for each expense item)
Answer. List the various expense items in a project:
 Direct and indirect costs
 Variable and fixed costs
 Actual and standard costs
Direct and indirect costs
Direct costs are expenses that directly affect the budget of a project. Expenses that are for the express
benefit of the project, and would not be incurred if not for the project, are usually called "direct
expenses." In other words, direct costs can be identified with specific project activities with high levels of
accuracy. For example, if a project organization outsources some of its system development works, the
amount paid to the developer for the development work would be a direct cost. Indirect costs, also known
Q5. Explain Benefit-Cost Ratio Analysis and Break-Even Analysis.
Answer. A benefit cost ratio (BCR) attempts to identify the relationship between the cost and benefits of a
proposed project. Benefit cost ratios are most often used in corporate finance to detail the relationship
between possible benefits and costs, both quantitative and qualitative, of undertaking new projects or
replacing old ones. The ratio is used to measure both the quantitative and the qualitative factors, since
sometimes the benefits and the costs cannot be measured exclusively in financial terms. When possible,
Q6. What are the steps that should be followed to construct a “house of quality”?
(Explain the 5 steps that should be followed to construct a house of quality)
Answer. 5 steps that should be followed to construct a house of quality:
1. Voice of the customer: This step includes determining and identifying the customer’s needs. The
main objective of this step is to translate the needs of every customer into engineering
specifications. Customers buy products that have the desired characteristics, and manufacturers
offer the desired characteristics. There should be a proper alignment between the needs of the
customers and the offerings
Fall-2016
Get solved assignments at nominal price of Rs.130 each.
Mail us at: subjects4u@gmail.com or contact at
09882243490

More Related Content

What's hot

Linear programming in market application
Linear programming in market applicationLinear programming in market application
Linear programming in market applicationAhmad Raza Bhatti
 
Ms 51 operations research
Ms 51 operations researchMs 51 operations research
Ms 51 operations researchsmumbahelp
 
Ml0017 mall management
Ml0017 mall managementMl0017 mall management
Ml0017 mall managementsmumbahelp
 
Technical Interview Workshop Sept 17 2007 V2 Website
Technical Interview Workshop Sept 17 2007 V2 WebsiteTechnical Interview Workshop Sept 17 2007 V2 Website
Technical Interview Workshop Sept 17 2007 V2 WebsiteMcGill Investment Club
 
Project management & its applications
Project management & its applicationsProject management & its applications
Project management & its applicationsStudy Stuff
 
use of Variance analysis
use of Variance analysisuse of Variance analysis
use of Variance analysisabrar_hassan
 
Om0010 operations management
Om0010 operations managementOm0010 operations management
Om0010 operations managementconsult4solutions
 
Software Engineering Economics Life Cycle.
Software Engineering Economics  Life Cycle.Software Engineering Economics  Life Cycle.
Software Engineering Economics Life Cycle.Sulman Ahmed
 
Om0018 technology management
Om0018 technology managementOm0018 technology management
Om0018 technology managementconsult4solutions
 
Om0017 advanced production and planning control
Om0017 advanced production and planning controlOm0017 advanced production and planning control
Om0017 advanced production and planning controlconsult4solutions
 
Productivity and efficiency analysis
Productivity and efficiency analysisProductivity and efficiency analysis
Productivity and efficiency analysisVeneficus
 
Om0010 operations management
Om0010 operations managementOm0010 operations management
Om0010 operations managementsmumbahelp
 
Cost cutting measures
Cost cutting measuresCost cutting measures
Cost cutting measuresVarun Sharma
 

What's hot (20)

Linear programming in market application
Linear programming in market applicationLinear programming in market application
Linear programming in market application
 
Target costing
Target costingTarget costing
Target costing
 
Homework8
Homework8Homework8
Homework8
 
Ms 51 operations research
Ms 51 operations researchMs 51 operations research
Ms 51 operations research
 
Ml0017 mall management
Ml0017 mall managementMl0017 mall management
Ml0017 mall management
 
9707 s14 ms_12
9707 s14 ms_129707 s14 ms_12
9707 s14 ms_12
 
Technical Interview Workshop Sept 17 2007 V2 Website
Technical Interview Workshop Sept 17 2007 V2 WebsiteTechnical Interview Workshop Sept 17 2007 V2 Website
Technical Interview Workshop Sept 17 2007 V2 Website
 
9707 s14 qp_12
9707 s14 qp_129707 s14 qp_12
9707 s14 qp_12
 
Project management & its applications
Project management & its applicationsProject management & its applications
Project management & its applications
 
use of Variance analysis
use of Variance analysisuse of Variance analysis
use of Variance analysis
 
Om0010 operations management
Om0010 operations managementOm0010 operations management
Om0010 operations management
 
Software Engineering Economics Life Cycle.
Software Engineering Economics  Life Cycle.Software Engineering Economics  Life Cycle.
Software Engineering Economics Life Cycle.
 
9707 s14 qp_11
9707 s14 qp_119707 s14 qp_11
9707 s14 qp_11
 
Break even
Break evenBreak even
Break even
 
Om0018 technology management
Om0018 technology managementOm0018 technology management
Om0018 technology management
 
Responsibilty centers EPM MBA
Responsibilty centers EPM MBA Responsibilty centers EPM MBA
Responsibilty centers EPM MBA
 
Om0017 advanced production and planning control
Om0017 advanced production and planning controlOm0017 advanced production and planning control
Om0017 advanced production and planning control
 
Productivity and efficiency analysis
Productivity and efficiency analysisProductivity and efficiency analysis
Productivity and efficiency analysis
 
Om0010 operations management
Om0010 operations managementOm0010 operations management
Om0010 operations management
 
Cost cutting measures
Cost cutting measuresCost cutting measures
Cost cutting measures
 

Viewers also liked

Raipur Sahitya Mahotsav Case Study and Report
Raipur Sahitya Mahotsav Case Study and ReportRaipur Sahitya Mahotsav Case Study and Report
Raipur Sahitya Mahotsav Case Study and ReportAadeep Bhatia
 
Ib0011 international marketing
Ib0011 international marketingIb0011 international marketing
Ib0011 international marketingconsult4solutions
 
Materi bab i surat al qadr dan al-alaq 1-5
Materi bab i surat al qadr dan al-alaq 1-5Materi bab i surat al qadr dan al-alaq 1-5
Materi bab i surat al qadr dan al-alaq 1-5wiki_tuwi23
 
Professional Certifications and Achievements
Professional Certifications and AchievementsProfessional Certifications and Achievements
Professional Certifications and AchievementsAbhishek Verma
 
Ppt bab asmaul husna
Ppt bab asmaul husnaPpt bab asmaul husna
Ppt bab asmaul husnawiki_tuwi23
 
NEHF Happy, Healthy, at Home symposium 100117 Workshop 2 - West Hampshire e...
NEHF Happy, Healthy, at Home symposium 100117   Workshop 2 - West Hampshire e...NEHF Happy, Healthy, at Home symposium 100117   Workshop 2 - West Hampshire e...
NEHF Happy, Healthy, at Home symposium 100117 Workshop 2 - West Hampshire e...Health Innovation Wessex
 
Odiun understanding oracle data integrator
Odiun understanding oracle data integratorOdiun understanding oracle data integrator
Odiun understanding oracle data integratorgutiejun
 
Lumate 091116 partanen
Lumate 091116 partanenLumate 091116 partanen
Lumate 091116 partanenLeena Partanen
 
Построение Saas-стартапа на django и angular
Построение Saas-стартапа на django и angularПостроение Saas-стартапа на django и angular
Построение Saas-стартапа на django и angularAlexander Lifanov
 

Viewers also liked (20)

Evaluation
EvaluationEvaluation
Evaluation
 
Raipur Sahitya Mahotsav Case Study and Report
Raipur Sahitya Mahotsav Case Study and ReportRaipur Sahitya Mahotsav Case Study and Report
Raipur Sahitya Mahotsav Case Study and Report
 
Belgium
BelgiumBelgium
Belgium
 
Ib0011 international marketing
Ib0011 international marketingIb0011 international marketing
Ib0011 international marketing
 
appache_1
appache_1appache_1
appache_1
 
Om0016 quality management
Om0016 quality managementOm0016 quality management
Om0016 quality management
 
Bibliography
BibliographyBibliography
Bibliography
 
Materi bab i surat al qadr dan al-alaq 1-5
Materi bab i surat al qadr dan al-alaq 1-5Materi bab i surat al qadr dan al-alaq 1-5
Materi bab i surat al qadr dan al-alaq 1-5
 
Wilson workbook 2015
Wilson workbook 2015Wilson workbook 2015
Wilson workbook 2015
 
第十三课 – 旅游
第十三课 – 旅游第十三课 – 旅游
第十三课 – 旅游
 
Vision
VisionVision
Vision
 
Tutorial De PowerPoint
Tutorial De PowerPointTutorial De PowerPoint
Tutorial De PowerPoint
 
Summary of Learning
Summary of Learning Summary of Learning
Summary of Learning
 
Professional Certifications and Achievements
Professional Certifications and AchievementsProfessional Certifications and Achievements
Professional Certifications and Achievements
 
Ppt bab asmaul husna
Ppt bab asmaul husnaPpt bab asmaul husna
Ppt bab asmaul husna
 
NEHF Happy, Healthy, at Home symposium 100117 Workshop 2 - West Hampshire e...
NEHF Happy, Healthy, at Home symposium 100117   Workshop 2 - West Hampshire e...NEHF Happy, Healthy, at Home symposium 100117   Workshop 2 - West Hampshire e...
NEHF Happy, Healthy, at Home symposium 100117 Workshop 2 - West Hampshire e...
 
AksumChar
AksumCharAksumChar
AksumChar
 
Odiun understanding oracle data integrator
Odiun understanding oracle data integratorOdiun understanding oracle data integrator
Odiun understanding oracle data integrator
 
Lumate 091116 partanen
Lumate 091116 partanenLumate 091116 partanen
Lumate 091116 partanen
 
Построение Saas-стартапа на django и angular
Построение Saas-стартапа на django и angularПостроение Saas-стартапа на django и angular
Построение Saas-стартапа на django и angular
 

Similar to Get MBA Assignments Solved for Rs.130

Pm0015 summer-2016
Pm0015 summer-2016Pm0015 summer-2016
Pm0015 summer-2016smumbahelp
 
Pm 0015 quantitative methods in project management
Pm 0015   quantitative methods in project managementPm 0015   quantitative methods in project management
Pm 0015 quantitative methods in project managementsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and schedulingconsult4solutions
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project managementsmumbahelp
 
Pm0010 introduction to project management
Pm0010 introduction to project managementPm0010 introduction to project management
Pm0010 introduction to project managementconsult4solutions
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project managementsmumbahelp
 
Bba303 quality management
Bba303 quality managementBba303 quality management
Bba303 quality managementsmumbahelp
 
Bba303 quality management
Bba303 quality managementBba303 quality management
Bba303 quality managementsmumbahelp
 
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docx
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docxEM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docx
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docxjack60216
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and schedulingconsult4solutions
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Project management 3rd sem - smu mba solved assignments
Project management  3rd   sem - smu mba solved assignmentsProject management  3rd   sem - smu mba solved assignments
Project management 3rd sem - smu mba solved assignmentssmumbahelp
 
A Guide to Strategic Case AnalysisEach group is responsible for .docx
A Guide to Strategic Case AnalysisEach group is responsible for .docxA Guide to Strategic Case AnalysisEach group is responsible for .docx
A Guide to Strategic Case AnalysisEach group is responsible for .docxsleeperharwell
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materialssmumbahelp
 
Pragmatic Cost Optimisation
Pragmatic Cost OptimisationPragmatic Cost Optimisation
Pragmatic Cost OptimisationGareth Stone
 
Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations managementsmumbahelp
 
Variance Analysis in Standard Costing
Variance Analysis in Standard CostingVariance Analysis in Standard Costing
Variance Analysis in Standard CostingVivek Mahajan
 

Similar to Get MBA Assignments Solved for Rs.130 (20)

Pm0015 summer-2016
Pm0015 summer-2016Pm0015 summer-2016
Pm0015 summer-2016
 
Pm 0015 quantitative methods in project management
Pm 0015   quantitative methods in project managementPm 0015   quantitative methods in project management
Pm 0015 quantitative methods in project management
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and scheduling
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Pm0015 quantitative methods in project management
Pm0015  quantitative methods in project managementPm0015  quantitative methods in project management
Pm0015 quantitative methods in project management
 
Pm0010 introduction to project management
Pm0010 introduction to project managementPm0010 introduction to project management
Pm0010 introduction to project management
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project management
 
Bba303 quality management
Bba303 quality managementBba303 quality management
Bba303 quality management
 
Bba303 quality management
Bba303 quality managementBba303 quality management
Bba303 quality management
 
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docx
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docxEM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docx
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docx
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011 project planning and schedulingPm0011 project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Project management 3rd sem - smu mba solved assignments
Project management  3rd   sem - smu mba solved assignmentsProject management  3rd   sem - smu mba solved assignments
Project management 3rd sem - smu mba solved assignments
 
A Guide to Strategic Case AnalysisEach group is responsible for .docx
A Guide to Strategic Case AnalysisEach group is responsible for .docxA Guide to Strategic Case AnalysisEach group is responsible for .docx
A Guide to Strategic Case AnalysisEach group is responsible for .docx
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materials
 
Pragmatic Cost Optimisation
Pragmatic Cost OptimisationPragmatic Cost Optimisation
Pragmatic Cost Optimisation
 
Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations management
 
Variance Analysis in Standard Costing
Variance Analysis in Standard CostingVariance Analysis in Standard Costing
Variance Analysis in Standard Costing
 

Recently uploaded

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 

Recently uploaded (20)

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 

Get MBA Assignments Solved for Rs.130

  • 1. Fall-2016 Get solved assignments at nominal price of Rs.130 each. Mail us at: subjects4u@gmail.com or contact at 09882243490 Master of Business Administration- MBA Semester 4 PM0015-Quantitaive Methods in Project Management (Book ID: B2011) Assignment (60 Marks) Note: Answer all questions must be written within 300 to 400 words each. Each Question carries 10 marks 6 X 10=60. Q1. Explain Business Value Models in detail.  Balanced scorecard model  The Treacy-Wiersema model  The Kano model Answer. The following business models in detail in the following section: Balanced scorecard model: The balanced scorecard model defines four scoring areas for business value and was first published by Robert S. Kaplan and David P. Norton in an article, “The Balanced Scorecard – Measures that Drive Performance.” The model was developed as a replacement for earlier systems; those only included the financial perspective to measure performance. The business scorecard model is an educational, informational, and Q2. What is parametric estimating? Explain the steps involved in the development of a parametric model. Answer. Parametric estimating: Parametric estimating is an estimating technique that uses a statistical relationship between historical data and other variables, such as square footage in construction and lines of code in software development for calculating an estimate for activity parameters, such as scope, cost, budget, and duration. Parametric estimating can produce higher levels of accuracy depending upon the accuracy and sophistication of the
  • 2. Q3. What is Capital Budgeting. What aspects of capital budgeting must be considered while selecting a project? Answer. Capital Budgeting: - Capital budgeting is a process used by companies for evaluating and ranking potential expenditures or investments that are significant in amount. The large expenditures could include the purchase of new equipment, rebuilding existing equipment, purchasing delivery vehicles, constructing additions to buildings, etc. The large amounts spent for these types of projects are known as capital expenditures. Q4. Explain the various expense items in a project. (List the various expense items in a project Describe each expense with suitable examples 9 (3 marks for each expense item) Answer. List the various expense items in a project:  Direct and indirect costs  Variable and fixed costs  Actual and standard costs Direct and indirect costs Direct costs are expenses that directly affect the budget of a project. Expenses that are for the express benefit of the project, and would not be incurred if not for the project, are usually called "direct expenses." In other words, direct costs can be identified with specific project activities with high levels of accuracy. For example, if a project organization outsources some of its system development works, the amount paid to the developer for the development work would be a direct cost. Indirect costs, also known Q5. Explain Benefit-Cost Ratio Analysis and Break-Even Analysis. Answer. A benefit cost ratio (BCR) attempts to identify the relationship between the cost and benefits of a proposed project. Benefit cost ratios are most often used in corporate finance to detail the relationship between possible benefits and costs, both quantitative and qualitative, of undertaking new projects or replacing old ones. The ratio is used to measure both the quantitative and the qualitative factors, since sometimes the benefits and the costs cannot be measured exclusively in financial terms. When possible, Q6. What are the steps that should be followed to construct a “house of quality”? (Explain the 5 steps that should be followed to construct a house of quality) Answer. 5 steps that should be followed to construct a house of quality: 1. Voice of the customer: This step includes determining and identifying the customer’s needs. The main objective of this step is to translate the needs of every customer into engineering
  • 3. specifications. Customers buy products that have the desired characteristics, and manufacturers offer the desired characteristics. There should be a proper alignment between the needs of the customers and the offerings Fall-2016 Get solved assignments at nominal price of Rs.130 each. Mail us at: subjects4u@gmail.com or contact at 09882243490