OBJECTIVES OF PROJECT MANAGEMENT
 The Successful development and implementation of all project’s procedure
 Productive guidance efficient
 The achievement of project’s main goal with in the given constraint
 Optimization of the allocated necessary inputs
 Production of complete project which follow the client’s exclusive need and
objectives
IMPORTANCE OF PROJECT MANAGEMENT
1. STRATEGICS MANAGEMENT 2. LEADERSHIP
3. CLEAR FOCUS & OBJECTIVES 4. REALISTIC PROJECT
PLANNING
5. QUALITY CONTROL 5. RISK MANAGEMENT
7. ORDERLY PROCESS 8. CONTINUES OVERSIGHT
9. SUBJECT MATTER EXPERTISE 10. MANAGING & LEARNING
FROM SUCCESS AND FAILURE
PROJECT MANAGEMENT TECHNIQUES
• 1. Classic technique: The classical technique in project management is an amazing
procedure that includes a proper plan to cover all of the upcoming work activities, which
tasks are to be performed, and what should be the chain of application that defines which
task to do first, allocating proper resources to the tasks according to their importance,
providing and receiving proper feedback from the team which helps in team building and also
monitoring the quality of the work done and how are the deadlines being met by the team.
• Where to use: The classical procedure is amazing for running projects that are performed
by a team that is small in number because a larger team with a complex strategy isn’t
required.
• 2. Waterfall technique: the waterfall technique is also considered a traditional project
management tool because it builds on the upper mentioned classical approach and
takes it to a whole new level.
• As the title suggests, the waterfall technique is based on your project management tasks
to be dealt with in a properly sequential form where the next task is only performed and
performed well when the previous task has been completed. Just like a waterfall, the
tasks flow to the desired direction smoothly but only if they are completed in a sequential
form.
• If you are working on a complex project with a lot of dependencies you can easily tackle
the management of such kind of project using gantt charts of ntask.
Where to use: the waterfall technique is an amazing technique that is used for complex
projects that can not be dealt with by the classical approach. This is because of the fact
that phasing is required in the development and if you really want to deliver a successful
project then a properly rigid work structuring is required.
3. AGILE PROJECT MANAGEMENT
• THE AGILE APPROACH IS BASICALLY CRUSHING THE BIG PROJECT STEPS INTO
SHORTER SPRINTS THAT HELP IN A DETAILED ANALYSIS OF THE WHOLE PROCESS
DURING THE DEVELOPMENT STAGE. THIS DETAILED ANALYSIS HELPS IN EFFECTIVE
AND ADAPTIVE PLANNING ACCORDING TO THE NEEDS AND CHANGES REQUIRED IN
THE PROJECT AS IT GAINS A PROPER SHAPE.
• ALL OF THESE ACTIVITIES RESULT IN A SOLID CONTINUAL IMPROVEMENT DURING
THE DEVELOPMENTAL STAGE, AND ALSO THE TEAMS BECOME MORE ORGANIZED
AND COLLABORATIVE INCLINED TO PRODUCE THE BEST RESULTS POSSIBLE.
• THE AGILE FRAMEWORKS COMMONLY INCLUDE DIFFERENT TECHNIQUES SUCH
AS SCRUM, KANBAN, FDD, AND DSDM, ETC.
• WHERE TO USE: THE AGILE PROJECT MANAGEMENT TECHNIQUE IS USED IN
PROJECTS WHOSE DEVELOPMENT UNRAVELS IN SHORT BUT PRECISE
INCREMENTS PERFORMED BY SMALL BUT HIGHLY COLLABORATIVE TEAMS.
• AS THE AGILE MANAGEMENT PROCEDURE IS SO FAMOUS THAT, TODAY, THERE ARE
A LOT OF PROJECTS AND WORK MANAGEMENT SOFTWARE TOOLS THAT WILL HELP
YOU EMBED SCRUM AND AGILE INTO YOUR PROJECT AND HELP YOU COMPLETE
THE DEVELOPMENT PROCESS WITH EASE.
4. RATIONAL UNIFIED PROCESS (RUP)
• RUP IS AN AMAZING FRAMEWORK THAT WAS SPECIALLY DESIGNED FOR THE
SOFTWARE MARKET WHERE THE SOFTWARE DEVELOPMENT TEAMS AND THE
PROJECTS THEY WORK ON, CAN BENEFIT FROM THIS FRAMEWORK AND
ACHIEVE THE BEST RESULTS POSSIBLE.
• RATIONAL UNIFIED PROCESS PRESCRIBES IMPLEMENTING A SEQUENTIAL OR
ITERATIVE DEVELOPMENTAL PROCESS LIKE THE WATERFALL TECHNIQUE, BUT
WITH A SLIGHT CHANGE AS THE FEEDBACK WHICH IS COLLECTED FOR THE
BETTERMENT OF THE PROJECT IN ALL FUTURE ITERATIONS AND
MODIFICATIONS, IS TAKEN FROM THE DIRECT PRODUCT USERS.
• WHERE TO USE: THE RUP PROCEDURE IS APPLIED TO SOFTWARE
DEVELOPMENT PROJECTS WHERE THE WHOLE PROCESS IS BROKEN DOWN
INTO PIECES AND ALSO WHERE THE END-USER INPUT AND SATISFACTION IS A
KEY FACTORS OF THE PROJECT.
5. PROGRAM EVALUATION AND REVIEW
TECHNIQUE
• PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) IS AN INCREDIBLE
SOFTWARE MANAGEMENT TECHNIQUE THAT IS VERY WIDELY USED IN A LOT
OF DIFFERENT AREAS AND INDUSTRIES. THE WAY THIS TECHNIQUE WORKS IS
THAT IT FACILITATES THE PROJECT WITH QUITE COMPLEX AND AMAZINGLY
DETAILED PLANNED SCENARIOS THAT HELP THE DEVELOPMENT TEAM TO
PROPERLY VISUALIZE THE WHOLE PROCESS AND THEIR END RESULTS ON
PERT CHARTS.
• THE MAIN FEATURE THAT THIS TECHNIQUE HAS IS THAT IT PERFORMS AN
EFFECTIVE ANALYSIS OF THE TASKS THAT ARE PERFORMED WITHIN THE
PROJECT. THAT HELPS THE TEAM TO KEEP TRACK OF ALL OF THEIR
DEVELOPMENTAL ACTIVITIES AND FIX THEIR WEAKNESSES.
• THIS TECHNIQUE WAS ORIGINALLY DESIGNED BY THE US NAVY DURING THE
COLD WAR ERA WHICH HELPED THEM TO INCREASE THE EFFICIENCY OF THE
WORK ACTIVITIES THAT WERE BEING PERFORMED IN DEVELOPING NEW
TECHNOLOGIES.
• WHERE TO USE: PROGRAM EVALUATION AND REVIEW TECHNIQUE IS BEST
SUITED FOR THOSE LARGE AND LONG-TERM PROJECTS WHERE THERE A LOT
OF NON-ROUTINE TASKS WITH EVER-CHANGING STAKES. ALSO, THE
6. CRITICAL PATH TECHNIQUE
• THE CRITICAL PATH TECHNIQUE IS AN AMAZING PROCEDURE THAT IS USED FOR
PROJECTS AND DIFFERENT TASKS TO SCHEDULE AND PLAN THE WORK ACTIVITIES,
ACCORDING TO THE REQUIREMENTS MENTIONED IN THE PROJECT BRIEF. THIS
TECHNIQUE IS ALSO IN CONJUNCTION WITH THE PROGRAM EVALUATION AND
REVIEW TECHNIQUE METHOD MENTIONED ABOVE.
• THIS IS AN INCREDIBLE TECHNIQUE THAT IS USED TO DETECT AND CONFIRM THE
LONGEST PATH FOR THE TASKS TO BE PERFORMED. THIS MEANS THAT THE
ACTIVITIES THAT ARE SUPPOSED TO HAPPEN ON A CERTAIN TRAJECTORY HAVE
THEIR CRITICAL IMPORTANCE HIGHLIGHTED SO THAT THE TASKS CAN BE
INDIVIDUALLY PERFORMED AND NOT IN A SEQUENTIAL FORM.
• THIS CRITICAL IMPORTANCE THAT TECHNIQUE FINDS OUT IS HELPFUL BECAUSE
THEN THE DEVELOPMENT TEAMS CAN CONTROL THE PROJECT BY PLAYING HEAD-
ON AND COMPLETE THE CRITICAL TASKS FIRST. THIS SAVES THEM PRECIOUS TIME
AND THEY CAN COMPLETE THE PROJECT WITH RELATIVE EASE, ONCE THE MORE
IMPORTANT WORK IS OUT OF THE WAY.
• WHERE TO USE: CRITICAL PATH TECHNIQUE IS MORE COMMONLY USED FOR VERY
COMPLEX PROJECTS THAT HAVE A LOT OF DIFFERENT TASKS. AND THE
DEVELOPMENT TEAM HAS NO IDEA WHAT TO COMPLETE FIRST SO THAT THEY CAN
MEET THE DEADLINES AND COMPLETE THE PROJECT IN A GOOD TIME WITHOUT
WASTING PRECIOUS TIME AND ENERGY ON DOING EVERYTHING AT ONCE, WHICH
7. CRITICAL CHAIN TECHNIQUE
• CRITICAL CHAIN TECHNIQUE IS AN INCREDIBLE DERIVATION FROM THE PERT AND
CRITICAL PATH METHODOLOGIES OF PROJECT MANAGEMENT. IT HAS A MORE
RELAXED APPROACH IN TERMS OF TASK ORDERS AND SCHEDULING AND
SUGGESTS THAT THERE SHOULD BE MORE FLEXIBILITY WHILE ALLOCATING
RESOURCING TO DIFFERENT TASKS AND MORE ATTENTION TO ANALYZE HOW THE
WORK TIME IS BEING SPENT BY THE TEAM ON DIFFERENT PROJECT ACTIVITIES.
• THE CCT SUGGESTS THAT THE WORK SHOULD BE DONE ON THE BASIS OF
PRIORITIZATION AND ALSO THE DEPENDENCIES RELATIVE TO THE PROJECT
SHOULD BE ANALYZED PROPERLY WHILE THE TIME SPENT ON DIFFERENT
ACTIVITIES SHOULD BE OPTIMIZED MORE CAREFULLY.
• WHERE TO USE: LIKE THE PROGRAM EVALUATION AND REVIEW TECHNIQUE AND
THE CRITICAL PATH TECHNIQUE, THE CRITICAL CHAIN TECHNIQUE IS USED IN VERY
COMPLEX PROJECTS. AS IT SHINES A MORE PROMINENT LIGHT ON HOW THE TEAM
SPENDS THEIR TIME AND REVENUE, IT IS BEST SUITED FOR PROJECTS WHERE THE
RESOURCES ARE LIMITED.
8. EXTREME PROJECT MANAGEMENT (XPM)
• EXTREME PROJECT MANAGEMENT TECHNIQUE HAS A
MORE LOOSE AND OPTIMISTIC APPROACH WHEN IT
COMES TO PLANNING A PROJECT. IT INSISTS THAT THE
APPROACH SHOULD BE OPEN AND THERE SHOULD BE A
REDUCTION OF FORMALISM IN THE COMPANY’S
CULTURE AND THE BEHAVIOR OF THE MANAGEMENT
SHOULD NOT BE STERN AND DETERMINISTIC.
• WHERE TO USE: XPM TECHNIQUE IS COMMONLY USED
IN LARGE PROJECTS WHERE THE COMPLEXITY AND
UNCERTAINTY ARE HIGH. THIS IS BECAUSE THERE ARE A
LARGE NUMBER OF UNCERTAIN AND UNPREDICTABLE
FACTORS INVOLVED IN THE PROJECT THAT NEED TO BE
9. KANBAN SYSTEM
• THE KANBAN SYSTEM IS THE AGILE METHODOLOGY APPROACH THAT HELPS TO VISUALIZE
THE PROJECT MANAGEMENT WORKFLOWS FROM “START” TO “DONE” STATUS COLUMNS. IT
GIVES YOU THE ABILITY TO MAP THE WORKFLOW AND PUT A LIMIT TO WORK IN PROGRESS.
MANY PEOPLE USE NOTEBOOKS, OR DISPLAY BOARDS ON THE WALL TO MOVE THE CARDS
ALONG THE WORK STAGES, BUT THERE ARE MANY USEFUL KANBAN TOOLS THAT CAN DO
THIS JOB MORE EFFICIENTLY.
• WHILE USING THIS TECHNIQUE OF PROJECT MANAGEMENT, YOU HAVE FULL FREEDOM TO
CUSTOMIZE THE NAME OF THE WORK STAGES THAT BEST FIT YOUR USE CASE. PROJECT
MANAGEMENT TOOLS LIKE NTASKOFFER PRE-BUILT KANBAN BOARD TEMPLATES THAT ARE
EASY TO GET STARTED FROM USERS ACROSS ANY INDUSTRY.
• ANOTHER BENEFIT OF THIS METHODOLOGY IS THAT THERE IS NO NEED TO HAVE A SCRUM
MASTER TO MANAGE THE WORK ASSIGNED, THE WHOLE PROJECT TEAM IS RESPONSIBLE
TO MAKE TIMELY DELIVERIES.
• WHERE TO USE: KANBAN CAN BE USED FOR ANY PROJECT FROM SMALL GIGS TO PERSONAL
TASK LISTS, CONSULTANT BOOKINGS, TO EVEN LARGE-SCALE SOFTWARE DEVELOPMENT
PROJECTS. IT IS MORE USEFUL TO IMPLEMENT IN ANY ORGANIZATION THAT HAS THE LESS
TECHNICAL STAFF, SO IT IS EASY TO ADAPT.
PROJECT MANAGEMENT TOOLS
• 1. ORGANIZING WORKFLOW & PLANNING: THE MOST IMPORTANT
PART AND THE LITERAL START OF ANY PROJECT IS THE PLANNING
STAGE WHICH IS BASICALLY THE CORE OF THE WHOLE PROCESS.
THIS STEP DEFINES WHO A PROJECT WILL BE PERFORMED AND
HOW WILL IT TAKE SHAPE SO THAT THE DESIRED QUALITY CAN BE
ENSURED AND ACHIEVED IN THE FUTURE.
• LARGE COMPANIES TEND TO USE COMPREHENSIVE SOLUTIONS
LIKE MS PROJECT THAT ARE DESIGNED FOR LARGER TEAMS. FOR
SMALLER TEAMS THOUGH, IT’S A DIFFERENT STORY. THERE ARE A
LOT OF DIFFERENT ALTERNATIVES ON THE MARKET WHICH YOU
CAN EQUIP YOURSELF WITH THAT DON’T HAVE ALL OF THE FANCY
FEATURES OF THOSE COMPREHENSIVE SOLUTIONS, BUT THEY
STILL GET THE JOB DONE WITH THEIR PLANNING AND ROADMAP
2. COMMUNICATION
• AS IT IS A MAJOR FACTOR IN ALMOST ALL OF THE TECHNIQUES AND
METHODOLOGIES IN NOT JUST THE PROJECT MANAGEMENT CONTEXT BUT
ALSO IN OTHER FIELDS OF THE MARKET, COMMUNICATION WITHIN A PROJECT
TEAM NEEDS TO BE FREQUENT AND EFFECTIVE. YOU CAN USE EMAILS FOR
ALL OF THE FORMAL STUFF, BUT YOU CAN ALSO USE APPLICATIONS LIKE
SKYPE AND SLACK FOR IMPROMPTU CONVERSATIONSAMONG TEAM MEMBERS
WHICH WILL INCREASE TEAM COLLABORATION RESULTING IN POSITIVE
GROWTH IN PRODUCTIVITY.
• 3. SCHEDULING AND TIME MANAGEMENT: MONEY IS THE TOP FACTOR
IN THE DEVELOPMENT OF A PROJECT OR ANYTHING REALLY. AND
WHILE IN CERTAIN PROJECTS YOU ARE ALLOWED TO SPEND MORE
RESOURCES AND TIME QUITE THOUGHTLESSLY, YOU HAVE TO BE
CAREFUL IN THE OTHER PROJECTS WHERE YOU SPEND THE REVENUE.
• THIS IS BECAUSE OF THE LIMITED RESOURCES AND TIME, THAT THE
PROJECT HAS FROM THE START AND ALSO BECAUSE YOU SHOULD
NOT SPEND VALUABLE RESOURCES ON TEAMS AND EQUIPMENT THAT
MIGHT NOT EVEN BE AVAILABLE WHEN YOU ARE ENVISIONING THE
WORK TO BE DONE. SO, YOU SHOULD ALWAYS SCHEDULE AHEAD AND
CLARIFY/ CONFIRM THE DATES WITH ALL OF THE TEAM MEMBERS
BEFORE SPENDING ALL OF THE REVENUE ON AN EMPTY ROOM FULL
OF RESOURCES BUT NO MANPOWER.
PM UNIT 1.pptx

More Related Content

Similar to PM UNIT 1.pptx

7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectProject Management Solutions
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniquesShivangi Saini
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
vnc.pptx
vnc.pptxvnc.pptx
vnc.pptxPigPug1
 
vnc.pptx
vnc.pptxvnc.pptx
vnc.pptxPigPug1
 
Time management pressent
Time management pressentTime management pressent
Time management pressentiklil fairuz
 
Applying both of waterfall and iterative development
Applying both of waterfall and iterative developmentApplying both of waterfall and iterative development
Applying both of waterfall and iterative developmentDeny Prasetia
 
HISTORY OF PROJECT MANAGEMENT & (1).pptx
HISTORY OF PROJECT MANAGEMENT & (1).pptxHISTORY OF PROJECT MANAGEMENT & (1).pptx
HISTORY OF PROJECT MANAGEMENT & (1).pptxAaleenKttk
 
Project Management.pptx
 Project  Management.pptx Project  Management.pptx
Project Management.pptxHafixFarhan
 
Agile Methodology - Software Engineering
Agile Methodology - Software EngineeringAgile Methodology - Software Engineering
Agile Methodology - Software EngineeringPurvik Rana
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last PlanningThomas Almore
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
Test Planning and Test Estimation Techniques
Test Planning and Test Estimation TechniquesTest Planning and Test Estimation Techniques
Test Planning and Test Estimation TechniquesMurageppa-QA
 
Project Management Presentation material
Project Management Presentation material Project Management Presentation material
Project Management Presentation material Abdel Rahman okasha
 

Similar to PM UNIT 1.pptx (20)

7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery project
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Life Cycle Phases
Life Cycle PhasesLife Cycle Phases
Life Cycle Phases
 
what-is-devops.ppt
what-is-devops.pptwhat-is-devops.ppt
what-is-devops.ppt
 
vnc.pptx
vnc.pptxvnc.pptx
vnc.pptx
 
vnc.pptx
vnc.pptxvnc.pptx
vnc.pptx
 
Time management pressent
Time management pressentTime management pressent
Time management pressent
 
Applying both of waterfall and iterative development
Applying both of waterfall and iterative developmentApplying both of waterfall and iterative development
Applying both of waterfall and iterative development
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
HISTORY OF PROJECT MANAGEMENT & (1).pptx
HISTORY OF PROJECT MANAGEMENT & (1).pptxHISTORY OF PROJECT MANAGEMENT & (1).pptx
HISTORY OF PROJECT MANAGEMENT & (1).pptx
 
Project Management.pptx
 Project  Management.pptx Project  Management.pptx
Project Management.pptx
 
Agile Methodology - Software Engineering
Agile Methodology - Software EngineeringAgile Methodology - Software Engineering
Agile Methodology - Software Engineering
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last Planning
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Test Planning and Test Estimation Techniques
Test Planning and Test Estimation TechniquesTest Planning and Test Estimation Techniques
Test Planning and Test Estimation Techniques
 
Chapter 2
Chapter 2 Chapter 2
Chapter 2
 
Project Management Presentation material
Project Management Presentation material Project Management Presentation material
Project Management Presentation material
 

Recently uploaded

18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 

Recently uploaded (20)

18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 

PM UNIT 1.pptx

  • 2. OBJECTIVES OF PROJECT MANAGEMENT  The Successful development and implementation of all project’s procedure  Productive guidance efficient  The achievement of project’s main goal with in the given constraint  Optimization of the allocated necessary inputs  Production of complete project which follow the client’s exclusive need and objectives
  • 3. IMPORTANCE OF PROJECT MANAGEMENT 1. STRATEGICS MANAGEMENT 2. LEADERSHIP 3. CLEAR FOCUS & OBJECTIVES 4. REALISTIC PROJECT PLANNING 5. QUALITY CONTROL 5. RISK MANAGEMENT 7. ORDERLY PROCESS 8. CONTINUES OVERSIGHT 9. SUBJECT MATTER EXPERTISE 10. MANAGING & LEARNING FROM SUCCESS AND FAILURE
  • 4. PROJECT MANAGEMENT TECHNIQUES • 1. Classic technique: The classical technique in project management is an amazing procedure that includes a proper plan to cover all of the upcoming work activities, which tasks are to be performed, and what should be the chain of application that defines which task to do first, allocating proper resources to the tasks according to their importance, providing and receiving proper feedback from the team which helps in team building and also monitoring the quality of the work done and how are the deadlines being met by the team. • Where to use: The classical procedure is amazing for running projects that are performed by a team that is small in number because a larger team with a complex strategy isn’t required.
  • 5. • 2. Waterfall technique: the waterfall technique is also considered a traditional project management tool because it builds on the upper mentioned classical approach and takes it to a whole new level. • As the title suggests, the waterfall technique is based on your project management tasks to be dealt with in a properly sequential form where the next task is only performed and performed well when the previous task has been completed. Just like a waterfall, the tasks flow to the desired direction smoothly but only if they are completed in a sequential form. • If you are working on a complex project with a lot of dependencies you can easily tackle the management of such kind of project using gantt charts of ntask. Where to use: the waterfall technique is an amazing technique that is used for complex projects that can not be dealt with by the classical approach. This is because of the fact that phasing is required in the development and if you really want to deliver a successful project then a properly rigid work structuring is required.
  • 6. 3. AGILE PROJECT MANAGEMENT
  • 7. • THE AGILE APPROACH IS BASICALLY CRUSHING THE BIG PROJECT STEPS INTO SHORTER SPRINTS THAT HELP IN A DETAILED ANALYSIS OF THE WHOLE PROCESS DURING THE DEVELOPMENT STAGE. THIS DETAILED ANALYSIS HELPS IN EFFECTIVE AND ADAPTIVE PLANNING ACCORDING TO THE NEEDS AND CHANGES REQUIRED IN THE PROJECT AS IT GAINS A PROPER SHAPE. • ALL OF THESE ACTIVITIES RESULT IN A SOLID CONTINUAL IMPROVEMENT DURING THE DEVELOPMENTAL STAGE, AND ALSO THE TEAMS BECOME MORE ORGANIZED AND COLLABORATIVE INCLINED TO PRODUCE THE BEST RESULTS POSSIBLE. • THE AGILE FRAMEWORKS COMMONLY INCLUDE DIFFERENT TECHNIQUES SUCH AS SCRUM, KANBAN, FDD, AND DSDM, ETC. • WHERE TO USE: THE AGILE PROJECT MANAGEMENT TECHNIQUE IS USED IN PROJECTS WHOSE DEVELOPMENT UNRAVELS IN SHORT BUT PRECISE INCREMENTS PERFORMED BY SMALL BUT HIGHLY COLLABORATIVE TEAMS. • AS THE AGILE MANAGEMENT PROCEDURE IS SO FAMOUS THAT, TODAY, THERE ARE A LOT OF PROJECTS AND WORK MANAGEMENT SOFTWARE TOOLS THAT WILL HELP YOU EMBED SCRUM AND AGILE INTO YOUR PROJECT AND HELP YOU COMPLETE THE DEVELOPMENT PROCESS WITH EASE.
  • 8. 4. RATIONAL UNIFIED PROCESS (RUP) • RUP IS AN AMAZING FRAMEWORK THAT WAS SPECIALLY DESIGNED FOR THE SOFTWARE MARKET WHERE THE SOFTWARE DEVELOPMENT TEAMS AND THE PROJECTS THEY WORK ON, CAN BENEFIT FROM THIS FRAMEWORK AND ACHIEVE THE BEST RESULTS POSSIBLE. • RATIONAL UNIFIED PROCESS PRESCRIBES IMPLEMENTING A SEQUENTIAL OR ITERATIVE DEVELOPMENTAL PROCESS LIKE THE WATERFALL TECHNIQUE, BUT WITH A SLIGHT CHANGE AS THE FEEDBACK WHICH IS COLLECTED FOR THE BETTERMENT OF THE PROJECT IN ALL FUTURE ITERATIONS AND MODIFICATIONS, IS TAKEN FROM THE DIRECT PRODUCT USERS. • WHERE TO USE: THE RUP PROCEDURE IS APPLIED TO SOFTWARE DEVELOPMENT PROJECTS WHERE THE WHOLE PROCESS IS BROKEN DOWN INTO PIECES AND ALSO WHERE THE END-USER INPUT AND SATISFACTION IS A KEY FACTORS OF THE PROJECT.
  • 9. 5. PROGRAM EVALUATION AND REVIEW TECHNIQUE
  • 10. • PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) IS AN INCREDIBLE SOFTWARE MANAGEMENT TECHNIQUE THAT IS VERY WIDELY USED IN A LOT OF DIFFERENT AREAS AND INDUSTRIES. THE WAY THIS TECHNIQUE WORKS IS THAT IT FACILITATES THE PROJECT WITH QUITE COMPLEX AND AMAZINGLY DETAILED PLANNED SCENARIOS THAT HELP THE DEVELOPMENT TEAM TO PROPERLY VISUALIZE THE WHOLE PROCESS AND THEIR END RESULTS ON PERT CHARTS. • THE MAIN FEATURE THAT THIS TECHNIQUE HAS IS THAT IT PERFORMS AN EFFECTIVE ANALYSIS OF THE TASKS THAT ARE PERFORMED WITHIN THE PROJECT. THAT HELPS THE TEAM TO KEEP TRACK OF ALL OF THEIR DEVELOPMENTAL ACTIVITIES AND FIX THEIR WEAKNESSES. • THIS TECHNIQUE WAS ORIGINALLY DESIGNED BY THE US NAVY DURING THE COLD WAR ERA WHICH HELPED THEM TO INCREASE THE EFFICIENCY OF THE WORK ACTIVITIES THAT WERE BEING PERFORMED IN DEVELOPING NEW TECHNOLOGIES. • WHERE TO USE: PROGRAM EVALUATION AND REVIEW TECHNIQUE IS BEST SUITED FOR THOSE LARGE AND LONG-TERM PROJECTS WHERE THERE A LOT OF NON-ROUTINE TASKS WITH EVER-CHANGING STAKES. ALSO, THE
  • 11.
  • 12. 6. CRITICAL PATH TECHNIQUE • THE CRITICAL PATH TECHNIQUE IS AN AMAZING PROCEDURE THAT IS USED FOR PROJECTS AND DIFFERENT TASKS TO SCHEDULE AND PLAN THE WORK ACTIVITIES, ACCORDING TO THE REQUIREMENTS MENTIONED IN THE PROJECT BRIEF. THIS TECHNIQUE IS ALSO IN CONJUNCTION WITH THE PROGRAM EVALUATION AND REVIEW TECHNIQUE METHOD MENTIONED ABOVE. • THIS IS AN INCREDIBLE TECHNIQUE THAT IS USED TO DETECT AND CONFIRM THE LONGEST PATH FOR THE TASKS TO BE PERFORMED. THIS MEANS THAT THE ACTIVITIES THAT ARE SUPPOSED TO HAPPEN ON A CERTAIN TRAJECTORY HAVE THEIR CRITICAL IMPORTANCE HIGHLIGHTED SO THAT THE TASKS CAN BE INDIVIDUALLY PERFORMED AND NOT IN A SEQUENTIAL FORM. • THIS CRITICAL IMPORTANCE THAT TECHNIQUE FINDS OUT IS HELPFUL BECAUSE THEN THE DEVELOPMENT TEAMS CAN CONTROL THE PROJECT BY PLAYING HEAD- ON AND COMPLETE THE CRITICAL TASKS FIRST. THIS SAVES THEM PRECIOUS TIME AND THEY CAN COMPLETE THE PROJECT WITH RELATIVE EASE, ONCE THE MORE IMPORTANT WORK IS OUT OF THE WAY. • WHERE TO USE: CRITICAL PATH TECHNIQUE IS MORE COMMONLY USED FOR VERY COMPLEX PROJECTS THAT HAVE A LOT OF DIFFERENT TASKS. AND THE DEVELOPMENT TEAM HAS NO IDEA WHAT TO COMPLETE FIRST SO THAT THEY CAN MEET THE DEADLINES AND COMPLETE THE PROJECT IN A GOOD TIME WITHOUT WASTING PRECIOUS TIME AND ENERGY ON DOING EVERYTHING AT ONCE, WHICH
  • 13.
  • 14. 7. CRITICAL CHAIN TECHNIQUE • CRITICAL CHAIN TECHNIQUE IS AN INCREDIBLE DERIVATION FROM THE PERT AND CRITICAL PATH METHODOLOGIES OF PROJECT MANAGEMENT. IT HAS A MORE RELAXED APPROACH IN TERMS OF TASK ORDERS AND SCHEDULING AND SUGGESTS THAT THERE SHOULD BE MORE FLEXIBILITY WHILE ALLOCATING RESOURCING TO DIFFERENT TASKS AND MORE ATTENTION TO ANALYZE HOW THE WORK TIME IS BEING SPENT BY THE TEAM ON DIFFERENT PROJECT ACTIVITIES. • THE CCT SUGGESTS THAT THE WORK SHOULD BE DONE ON THE BASIS OF PRIORITIZATION AND ALSO THE DEPENDENCIES RELATIVE TO THE PROJECT SHOULD BE ANALYZED PROPERLY WHILE THE TIME SPENT ON DIFFERENT ACTIVITIES SHOULD BE OPTIMIZED MORE CAREFULLY. • WHERE TO USE: LIKE THE PROGRAM EVALUATION AND REVIEW TECHNIQUE AND THE CRITICAL PATH TECHNIQUE, THE CRITICAL CHAIN TECHNIQUE IS USED IN VERY COMPLEX PROJECTS. AS IT SHINES A MORE PROMINENT LIGHT ON HOW THE TEAM SPENDS THEIR TIME AND REVENUE, IT IS BEST SUITED FOR PROJECTS WHERE THE RESOURCES ARE LIMITED.
  • 15. 8. EXTREME PROJECT MANAGEMENT (XPM)
  • 16. • EXTREME PROJECT MANAGEMENT TECHNIQUE HAS A MORE LOOSE AND OPTIMISTIC APPROACH WHEN IT COMES TO PLANNING A PROJECT. IT INSISTS THAT THE APPROACH SHOULD BE OPEN AND THERE SHOULD BE A REDUCTION OF FORMALISM IN THE COMPANY’S CULTURE AND THE BEHAVIOR OF THE MANAGEMENT SHOULD NOT BE STERN AND DETERMINISTIC. • WHERE TO USE: XPM TECHNIQUE IS COMMONLY USED IN LARGE PROJECTS WHERE THE COMPLEXITY AND UNCERTAINTY ARE HIGH. THIS IS BECAUSE THERE ARE A LARGE NUMBER OF UNCERTAIN AND UNPREDICTABLE FACTORS INVOLVED IN THE PROJECT THAT NEED TO BE
  • 17. 9. KANBAN SYSTEM • THE KANBAN SYSTEM IS THE AGILE METHODOLOGY APPROACH THAT HELPS TO VISUALIZE THE PROJECT MANAGEMENT WORKFLOWS FROM “START” TO “DONE” STATUS COLUMNS. IT GIVES YOU THE ABILITY TO MAP THE WORKFLOW AND PUT A LIMIT TO WORK IN PROGRESS. MANY PEOPLE USE NOTEBOOKS, OR DISPLAY BOARDS ON THE WALL TO MOVE THE CARDS ALONG THE WORK STAGES, BUT THERE ARE MANY USEFUL KANBAN TOOLS THAT CAN DO THIS JOB MORE EFFICIENTLY. • WHILE USING THIS TECHNIQUE OF PROJECT MANAGEMENT, YOU HAVE FULL FREEDOM TO CUSTOMIZE THE NAME OF THE WORK STAGES THAT BEST FIT YOUR USE CASE. PROJECT MANAGEMENT TOOLS LIKE NTASKOFFER PRE-BUILT KANBAN BOARD TEMPLATES THAT ARE EASY TO GET STARTED FROM USERS ACROSS ANY INDUSTRY. • ANOTHER BENEFIT OF THIS METHODOLOGY IS THAT THERE IS NO NEED TO HAVE A SCRUM MASTER TO MANAGE THE WORK ASSIGNED, THE WHOLE PROJECT TEAM IS RESPONSIBLE TO MAKE TIMELY DELIVERIES. • WHERE TO USE: KANBAN CAN BE USED FOR ANY PROJECT FROM SMALL GIGS TO PERSONAL TASK LISTS, CONSULTANT BOOKINGS, TO EVEN LARGE-SCALE SOFTWARE DEVELOPMENT PROJECTS. IT IS MORE USEFUL TO IMPLEMENT IN ANY ORGANIZATION THAT HAS THE LESS TECHNICAL STAFF, SO IT IS EASY TO ADAPT.
  • 18. PROJECT MANAGEMENT TOOLS • 1. ORGANIZING WORKFLOW & PLANNING: THE MOST IMPORTANT PART AND THE LITERAL START OF ANY PROJECT IS THE PLANNING STAGE WHICH IS BASICALLY THE CORE OF THE WHOLE PROCESS. THIS STEP DEFINES WHO A PROJECT WILL BE PERFORMED AND HOW WILL IT TAKE SHAPE SO THAT THE DESIRED QUALITY CAN BE ENSURED AND ACHIEVED IN THE FUTURE. • LARGE COMPANIES TEND TO USE COMPREHENSIVE SOLUTIONS LIKE MS PROJECT THAT ARE DESIGNED FOR LARGER TEAMS. FOR SMALLER TEAMS THOUGH, IT’S A DIFFERENT STORY. THERE ARE A LOT OF DIFFERENT ALTERNATIVES ON THE MARKET WHICH YOU CAN EQUIP YOURSELF WITH THAT DON’T HAVE ALL OF THE FANCY FEATURES OF THOSE COMPREHENSIVE SOLUTIONS, BUT THEY STILL GET THE JOB DONE WITH THEIR PLANNING AND ROADMAP
  • 19. 2. COMMUNICATION • AS IT IS A MAJOR FACTOR IN ALMOST ALL OF THE TECHNIQUES AND METHODOLOGIES IN NOT JUST THE PROJECT MANAGEMENT CONTEXT BUT ALSO IN OTHER FIELDS OF THE MARKET, COMMUNICATION WITHIN A PROJECT TEAM NEEDS TO BE FREQUENT AND EFFECTIVE. YOU CAN USE EMAILS FOR ALL OF THE FORMAL STUFF, BUT YOU CAN ALSO USE APPLICATIONS LIKE SKYPE AND SLACK FOR IMPROMPTU CONVERSATIONSAMONG TEAM MEMBERS WHICH WILL INCREASE TEAM COLLABORATION RESULTING IN POSITIVE GROWTH IN PRODUCTIVITY.
  • 20. • 3. SCHEDULING AND TIME MANAGEMENT: MONEY IS THE TOP FACTOR IN THE DEVELOPMENT OF A PROJECT OR ANYTHING REALLY. AND WHILE IN CERTAIN PROJECTS YOU ARE ALLOWED TO SPEND MORE RESOURCES AND TIME QUITE THOUGHTLESSLY, YOU HAVE TO BE CAREFUL IN THE OTHER PROJECTS WHERE YOU SPEND THE REVENUE. • THIS IS BECAUSE OF THE LIMITED RESOURCES AND TIME, THAT THE PROJECT HAS FROM THE START AND ALSO BECAUSE YOU SHOULD NOT SPEND VALUABLE RESOURCES ON TEAMS AND EQUIPMENT THAT MIGHT NOT EVEN BE AVAILABLE WHEN YOU ARE ENVISIONING THE WORK TO BE DONE. SO, YOU SHOULD ALWAYS SCHEDULE AHEAD AND CLARIFY/ CONFIRM THE DATES WITH ALL OF THE TEAM MEMBERS BEFORE SPENDING ALL OF THE REVENUE ON AN EMPTY ROOM FULL OF RESOURCES BUT NO MANPOWER.