This document outlines the technical coordination duties of John Carrick, including:
1. Attending internal meetings like toolbox talks and technical region meetings as well as external meetings with employers and councils.
2. Processing regulatory applications for approvals.
3. Conducting site inspections and providing technical support through responding to requests for information, tracking changes, and liaising with consultants and contractors.
4. Ensuring compliance with standards through auditing drawings and checklists.
1. . P a g e 1
PfPfPfPf----06060606
John Carrick
PORTFOLIOPORTFOLIOPORTFOLIOPORTFOLIO 00006666
((((TECHNICAL COORDINATITECHNICAL COORDINATITECHNICAL COORDINATITECHNICAL COORDINATIONONONON))))
.
2. . P a g e 2
1.1.1.1. INTERNALINTERNALINTERNALINTERNAL MEETINMEETINMEETINMEETINGSGSGSGS
Internal Meetings
• Site Trades weekly forum
• Toolbox Talks
• Technical Region Meetings
• Project Management Weekly Synopsis
• Consultants Forum
• Progress Meetings
3. . P a g e 3
2.2.2.2. EXTERNALEXTERNALEXTERNALEXTERNAL MEETINMEETINMEETINMEETINGSGSGSGS
As part of the Technical Team, working closely with the Architectural Team, I have been attending various meetings
to provide not only Technical presence but also to be on hand for any Technical Queries relating to Design,
Implementation and Construction matters, to formulate alternative solutions to matters arising and to offer a
resolve that is amicable to all parties.
External Meetings
• Employers Agent, Site Progress.
• Council Planning Forum
• Council Strategic Development
4. . P a g e 4
3.3.3.3. REGULATORY APPLICATIONSREGULATORY APPLICATIONSREGULATORY APPLICATIONSREGULATORY APPLICATIONS
Applications;
• NHBC
• Robust Details Registration
• Building Regulations
• Planning Applications
5. . P a g e 5
4.4.4.4.SITE INSPECTIONSSITE INSPECTIONSSITE INSPECTIONSSITE INSPECTIONS
Ply panelling withinPly panelling withinPly panelling withinPly panelling within partitionspartitionspartitionspartitions
4.1a4.1a4.1a4.1a 4.1b4.1b4.1b4.1b 4.1c4.1c4.1c4.1c
Flexible duct to MV installationFlexible duct to MV installationFlexible duct to MV installationFlexible duct to MV installation
4.2a4.2a4.2a4.2a 4.2b4.2b4.2b4.2b 4.2c4.2c4.2c4.2c
6. . P a g e 6
5.5.5.5. TECHNICAL SUPPORTTECHNICAL SUPPORTTECHNICAL SUPPORTTECHNICAL SUPPORT
Office or Site Based TechnicalOffice or Site Based TechnicalOffice or Site Based TechnicalOffice or Site Based Technical Coordination/Construction AdviceCoordination/Construction AdviceCoordination/Construction AdviceCoordination/Construction Advice;;;;
• RespondiRespondiRespondiResponding to RFI’sng to RFI’sng to RFI’sng to RFI’s
• Tracking VO’sTracking VO’sTracking VO’sTracking VO’s
• Liaison regarding Change ControlsLiaison regarding Change ControlsLiaison regarding Change ControlsLiaison regarding Change Controls
• Coordinating with internal DisciplinesCoordinating with internal DisciplinesCoordinating with internal DisciplinesCoordinating with internal Disciplines
• Liaising with external ConsultantsLiaising with external ConsultantsLiaising with external ConsultantsLiaising with external Consultants
• ProProProPro----Active with external contractorsActive with external contractorsActive with external contractorsActive with external contractors
• Part of Site Management TeamPart of Site Management TeamPart of Site Management TeamPart of Site Management Team
• OOOOnnnn----SSSSiiiitetetete TTTTeeeecccchnhnhnhniiiiccccaaaallll aaaannnndddd CCCCoooonnnnssssttttrrrruuuucccctiotiotiotionnnn AAAAddddvvvvisisisisoooorrrr,,,, ttttoooo MMMMaaaannnnaaaaggggememememeeeennnntttt aaaandndndnd TTTTrarararaddddeeeessss
7. . P a g e 7
6.6.6.6. CHECKLISTSCHECKLISTSCHECKLISTSCHECKLISTS
General Auditing of drawingsGeneral Auditing of drawingsGeneral Auditing of drawingsGeneral Auditing of drawings to establish buildto establish buildto establish buildto establish build----ability and conformity, to ensure drawingsability and conformity, to ensure drawingsability and conformity, to ensure drawingsability and conformity, to ensure drawings ffffrrrroooommmm vvvvarararariiiiououououssss
ssssooooururururcccceseseses,,,, reflect the project holistically;reflect the project holistically;reflect the project holistically;reflect the project holistically;
8. . P a g e 8
7.7.7.7. COMPLIANCESCOMPLIANCESCOMPLIANCESCOMPLIANCES
Conducting Technical Audits;Conducting Technical Audits;Conducting Technical Audits;Conducting Technical Audits;
• Compliance checklistsCompliance checklistsCompliance checklistsCompliance checklists
• NHBCNHBCNHBCNHBC
• LTHLTHLTHLTH
• SBDSBDSBDSBD
• CSHCSHCSHCSH