Introduction
The PET Recycling Company NPC t/a PETCO welcomes the invitation from the City of Cape Town
(CoCT) to comment on the deliverables of the City’s 3rd Generation Integrated Waste Management
Plan (IWMP).
We have reviewed the deliverables and we support their inclusion in the drafting of the City’s 3rd
Generation IWMP. We would however like to see additional considerations be included in the
IWMP which we have detailed below.
Integration of the informal sector
The informal sector and waste pickers (also known as reclaimers) will be present in the system. The
IWMP deliverables should make provision for their inclusion. The presence of reclaimers will affect
several aspects of the IWMP:
 Revenue from certain recyclables will be claimed by the reclaimers. The financial viability of
projects should be tested with sensitivity analyses conducted for varying yields on collected
material.
 Drop-off points, split bin systems and any other publicly accessible central points of waste
collection that are not privately managed should be designed with access for reclaimers in
mind.
 Reclaimers are likely to attempt to access the materials whether they are permitted to or
not, so provision should be made for them to do so where possible in a way that is safe and
minimizes negative environmental and cleanliness impacts.
 Material Recovery Facilities (MRFs) and other central collection/sorting locations should be
designed to allow reclaimers to sell material to them.
PETCO is in the position to assist the City directly in this regard and can draw on our experience and
existing programmes.
Page 2 of 4
Inclusion of Previously Disadvantaged Individuals (PDIs)
We request that emphasis be placed on promoting the inclusion of PDIs in the recycling and waste
management economy by creating, or linking to existing, policies that make provision for PDIs to be
given the opportunity to manage drop-off points, collection systems, MRFs etc.
Organisations such as ourselves, groundWorks, the International Labor Organization (ILO) and
Women in Informal Employment: Globalizing and Organizing (WEIGO) can assist in this regard.
End-use markets
The collection of material is inextricably tied to the end-use markets for that material. A lack of
end-use markets will result in material being stored and/or sent to landfill.
The IWMP should address end-use markets as thoroughly as possible, with measures such as:
 Identifying markets and buyers for the material.
 Seeking input from the businesses and NGOs on how much material and what type of
material can be absorbed.
 Clarify assumptions of end-use market off-take, allowing bodies such as PETCO to inform
the CoCT when the underlying assumptions have changed.
 Make provision for periodic review of the underlying assumptions of end-use markets.
 Establishing / linking to the CoCT Green Procurement programmes to develop end-use
markets for recycled products.
 Providing incentives (such as reduction on waste management fees/rates) for organisations
that purchase locally-produced recycled products.
 Propose additional end-use market incentives or support.
Sharing data, best practices and lessons learnt
The IWMP should make provision for sharing data, best practices and lessons learnt from
implementing these projects and programmes. There will be a wealth of information that will assist
many parties in making these and other programmes a success.
We would like to see such information sharing related to:
 Public awareness campaigns: measuring and evaluating the effectiveness of campaigns.
 Split bin system: Data on participation rates, effective marketing methods, waste profiles
etc.
Page 3 of 4
 Ringfenced financial system: Data will assist in establish full-cost account baselines for waste
management.
 Job creation statistics should also be measured.
 Waste to energy performance, viability and integration.
Public-Private Partnerships (PPP) & Extended Producer Responsibility (EPR) funding
PETCO would like to see provision made for (Extended Producer Responsibility) EPR organisations
to be able to make financial contributions to projects as a mechanism for meeting their EPR
obligations and in so doing, claim benefits of waste reduction, infrastructure spend and job creation
from those contributions.
Where funding is collected by the Government on waste material e.g. plastic bags and soon, tyres,
the IWMP should have mechanisms in place to apply for funding from Government for IWMP
projects, where projects manage that product waste.
We also believe that off balance-sheet agreements may provide the opportunity for more flexible
arrangements that assist faster roll-out of certain types of projects. For example, providing access
to land for buyback centers to be established by the private sector may be quicker /easier for the
City than entering a joint-venture partnership.
With that said, we believe that there should be a wide variety of PPP models available to be
employed, and it would help if the City could identify these along with the roles/expectations and
requirements of participating parties. This would help us in seeking out the relevant partnerships
that will readily fit within the framework provided by the City. For example, a model that calls for
participants to provide Personal Protective Equipment, cages or other equipment would be
welcomed by PETCO.
Material Recovery Facilities (MRFs)
Where the City develops MRFs, small MRFs or even Plastic Recovery Facilities (PRFs), we request
that the City considers the possibility of separating Plastics fractions into their individual material
streams and not grouping them as a singular material type. We recommend consulting with
industry for input on materials being sought.
In conjunction with industry, there may also be options for financial support from PETCO and
others for equipment e.g. infra-red sorting.
Organisations such as PETCO should also be consulted to provide input into the design
requirements for such facilities.
Page 4 of 4
Waste-to-Energy
The plans for waste to energy should be carefully planned and viability based on recycling non-
recycled fractions, as well as to cap total installed capacity in the CoCT to reasonable levels so as
not to affect the viability of recycling streams.
Waste to energy projects will face several challenges, some of which we have highlighted in our
discussion document which can be found at www.petco.co.za/energyrecovery. We request that the
IWMP requires the Transaction Advisor to address these challenges.
Awareness
PETCO suggest that the City lists the programmes that are currently in place for public education
and awareness. Additionally, there should be clarity in how this links in with the national awareness
campaigns that are being rolled out by the Department of Environmental Affairs.
We also would like to see detail about the Monitoring and Evaluation that will be put in place e.g.
research to track behavior change or increased awareness resulting from awareness campaigns.
Descriptions of the plan for dealing with public comments and feedback would be most valuable, as
would identification of the partners the City will be working with to raise awareness e.g. zoo’s,
aquaria or prominent NGOs.
Share implementation plans and updates on progress
PETCO requests that IWMP projects and programmes implementation plans be shared to allow
organisations such as ours to identify where we can leverage partnerships which assist the CoCT
and ourselves to meet common objectives.

More Related Content

Viewers also liked

The 4 visa requirements for eb 5 visa
The 4 visa requirements for eb 5 visaThe 4 visa requirements for eb 5 visa
The 4 visa requirements for eb 5 visa
Wildes Weinberg
 
Презентация 1.37 - Мероприятия по обеспечению доступа инвалидов и маломобильн...
Презентация 1.37 - Мероприятия по обеспечению доступа инвалидов и маломобильн...Презентация 1.37 - Мероприятия по обеспечению доступа инвалидов и маломобильн...
Презентация 1.37 - Мероприятия по обеспечению доступа инвалидов и маломобильн...
Igor Golovin
 
How is the new Express Entry system doing?
How is the new Express Entry system doing?How is the new Express Entry system doing?
How is the new Express Entry system doing?
Nachman Phulwani Zimovcak (NPZ) Law Group, P.C.
 
Experiential Stats 2016
Experiential Stats 2016Experiential Stats 2016
Experiential Stats 2016
Brian Dooley
 
En Jan petit
En Jan petitEn Jan petit
En Jan petit
teresa.hdzmorlans
 
Quality Management in E-learning
Quality Management in E-learningQuality Management in E-learning
Quality Management in E-learning
CommLab India – Rapid eLearning Solutions
 
LCR & The EB-5 Investment Visa | The Most Desired Investment Program in the W...
LCR & The EB-5 Investment Visa | The Most Desired Investment Program in the W...LCR & The EB-5 Investment Visa | The Most Desired Investment Program in the W...
LCR & The EB-5 Investment Visa | The Most Desired Investment Program in the W...
Rogelio Caceres
 
Microcontroleur arduino uno
Microcontroleur arduino unoMicrocontroleur arduino uno
Microcontroleur arduino uno
byorn TANDU
 

Viewers also liked (8)

The 4 visa requirements for eb 5 visa
The 4 visa requirements for eb 5 visaThe 4 visa requirements for eb 5 visa
The 4 visa requirements for eb 5 visa
 
Презентация 1.37 - Мероприятия по обеспечению доступа инвалидов и маломобильн...
Презентация 1.37 - Мероприятия по обеспечению доступа инвалидов и маломобильн...Презентация 1.37 - Мероприятия по обеспечению доступа инвалидов и маломобильн...
Презентация 1.37 - Мероприятия по обеспечению доступа инвалидов и маломобильн...
 
How is the new Express Entry system doing?
How is the new Express Entry system doing?How is the new Express Entry system doing?
How is the new Express Entry system doing?
 
Experiential Stats 2016
Experiential Stats 2016Experiential Stats 2016
Experiential Stats 2016
 
En Jan petit
En Jan petitEn Jan petit
En Jan petit
 
Quality Management in E-learning
Quality Management in E-learningQuality Management in E-learning
Quality Management in E-learning
 
LCR & The EB-5 Investment Visa | The Most Desired Investment Program in the W...
LCR & The EB-5 Investment Visa | The Most Desired Investment Program in the W...LCR & The EB-5 Investment Visa | The Most Desired Investment Program in the W...
LCR & The EB-5 Investment Visa | The Most Desired Investment Program in the W...
 
Microcontroleur arduino uno
Microcontroleur arduino unoMicrocontroleur arduino uno
Microcontroleur arduino uno
 

Similar to PETCO-Comments-on-CoCT-3rd-Gen-IWMP-Deliverables-31-October-2016

Extended producer responsibility (epr)
Extended producer responsibility (epr)Extended producer responsibility (epr)
Extended producer responsibility (epr)
jackass18
 
Alejandro saenzcore digital artifact (resource)_june 23 2015
Alejandro saenzcore digital artifact (resource)_june 23 2015Alejandro saenzcore digital artifact (resource)_june 23 2015
Alejandro saenzcore digital artifact (resource)_june 23 2015
Alejandro S. Core
 
Financing for Development
Financing for DevelopmentFinancing for Development
Financing for Development
Patsy Arana Tagle
 
Center for Clean Air Policy- Byproduct Synergy
Center for Clean Air Policy- Byproduct SynergyCenter for Clean Air Policy- Byproduct Synergy
Center for Clean Air Policy- Byproduct Synergy
Obama White House
 
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...Medhavi Sharma
 
Rethinking Reuse Conference report
Rethinking Reuse Conference reportRethinking Reuse Conference report
Rethinking Reuse Conference reportAndrea Pellegram
 
UNEP SP PSS Webinar MJones
UNEP SP PSS Webinar MJonesUNEP SP PSS Webinar MJones
UNEP SP PSS Webinar MJonesMervyn Jones
 
The Climate Compass: 10th Edition
The Climate Compass: 10th EditionThe Climate Compass: 10th Edition
The Climate Compass: 10th Edition
PakistanEnvironmentT
 
Overseeing Fairness in the Marketplace_2015
Overseeing Fairness in the Marketplace_2015Overseeing Fairness in the Marketplace_2015
Overseeing Fairness in the Marketplace_2015Jodi Tomchyshyn London
 
Enhancing transparency in the land sector under the Paris Agreement: Bringing...
Enhancing transparency in the land sector under the Paris Agreement: Bringing...Enhancing transparency in the land sector under the Paris Agreement: Bringing...
Enhancing transparency in the land sector under the Paris Agreement: Bringing...
CIFOR-ICRAF
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
GIB2015_Closing Financing Gap in Resilient Infrastructure_ArikanGIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
GIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
Global Infrastructure Basel Foundation
 
Public Private Partnerships at CIAT
Public Private Partnerships at CIATPublic Private Partnerships at CIAT
Public Private Partnerships at CIAT
CIAT
 
Interreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIGInterreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIG
CENTA3
 
LS na China
LS na ChinaLS na China
LS na China
leonardo2710
 
LS na China
LS na ChinaLS na China
LS na China
leonardo2710
 
Advocacy Plan and Application to Framework
Advocacy Plan and Application to Framework Advocacy Plan and Application to Framework
Advocacy Plan and Application to Framework Faisal Hassan, MPP
 
Privatisation
PrivatisationPrivatisation
PrivatisationYong Feng
 
A framework for action at rio+20 and beyond
A framework for action at rio+20 and beyondA framework for action at rio+20 and beyond
A framework for action at rio+20 and beyondPim Piepers
 
EPR Summit IV Overview
EPR Summit IV OverviewEPR Summit IV Overview
EPR Summit IV Overview
future500
 

Similar to PETCO-Comments-on-CoCT-3rd-Gen-IWMP-Deliverables-31-October-2016 (20)

Extended producer responsibility (epr)
Extended producer responsibility (epr)Extended producer responsibility (epr)
Extended producer responsibility (epr)
 
Alejandro saenzcore digital artifact (resource)_june 23 2015
Alejandro saenzcore digital artifact (resource)_june 23 2015Alejandro saenzcore digital artifact (resource)_june 23 2015
Alejandro saenzcore digital artifact (resource)_june 23 2015
 
Financing for Development
Financing for DevelopmentFinancing for Development
Financing for Development
 
Center for Clean Air Policy- Byproduct Synergy
Center for Clean Air Policy- Byproduct SynergyCenter for Clean Air Policy- Byproduct Synergy
Center for Clean Air Policy- Byproduct Synergy
 
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...
 
Rethinking Reuse Conference report
Rethinking Reuse Conference reportRethinking Reuse Conference report
Rethinking Reuse Conference report
 
UNEP SP PSS Webinar MJones
UNEP SP PSS Webinar MJonesUNEP SP PSS Webinar MJones
UNEP SP PSS Webinar MJones
 
The Climate Compass: 10th Edition
The Climate Compass: 10th EditionThe Climate Compass: 10th Edition
The Climate Compass: 10th Edition
 
Overseeing Fairness in the Marketplace_2015
Overseeing Fairness in the Marketplace_2015Overseeing Fairness in the Marketplace_2015
Overseeing Fairness in the Marketplace_2015
 
Enhancing transparency in the land sector under the Paris Agreement: Bringing...
Enhancing transparency in the land sector under the Paris Agreement: Bringing...Enhancing transparency in the land sector under the Paris Agreement: Bringing...
Enhancing transparency in the land sector under the Paris Agreement: Bringing...
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
GIB2015_Closing Financing Gap in Resilient Infrastructure_ArikanGIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
GIB2015_Closing Financing Gap in Resilient Infrastructure_Arikan
 
001441
001441001441
001441
 
Public Private Partnerships at CIAT
Public Private Partnerships at CIATPublic Private Partnerships at CIAT
Public Private Partnerships at CIAT
 
Interreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIGInterreg Sudoe TWIST - Launching interest group EIUIG
Interreg Sudoe TWIST - Launching interest group EIUIG
 
LS na China
LS na ChinaLS na China
LS na China
 
LS na China
LS na ChinaLS na China
LS na China
 
Advocacy Plan and Application to Framework
Advocacy Plan and Application to Framework Advocacy Plan and Application to Framework
Advocacy Plan and Application to Framework
 
Privatisation
PrivatisationPrivatisation
Privatisation
 
A framework for action at rio+20 and beyond
A framework for action at rio+20 and beyondA framework for action at rio+20 and beyond
A framework for action at rio+20 and beyond
 
EPR Summit IV Overview
EPR Summit IV OverviewEPR Summit IV Overview
EPR Summit IV Overview
 

PETCO-Comments-on-CoCT-3rd-Gen-IWMP-Deliverables-31-October-2016

  • 1. CITY OF CAPE TOWN 3RD GENERATION INTEGRATED WASTE MANAGEMENT PLAN DELIVERABLES PECTO NPC COMMENT 31 OCTOBER 2016 Introduction The PET Recycling Company NPC t/a PETCO welcomes the invitation from the City of Cape Town (CoCT) to comment on the deliverables of the City’s 3rd Generation Integrated Waste Management Plan (IWMP). We have reviewed the deliverables and we support their inclusion in the drafting of the City’s 3rd Generation IWMP. We would however like to see additional considerations be included in the IWMP which we have detailed below. Integration of the informal sector The informal sector and waste pickers (also known as reclaimers) will be present in the system. The IWMP deliverables should make provision for their inclusion. The presence of reclaimers will affect several aspects of the IWMP:  Revenue from certain recyclables will be claimed by the reclaimers. The financial viability of projects should be tested with sensitivity analyses conducted for varying yields on collected material.  Drop-off points, split bin systems and any other publicly accessible central points of waste collection that are not privately managed should be designed with access for reclaimers in mind.  Reclaimers are likely to attempt to access the materials whether they are permitted to or not, so provision should be made for them to do so where possible in a way that is safe and minimizes negative environmental and cleanliness impacts.  Material Recovery Facilities (MRFs) and other central collection/sorting locations should be designed to allow reclaimers to sell material to them. PETCO is in the position to assist the City directly in this regard and can draw on our experience and existing programmes.
  • 2. Page 2 of 4 Inclusion of Previously Disadvantaged Individuals (PDIs) We request that emphasis be placed on promoting the inclusion of PDIs in the recycling and waste management economy by creating, or linking to existing, policies that make provision for PDIs to be given the opportunity to manage drop-off points, collection systems, MRFs etc. Organisations such as ourselves, groundWorks, the International Labor Organization (ILO) and Women in Informal Employment: Globalizing and Organizing (WEIGO) can assist in this regard. End-use markets The collection of material is inextricably tied to the end-use markets for that material. A lack of end-use markets will result in material being stored and/or sent to landfill. The IWMP should address end-use markets as thoroughly as possible, with measures such as:  Identifying markets and buyers for the material.  Seeking input from the businesses and NGOs on how much material and what type of material can be absorbed.  Clarify assumptions of end-use market off-take, allowing bodies such as PETCO to inform the CoCT when the underlying assumptions have changed.  Make provision for periodic review of the underlying assumptions of end-use markets.  Establishing / linking to the CoCT Green Procurement programmes to develop end-use markets for recycled products.  Providing incentives (such as reduction on waste management fees/rates) for organisations that purchase locally-produced recycled products.  Propose additional end-use market incentives or support. Sharing data, best practices and lessons learnt The IWMP should make provision for sharing data, best practices and lessons learnt from implementing these projects and programmes. There will be a wealth of information that will assist many parties in making these and other programmes a success. We would like to see such information sharing related to:  Public awareness campaigns: measuring and evaluating the effectiveness of campaigns.  Split bin system: Data on participation rates, effective marketing methods, waste profiles etc.
  • 3. Page 3 of 4  Ringfenced financial system: Data will assist in establish full-cost account baselines for waste management.  Job creation statistics should also be measured.  Waste to energy performance, viability and integration. Public-Private Partnerships (PPP) & Extended Producer Responsibility (EPR) funding PETCO would like to see provision made for (Extended Producer Responsibility) EPR organisations to be able to make financial contributions to projects as a mechanism for meeting their EPR obligations and in so doing, claim benefits of waste reduction, infrastructure spend and job creation from those contributions. Where funding is collected by the Government on waste material e.g. plastic bags and soon, tyres, the IWMP should have mechanisms in place to apply for funding from Government for IWMP projects, where projects manage that product waste. We also believe that off balance-sheet agreements may provide the opportunity for more flexible arrangements that assist faster roll-out of certain types of projects. For example, providing access to land for buyback centers to be established by the private sector may be quicker /easier for the City than entering a joint-venture partnership. With that said, we believe that there should be a wide variety of PPP models available to be employed, and it would help if the City could identify these along with the roles/expectations and requirements of participating parties. This would help us in seeking out the relevant partnerships that will readily fit within the framework provided by the City. For example, a model that calls for participants to provide Personal Protective Equipment, cages or other equipment would be welcomed by PETCO. Material Recovery Facilities (MRFs) Where the City develops MRFs, small MRFs or even Plastic Recovery Facilities (PRFs), we request that the City considers the possibility of separating Plastics fractions into their individual material streams and not grouping them as a singular material type. We recommend consulting with industry for input on materials being sought. In conjunction with industry, there may also be options for financial support from PETCO and others for equipment e.g. infra-red sorting. Organisations such as PETCO should also be consulted to provide input into the design requirements for such facilities.
  • 4. Page 4 of 4 Waste-to-Energy The plans for waste to energy should be carefully planned and viability based on recycling non- recycled fractions, as well as to cap total installed capacity in the CoCT to reasonable levels so as not to affect the viability of recycling streams. Waste to energy projects will face several challenges, some of which we have highlighted in our discussion document which can be found at www.petco.co.za/energyrecovery. We request that the IWMP requires the Transaction Advisor to address these challenges. Awareness PETCO suggest that the City lists the programmes that are currently in place for public education and awareness. Additionally, there should be clarity in how this links in with the national awareness campaigns that are being rolled out by the Department of Environmental Affairs. We also would like to see detail about the Monitoring and Evaluation that will be put in place e.g. research to track behavior change or increased awareness resulting from awareness campaigns. Descriptions of the plan for dealing with public comments and feedback would be most valuable, as would identification of the partners the City will be working with to raise awareness e.g. zoo’s, aquaria or prominent NGOs. Share implementation plans and updates on progress PETCO requests that IWMP projects and programmes implementation plans be shared to allow organisations such as ours to identify where we can leverage partnerships which assist the CoCT and ourselves to meet common objectives.