Personal Trainer Case Study ISY00243 2016 Page 1
CASE STUDY PART 1
INTRODUCTION
Personal Trainer, Inc, owns and operates fitness centres in
various cities in Victoria and
southern NSW. The fitness centres have done well, and the
company is planning an
expansion by opening a new “supercentre” in Brisbane,
Queensland.
BACKGROUND
Kate Umi, CEO, heads Personal Trainer’s management team.
Three managers report to her
at the firm’s Melbourne headquarters: Janet McDonald,
manager, finance; Tai Tranh,
manager, sales and marketing; and Ryan Curry, manager,
operations. The managers who
run the 12 existing centres all report to Ryan. Kate wants the
new supercentre in Brisbane to
emphasis a wide variety of personal services and special
programs for members. If the
supercentre approach is successful, it will become the model for
Personal Trainer’s future
growth. Kate personally selected Jason Lewis, a manager with
three years of fitness centre
experience, to run the new facility.
The new supercentre will feature a large exercise area with
state-of-the-art equipment, a
swimming pool, a sporting goods shop, a health food store, and
a snack bar – with healthy
snacks, of course! In addition, the centre will offer child care
with special programs for
various ages, and a computer café. Kate also wants members to
have online access to
customised training programs and progress reports.
The Personal Trainer business currently uses AllAccounts, a
popular accounting package, to
manage its receivables, payables and general ledger.
Membership lists and word processing
are handled with Microsoft Office products Excel and Word.
Kate believes the new
supercentre will require additional data management capability,
and she decided to hire
Patterson and Wilder, an IT consulting firm, to help Personal
Trainer, Inc, to develop an
information system for the new operation. The firm assigned
Sarah Parkly, an experienced
consultant, to work with the Personal Trainer team. Sarah’s first
task was to learn more
about business operations at the new centre, so she requested a
meeting with Jason. After
introducing themselves, there was a discussion about the new
information system. The
transcript of their meeting is on the next page.
Note:
This case study is to be used throughout this Session, to answer
questions in set activities, which
will be compiled into a report. Part A of this report, an “Initial
Investigation” is to be submitted at
the end of Week 6. The final report (including your Part A
adjusted after marker feedback) is to be
submitted in Week 12.
You should use all relevant parts of the case study to inform
your answers for the report.
Personal Trainer Case Study ISY00243 2016 Page 2
ACTIVITY 1
1. Use the background information to create a short summary
(one short paragraph)
about the “Personal Trainer” business.
2. Create an organisation chart for the Personal Trainer
business.
3. Use the information above to describe the area of the
organisation under study (i.e.
the business functions that will be handled by the new
information system).
4. Add the background information, organisation chart, and
business functions to your
Report document in Part A: Initial Investigation.
Sarah: Tell me about your plans for the new operation. I’m
especially interested in what kind of
information management you’ll need.
Jason: Kate thinks that we’ll need more information support
because of the size and complexity
of the new operation. To tell the truth, I’m not so sure. We’ve
had no problems with
AllAccounts at the other centres and I don’t really want to
reinvent the wheel.
Sarah: Maybe we should start by looking at the similarities –
and the differences – between the
new centre and the existing ones.
Jason: OK, let’s do that. First of all, we offer the same basic
services everywhere. That includes
the exercise equipment, a pool, and in most centres, a snack bar.
Some centres also sell
sporting goods, and one offers child care – but not child-fitness
programmes. It’s true that
we’ve never put all this together under one roof. And, I admit,
we’ve never offered online
access. To be honest, I’m not absolutely sure what Kate has in
mind when she talks about
24/7 Web-based access. One more feature – we plan to set up
two levels of membership
– let’s call them silver and gold for now. Silver members can
use all the basic services, but
will pay additional fees for some special programs, such as
child fitness. Gold members
will have unlimited use of all services.
Sarah: So with all this going on, wouldn’t an overall system
make your job easier?
Jason: Yes, but I don’t know where to start.
Sarah: Jason, that’s why I’m here. I’ll work with you and the
rest of the team to come up with a
solution that supports your business.
Jason: Sounds good to me. When can we start?
Sarah: Let’s get together first thing tomorrow. Bring along an
organisation chart and think about
how you plan to run the new facility. We’ll try to build a model
of the new operation so
we can identify the system capabilities and the business
benefits.
Personal Trainer Case Study ISY00243 2016 Page 3
CASE STUDY PART 2
At their initial meeting, Sarah and Jason discussed some initial
steps in planning an
information system for the new facility. The next morning, they
worked together on a
business profile, and talked together about various types of
information systems that would
provide the best support for the supercentre’s operations.
Sarah starts creating a System Vision Document for the new
Personal Trainer system, so she
can use this to define a vision for the new system.
ACTIVITY 2
1. Either by yourself or with another class member, brainstorm
all the functions that
the Personal Trainer system might fulfil. Keep it at a very high
level.
2. Prepare a draft System Vision Document for the new Personal
Trainer system. This
System Vision Document will be revised when you find out
more about the
requirements for the system. An example System Vision
Document can be seen in
Figure 1.8 of your textbook (Figure 1.5 in the 6th ed).
3. Add your System Vision Document to your Report document
in Part A: Initial
Investigation.
CASE STUDY PART 3
In this section, you are acting as a student intern at Personal
Trainer, working on the new
Information System. Sarah has asked you to help her plan the
new information system
project, as she knows that you have studied project management
tools and techniques.
Specifically, she wants you to get ready for the next set of
systems development tasks,
which will be requirements modelling for the new system.
Yesterday, Sarah called you into
her office to discuss the specific tasks she wants you to
perform. After meeting with Sarah,
you sit down and review your notes. She wants you to treat the
set of tasks as a project, and
to use project management skills to plan the tasks.
Here is what she suggested to you to you as a work breakdown
structure, including the
duration she estimated for each task:
x First, you need to meet with fitness centre managers at other
Personal Trainer
locations (5 days);
x You can then conduct a series of interviews (5 days);
Personal Trainer Case Study ISY00243 2016 Page 4
x When the interviews are complete, you can review company
records (3 days) while
observing business operations (8 days);
x When you have reviewed the records and observed business
operations, you can
o analyse the AllAccounts accounting software (5 days) and
o study a sample of sales and billing transactions (2 days);
x After completing your study, prepare a report for Sarah (1
day).
ACTIVITY 3
1. Create a table, listing all tasks separately, with their
duration;
2. Identify all dependencies, and indicate what predecessor
tasks are required;
3. Construct a Gantt chart in Microsoft Project or other project
management software;
4. Identify the PERT/CPM chart in the software, and identify
the critical path;
5. Determine the overall duration of the project;
6. Take clear screenshots of the Gantt chart and PERT/CPM
chart and paste into your
Report document in Part A: Initial Investigation under Project
Management.
7. Include the overall duration and critical path in your report.
CASE STUDY PART 4
As an analyst working on the development of the new system, it
is Sarah’s role to ensure
that the project is feasible. Some of the reasons that projects
fail are: incomplete
requirements, lack of executive support, lack of technical
support, poor project planning and
lack of required resources. At this stage, Sarah decides to do an
initial project feasibility
analysis, to see whether Personal Trainer should continue with
its plan for the new
information system.
ACTIVITY 4
1. What are the risks associated with this project? Create a list
of up to 10 risks and
their likelihood of happening (see Study Guide topic 4, activity
4.6 for an example of
how this should be set out).
2. Define the anticipated benefits of the new system. This
should include both tangible
and intangible benefits. Wherever possible, translate the
intangible benefits into
anticipated tangible benefits.
Personal Trainer Case Study ISY00243 2016 Page 5
3. Define the expected costs of the new system. Look at the
examples given in
workshop activities for some examples of expense categories. It
is ok to give
estimates at this point.
4. Use two or more cost-benefit analysis techniques to decide
whether to proceed
with the project.
5. Create a new section in Part A of your report: Risk and Cost
Benefit Analysis. Insert
your work from above, and give a clear indication as to whether
it is feasible to
continue with the project.
6. Does the proposed system present a strong business case?
Why or why not? Include
a recommendation as to whether the system should proceed, as
the final part of
your preliminary report. The Preliminary Investigation part of
your Report can now
be submitted.
CASE STUDY PART 5
Sarah has given you a list of tasks to do, which include
interviewing staff at other Personal
Trainer locations. This is part of the investigation, where fact-
finding is conducted to find
out more about the requirements for the proposed system.
ACTIVITY 5
1. What fact-finding techniques, apart from interviews, would
you recommend to
Sarah, to find out the requirements for the new system?
2. Identify a staff member (make up their name) and their job
role at a Personal Trainer
location.
3. Develop a list of questions for an interview with this staff
member. Identify the time
anticipated for the interview. Review your topic on creating
interview questions, and
make sure you include suitable question types.
4. Include the interview plan in the Appendices for your Report.
5. Include the recommendations for other fact-finding
techniques, in your Report.
Personal Trainer Case Study ISY00243 2016 Page 6
CASE STUDY PART 6
During requirements modelling for the new system, Sarah
Parkly met with several fitness
centre managers at Personal Trainer locations. She conducted a
series of interviews,
reviewed company records, observed business operations,
analysed the AllAccounts
accounting software, and studied a sample of sales and billing
transactions. Sarah’s
objective was to develop a list of system requirements for the
proposed system. She found
the following:
x A typical centre has 300-500 members, with two membership
levels: full and limited.
Full members have access to all activities. Limited members are
restricted to
activities they have selected, but they can participate in other
activities by paying an
additional usage fee. All members have credit privileges. Credit
purchases for
merchandise and services are currently recorded on a paper
credit slip, which is
signed by the member, to be invoiced at the end of the month.
x At the end of each day, cash/EFTPOS sales and credit charge
amounts are entered
into the AllAccounts accounting software, which runs on an
office computer at each
location. Daily cash takings are deposited in a local bank in the
corporate Personal
Trainer account. The AllAccounts program produces a daily
activity report with a
listing of all sales transactions.
x At the end of the month, the local manager uses AllAccounts
to transmit an accounts
receivable summary to the Personal Trainer head office in
Melbourne, where
member statements are prepared and mailed. Members mail their
payments to the
Personal Trainer head office, where the payment is applied to
the member account.
x The AllAccounts program stores basic member information,
but does not include
information about member preferences, activities and history.
x Currently the AllAccounts program produces one local report
(the daily activity
report) and three reports that are prepared at the head office
location: a monthly
member sales report, an exception report for inactive members
and late payers, and
a quarterly profit-and-loss report that shows a breakdown of
revenue and costs for
each separate activity.
During the interviews, Sarah received a number of “wish list”
comments from managers and
staff members. For example, managers want more analytical
features so they can spot
trends and launch special promotions and temporary discounts.
Managers also want better
information about the profitability of specific business
activities at their centres, instead of
bottom-line totals.
Several managers want to offer computerised activity and
wellness logs, fitness coaching for
seniors, and various social networking options, including email
communications, fitness
blogs, Facebook and Twitter posts. Staff members want better
ways to handle information
Personal Trainer Case Study ISY00243 2016 Page 7
about part-time instructors and trainers, and several people
suggested using scannable ID
cards to capture data.
ACTIVITY 6
1. Write down a list of the main functions needed to be handled
by the new system.
2. What are the roles that will be interacting with the system?
3. Using all the information that you know about the Personal
Trainer business so far,
create a use-case diagram for the new system.
4. Select four use-cases and write a brief use-case description
for them.
5. Pick one of these use-cases and write a full use-case
description for it. Use an activity
diagram in the full description.
6. Include the following in your report:
x the use-case diagram;
x the brief use-case descriptions;
x the full use-case description, including your activity diagram.
CASE STUDY PART 7
Sarah has been preparing the System Requirement report for
Kate Umi, Personal Trainer’s
CEO. From her investigation so far, Sarah is leaning towards a
recommendation for either in-
house development or outsourcing options for the new system.
She does not feel that a
commercial software package would meet Personal Trainer’s
needs.
Based on her research, Sarah felt that it would be premature to
select a development
strategy at this time. Instead, she recommended to Kate that an
in-house team should
develop a design prototype, using a relational database as a
model. Sarah said that the
prototype would have two main objectives:
x it would represent a user-approved model of the new system,
and
x it would identify all system entities and the relationships
between them.
Sarah explained that it would be better to design the basic
system first, and then address
other issues, including Web enhancements and implementation
options. She proposed a
three-step plan:
1. data design
2. user interface design, and
3. application architecture.
Personal Trainer Case Study ISY00243 2016 Page 8
She explained that systems analysts refer to this as the system
design phase of a
development project. Kate agreed with Sarah’s recommendation,
and asked her to go
forward with the plan.
ACTIVITY 7
1. Review the Personal Trainer fact-finding summary and all
other information you
have about the required system.
2. Draw an ERD with crows-foot cardinality notation. Assume
that system entities
include members, classes, merchandise, and fitness instructors
(at minimum).
3. Design tables – making sure each table only refers to one
“thing”. As you create the
database design, identify primary and foreign keys by
underlining primary keys, and
making foreign keys italic.
4. If you add primary keys which use codes – for example a
code for the instructorID,
then identify the format of these codes.
5. Create suitable sample data to populate the fields for at least
three records in each
table.
6. Include the following in your report:
x The ERD you have completed;
x The database design (schemas);
x Formats of codes used;
x Sample data for each table.
CASE STUDY 8
Sarah is now making sure that she has sufficient models to
understand the new system. In
reviewing the models she has (use-cases diagrams, including
activity diagrams) she realised
that she had not included a system sequence diagram for any of
the use cases.
After creating this, she is ready to review the options for a new
system, and make a
recommendation to Kate Umi.
ACTIVITY 8
1. Create a system sequence diagram for one of the use cases
identified in Activity 6.
2. Add this system sequence diagram to your report in the
appropriate area.
3. Search online for potential commercial software packages for
Personal Trainer.
Identify two packages, and compare their features, and their
suitability to be used as
the new system.
Personal Trainer Case Study ISY00243 2016 Page 9
4. Present four options for the new system in your report. One
of these must be in-
house development, and two of the others may be the
commercial packages in (3)
above.
5. Review your feasibility analysis for the new system. Taking
all options into
consideration, make a recommendation for the new system, in
your “Conclusion and
Recommendations” section.
FINAL STEPS
Sarah has completed the content of her report, and now needs to
make sure that the report
is presented professionally, as it will be shown to the CEO,
managers of the existing centres
and Jason Lewis, the manager of the new supercentre in
Brisbane, as well as any potential
investors in the new system.
ACTIVITY 9
Ensure your report is professionally presented. This means your
report should include:
x a title page, with the name of the Report, and the analyst’s
name (your name);
x an executive summary;
x a table of contents, with page numbers;
x page numbers on all pages except the title page;
x Headings, sub-headings, dot-points and numbering where
necessary. Headings
should be numbered or the structure should otherwise be easily
identified;
x Appendices where necessary;
x Formatting and whitespace (space where there is no text or
pictures) used
appropriately;
x Page orientation used appropriately. For example, if you have
an ERD that will show
better in landscape orientation than portrait orientation
, set a Section break
(Page Layout > Breaks) before this page, set the page to
landscape and then set
another Section break to start the new page in portrait again.
Hand in your report via the Assignment Link on MySCU.

Personal Trainer Case Study ISY00243 2016 Page 1 CASE STUD.docx

  • 1.
    Personal Trainer CaseStudy ISY00243 2016 Page 1 CASE STUDY PART 1 INTRODUCTION Personal Trainer, Inc, owns and operates fitness centres in various cities in Victoria and southern NSW. The fitness centres have done well, and the company is planning an expansion by opening a new “supercentre” in Brisbane, Queensland. BACKGROUND Kate Umi, CEO, heads Personal Trainer’s management team. Three managers report to her at the firm’s Melbourne headquarters: Janet McDonald, manager, finance; Tai Tranh, manager, sales and marketing; and Ryan Curry, manager, operations. The managers who run the 12 existing centres all report to Ryan. Kate wants the new supercentre in Brisbane to emphasis a wide variety of personal services and special programs for members. If the supercentre approach is successful, it will become the model for Personal Trainer’s future growth. Kate personally selected Jason Lewis, a manager with three years of fitness centre experience, to run the new facility. The new supercentre will feature a large exercise area with state-of-the-art equipment, a swimming pool, a sporting goods shop, a health food store, and a snack bar – with healthy
  • 2.
    snacks, of course!In addition, the centre will offer child care with special programs for various ages, and a computer café. Kate also wants members to have online access to customised training programs and progress reports. The Personal Trainer business currently uses AllAccounts, a popular accounting package, to manage its receivables, payables and general ledger. Membership lists and word processing are handled with Microsoft Office products Excel and Word. Kate believes the new supercentre will require additional data management capability, and she decided to hire Patterson and Wilder, an IT consulting firm, to help Personal Trainer, Inc, to develop an information system for the new operation. The firm assigned Sarah Parkly, an experienced consultant, to work with the Personal Trainer team. Sarah’s first task was to learn more about business operations at the new centre, so she requested a meeting with Jason. After introducing themselves, there was a discussion about the new information system. The transcript of their meeting is on the next page. Note: This case study is to be used throughout this Session, to answer questions in set activities, which will be compiled into a report. Part A of this report, an “Initial Investigation” is to be submitted at the end of Week 6. The final report (including your Part A adjusted after marker feedback) is to be submitted in Week 12. You should use all relevant parts of the case study to inform your answers for the report.
  • 3.
    Personal Trainer CaseStudy ISY00243 2016 Page 2 ACTIVITY 1 1. Use the background information to create a short summary (one short paragraph) about the “Personal Trainer” business. 2. Create an organisation chart for the Personal Trainer business. 3. Use the information above to describe the area of the organisation under study (i.e. the business functions that will be handled by the new information system). 4. Add the background information, organisation chart, and business functions to your Report document in Part A: Initial Investigation. Sarah: Tell me about your plans for the new operation. I’m especially interested in what kind of information management you’ll need. Jason: Kate thinks that we’ll need more information support because of the size and complexity of the new operation. To tell the truth, I’m not so sure. We’ve had no problems with AllAccounts at the other centres and I don’t really want to reinvent the wheel. Sarah: Maybe we should start by looking at the similarities –
  • 4.
    and the differences– between the new centre and the existing ones. Jason: OK, let’s do that. First of all, we offer the same basic services everywhere. That includes the exercise equipment, a pool, and in most centres, a snack bar. Some centres also sell sporting goods, and one offers child care – but not child-fitness programmes. It’s true that we’ve never put all this together under one roof. And, I admit, we’ve never offered online access. To be honest, I’m not absolutely sure what Kate has in mind when she talks about 24/7 Web-based access. One more feature – we plan to set up two levels of membership – let’s call them silver and gold for now. Silver members can use all the basic services, but will pay additional fees for some special programs, such as child fitness. Gold members will have unlimited use of all services. Sarah: So with all this going on, wouldn’t an overall system make your job easier? Jason: Yes, but I don’t know where to start. Sarah: Jason, that’s why I’m here. I’ll work with you and the rest of the team to come up with a solution that supports your business. Jason: Sounds good to me. When can we start? Sarah: Let’s get together first thing tomorrow. Bring along an organisation chart and think about how you plan to run the new facility. We’ll try to build a model of the new operation so
  • 5.
    we can identifythe system capabilities and the business benefits. Personal Trainer Case Study ISY00243 2016 Page 3 CASE STUDY PART 2 At their initial meeting, Sarah and Jason discussed some initial steps in planning an information system for the new facility. The next morning, they worked together on a business profile, and talked together about various types of information systems that would provide the best support for the supercentre’s operations. Sarah starts creating a System Vision Document for the new Personal Trainer system, so she can use this to define a vision for the new system. ACTIVITY 2 1. Either by yourself or with another class member, brainstorm all the functions that the Personal Trainer system might fulfil. Keep it at a very high level. 2. Prepare a draft System Vision Document for the new Personal Trainer system. This System Vision Document will be revised when you find out more about the requirements for the system. An example System Vision Document can be seen in Figure 1.8 of your textbook (Figure 1.5 in the 6th ed). 3. Add your System Vision Document to your Report document
  • 6.
    in Part A:Initial Investigation. CASE STUDY PART 3 In this section, you are acting as a student intern at Personal Trainer, working on the new Information System. Sarah has asked you to help her plan the new information system project, as she knows that you have studied project management tools and techniques. Specifically, she wants you to get ready for the next set of systems development tasks, which will be requirements modelling for the new system. Yesterday, Sarah called you into her office to discuss the specific tasks she wants you to perform. After meeting with Sarah, you sit down and review your notes. She wants you to treat the set of tasks as a project, and to use project management skills to plan the tasks. Here is what she suggested to you to you as a work breakdown structure, including the duration she estimated for each task: x First, you need to meet with fitness centre managers at other Personal Trainer locations (5 days); x You can then conduct a series of interviews (5 days); Personal Trainer Case Study ISY00243 2016 Page 4
  • 7.
    x When theinterviews are complete, you can review company records (3 days) while observing business operations (8 days); x When you have reviewed the records and observed business operations, you can o analyse the AllAccounts accounting software (5 days) and o study a sample of sales and billing transactions (2 days); x After completing your study, prepare a report for Sarah (1 day). ACTIVITY 3 1. Create a table, listing all tasks separately, with their duration; 2. Identify all dependencies, and indicate what predecessor tasks are required; 3. Construct a Gantt chart in Microsoft Project or other project management software; 4. Identify the PERT/CPM chart in the software, and identify the critical path; 5. Determine the overall duration of the project; 6. Take clear screenshots of the Gantt chart and PERT/CPM chart and paste into your Report document in Part A: Initial Investigation under Project Management. 7. Include the overall duration and critical path in your report.
  • 8.
    CASE STUDY PART4 As an analyst working on the development of the new system, it is Sarah’s role to ensure that the project is feasible. Some of the reasons that projects fail are: incomplete requirements, lack of executive support, lack of technical support, poor project planning and lack of required resources. At this stage, Sarah decides to do an initial project feasibility analysis, to see whether Personal Trainer should continue with its plan for the new information system. ACTIVITY 4 1. What are the risks associated with this project? Create a list of up to 10 risks and their likelihood of happening (see Study Guide topic 4, activity 4.6 for an example of how this should be set out). 2. Define the anticipated benefits of the new system. This should include both tangible and intangible benefits. Wherever possible, translate the intangible benefits into anticipated tangible benefits. Personal Trainer Case Study ISY00243 2016 Page 5 3. Define the expected costs of the new system. Look at the examples given in workshop activities for some examples of expense categories. It is ok to give estimates at this point.
  • 9.
    4. Use twoor more cost-benefit analysis techniques to decide whether to proceed with the project. 5. Create a new section in Part A of your report: Risk and Cost Benefit Analysis. Insert your work from above, and give a clear indication as to whether it is feasible to continue with the project. 6. Does the proposed system present a strong business case? Why or why not? Include a recommendation as to whether the system should proceed, as the final part of your preliminary report. The Preliminary Investigation part of your Report can now be submitted. CASE STUDY PART 5 Sarah has given you a list of tasks to do, which include interviewing staff at other Personal Trainer locations. This is part of the investigation, where fact- finding is conducted to find out more about the requirements for the proposed system. ACTIVITY 5 1. What fact-finding techniques, apart from interviews, would you recommend to Sarah, to find out the requirements for the new system? 2. Identify a staff member (make up their name) and their job role at a Personal Trainer location.
  • 10.
    3. Develop alist of questions for an interview with this staff member. Identify the time anticipated for the interview. Review your topic on creating interview questions, and make sure you include suitable question types. 4. Include the interview plan in the Appendices for your Report. 5. Include the recommendations for other fact-finding techniques, in your Report. Personal Trainer Case Study ISY00243 2016 Page 6 CASE STUDY PART 6 During requirements modelling for the new system, Sarah Parkly met with several fitness centre managers at Personal Trainer locations. She conducted a series of interviews, reviewed company records, observed business operations, analysed the AllAccounts accounting software, and studied a sample of sales and billing transactions. Sarah’s objective was to develop a list of system requirements for the proposed system. She found the following: x A typical centre has 300-500 members, with two membership levels: full and limited. Full members have access to all activities. Limited members are restricted to activities they have selected, but they can participate in other
  • 11.
    activities by payingan additional usage fee. All members have credit privileges. Credit purchases for merchandise and services are currently recorded on a paper credit slip, which is signed by the member, to be invoiced at the end of the month. x At the end of each day, cash/EFTPOS sales and credit charge amounts are entered into the AllAccounts accounting software, which runs on an office computer at each location. Daily cash takings are deposited in a local bank in the corporate Personal Trainer account. The AllAccounts program produces a daily activity report with a listing of all sales transactions. x At the end of the month, the local manager uses AllAccounts to transmit an accounts receivable summary to the Personal Trainer head office in Melbourne, where member statements are prepared and mailed. Members mail their payments to the Personal Trainer head office, where the payment is applied to the member account. x The AllAccounts program stores basic member information, but does not include information about member preferences, activities and history. x Currently the AllAccounts program produces one local report (the daily activity report) and three reports that are prepared at the head office location: a monthly member sales report, an exception report for inactive members and late payers, and
  • 12.
    a quarterly profit-and-lossreport that shows a breakdown of revenue and costs for each separate activity. During the interviews, Sarah received a number of “wish list” comments from managers and staff members. For example, managers want more analytical features so they can spot trends and launch special promotions and temporary discounts. Managers also want better information about the profitability of specific business activities at their centres, instead of bottom-line totals. Several managers want to offer computerised activity and wellness logs, fitness coaching for seniors, and various social networking options, including email communications, fitness blogs, Facebook and Twitter posts. Staff members want better ways to handle information Personal Trainer Case Study ISY00243 2016 Page 7 about part-time instructors and trainers, and several people suggested using scannable ID cards to capture data. ACTIVITY 6 1. Write down a list of the main functions needed to be handled by the new system. 2. What are the roles that will be interacting with the system? 3. Using all the information that you know about the Personal Trainer business so far,
  • 13.
    create a use-casediagram for the new system. 4. Select four use-cases and write a brief use-case description for them. 5. Pick one of these use-cases and write a full use-case description for it. Use an activity diagram in the full description. 6. Include the following in your report: x the use-case diagram; x the brief use-case descriptions; x the full use-case description, including your activity diagram. CASE STUDY PART 7 Sarah has been preparing the System Requirement report for Kate Umi, Personal Trainer’s CEO. From her investigation so far, Sarah is leaning towards a recommendation for either in- house development or outsourcing options for the new system. She does not feel that a commercial software package would meet Personal Trainer’s needs. Based on her research, Sarah felt that it would be premature to select a development strategy at this time. Instead, she recommended to Kate that an in-house team should develop a design prototype, using a relational database as a model. Sarah said that the prototype would have two main objectives: x it would represent a user-approved model of the new system, and x it would identify all system entities and the relationships between them.
  • 14.
    Sarah explained thatit would be better to design the basic system first, and then address other issues, including Web enhancements and implementation options. She proposed a three-step plan: 1. data design 2. user interface design, and 3. application architecture. Personal Trainer Case Study ISY00243 2016 Page 8 She explained that systems analysts refer to this as the system design phase of a development project. Kate agreed with Sarah’s recommendation, and asked her to go forward with the plan. ACTIVITY 7 1. Review the Personal Trainer fact-finding summary and all other information you have about the required system. 2. Draw an ERD with crows-foot cardinality notation. Assume that system entities include members, classes, merchandise, and fitness instructors (at minimum). 3. Design tables – making sure each table only refers to one “thing”. As you create the database design, identify primary and foreign keys by underlining primary keys, and
  • 15.
    making foreign keysitalic. 4. If you add primary keys which use codes – for example a code for the instructorID, then identify the format of these codes. 5. Create suitable sample data to populate the fields for at least three records in each table. 6. Include the following in your report: x The ERD you have completed; x The database design (schemas); x Formats of codes used; x Sample data for each table. CASE STUDY 8 Sarah is now making sure that she has sufficient models to understand the new system. In reviewing the models she has (use-cases diagrams, including activity diagrams) she realised that she had not included a system sequence diagram for any of the use cases. After creating this, she is ready to review the options for a new system, and make a recommendation to Kate Umi. ACTIVITY 8 1. Create a system sequence diagram for one of the use cases identified in Activity 6. 2. Add this system sequence diagram to your report in the appropriate area. 3. Search online for potential commercial software packages for Personal Trainer.
  • 16.
    Identify two packages,and compare their features, and their suitability to be used as the new system. Personal Trainer Case Study ISY00243 2016 Page 9 4. Present four options for the new system in your report. One of these must be in- house development, and two of the others may be the commercial packages in (3) above. 5. Review your feasibility analysis for the new system. Taking all options into consideration, make a recommendation for the new system, in your “Conclusion and Recommendations” section. FINAL STEPS Sarah has completed the content of her report, and now needs to make sure that the report is presented professionally, as it will be shown to the CEO, managers of the existing centres and Jason Lewis, the manager of the new supercentre in Brisbane, as well as any potential investors in the new system. ACTIVITY 9 Ensure your report is professionally presented. This means your report should include: x a title page, with the name of the Report, and the analyst’s
  • 17.
    name (your name); xan executive summary; x a table of contents, with page numbers; x page numbers on all pages except the title page; x Headings, sub-headings, dot-points and numbering where necessary. Headings should be numbered or the structure should otherwise be easily identified; x Appendices where necessary; x Formatting and whitespace (space where there is no text or pictures) used appropriately; x Page orientation used appropriately. For example, if you have an ERD that will show better in landscape orientation than portrait orientation , set a Section break (Page Layout > Breaks) before this page, set the page to landscape and then set another Section break to start the new page in portrait again. Hand in your report via the Assignment Link on MySCU.