Perhitungan RAB Rencana Pondasi
- 3. VOLUME PASANGAN BATU KALI
𝐴 =
𝑎+𝑏
2
t
=
0.5 +0.8
2
1.5
𝐴 = 0,975 𝑚2
𝑉𝑡𝑜𝑡𝑎𝑙 = 𝐴. 𝑝
𝑉𝑡𝑜𝑡𝑎𝑙 = 0.975 𝑚2 𝑥 10
= 9,75 𝑚3
Sloof
15/20
1,5m
0,5 m
1,5m
0,8 m
- 4. VOLUME GALIAN TANAH
𝐴 =
𝑎+𝑏
2
t
=
1.5 +0.8
2
1.5
𝐴 = 1,725 𝑚2
𝑉𝑡𝑜𝑡𝑎𝑙 = 𝐴 . 𝑝
𝑉𝑡𝑜𝑡𝑎𝑙 = 1, 725 𝑚2 𝑥 10
= 17,25 𝑚3
Sloof
15/20
1,5m
0,5 m
1,5m
0,8 m
- 5. VOLUME SLOOF BETON
𝐴 = 𝑝 𝑥 𝑙
= 15 𝑥 20
= 300 𝑐𝑚2 = 3 𝑥 10−2 𝑚2
𝑉𝑡𝑜𝑡𝑎𝑙 = 𝐴 𝑥 𝑡
= 3 𝑥 10−2 x 10
= 3 𝑥 10−1
= 0,3 𝑚3
- 6. ANALISA HARGA SATUAN
PEKERJAANSNI tahun 2011
No. Pekerjaan Uraian Satuan indeks Volume i x V Harga Satuan Harga
B-02 1 M3 Galian Tanah Biasa Pekerja OH 0,526 17,25 9,0735 42.000,00Rp 381.087,00Rp
Sedalam 2 m Mandor OH 0,052 17,25 0,897 80.000,00Rp 71.760,00Rp
Jumlah 452.847,00Rp
C-03 1 M3 Pasang Pondasi Batu belah M3 1,1 9,75 10,725 205.500,00Rp 2.203.987,50Rp
Batu kali adk 1pc:5ps Semen Portland Kg 136 9,75 1326 1.406,00Rp 1.864.356,00Rp
Pasir Pasang M3 0,544 9,75 5,304 233.400,00Rp 1.237.953,60Rp
Pekerja OH 1,5 9,75 14,625 42.000,00Rp 614.250,00Rp
Tukang Batu OH 0,6 9,75 5,85 65.000,00Rp 380.250,00Rp
Kepala Tukang OH 0,06 9,75 0,585 75.000,00Rp 43.875,00Rp
Mandor OH 0,075 9,75 0,73125 80.000,00Rp 58.500,00Rp
Jumlah 6.403.172,10Rp
1 M3 Urugan Tanah Pekerja OH 0,526 7,5 3,945 42.000,00Rp 165.690,00Rp
Kembali Mandor OH 0,052 7,5 0,39 80.000,00Rp 31.200,00Rp
Jumlah 196.890,00Rp
D-17r2 1 M3 Sloof Beton Tulang Kayu papan M3 0,27 0,3 0,081 2.850.000,00Rp 230.850,00Rp
15/20 (180kg besi + bekisting) Paku biasa 2"-5" Kg 2 0,3 0,6 23.400,00Rp 14.040,00Rp
4 dia. 12 ring 8-15 Besi Beton Kg 180 0,3 54 16.500,00Rp 891.000,00Rp
Kawat Beton Kg 3 0,3 0,9 27.700,00Rp 24.930,00Rp
Semen Portland Kg 323 0,3 96,9 1.200,00Rp 116.280,00Rp
Pasir Beton M3 0,52 0,3 0,156 225.000,00Rp 35.100,00Rp
Koral Beton 2/3 M3 0,78 0,3 0,234 200.000,00Rp 46.800,00Rp
Pekerja OH 4,85 0,3 1,455 55.000,00Rp 80.025,00Rp
Tukang Batu OH 0,35 0,3 0,105 70.000,00Rp 7.350,00Rp
Tukang Kayu OH 1,56 0,3 0,468 70.000,00Rp 32.760,00Rp
Tukang Besi OH 1,4 0,3 0,42 70.000,00Rp 29.400,00Rp
Kepala Tukang OH 0,331 0,3 0,0993 80.000,00Rp 7.944,00Rp
Mandor OH 0,17 0,3 0,051 85.000,00Rp 4.335,00Rp
Jumlah 1.520.814,00Rp
8.573.723,00RpTOTAL RENCANA ANGGARAN BIAYA
- 7. KURVA TARGET PEKERJAAN
% 1 2 3 4 5
Galian Tanah 4,78 4 1
Pasangan Batu kali 77,1 20 35 15
Urugan Tanah Kembali 2,08 10 ######
Sloof beton bertulang 16,04 15
100
jumlah 4 21 35 25 15
jumlah komulatif 4 25 60 85 100
0 1
1 4
2 25
3 60
4 85
5 100
Hari ke
Pekerjaan
-
20
40
60
80
100
120
0 1 2 3 4 5 6
target(%)
Hari ke-
Kurva S
- 8. KURVA RENCANA JUMLAH PEKERJA
pekerja mandor t.batu t.besi
1 7 1 0 0
2 7 2 2 0
3 7 2 2 0
4 7 2 2 0
5 1 1 0 1
0
1
2
3
4
5
6
7
8
1 2 3 4 5
JumlahPekerja
Hari ke-
Kurva Pekerja
pekerja mandor t.batu t.besi
- 9. KURVA RENCANA PEMBELIAN
MATERIAL
0
1
2
3
4
5
6
1 2 3 4 5
M3
Hari ke-
KEBUTUHAN MATERIAL
Batu belah Pasir Pasang Kayu papan
Koral beton Pasir beton
4 5
198,9 96,9
0,6 0
0 54
0 0,9
0
464,1
663
198,9
96,9
0 0 0 0,6 00 0 0 0
54
0 0 0 0 0,9
0
100
200
300
400
500
600
700
1 2 3 4 5
kg
Hari ke-
KEBUTUHAN MATERIAL
Semen Portland paku Besi Beton Kawat Beton