This document provides a test script description for load and performance testing of mobile applications. It outlines clients and scenarios to be tested, protocols and services used, expected data and criteria, minimum system requirements, and detailed descriptions of test scenarios including steps, validations, and expected responses.
Everyone is already familiar with the idea of distributed applications that continue to function in the face of intermittent network connectivity, but its only since the release of HTML5 that a solution for discontinuous network connectivity can be extended to web applications.
In this session Florin will demonstrate how Oracle JET can be utilised to build offline web modules that may cache within the browser’s local database when the server is out of reach and how these modules can be integrated with existing APEX or ADF applications.
Everyone is already familiar with the idea of distributed applications that continue to function in the face of intermittent network connectivity, but its only since the release of HTML5 that a solution for discontinuous network connectivity can be extended to web applications.
In this session Florin will demonstrate how Oracle JET can be utilised to build offline web modules that may cache within the browser’s local database when the server is out of reach and how these modules can be integrated with existing APEX or ADF applications.
ATS TEL offers a complete software-based call center setup for the businesses, which includes Predictive Dialer, Auto Dialer and Cloud PBX. Cloud PBX service of ATS TEL is based on Voice over internet Protocol (VoIP).
http://atstel.com/
EECI 2010 - The Power of ExpressionEngine's Dynamic TemplatesFortySeven Media
Join us as we explore EE's various template and variable types. We'll find out the best ways to use and implement them through a plethora of real-world examples. Put the power back in your hands with dynamic templates.
How to Effectively Manage the Sales Lead Follow-Up ProcessSalesScripter
Following up with sales prospects can be tricky. Sometimes you don’t follow up enough and might be missing out on the business. Other times you might follow up too much where the only thing you are doing is damaging the relationship and wasting valuable time.
If you can relate to that, you should join us for our next webinar “How to Effectively Manage the Sales Lead Follow-Up Process” where we will share a structured process that you can use that will provide clarity for how best to follow up on sales leads.
Sample Report (Mary Example) of an actual phone test measuring the Call Center employees ability to handle difficult call situations. Measures manners, effectiveness, accuracy, customer analysis, and ability to perform effective follow-up. Contact us for more info or to try one out...not expensive. English only.
E-Gas Sewa is always committed to provide high quality supply of LPG gas and continuously develop its facilities .
This helps to achieve the excellence in securing reliable services that would meet the growing demand and exceed the future needs and expectations of our customers.
Several e-facilities such as the on-line bill payments and payments through the banks were introduced to provide more convenient services for the customers.
ATS TEL offers a complete software-based call center setup for the businesses, which includes Predictive Dialer, Auto Dialer and Cloud PBX. Cloud PBX service of ATS TEL is based on Voice over internet Protocol (VoIP).
http://atstel.com/
EECI 2010 - The Power of ExpressionEngine's Dynamic TemplatesFortySeven Media
Join us as we explore EE's various template and variable types. We'll find out the best ways to use and implement them through a plethora of real-world examples. Put the power back in your hands with dynamic templates.
How to Effectively Manage the Sales Lead Follow-Up ProcessSalesScripter
Following up with sales prospects can be tricky. Sometimes you don’t follow up enough and might be missing out on the business. Other times you might follow up too much where the only thing you are doing is damaging the relationship and wasting valuable time.
If you can relate to that, you should join us for our next webinar “How to Effectively Manage the Sales Lead Follow-Up Process” where we will share a structured process that you can use that will provide clarity for how best to follow up on sales leads.
Sample Report (Mary Example) of an actual phone test measuring the Call Center employees ability to handle difficult call situations. Measures manners, effectiveness, accuracy, customer analysis, and ability to perform effective follow-up. Contact us for more info or to try one out...not expensive. English only.
E-Gas Sewa is always committed to provide high quality supply of LPG gas and continuously develop its facilities .
This helps to achieve the excellence in securing reliable services that would meet the growing demand and exceed the future needs and expectations of our customers.
Several e-facilities such as the on-line bill payments and payments through the banks were introduced to provide more convenient services for the customers.
WebSphere Technical University: Top WebSphere Problem Determination FeaturesChris Bailey
Problem determination is an important focus area in the IBM WebSphere Application Server. Serviceability improvements have been added that have greatly improved the ability to find root causes of problems in both the full IBM WebSphere Application Server profile, and the newer Liberty profile. The session focuses on how to effectively use serviceability improvements added to the application server since V8.0. This includes high performance extensibe logging, cross-component trace, IBM Support Assistant data collector, timed operations, memory leak detection/prevention, and IBM Support Assistant 5.
Presented at the WebSphere Technical University 2014, Dusseldorf
WebSphere App Server vs JBoss vs WebLogic vs Tomcat (InterConnect 2016)Roman Kharkovski
Presented at InterConnect 2016 in Las Vegas, this presentation provides a view on the differences between WebSphere Application Server and Liberty Profile vs. competitive offerings, such as Apache Tomcat, Red Hat JBoss and Oracle WebLogic. It covers both the technical (feature/function) as well as cost considerations (TCA, TCO).
Performance is the most important attribute for success of any commercial and Enterprise Software. In a client server environment, developers focus a lot on optimizing the Data and Logical Tiers. Optimization of Presentation Tier which is responsible for more than 30 % of performance is usually ignored.
The document is developed with the intension to teach the technical staff on Optimizing the Presentation Tier which significantly improves the performance of the Client Server applications.
Architecting and Tuning IIB/eXtreme Scale for Maximum Performance and Reliabi...Prolifics
Abstract: Recent projects have stressed the "need for speed" while handling large amounts of data, with near zero downtime. An analysis of multiple environments has identified optimizations and architectures that improve both performance and reliability. The session covers data gathering and analysis, discussing everything from the network (multiple NICs, nearby catalogs, high speed Ethernet), to the latest features of extreme scale. Performance analysis helps pinpoint where time is spent (bottlenecks) and we discuss optimization techniques (MQ tuning, IIB performance best practices) as well as helpful IBM support pacs. Log Analysis pinpoints system stress points (e.g. CPU starvation) and steps on the path to near zero downtime.
Wipro & Experitest Co webinar: Enhance your Mobile App with Load Testing and Increased Productivity.
Wipro and Experitest on a live webinar on improving the performance of your mobile application while expanding productivity. The solutions we present will allow you to test faster, and more diligently than ever, combining load, performance, and functionality all at once.
The session covers:
- A case study involving Wipro and SeeTest working with a major American Bank
- Live demo to show SeeTest Automation integrate into HP LoadRunner
- How Wipro developed a mainframe component to perform backend validation
- Live demo of Wipro's SeeTest Framework, and how it improves productivity by 50%
Speakers:
Guy Arieli, CTO, Experitest
Sudheer Mohan, Director - Mobility Certification & Automation, Wipro
Similar to Ginsbourg.Com - Performance and load test script template 1.2 (20)
Human erythrocyte filterability at low driving pressure version 7.1Shay Ginsbourg
Abstract
In this study, the human RBC capillary flow has been modeled by passing 11 l of
RBC suspension (Hematocrit = 6%) in phosphate buffer solution (PBS) of a viscosity
of 1 and 2.6 cP (in the presence of 2% Dextran) through 5 m pore diameter
polycarbonate Nuclepore filters. We’ve developed a digitally controlled experimental
system for measuring the RBC filterability at a constant driving pressure, in the range
of 10 to 400 Pa, producing a wall shear stress range of 1 to 50 Pa. The RBC
filterability was evaluated by measuring the cell suspension flow rate normalized by
the PBS flow rate. The RBC filterability has been found to be a nonlinear function of
the driving pressure, having a single minimum locus at 25 Pa. Lowering the driving
pressure below 25 Pa revealed an unexpected increase of the RBC filterability.
The maximal RBC filterability (near unity) was detected at the lowest driving
pressure (10 Pa) and the corresponding estimated RBC linear velocity while traveling
through the capillary pore was as high as 800 m/sec. Increasing the driving pressure
above 25 Pa confirmed previous results, where RBC filterability is monotonically and
asymptotically increasing. Increasing the PBS medium viscosity from 1 to 2.26 cP
significantly attenuated the RBC filterability and led to the anomalous increase of
RBC deformability at the 10Pa pressure range. We propose that the anomalous
increase in RBC deformability was caused by RBCs undergoing spontaneous
mechanical fluctuations.
Software Engineering, Software Consulting, Tech Lead, Spring Boot, Spring Cloud, Spring Core, Spring JDBC, Spring Transaction, Spring MVC, OpenShift Cloud Platform, Kafka, REST, SOAP, LLD & HLD.
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoamtakuyayamamoto1800
In this slide, we show the simulation example and the way to compile this solver.
In this solver, the Helmholtz equation can be solved by helmholtzFoam. Also, the Helmholtz equation with uniformly dispersed bubbles can be simulated by helmholtzBubbleFoam.
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...Mind IT Systems
Healthcare providers often struggle with the complexities of chronic conditions and remote patient monitoring, as each patient requires personalized care and ongoing monitoring. Off-the-shelf solutions may not meet these diverse needs, leading to inefficiencies and gaps in care. It’s here, custom healthcare software offers a tailored solution, ensuring improved care and effectiveness.
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...Globus
Large Language Models (LLMs) are currently the center of attention in the tech world, particularly for their potential to advance research. In this presentation, we'll explore a straightforward and effective method for quickly initiating inference runs on supercomputers using the vLLM tool with Globus Compute, specifically on the Polaris system at ALCF. We'll begin by briefly discussing the popularity and applications of LLMs in various fields. Following this, we will introduce the vLLM tool, and explain how it integrates with Globus Compute to efficiently manage LLM operations on Polaris. Attendees will learn the practical aspects of setting up and remotely triggering LLMs from local machines, focusing on ease of use and efficiency. This talk is ideal for researchers and practitioners looking to leverage the power of LLMs in their work, offering a clear guide to harnessing supercomputing resources for quick and effective LLM inference.
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...Globus
The U.S. Geological Survey (USGS) has made substantial investments in meeting evolving scientific, technical, and policy driven demands on storing, managing, and delivering data. As these demands continue to grow in complexity and scale, the USGS must continue to explore innovative solutions to improve its management, curation, sharing, delivering, and preservation approaches for large-scale research data. Supporting these needs, the USGS has partnered with the University of Chicago-Globus to research and develop advanced repository components and workflows leveraging its current investment in Globus. The primary outcome of this partnership includes the development of a prototype enterprise repository, driven by USGS Data Release requirements, through exploration and implementation of the entire suite of the Globus platform offerings, including Globus Flow, Globus Auth, Globus Transfer, and Globus Search. This presentation will provide insights into this research partnership, introduce the unique requirements and challenges being addressed and provide relevant project progress.
Code reviews are vital for ensuring good code quality. They serve as one of our last lines of defense against bugs and subpar code reaching production.
Yet, they often turn into annoying tasks riddled with frustration, hostility, unclear feedback and lack of standards. How can we improve this crucial process?
In this session we will cover:
- The Art of Effective Code Reviews
- Streamlining the Review Process
- Elevating Reviews with Automated Tools
By the end of this presentation, you'll have the knowledge on how to organize and improve your code review proces
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...Juraj Vysvader
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I didn't get rich from it but it did have 63K downloads (powered possible tens of thousands of websites).
Cyaniclab : Software Development Agency Portfolio.pdfCyanic lab
CyanicLab, an offshore custom software development company based in Sweden,India, Finland, is your go-to partner for startup development and innovative web design solutions. Our expert team specializes in crafting cutting-edge software tailored to meet the unique needs of startups and established enterprises alike. From conceptualization to execution, we offer comprehensive services including web and mobile app development, UI/UX design, and ongoing software maintenance. Ready to elevate your business? Contact CyanicLab today and let us propel your vision to success with our top-notch IT solutions.
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...Globus
The Earth System Grid Federation (ESGF) is a global network of data servers that archives and distributes the planet’s largest collection of Earth system model output for thousands of climate and environmental scientists worldwide. Many of these petabyte-scale data archives are located in proximity to large high-performance computing (HPC) or cloud computing resources, but the primary workflow for data users consists of transferring data, and applying computations on a different system. As a part of the ESGF 2.0 US project (funded by the United States Department of Energy Office of Science), we developed pre-defined data workflows, which can be run on-demand, capable of applying many data reduction and data analysis to the large ESGF data archives, transferring only the resultant analysis (ex. visualizations, smaller data files). In this talk, we will showcase a few of these workflows, highlighting how Globus Flows can be used for petabyte-scale climate analysis.
Globus Connect Server Deep Dive - GlobusWorld 2024Globus
We explore the Globus Connect Server (GCS) architecture and experiment with advanced configuration options and use cases. This content is targeted at system administrators who are familiar with GCS and currently operate—or are planning to operate—broader deployments at their institution.
Understanding Globus Data Transfers with NetSageGlobus
NetSage is an open privacy-aware network measurement, analysis, and visualization service designed to help end-users visualize and reason about large data transfers. NetSage traditionally has used a combination of passive measurements, including SNMP and flow data, as well as active measurements, mainly perfSONAR, to provide longitudinal network performance data visualization. It has been deployed by dozens of networks world wide, and is supported domestically by the Engagement and Performance Operations Center (EPOC), NSF #2328479. We have recently expanded the NetSage data sources to include logs for Globus data transfers, following the same privacy-preserving approach as for Flow data. Using the logs for the Texas Advanced Computing Center (TACC) as an example, this talk will walk through several different example use cases that NetSage can answer, including: Who is using Globus to share data with my institution, and what kind of performance are they able to achieve? How many transfers has Globus supported for us? Which sites are we sharing the most data with, and how is that changing over time? How is my site using Globus to move data internally, and what kind of performance do we see for those transfers? What percentage of data transfers at my institution used Globus, and how did the overall data transfer performance compare to the Globus users?
Software Engineering, Software Consulting, Tech Lead.
Spring Boot, Spring Cloud, Spring Core, Spring JDBC, Spring Security,
Spring Transaction, Spring MVC,
Log4j, REST/SOAP WEB-SERVICES.
Unleash Unlimited Potential with One-Time Purchase
BoxLang is more than just a language; it's a community. By choosing a Visionary License, you're not just investing in your success, you're actively contributing to the ongoing development and support of BoxLang.
May Marketo Masterclass, London MUG May 22 2024.pdfAdele Miller
Can't make Adobe Summit in Vegas? No sweat because the EMEA Marketo Engage Champions are coming to London to share their Summit sessions, insights and more!
This is a MUG with a twist you don't want to miss.
We describe the deployment and use of Globus Compute for remote computation. This content is aimed at researchers who wish to compute on remote resources using a unified programming interface, as well as system administrators who will deploy and operate Globus Compute services on their research computing infrastructure.
Ginsbourg.Com - Performance and load test script template 1.2
1. www.ginsbourg.com
Performance & Load Test
Test Script Description
Customer: Company Name
Project: Mobile Applications
Edited by: Shay Ginsbourg
Revision: 1.2
Date: 11-May-2014
2. www.ginsbourg.com
Page 2 of 12
Document Version History
Revision Date Author Details
1.0 01.05.14 Shay Ginsbourg Document established.
1.1 10.05.14 Shay Ginsbourg Glossary and Abbreviations added.
1.2 11.05.14 Shay Ginsbourg Clients & Scenarios added.
Protocols & Services added.
Data & Criteria added.
Minimum OS and Hardware Requirements added.
3. www.ginsbourg.com
Page 3 of 12
Contents
1. Scope .................................................................................................................. 4
2. Introduction.......................................................................................................... 4
A. General............................................................................................................. 4
B. Clients & Scenarios .......................................................................................... 4
C. Protocols & Services ........................................................................................ 5
D. Data & Criteria.................................................................................................. 5
3. Minimum OS and Hardware Requirements ......................................................... 7
4. Glossary and Abbreviations................................................................................. 8
5. Scenario Descriptions.......................................................................................... 9
4.1. Scenario for Login and browsing................................................................... 9
4.2. Scenario for TBD 1...................................................................................... 10
4.3. Scenario for TBD 2...................................................................................... 10
4.4. Scenario for TBD 3...................................................................................... 11
4.5. Scenario for TBD 4...................................................................................... 12
4. www.ginsbourg.com
Page 4 of 12
1. Scope
This document provides a specified description of the test scripts intended for a web
performance and load test. The document provides all the required information on
the clients & scenarios, the protocols & services, the data & criteria, the minimum OS
and hardware requirements, the relevant glossary and abbreviations list, and finally,
the full scenario descriptions.
2. Introduction
A. General
2.1.The public URL of the web site/application under test is:
___________________________
2.2.The types of web servers and database servers that operate the web
site/application are: ___________________________
2.3.The development tools that were used for developing the web site/application
are: ___________________________
B. Clients & Scenarios
2.4.The types of desktop and mobile clients that would request that URL are:
___________________________
2.5.MS-IE browser can/can’t access the web site/application under test.
2.6.The web site/application is/isn’t designed for clients other than MS-IE
browser. They are: ___________________________
5. www.ginsbourg.com
Page 5 of 12
2.7.The number of users that are expected to concurrently access it (running at
the same time) is: ___________________________
2.8.The common operations that users are expected to perform at that web site
are: ___________________________
2.9.The number of scenarios that are needed to be tested under load are:
___________________________
2.10. Extensive functional testing was/wasn’t successfully passed for the
above specified scenarios. The functional testing conclusions were:
___________________________
C. Protocols & Services
2.11. The clients communicate with the server by GET/POST methods of
HTTP protocol. TRUE / FALSE ___________________________
2.12. The server communicates with the client by sending HTTP responses.
TRUE / FALSE ___________________________
2.13. The connection between the client and the server secured by HTTPS
protocol. TRUE / FALSE ___________________________
2.14. The user have to login into the website by using a private password:
TRUE / FALSE ___________________________
2.15. The client and server communicate in methods of protocols other than
HTTP/HTTPS. TRUE / FALSE ___________________________
2.16. The server application provides Web services as follows: (SOAP,
REST, WCF, etc.) ___________________________
D. Data & Criteria
2.17. The number of kilo bytes of data that the server sends to the client
every second on average is: ___________________________
6. www.ginsbourg.com
Page 6 of 12
2.18. The number of kilo bytes of data does that clients send to the server
every second on average is: ___________________________
2.19. The entrance criteria to the load test (initial database, load generation
hardware, etc.) are: ___________________________
2.20. The exit criteria from the load test (Average response time, throughput,
etc.) are: ___________________________
7. www.ginsbourg.com
Page 7 of 12
3. Minimum OS and Hardware Requirements
The minimum hardware requirements for each load generation host are:
CPU i5
RAM 4 GB
HD/SSD 500 GB
Ethernet 1 GB
For UNIX hosts (RECOMENDED), the specific additional requirements are:
OS Desktop Linux Ubuntu 14 64-bit
Java Java virtual machine 64-bit for UNIX
Web Internet access
For Windows hosts, the specific additional requirements are:
OS Desktop Microsoft Windows 7 64-bit
Java Java virtual machine 64-bit for Window
Sniffer Fiddler 4 for Windows
Web Internet access
8. www.ginsbourg.com
Page 8 of 12
4. Glossary and Abbreviations
AJAX Asynchronous JavaScript and XML
ALM Application Life Management
ASP Active Server Pages
CRM
Customer Relationship
Management
ERP Enterprise Resource Planning
FTP File Transfer Protocol
GUI Graphic User Interface
GWT Google Web Toolkit
HTTP Hypertext Transfer Protocol
HTML Hypertext Markup Language
IDE
Integrated Development
Environment
IMAP Internet Message Access Protocol
iOS Apple Mobile Operating System
IP Internet Protocol
J2EE Java 2 Platform Enterprise Edition
LR LoadRunner
N/A Not Available
NCA Network Computing Architecture
NTLM
Windows NT LAN Network
Manager
NV Network Virtualization
OS Operating System
POP3 Post Office Protocol version 3
RTE Remote Terminal Emulation
RUM Real User Monitoring
SaaS Software as a Service
SMP SAP Mobile Platform
SMTP Simple Mail Transfer Protocol
SNMP
Simple Network Management
Protocol
SOA Service-Oriented Architecture
SPA Single Page Applications
SQL Structured Query Language
UI User Interface
9. www.ginsbourg.com
Page 9 of 12
5. Scenario Descriptions
4.1. Scenario for Login and browsing
Step Description Validation
1 Start at URL: TBD Verify response time < 4 sec
2 Enter user and password and click OK. Verify entering the app by finding
string “HELLO” in the HTML.
3 Go to TBD Verify that size of FLASH is > 5 MB
4 Verify REGEX: TBD
5
6
7
8
9
10