The document outlines the construction of a new expansion to an existing 10k facility, including exterior walls made of new grey blocks, a hallway connecting to the expansion, and an entrance to a new Inspection/Test Department. New areas like a Grid Test Department, flying probe quarter, and increased space for visual inspection processes are part of the expansion, along with AOI Bays and interior construction work that is still ongoing, as indicated by signs apologizing for the dust from ongoing construction work. A new Reverse Pulse Plating Line is also under construction as part of the expansion.