Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Parsvnath Royale Residential Apartments in Panchkula
1. PARSVNATH ROYALE PANCHKULA
RERA REGN. NO.HRERA-PKL-PKL-16-2018
ADDRESS :- Parsvnath Royale , Behind GH-105/111, Sec-20,
Panchkula
OVERVIEW
Parsvnath Developers offers Parsvnath Royale in Panchkula. It
is a domestic complex based in Sector 20, Panchkula. They
offer 3 BHK apartments, covering a unit area of 1740 to 1780,
airy, spacious room, the large windows designed for cross
ventilation and the modular kitchen.
HIGHLIGHTS
7 Kms from Chandigarh
airport
3.5 Kms from ISBT
Panchkula
High specification
Modular kitchen
2. Water through R. O
System
Shops for daily needs
Security guard at gate
Ample Parking Space
SPECIFICATION
Structure
Earthquake resistant structure
Living / Dining / Lobby
Floor
Imported Marble
Walls
Acrylic emulsion paint
Ceiling
Oil bound distemper and POP moulding & cornice
Bedrooms
3. Floor
Laminated wooden flooring
Walls
Acrylic emulsion paint
Ceiling
Oil bound distemper and POP cornice
Doors
Internal Door
Polished hardwood frame with flush doors
Entrance doors
Veneered and polished flush shutter/moulded skin door.
Hardware
Shutter hinges in brass. All other hardware in brass. All doors
except those in toilets & kitchen to be provided with a mortice
lock.
Windows
Aluminum anodized windows with sliding glass shutter
4. Walls
Ceramic tiles upto2'.00" above counter and oil bound
distemper in the balance area.
Floor
Combination of one or more or vitrified tiles/ ceramic tiles,
marble/stone floor
Counter
Polished counter with top.
Fitting / Fixtures
CP fittings, double bowl stainless steel sink with drain, exhaust
fan.
Balcony Floor
Anti skid ceramic tiles
Walls & Ceiling
Textured Paint.
External Finishes
5. Textured Finish
Electrical Fixtures
Fluorescent tubes in all bedrooms, drawing/dining room.
Electrical Work
Electrical work with copper wires in concealed PVC conduits,
provision shall be made for sufficient lighting & power points.
Air-Conditioning
Split air-conditioning in Drawing, Dining & all Bedrooms
through individual Unit.
Security System
Single entry & exit gated community.
Drinking Water Supply
Through individual R.O. supply.
Connectivity
Broadband Internet connectivity
7. 10%
80%
5%
At the time of booking……………………………………………………………………………… 10%
Within 30 days of booking………………………………………………………………………… 10%
Within 2 Months of booking………………………………………………………………………… 20%
Within 3 Months of booking………………………………………………………………………… 20%
Within 4 Months of booking………………………………………………………………………… 20%
Within 5 Months of booking………………………………………………………………………… 15%
5%
10%
76%
5%
10%
10%
10%
10%
10%
10%
7%
7%
On Start of Installation of Lifts / 8 Months, whichever is later ………………………………………. 7%
On Start Of Flooring / 9 Months, whichever is later ……………………………………………… 7%
7%
5%
On Start of Tiling work in Toilets / 10 Months, whichever is later……………………………………
On Start of Eighth Floor Roof Slab / 4 Months, whichever is later ……………………………
On Start of Top Floor Roof Slab / 5 Months, whichever is later ………………………………
On Start of Internal Plaster / 6 Months, whichever is later ………………………………………
At the time of offer of possession........…………………………………………………………….
On Start of External Plaster / 7 Months, whichever is later ………………………………………
At the time of offer of possession........………………………………………………………
Plan C - TIME LINKED PAYMENT PLAN
At the time of offer of possession........………………………………………………………
On Start of Seventh Floor Roof Slab / 3 Months, whichever is later ……………………………
PAYMENT PLANS FOR T5 toT9
Plan A: DOWN PAYMENT PLAN (WITH 9% REBATE)
At the time of Booking…………………………………………………………………………
Within 45 days of Booking……………………………………………………………………
At the time of offer of possession…………………………………………………………………
Plan B: CONSTRUCTION LINKED PAYMENT PLAN
At the time of booking………………………………………………………………………………
Within 30 days of booking…………………………………………………………………………
Within 60 days of booking ………………………………………………………………………….
PAYMENT PLANS FOR T1 to T4
Plan A - DOWN PAYMENT PLAN (WITH 5% REBATE)
At the time of Booking…………………………………………………………………………
Within 45 days of booking……………………………………………………………………