This document summarizes the PanHlaing River Rehabilitation Project in Myanmar. The project aims to rehabilitate 54.7 km of the PanHlaing River to restore its functions of drainage, navigation, and water supply. Works include re-excavating the river channel, building sluice gates, and protecting 48,065 hectares of land and crops from flooding. The project goals are to improve irrigation, drainage, flood protection, navigation, and socioeconomic conditions in surrounding areas.
THE CHALLENGE POSED BY FLOOD OR RAIN IS PRONGED IN KASUR ie RIVER SUTLEJ AND THE INUNDATION OF LOW-LYING AREAS ON THE CITY DUE TO HONSOON RAINS. THE PRIME OBJECTIVE OF THIS PLAN IS TO SAVE HUMAN LIFE AND PROPERTY --------------
its talking about one of the project's of king bhumibol adulyadej and this is one of the projects in Thailand. This project is about the DAM built near pasak river in Thailand.
THE CHALLENGE POSED BY FLOOD OR RAIN IS PRONGED IN KASUR ie RIVER SUTLEJ AND THE INUNDATION OF LOW-LYING AREAS ON THE CITY DUE TO HONSOON RAINS. THE PRIME OBJECTIVE OF THIS PLAN IS TO SAVE HUMAN LIFE AND PROPERTY --------------
its talking about one of the project's of king bhumibol adulyadej and this is one of the projects in Thailand. This project is about the DAM built near pasak river in Thailand.
Geographical coverage is the largest – 26% of India’s land mass
Most populated basin – hosts 43% of India’s population
Annual surface water potential – 28% of India’s total
38% of India’s total estimated utilizable water comes from Ganga Basin – highest amongst all
Estimated utilizable surface water in Ganga is 48%
Nearly 40% of India’s total estimated replenishable ground water resources comes from Ganga Basin
Najafgarh Jheel & Najafgarh drain is historical water body existing since the times of the Mughals on the south-west periphery of Delhi City (India)Najfafgarh lake, Najafgarh marsh or Najafgarh jheel (Jheel in Hindi means a lake) used to be a vast lake in the South West of Delhi in India near the town of Najafgarh from which it takes its name, it was connected to the river Yamuna by a natural shallow nullah or drain called the Najafgarh nullah.
However after the 1960s the Flood Control Department of Delhi kept widening the Najfagarh drain and eventually quickly drained the once huge and ecologically rich Najafgarh lake completely.It was also a major source of ground water recharge for entire Delhi.
Over the period of time and due to urbanization, this revulate got converted into a drain due to constant release of untreated waste from the surrounding areas and the industries.
The draining of this vast lake affected the entire climate of this important region that is India’s capital territory of Delhi and its neighborhood, it also led to the underground water-table going down leading to water scarcity for this densely populated region.
A slideshow on Riverfront development (ongoing activities as well as prospective and necessary measures) in Varanasi, why Varanasi Ghats mean so much, why blind urbanization is not enough, etc.
Aurangabad district is located mostly in Godavari Basin, fall under Maharashtra agro climatic zone-VII (Central Maharashtra Plateau Zone). It is ‘Assured Rainfall Zone’ with average rainfall of 450-650 mm.
Field visit report of Moragahakanda reservoir project Deshan Arachchige
this report contain description about project and construction process,all information are gathered during visit by Kotelawela Defence University and literature.
In our Living space, people consciously, unconsciously build up many different aspects and scales of circular systems. For the existing coastal villages to achieve
coexistence with the environment in the era of climate changes, the circular systems in the coastal area must be resilient and create a well-knitted network, or so to say
“an along coast sustainable eco-web”.
Based on my observation, I began develop a methodology to observe various scales of circulations in the environment, and find out local characters and coastal resources that
have the potential abilities to accept storm surge.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Pan hlaing river (wwd 2015)final
1. Integrated Water System Development Exemplified
by
PanHlaing River Rehabilitation Project
Prepared by
Dr. Zaw Lwin Tun, Director
Hla Oo Nwe, Deputy Director
Irrigation Department
Ministry of Agriculture and Irrigation
2. Yangon Region
Area : 10,170 Sq-Km
Population : 7,355,075
Ayeyarwady Region
Area : 35,032 Sq-Km
Population : 6,175,123
Country Myanmar
Area : 676,577 Sq-Km
Population : 51,419,420
3. Background Information
- PanHlaing River is one of the main tributaries of Ayeyarwady
River and flows into Hlaing River near the Yangon City.
- The main function of PanHlaing River is contributed as
drainage channel in flood season and also used for navigation
all year round.
- In the past decades, functions of PanHlaing River is deviated
due to siltation in the main course.
- The length of PanHlaing River from junction with Kokkowa
River to the mouth is about 34 miles (54.7 km) and it can
use only 10 miles (16.1 km) for navigation at present.
- Rehabilitation (Re-excavation) Project will be initiated and
setup the plan for development of PanHlaing River including
its surrounding.
- PanHlaing Sluice Gates construction is one of the
infrastructures development.
4. Total length of PanHlaing River to be rehabilitated (re-excavated): 54.7 km
5. Rehabilitation of PanHlaing River Project
Location of PanHlaing River (Kokkowa River -Hlaing River)
Total length of PanHlaing River to be rehabilitated (re-excavated):
34 miles (54.7 km) [7.5 miles in Ayeyarwady; 26.5 miles in Yangon]
6. Objectives of the Project
- To achieve the original channel
morphology of PanHlaing River
especially in the manner of
drainage purpose and navigation
- To supply the fresh water for
agricultural development scheme
and Industrial zone
- To prevent the sea water
intrusion (saline water) and
siltation problem
- To establish the agricultural
production zone targeted for
rural area development
Proposed Alignment of Sluice Gate
PanHlaing River at the junction with Kokkowa River
(R.D-0+000’)
PanHlaing River at Mazali Bridge (R.D-2+800’)
7. Benefits of the Project (For Agriculture)
Total Flood Protected Land Area 48,065 hectares
Total Flood Protected Crop Area 44,778 hectares
In Ayeyarwady Region
NyaungDon Township
- Flood Protected Land Area 7,614 hectares
- Flood Protected Crop Area 6,096 hectares
In Yangon Region
TwanTe Township
- Flood Protected Land Area 30,623 hectares
- Flood Protected Crop Area 30,212 hectares
HtanTabin Township
- Flood Protected Land Area 9,828 hectares
- Flood Protected Crop Area 8,470 hectares
Low flow condition of PanHlaing River (R.D-5+000’)
Minimum flow condition of summer season
(R.D-10+000’)
Minimum flow condition of summer season
(R.D-19+000’)
8. Investigation Works Undertaken
Topographic Area Survey
Hydrological Investigation & Analysis
Geological Investigation
Socio-economic Survey
Rehabilitation Works Undertaken
Construction (9) - RD 0+000 to RD 46+000
Construction (1) - RD 46+000 to RD 90+000
Construction (9) - RD 90+000 to RD 120+000
Construction (1) - RD 120+000 to RD 145+000
Yangon Region O&M Branch - RD 145+000 to
RD 181+500
View of PanHlaing River in dry season (R.D-25+000’)
Highway bridge crossing PanHlaing River (R.D-
150+600’)
Silt deposition in PanHlaing River at U/S of highway
bridge (Low tide)
9. PanHlaing River at 2003,
near Khat thi ya sluice
gate, RD 35+000
Mya ge
Sluice Gate
Khat Thi Ya
Sluice Gate
PanHlaing River at 2014,
near Khat thi ya sluice gate
Khat Thi Ya
Sluice Gate
Mya ge
Sluice Gate
Mya Ge sluice gate,
RD 46+000
10. PanHlaing River at 2003
Sandayaw sluice gate
Drain out water to PanHlaing River
PanHlaing River at 2014
Sandayaw sluice gate
Drain out water to PanHlaing River
Sandayaw
Sluice Gate
Sandayaw
Sluice Gate
11. PanHlaing River at RD 0+000
Before During Construction After
PanHlaing River at RD 26+000
12. Before During Construction After
PanHlaing River at RD 139+000 To RD 140+000
PanHlaing River at RD 145+000 To RD 160+695
13. PanHlaing River, Temporary Dyke at RD 174+750
Before During Construction After
PanHlaing River, Temporary Dyke at RD 158+000
14. RD 8+000 to RD 10+000
Embankment / Gangar Road way
RD 10+000
Than payar creek sluice
RD 56+000
Mingalar sluice gate
RD 58+000
Kha Naung Paw and Lay Ein Su
Village Bridge
RD 67+000
Outlet
RD 78+150
Culvert
19. Conclusions
- Irrigation Water Supply,
Drainage and Flood Protection
for Land and Crop Areas
- Fresh Water Supply for
Possible Expansion of the
Urbanized Area of Yangon City
- Navigation
- Better Socio-economic,
Trading and Transportation
Conditions for Local Rural
Communities