SlideShare a Scribd company logo
Identify the ‘'performance” component in following instructional objective
Write a Letter of Inquiry. Complaint. Cover Letter. Memo and Memo Report for a given
event description
I. Write a Letter of Inquiry. Complaint. Cover Letter. Memo and Memo Reports
II. Write a Letter of Inquiry
III. For a given event description
a. I
b. Ill
c. II and III
d. I and III
Bloom’s Taxonomy has divided learning into three domains where cognitive domain
A. Involves thinking
B. Invo 1 ve s writin g
C. Involves action
D. Involves attitude
When we have achieved the analvsis level of the cognitive domain that means
A. We have achieved only the analysis level of the cognitive domain
B. We have achieved the analysis level and all the lower levels of the cognitive domain
C. We have achieved all the levels of the cognitive domain
D. We have achieved no level of the cognitive domain
Which one of the following instructional objectives is learner-centric?
A. Formulate modelling of physical systems and derive their transfer function
B. Extend their knowledge in the engineering field
C. Sound foundation in mathematical, scientific and engineering fundamentals
D. Students will understand how to operate a machine
Which one of the following instructional objectives is learner-centric?
A. Formulate modelling of physical systems and derive their transfer function
B. Extend their knowledge in the engineering field
C. Sound foundation in mathematical, scientific and engineering fundamentals
D. Students will understand how to operate a machine
In order to develop skills in the psychomotor domain,
A. Students need to write a report on the procedure on how to develop the skill
B. Students need to observe how the experiment is done
C. Students need to attend the laboratory session only
D. Students need to design the experiment, collect the data, analyze and conclude the experiment
Identify Bloom’s Taxonomy action verbs in the following objective Outcome: -Design
advanced control techniques and analyse the performance of the closed- loop system.
A. Design. Analyse
B. Techniques, analyse
C. Performance. Design
D. Control. Performance
Which of the following instructional objectives are measurable, achievable and specific?
a. Identify symmetric and skew-symmetric tensors and calculate the addition and outer product of
a given tensor
b. Understand the principles of surface tension and viscosity
c. For a given RLC network, calculate the current, voltage, power and impedance in any node
d. Given a physical control problem, identify and apply suitable feedback control method and
evaluate control performance
The three components of instructional objectives are
a. Performance components, appreciation components and effective components
b. Performance components which are measurable, condition components which are specific and
criterion components which are achievable
c. Covert components and overt components
d. Measurable components
Which of the following instructional objective(s) is/are in higher cognitive domain?
(I) Given any technical requirement, write the technical report without grammatical
mistakes.
(II) For a given business requirement, develop the required business conununication in
spoken and written form.
(III) Employ a range of general and technical vocabulary and grammatical competence in
academic and professional spoken communication.
a. (I)
b. (in)
C. (I) and (II)
d. (II)

More Related Content

Similar to Outcome based education.docx

C++ Unit_01
C++ Unit_01C++ Unit_01
Framing MCQ based on Blooms Taxonomy Theory
Framing MCQ based on Blooms Taxonomy TheoryFraming MCQ based on Blooms Taxonomy Theory
Framing MCQ based on Blooms Taxonomy Theory
g12551615
 
Page 2 of 5 MG 620 Term Project and Grading RubricsSPRING 2.docx
Page 2 of 5 MG 620 Term Project and Grading RubricsSPRING 2.docxPage 2 of 5 MG 620 Term Project and Grading RubricsSPRING 2.docx
Page 2 of 5 MG 620 Term Project and Grading RubricsSPRING 2.docx
karlhennesey
 
(Final) Feedback and Control System.docx
(Final) Feedback and Control System.docx(Final) Feedback and Control System.docx
(Final) Feedback and Control System.docx
RechieJohnRelator
 
ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...
smumbahelp
 
Test bank for canadian human resource management a strategic approach canadia...
Test bank for canadian human resource management a strategic approach canadia...Test bank for canadian human resource management a strategic approach canadia...
Test bank for canadian human resource management a strategic approach canadia...
kendosila
 
Student Name Daniel RosadoCourseCIS339Session (month, ye.docx
Student Name Daniel RosadoCourseCIS339Session (month, ye.docxStudent Name Daniel RosadoCourseCIS339Session (month, ye.docx
Student Name Daniel RosadoCourseCIS339Session (month, ye.docx
emelyvalg9
 
BISH CS Modle Exit Exam.doc
BISH CS Modle Exit Exam.docBISH CS Modle Exit Exam.doc
BISH CS Modle Exit Exam.doc
AnimutGeremew3
 
Due December 10This research will be on the company Apple t
Due December 10This research will be on the company Apple tDue December 10This research will be on the company Apple t
Due December 10This research will be on the company Apple t
AlyciaGold776
 
Parcc public blueprints narrated math 04262013
Parcc public blueprints narrated math 04262013Parcc public blueprints narrated math 04262013
Parcc public blueprints narrated math 04262013Achieve, Inc.
 
DLL_TLE ICT CSS 9_Q1_D2.docx
DLL_TLE  ICT CSS 9_Q1_D2.docxDLL_TLE  ICT CSS 9_Q1_D2.docx
DLL_TLE ICT CSS 9_Q1_D2.docx
Lorelie Aubrey Almelia
 
An Automatic Question Paper Generation : Using Bloom's Taxonomy
An Automatic Question Paper Generation : Using Bloom's   TaxonomyAn Automatic Question Paper Generation : Using Bloom's   Taxonomy
An Automatic Question Paper Generation : Using Bloom's Taxonomy
IRJET Journal
 
Uop qnt 565 final exam guide 2 new
Uop qnt 565 final exam guide 2 newUop qnt 565 final exam guide 2 new
Uop qnt 565 final exam guide 2 new
olivergeorg
 
MGT150. PROJECT MANAGEMENT (MGT150) TAKE ASSESSMENT FINAL EXAM.docx
MGT150. PROJECT MANAGEMENT (MGT150)  TAKE ASSESSMENT FINAL EXAM.docxMGT150. PROJECT MANAGEMENT (MGT150)  TAKE ASSESSMENT FINAL EXAM.docx
MGT150. PROJECT MANAGEMENT (MGT150) TAKE ASSESSMENT FINAL EXAM.docx
annandleola
 
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Suma Kamadod
 
Six Sigma Green Belt - Find the area under the standard normal curve between ...
Six Sigma Green Belt - Find the area under the standard normal curve between ...Six Sigma Green Belt - Find the area under the standard normal curve between ...
Six Sigma Green Belt - Find the area under the standard normal curve between ...
Suma Kamadod
 
Six Sigma Green Belt - Out of the following which technique is most useful in...
Six Sigma Green Belt - Out of the following which technique is most useful in...Six Sigma Green Belt - Out of the following which technique is most useful in...
Six Sigma Green Belt - Out of the following which technique is most useful in...
Suma Kamadod
 
Six Sigma Green Belt - Which of the following measures is a sufficient statis...
Six Sigma Green Belt - Which of the following measures is a sufficient statis...Six Sigma Green Belt - Which of the following measures is a sufficient statis...
Six Sigma Green Belt - Which of the following measures is a sufficient statis...
Suma Kamadod
 
Six Sigma Green Belt - A company is receiving an unusually high number of ret...
Six Sigma Green Belt - A company is receiving an unusually high number of ret...Six Sigma Green Belt - A company is receiving an unusually high number of ret...
Six Sigma Green Belt - A company is receiving an unusually high number of ret...
Suma Kamadod
 
Six Sigma Green Belt - In analysis of variance, which of the following distri...
Six Sigma Green Belt - In analysis of variance, which of the following distri...Six Sigma Green Belt - In analysis of variance, which of the following distri...
Six Sigma Green Belt - In analysis of variance, which of the following distri...
Suma Kamadod
 

Similar to Outcome based education.docx (20)

C++ Unit_01
C++ Unit_01C++ Unit_01
C++ Unit_01
 
Framing MCQ based on Blooms Taxonomy Theory
Framing MCQ based on Blooms Taxonomy TheoryFraming MCQ based on Blooms Taxonomy Theory
Framing MCQ based on Blooms Taxonomy Theory
 
Page 2 of 5 MG 620 Term Project and Grading RubricsSPRING 2.docx
Page 2 of 5 MG 620 Term Project and Grading RubricsSPRING 2.docxPage 2 of 5 MG 620 Term Project and Grading RubricsSPRING 2.docx
Page 2 of 5 MG 620 Term Project and Grading RubricsSPRING 2.docx
 
(Final) Feedback and Control System.docx
(Final) Feedback and Control System.docx(Final) Feedback and Control System.docx
(Final) Feedback and Control System.docx
 
ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...
 
Test bank for canadian human resource management a strategic approach canadia...
Test bank for canadian human resource management a strategic approach canadia...Test bank for canadian human resource management a strategic approach canadia...
Test bank for canadian human resource management a strategic approach canadia...
 
Student Name Daniel RosadoCourseCIS339Session (month, ye.docx
Student Name Daniel RosadoCourseCIS339Session (month, ye.docxStudent Name Daniel RosadoCourseCIS339Session (month, ye.docx
Student Name Daniel RosadoCourseCIS339Session (month, ye.docx
 
BISH CS Modle Exit Exam.doc
BISH CS Modle Exit Exam.docBISH CS Modle Exit Exam.doc
BISH CS Modle Exit Exam.doc
 
Due December 10This research will be on the company Apple t
Due December 10This research will be on the company Apple tDue December 10This research will be on the company Apple t
Due December 10This research will be on the company Apple t
 
Parcc public blueprints narrated math 04262013
Parcc public blueprints narrated math 04262013Parcc public blueprints narrated math 04262013
Parcc public blueprints narrated math 04262013
 
DLL_TLE ICT CSS 9_Q1_D2.docx
DLL_TLE  ICT CSS 9_Q1_D2.docxDLL_TLE  ICT CSS 9_Q1_D2.docx
DLL_TLE ICT CSS 9_Q1_D2.docx
 
An Automatic Question Paper Generation : Using Bloom's Taxonomy
An Automatic Question Paper Generation : Using Bloom's   TaxonomyAn Automatic Question Paper Generation : Using Bloom's   Taxonomy
An Automatic Question Paper Generation : Using Bloom's Taxonomy
 
Uop qnt 565 final exam guide 2 new
Uop qnt 565 final exam guide 2 newUop qnt 565 final exam guide 2 new
Uop qnt 565 final exam guide 2 new
 
MGT150. PROJECT MANAGEMENT (MGT150) TAKE ASSESSMENT FINAL EXAM.docx
MGT150. PROJECT MANAGEMENT (MGT150)  TAKE ASSESSMENT FINAL EXAM.docxMGT150. PROJECT MANAGEMENT (MGT150)  TAKE ASSESSMENT FINAL EXAM.docx
MGT150. PROJECT MANAGEMENT (MGT150) TAKE ASSESSMENT FINAL EXAM.docx
 
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
Six Sigma Green Belt - An x and r chart is used to a. indicate process variat...
 
Six Sigma Green Belt - Find the area under the standard normal curve between ...
Six Sigma Green Belt - Find the area under the standard normal curve between ...Six Sigma Green Belt - Find the area under the standard normal curve between ...
Six Sigma Green Belt - Find the area under the standard normal curve between ...
 
Six Sigma Green Belt - Out of the following which technique is most useful in...
Six Sigma Green Belt - Out of the following which technique is most useful in...Six Sigma Green Belt - Out of the following which technique is most useful in...
Six Sigma Green Belt - Out of the following which technique is most useful in...
 
Six Sigma Green Belt - Which of the following measures is a sufficient statis...
Six Sigma Green Belt - Which of the following measures is a sufficient statis...Six Sigma Green Belt - Which of the following measures is a sufficient statis...
Six Sigma Green Belt - Which of the following measures is a sufficient statis...
 
Six Sigma Green Belt - A company is receiving an unusually high number of ret...
Six Sigma Green Belt - A company is receiving an unusually high number of ret...Six Sigma Green Belt - A company is receiving an unusually high number of ret...
Six Sigma Green Belt - A company is receiving an unusually high number of ret...
 
Six Sigma Green Belt - In analysis of variance, which of the following distri...
Six Sigma Green Belt - In analysis of variance, which of the following distri...Six Sigma Green Belt - In analysis of variance, which of the following distri...
Six Sigma Green Belt - In analysis of variance, which of the following distri...
 

Recently uploaded

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 

Recently uploaded (20)

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 

Outcome based education.docx

  • 1. Identify the ‘'performance” component in following instructional objective Write a Letter of Inquiry. Complaint. Cover Letter. Memo and Memo Report for a given event description I. Write a Letter of Inquiry. Complaint. Cover Letter. Memo and Memo Reports II. Write a Letter of Inquiry III. For a given event description a. I b. Ill c. II and III d. I and III
  • 2. Bloom’s Taxonomy has divided learning into three domains where cognitive domain A. Involves thinking B. Invo 1 ve s writin g C. Involves action D. Involves attitude When we have achieved the analvsis level of the cognitive domain that means A. We have achieved only the analysis level of the cognitive domain B. We have achieved the analysis level and all the lower levels of the cognitive domain C. We have achieved all the levels of the cognitive domain D. We have achieved no level of the cognitive domain
  • 3. Which one of the following instructional objectives is learner-centric? A. Formulate modelling of physical systems and derive their transfer function B. Extend their knowledge in the engineering field C. Sound foundation in mathematical, scientific and engineering fundamentals D. Students will understand how to operate a machine Which one of the following instructional objectives is learner-centric? A. Formulate modelling of physical systems and derive their transfer function B. Extend their knowledge in the engineering field C. Sound foundation in mathematical, scientific and engineering fundamentals D. Students will understand how to operate a machine
  • 4. In order to develop skills in the psychomotor domain, A. Students need to write a report on the procedure on how to develop the skill B. Students need to observe how the experiment is done C. Students need to attend the laboratory session only D. Students need to design the experiment, collect the data, analyze and conclude the experiment
  • 5. Identify Bloom’s Taxonomy action verbs in the following objective Outcome: -Design advanced control techniques and analyse the performance of the closed- loop system. A. Design. Analyse B. Techniques, analyse C. Performance. Design D. Control. Performance Which of the following instructional objectives are measurable, achievable and specific? a. Identify symmetric and skew-symmetric tensors and calculate the addition and outer product of a given tensor
  • 6. b. Understand the principles of surface tension and viscosity c. For a given RLC network, calculate the current, voltage, power and impedance in any node d. Given a physical control problem, identify and apply suitable feedback control method and evaluate control performance The three components of instructional objectives are a. Performance components, appreciation components and effective components b. Performance components which are measurable, condition components which are specific and criterion components which are achievable c. Covert components and overt components
  • 8. Which of the following instructional objective(s) is/are in higher cognitive domain? (I) Given any technical requirement, write the technical report without grammatical mistakes. (II) For a given business requirement, develop the required business conununication in spoken and written form. (III) Employ a range of general and technical vocabulary and grammatical competence in academic and professional spoken communication. a. (I) b. (in) C. (I) and (II) d. (II)