1. OTM’s Fleet Module:
Integrating with On-Board Trip
Computers (OBTCs)
P
pp
Pp Srinivas Rajagopal, Oracle
Teresa Shull, OmniSource
August 15, 2012 Spencer Blackman, Hitachi Consulting
2. Introduction to OmniSource
• Founded in 1943 • OmniSource buys and sells scrap metal,
both ferrous and non-ferrous
• HQ in Fort Wayne, IN
• OmniSource places scrap containers in
• Shipped over 6 million factories, buying the scrap from the
factory; or buying the metal scrap from
tons in 2010 demolition sites
• Acquired by Steel
• The scrap is weighed, processed,
Dynamics (SDI) in 2007 shredded and sorted at OmniSource
facilities
• OmniSource sells the ferrous scrap to
its parent , Steel Dynamics, and other
steel mills, where it is melted and
converted into new steel
• The non-ferrous scrap, such as copper,
is shredded and containerized and
increasingly sent to China
5. Solution Scope
• Unified transportation platform, intended to replace
several legacy systems often divided by mode
• Proactive planning vs. post-activity recording
• Carrier cost savings, better rate management,
automation and visibility/reporting company-wide
• Fleet-wise, ability to:
– Consolidate duties and enable regional dispatch
– Enable proactive dispatch while still allowing for dynamic
additions/subtractions as driver activity changes through out the
day
– Get more thorough equipment tracking and inventory
6. Integration Overview
• Compliance DB (ODS) • EDI Partner: RMI
based on Oracle APEX • CarrierWeb links to In-
• Industry-specific ERP: SAI Truck Units
11. At-Stop Flow Step 1: Arrive
Driver enters Arrival Event and is prompted for Equipment
12. At-Stop Flow Step 2: Delay / Error (Optional)
At the Stop, Driver can go on “Customer Delay”
13. At-Stop Flow Step 2: Delay / Error (Optional)
Delay Event entered in OTM
• Detention at Shipper (DSH), Consignee (DCO) or Live Load (LL)
• Delay Duration captured as Special Service, copied to Shipment
• An Agent calculates delay in Rated Hours and writes to Refnum
• Upon Recalc, an Accessorial based on the Refnum Value is applied
14. At-Stop Flow Step 3: Depart
Driver enters Depart Event and is prompted for Equipment
15. Inter-Stop Delays
• Mechanical Breakdown (Box, Tire, Trailer, Power
Unit, Misc)
– Creates OTM Location record and adds an NFR stop
• Pre- and Post-Trip Inspections
• Fuel Stop
• Neutral Scale
• Stopoff
• Miscellaneous (DOT Inspection)